Station Platform Reconstruction Capital Project
State of Platforms
 45 outdoor stations – concrete platforms have been exposed to
weather and de-icing agents for decades
 Platforms built 35-40 years ago are now deteriorating
• 10 stations already have rebuilt platforms
• 15 stations have platforms in good condition
• 20 stations have platforms requiring immediate attention; temporary
measures installed where needed to stabilize and ensure safety until
reconstruction occurs
 Concrete repair is a necessary safety project
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY3
State of Platforms
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
Station Platform Reconstruction Capital Project
Braddock Road Station
King St Station
Van Dorn Station
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY4
 Extensive set-up and take down of work zones and temporary
measures limits productivity and extends project duration
 Customer access restrictions if stations remain open
 Bad weather (rain, excessive cold) delays concrete work
Platform Rebuilding – Challenges
Station Platform Reconstruction Capital Project
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY5
 Minnesota Avenue and Deanwood
• Stations remained open, no rush-hour service impacts
• Work occurred during nights and weekends
Platform Rebuilding – Recent Experience
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
Station Platform Reconstruction Capital Project
• Negative Customer Experience
• Limited available platform space for customers
• Difficult to maneuver around work zone
• Construction site with equipment blocking access
• Clutter and mess
• Low daily productivity due to set up and
take down time
• Rebuilding platforms at just two stations
took three years
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY6
• Providing 24/7 track access substantially reduces project duration, is
safer, and costs less
Efficiency Comparison
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
Station Platform Reconstruction Capital Project
0 2 4 6 8 10 12 14 16 18 20
Continuous Work
Series of Weekend Shutdowns
During Non-Passenger Hours Only
Time to Complete One Station
Months
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY7
If Federal Employee John takes Metro to work and back home five days/week, he’ll be inconvenienced by
platform repairs at his station during 130 trips in three months vs. 1,560 trips in 3 years.
Minimizing Commuter Impact
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
Station Platform Reconstruction Capital Project
Three
months
Three
Years
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY8
 Complete 20 stations between May 2019 – September 2021
utilizing continuous work plan
 $300-$500 million in capital project costs over three years
 Extended summer shutdowns on portions of the system each year
between Memorial Day and Labor Day (when ridership lighter)
 Work continues at other times of year with limited single tracking or
shorter track outages to minimize service impacts
 Advance planning to coordinate with jurisdictions and partner
agencies; provide customers at least three months advance notice
of service impacts and mitigation options for riders
Project Plan
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
Station Platform Reconstruction Capital Project
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY9
 Solicited industry input for rebuilding platforms
• Two responses agreed – 3 stations in 90 days
 Grouping stations based on platform conditions and location
 Evaluating station configurations and service impacts:
• Side platform vs. center platform
• Examining cross-over proximity to stations and station proximity to the end of
a line
• Considering impact of work at any one station on the remainder of the line
• Goal is to maximize service across the whole system
Implementation Strategy
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
Station Platform Reconstruction Capital Project
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY10
 Complete work on nearby tracks and infrastructure:
• Demolish Huntington Parking Garage
• Repair rail bridge near the Van Dorn Station
• Install a new crossover north of King Street Station
• Replace traction power equipment for three substations
• Conduct a repair blitz of the Alexandria Rail Yard
• Commence invasive work for the Potomac Yard Station
• Repair crossover at Huntington Station
 Improve stations and customer amenities during shutdowns
Additional Work During Summer 2019
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
Station Platform Reconstruction Capital Project
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY11
Planning/contracting underway for the following:
 Summer 2019: Braddock Road, King Street
& Eisenhower Ave (Memorial to Labor Day)
Shutdown BL/YL south of National Airport
 September 2019: Van Dorn Street
Continuous single tracking affecting Blue Line only
 October – December 2019: Franconia-Springfield
No significant service impacts expected
 January – May 2020: National Airport &
Huntington
No significant service impacts expected
Phase I
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
Station Platform Reconstruction Capital Project
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY12
 Virginia (VDOT) contract to add toll lanes to I-66 outside the Beltway
• Widening will impact all bridges from Beltway to Vienna Station
• Bridge work over Orange Line will impact service at Dunn Loring and Vienna
Stations
• Preliminary plans of I-66 contractor include numerous service shutdowns
over three to four years
 I-395 Construction
• Project extending the I-395 Express Lanes by eight miles from Turkeycock
Run to Eads Street
• Impact of I-395 project construction during summer 2019 platform work
Other Service Impacts: I-66 Widening and I-395
Construction
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
Station Platform Reconstruction Capital Project
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY13
Next Steps
 Coordinate with jurisdictions and transportation partners to begin
developing service alternatives for customers during summer 2019
 Initial Virginia coordination meeting held on May 24 and follow up
conference call held on July 12
 Will continue to hold regular conference calls with Virginia stakeholders
organized by NVTC and WMATA
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
Station Platform Reconstruction Capital Project

More Related Content

What's hot

Wastewater Master Plan Update -- Northgate
Wastewater Master Plan Update -- NorthgateWastewater Master Plan Update -- Northgate
Wastewater Master Plan Update -- Northgate
City of College Station
 
Kennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationKennedy Mobility Hub Presentation
Kennedy Mobility Hub Presentation
Crosstown TO
 

What's hot (20)

Melbourne metro tunnel project
Melbourne metro tunnel projectMelbourne metro tunnel project
Melbourne metro tunnel project
 
Vermont Power Import Alternatives
Vermont Power Import AlternativesVermont Power Import Alternatives
Vermont Power Import Alternatives
 
Confederation line quarterly memo to council q1 2017
Confederation line quarterly memo to council q1 2017Confederation line quarterly memo to council q1 2017
Confederation line quarterly memo to council q1 2017
 
Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project: Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project: Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation
 
Fort Bragg, NC
Fort Bragg, NCFort Bragg, NC
Fort Bragg, NC
 
Kennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationKennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting Presentation
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
 
RTE Roundabout Analysis - Technical Data
RTE Roundabout Analysis - Technical DataRTE Roundabout Analysis - Technical Data
RTE Roundabout Analysis - Technical Data
 
Accelerating the Transition to Electric Heavy Duty Trucking by Salim Youssedz...
Accelerating the Transition to Electric Heavy Duty Trucking by Salim Youssedz...Accelerating the Transition to Electric Heavy Duty Trucking by Salim Youssedz...
Accelerating the Transition to Electric Heavy Duty Trucking by Salim Youssedz...
 
