SlideShare a Scribd company logo
1 of 4
RNO Case Security Level:
Case Title:How to improve CS IRAT HO due to physical channel failure
Author Kayode Banjo (K00733670)
Date 31-07-2013
Product &
Version
V900R012C01SPH510------RNC;
V200R012C00SPC400------NodeB;
Problem
Descripti
on
In A Project, a dip in CS IRAT HO was discovered on RV0561H
Alarm
Informati
on
Null
Possible
Causes
1. Missing Neighbor (2G and 3G)
2. 2G Congestion (TCH or SDCCH)
3. Poor 2G Coverage
4. Hardware and Transmission Alarm on 3G and 2G
5. Hidden Fault like UL & DL unbalance, main diversity
6. Abnormal neighbor definition
7. Parameter Conflict (BCCH, LAC and BSIC)
Analysis CS IRAT HO KPI
CS IRAT Failure was due to physical channel failure.
2015-10-06 HUAWEI Confidential Page1, Total4
Before Optimization After Optimization
RNO Case Security Level:
Location of the 2G Cells
RV0561B(co-site of the problematic cell), BY0002B and RV0351C had the same
BCCH and BSIC.
Solution 1. Alarms checked on both 3G and 2G site indicated no alarm.
2. Checked 2G KPI i.e TCH and SDCCH Congestion and Drop rate, the KPI is
normal.
3. Abis and A interface checked for any faulty reason, none found and it is stable.
4. Uplink and downlink imbalance and main diversity cross-checked on 2G target
cell. KPI is normal.
5. Neighbor audit carried out on 3G showed that target 2G cell that has highest
failure was 100km away which has the same BSIC and BCCH with RV0351C
(43km away from source cell), RV0561B(co-site) with different LAC area as
2015-10-06 HUAWEI Confidential Page2, Total4
RV0351C
RV0561B
BY0002B
RNO Case Security Level:
shown in the table below. We checked TA measurement of both BY0002B and
RV0351C, the result showed that BY0002B was overshooting to the coverage of
RV0561B thereby causing adjacent interference. After consulting 2G planning
team, find below the BSIC and BCCH replan for the target 2G cell in question,
BY0002B and after monitoring within some days, KPI improved and target was
met.
2G Parameter Info before Replaning
After replanning BY0002B
Find below the 3G to 2G performance stat of RV0561H. The action was carried out on
24/04/2013 08:00:00 and after monitoring, HO stopped handing over to the cell around
25/04/2013 08:00:00 am and the KPI improved.
Suggestio
n and
Summary
In this scenario, apart from checking any impacting alarms on both source and target cell,
parameter audit should always be carried out on both 2G and 3G most especially LAC, BCCH and
BSIC to avoid conflict in every 5days because 2G planning team made changes to these parameter
often without informing the 3G team. Even when the reason of the failures indicated “Physical
channel failure” meaning “congestion on the 2G cells or 2G cell is not available”, it may be due to
parameter conflict during decoding by the MS.
2015-10-06 HUAWEI Confidential Page3, Total4
RNO Case Security Level:
Attachme
nt
Reference
2015-10-06 HUAWEI Confidential Page4, Total4

More Related Content

What's hot

Hw lte rf-optimization-guide
Hw lte rf-optimization-guideHw lte rf-optimization-guide
Hw lte rf-optimization-guidetharinduwije
 
Lte network planning huawei technologies
Lte network planning huawei technologiesLte network planning huawei technologies
Lte network planning huawei technologiesChaudary Imran
 
Sharing session huawei network optimization january 2015 ver3
Sharing session huawei network optimization january 2015 ver3Sharing session huawei network optimization january 2015 ver3
Sharing session huawei network optimization january 2015 ver3Arwan Priatna
 
LTE RADIO PROTOCOLS
LTE RADIO PROTOCOLSLTE RADIO PROTOCOLS
LTE RADIO PROTOCOLSbrkavyashree
 
2 g training optimization
2 g training optimization2 g training optimization
2 g training optimizationAhmed Gad
 
2 drive test analysis ver1
2 drive test analysis ver12 drive test analysis ver1
2 drive test analysis ver1Virak Sou
 
Lte basic parameters
Lte basic parametersLte basic parameters
Lte basic parametersLinh Phạm
 
Ericsson optimization opti
Ericsson optimization optiEricsson optimization opti
Ericsson optimization optiTerra Sacrifice
 
Gsm frequency-planning-issue2
Gsm frequency-planning-issue2Gsm frequency-planning-issue2
Gsm frequency-planning-issue2swatisabnis87
 
Huawei case analysis call drop
Huawei case analysis call dropHuawei case analysis call drop
Huawei case analysis call dropMuffat Itoro
 
Lte capacity monitoring
Lte capacity monitoringLte capacity monitoring
Lte capacity monitoringKlajdi Husi
 
395317358-LTE-Resource-Usage-Optimization.pptx
395317358-LTE-Resource-Usage-Optimization.pptx395317358-LTE-Resource-Usage-Optimization.pptx
395317358-LTE-Resource-Usage-Optimization.pptxSudheeraIndrajith
 
Ericsson important optimization parameters
Ericsson important optimization parametersEricsson important optimization parameters
Ericsson important optimization parametersPagla Knight
 
Cs hs drop analysis and optimization presentation
Cs  hs drop analysis and optimization presentationCs  hs drop analysis and optimization presentation
Cs hs drop analysis and optimization presentationDaniel Amaning
 

What's hot (20)

Hw lte rf-optimization-guide
Hw lte rf-optimization-guideHw lte rf-optimization-guide
Hw lte rf-optimization-guide
 
Lte network planning huawei technologies
Lte network planning huawei technologiesLte network planning huawei technologies
Lte network planning huawei technologies
 
Part 2 planning of 3G
Part 2  planning of 3GPart 2  planning of 3G
Part 2 planning of 3G
 
Sharing session huawei network optimization january 2015 ver3
Sharing session huawei network optimization january 2015 ver3Sharing session huawei network optimization january 2015 ver3
Sharing session huawei network optimization january 2015 ver3
 
LTE RADIO PROTOCOLS
LTE RADIO PROTOCOLSLTE RADIO PROTOCOLS
LTE RADIO PROTOCOLS
 
2 g training optimization
2 g training optimization2 g training optimization
2 g training optimization
 
2 g data call flow
2 g data call flow2 g data call flow
2 g data call flow
 
63077585 idle-mode-parameter-optimization
63077585 idle-mode-parameter-optimization63077585 idle-mode-parameter-optimization
63077585 idle-mode-parameter-optimization
 
2 drive test analysis ver1
2 drive test analysis ver12 drive test analysis ver1
2 drive test analysis ver1
 
Lte basic parameters
Lte basic parametersLte basic parameters
Lte basic parameters
 
40234553 drive-test
40234553 drive-test40234553 drive-test
40234553 drive-test
 
Ericsson optimization opti
Ericsson optimization optiEricsson optimization opti
Ericsson optimization opti
 
Gsm frequency-planning-issue2
Gsm frequency-planning-issue2Gsm frequency-planning-issue2
Gsm frequency-planning-issue2
 
Huawei case analysis call drop
Huawei case analysis call dropHuawei case analysis call drop
Huawei case analysis call drop
 
Lte capacity monitoring
Lte capacity monitoringLte capacity monitoring
Lte capacity monitoring
 
395317358-LTE-Resource-Usage-Optimization.pptx
395317358-LTE-Resource-Usage-Optimization.pptx395317358-LTE-Resource-Usage-Optimization.pptx
395317358-LTE-Resource-Usage-Optimization.pptx
 
GSM Idle Mode Behavior
GSM Idle Mode BehaviorGSM Idle Mode Behavior
GSM Idle Mode Behavior
 
Ericsson important optimization parameters
Ericsson important optimization parametersEricsson important optimization parameters
Ericsson important optimization parameters
 
huawei doc
huawei dochuawei doc
huawei doc
 
Cs hs drop analysis and optimization presentation
Cs  hs drop analysis and optimization presentationCs  hs drop analysis and optimization presentation
Cs hs drop analysis and optimization presentation
 

Similar to Cs irat degradation due to physical channel failure

Maintenance experience issue285 (gsm%26 umts products special issue) 686802
Maintenance experience issue285 (gsm%26 umts products special issue) 686802 Maintenance experience issue285 (gsm%26 umts products special issue) 686802
Maintenance experience issue285 (gsm%26 umts products special issue) 686802 Maya Krishnan
 
Saudi Arabian Power Distribution Code 2020
Saudi Arabian Power Distribution Code 2020Saudi Arabian Power Distribution Code 2020
Saudi Arabian Power Distribution Code 2020Power System Operation
 
3 g ibs walk test report dhk_v1415_tems
3 g ibs walk test report dhk_v1415_tems3 g ibs walk test report dhk_v1415_tems
3 g ibs walk test report dhk_v1415_temsIshaque uddin
 
03 gsm bss network kpi (sdcch congestion rate) optimization manual
03 gsm bss network kpi (sdcch congestion rate) optimization manual03 gsm bss network kpi (sdcch congestion rate) optimization manual
03 gsm bss network kpi (sdcch congestion rate) optimization manualtharinduwije
 
NSA Mobility Managment.pptx
NSA Mobility Managment.pptxNSA Mobility Managment.pptx
NSA Mobility Managment.pptxErayUyanik
 
287995345-Huawei-WCDMA-Radio-Parameters-Optimization-Cases.pdf
287995345-Huawei-WCDMA-Radio-Parameters-Optimization-Cases.pdf287995345-Huawei-WCDMA-Radio-Parameters-Optimization-Cases.pdf
287995345-Huawei-WCDMA-Radio-Parameters-Optimization-Cases.pdfObeidAllah
 
Code congestion problem analysis
Code congestion problem analysisCode congestion problem analysis
Code congestion problem analysisSyed Zahid Shah
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...EMERSON EDUARDO RODRIGUES
 
Gsm product training technical cases
Gsm product training technical casesGsm product training technical cases
Gsm product training technical casesBez Lemma
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rmEmerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rmEMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - cleanEmerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - cleanEMERSON EDUARDO RODRIGUES
 
Topological Advancement in DVR; A review
Topological Advancement in DVR; A reviewTopological Advancement in DVR; A review
Topological Advancement in DVR; A reviewIRJET Journal
 
Trace window for dropped calls nsn
Trace window for dropped calls nsnTrace window for dropped calls nsn
Trace window for dropped calls nsnisvo
 
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal  4G DT Analysis Cases Module.pptxSON Server Web KPI Portal  4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptxssuser2b76bb
 
한국정보통신기술협회 5 g-b5g 표준기술 세미나-배포용
한국정보통신기술협회 5 g-b5g 표준기술 세미나-배포용한국정보통신기술협회 5 g-b5g 표준기술 세미나-배포용
한국정보통신기술협회 5 g-b5g 표준기술 세미나-배포용YoungbeomKim5
 

Similar to Cs irat degradation due to physical channel failure (20)

Maintenance experience issue285 (gsm%26 umts products special issue) 686802
Maintenance experience issue285 (gsm%26 umts products special issue) 686802 Maintenance experience issue285 (gsm%26 umts products special issue) 686802
Maintenance experience issue285 (gsm%26 umts products special issue) 686802
 
Saudi Arabian Power Distribution Code 2020
Saudi Arabian Power Distribution Code 2020Saudi Arabian Power Distribution Code 2020
Saudi Arabian Power Distribution Code 2020
 
Grid code 2014
Grid code 2014Grid code 2014
Grid code 2014
 
NIGERIA GRID CODE
NIGERIA GRID CODE NIGERIA GRID CODE
NIGERIA GRID CODE
 
3 g ibs walk test report dhk_v1415_tems
3 g ibs walk test report dhk_v1415_tems3 g ibs walk test report dhk_v1415_tems
3 g ibs walk test report dhk_v1415_tems
 
03 gsm bss network kpi (sdcch congestion rate) optimization manual
03 gsm bss network kpi (sdcch congestion rate) optimization manual03 gsm bss network kpi (sdcch congestion rate) optimization manual
03 gsm bss network kpi (sdcch congestion rate) optimization manual
 
NSA Mobility Managment.pptx
NSA Mobility Managment.pptxNSA Mobility Managment.pptx
NSA Mobility Managment.pptx
 
287995345-Huawei-WCDMA-Radio-Parameters-Optimization-Cases.pdf
287995345-Huawei-WCDMA-Radio-Parameters-Optimization-Cases.pdf287995345-Huawei-WCDMA-Radio-Parameters-Optimization-Cases.pdf
287995345-Huawei-WCDMA-Radio-Parameters-Optimization-Cases.pdf
 
Code congestion problem analysis
Code congestion problem analysisCode congestion problem analysis
Code congestion problem analysis
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...
 
Gsm product training technical cases
Gsm product training technical casesGsm product training technical cases
Gsm product training technical cases
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rmEmerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - cleanEmerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean
 
Topological Advancement in DVR; A review
Topological Advancement in DVR; A reviewTopological Advancement in DVR; A review
Topological Advancement in DVR; A review
 
Trace window for dropped calls nsn
Trace window for dropped calls nsnTrace window for dropped calls nsn
Trace window for dropped calls nsn
 
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal  4G DT Analysis Cases Module.pptxSON Server Web KPI Portal  4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptx
 
한국정보통신기술협회 5 g-b5g 표준기술 세미나-배포용
한국정보통신기술협회 5 g-b5g 표준기술 세미나-배포용한국정보통신기술협회 5 g-b5g 표준기술 세미나-배포용
한국정보통신기술협회 5 g-b5g 표준기술 세미나-배포용
 
NodeB Application Part
NodeB Application PartNodeB Application Part
NodeB Application Part
 

Recently uploaded

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 

Recently uploaded (20)

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 

Cs irat degradation due to physical channel failure

  • 1. RNO Case Security Level: Case Title:How to improve CS IRAT HO due to physical channel failure Author Kayode Banjo (K00733670) Date 31-07-2013 Product & Version V900R012C01SPH510------RNC; V200R012C00SPC400------NodeB; Problem Descripti on In A Project, a dip in CS IRAT HO was discovered on RV0561H Alarm Informati on Null Possible Causes 1. Missing Neighbor (2G and 3G) 2. 2G Congestion (TCH or SDCCH) 3. Poor 2G Coverage 4. Hardware and Transmission Alarm on 3G and 2G 5. Hidden Fault like UL & DL unbalance, main diversity 6. Abnormal neighbor definition 7. Parameter Conflict (BCCH, LAC and BSIC) Analysis CS IRAT HO KPI CS IRAT Failure was due to physical channel failure. 2015-10-06 HUAWEI Confidential Page1, Total4 Before Optimization After Optimization
  • 2. RNO Case Security Level: Location of the 2G Cells RV0561B(co-site of the problematic cell), BY0002B and RV0351C had the same BCCH and BSIC. Solution 1. Alarms checked on both 3G and 2G site indicated no alarm. 2. Checked 2G KPI i.e TCH and SDCCH Congestion and Drop rate, the KPI is normal. 3. Abis and A interface checked for any faulty reason, none found and it is stable. 4. Uplink and downlink imbalance and main diversity cross-checked on 2G target cell. KPI is normal. 5. Neighbor audit carried out on 3G showed that target 2G cell that has highest failure was 100km away which has the same BSIC and BCCH with RV0351C (43km away from source cell), RV0561B(co-site) with different LAC area as 2015-10-06 HUAWEI Confidential Page2, Total4 RV0351C RV0561B BY0002B
  • 3. RNO Case Security Level: shown in the table below. We checked TA measurement of both BY0002B and RV0351C, the result showed that BY0002B was overshooting to the coverage of RV0561B thereby causing adjacent interference. After consulting 2G planning team, find below the BSIC and BCCH replan for the target 2G cell in question, BY0002B and after monitoring within some days, KPI improved and target was met. 2G Parameter Info before Replaning After replanning BY0002B Find below the 3G to 2G performance stat of RV0561H. The action was carried out on 24/04/2013 08:00:00 and after monitoring, HO stopped handing over to the cell around 25/04/2013 08:00:00 am and the KPI improved. Suggestio n and Summary In this scenario, apart from checking any impacting alarms on both source and target cell, parameter audit should always be carried out on both 2G and 3G most especially LAC, BCCH and BSIC to avoid conflict in every 5days because 2G planning team made changes to these parameter often without informing the 3G team. Even when the reason of the failures indicated “Physical channel failure” meaning “congestion on the 2G cells or 2G cell is not available”, it may be due to parameter conflict during decoding by the MS. 2015-10-06 HUAWEI Confidential Page3, Total4
  • 4. RNO Case Security Level: Attachme nt Reference 2015-10-06 HUAWEI Confidential Page4, Total4