Wastewater Master Plan Update -- Northgate
Wastewater Master Plan Update -- NorthgateWastewater Master Plan Update -- Northgate
Wastewater Master Plan Update -- Northgate
 
Substantial completion flatlick branch iii stream restoration
Substantial completion   flatlick branch iii stream restorationSubstantial completion   flatlick branch iii stream restoration
Substantial completion flatlick branch iii stream restoration
 
Kennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationKennedy Mobility Hub Presentation
Kennedy Mobility Hub Presentation
 
WV State Freight Plan
WV State Freight PlanWV State Freight Plan
WV State Freight Plan
 
Performance Measures for Highway Capacity Decision Making
Performance Measures forHighway Capacity Decision MakingPerformance Measures forHighway Capacity Decision Making
Performance Measures for Highway Capacity Decision Making
 
Calstart fuel cell bus review short v3
Calstart fuel cell bus review short v3Calstart fuel cell bus review short v3
Calstart fuel cell bus review short v3
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor Wide
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
 
pt 8: The Quickway Proposal: North County
pt 8: The Quickway Proposal: North Countypt 8: The Quickway Proposal: North County
pt 8: The Quickway Proposal: North County
 
Exhibit b draft capital improvement program
Exhibit b   draft capital improvement programExhibit b   draft capital improvement program
Exhibit b draft capital improvement program
 
Multi-Criteria Assessment
Multi-Criteria AssessmentMulti-Criteria Assessment
Multi-Criteria Assessment
 

Similar to WMATA Station Platform Reconstruction Capital Project Summer 2019

Integration of mega projects into the existing network – the critical role of...
Integration of mega projects into the existing network – the critical role of...Integration of mega projects into the existing network – the critical role of...
Integration of mega projects into the existing network – the critical role of...
JumpingJaq
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
Crosstown TO
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018
Crosstown TO
 
rup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgraderup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgrade
Robert Lee - CEng, MICE, PMP
 

Similar to WMATA Station Platform Reconstruction Capital Project Summer 2019 (20)

WMATA Blue and Yellow Lines Station Shutdown Bus Service Plans
WMATA Blue and Yellow Lines Station Shutdown Bus Service PlansWMATA Blue and Yellow Lines Station Shutdown Bus Service Plans
WMATA Blue and Yellow Lines Station Shutdown Bus Service Plans
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5
 
SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015
 
2010 10 14_bay_bridge_report_v5_d
2010 10 14_bay_bridge_report_v5_d2010 10 14_bay_bridge_report_v5_d
2010 10 14_bay_bridge_report_v5_d
 
Integration of mega projects into the existing network – the critical role of...
Integration of mega projects into the existing network – the critical role of...Integration of mega projects into the existing network – the critical role of...
Integration of mega projects into the existing network – the critical role of...
 
NCDOT Rail Update
NCDOT Rail UpdateNCDOT Rail Update
NCDOT Rail Update
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
 
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line StationAPWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
 
Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
 
Update trans supporting_documents.pdf 3
Update trans supporting_documents.pdf 3Update trans supporting_documents.pdf 3
Update trans supporting_documents.pdf 3
 
Gloucester County Transportation Study
Gloucester County Transportation Study Gloucester County Transportation Study
Gloucester County Transportation Study
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
 
rup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgraderup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgrade
 
Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020
 
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
 
Metra Station - Fulton Market/Kinzie
Metra Station - Fulton Market/KinzieMetra Station - Fulton Market/Kinzie
Metra Station - Fulton Market/Kinzie
 

More from Fairfax County

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Recently uploaded

9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 
The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdom
lunadelior
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 

Recently uploaded (20)

Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In DubaiDubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
 
10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf
 
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
 
Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024
 
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full Details
 
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdom
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
 

WMATA Station Platform Reconstruction Capital Project Summer 2019

  • 1. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY1 WMATA Station Platform Reconstruction Capital Project Summer 2019 Fairfax County Board Transportation Committee 7/17/2018
  • 2. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY2 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY Station Platform Reconstruction Capital Project State of Platforms  45 outdoor stations – concrete platforms have been exposed to weather and de-icing agents for decades  Platforms built 35-40 years ago are now deteriorating • 10 stations already have rebuilt platforms • 15 stations have platforms in good condition • 20 stations have platforms requiring immediate attention; temporary measures installed where needed to stabilize and ensure safety until reconstruction occurs  Concrete repair is a necessary safety project
  • 3. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY3 State of Platforms WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY Station Platform Reconstruction Capital Project Braddock Road Station King St Station Van Dorn Station
  • 4. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY4  Extensive set-up and take down of work zones and temporary measures limits productivity and extends project duration  Customer access restrictions if stations remain open  Bad weather (rain, excessive cold) delays concrete work Platform Rebuilding – Challenges Station Platform Reconstruction Capital Project
  • 5. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY5  Minnesota Avenue and Deanwood • Stations remained open, no rush-hour service impacts • Work occurred during nights and weekends Platform Rebuilding – Recent Experience WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY Station Platform Reconstruction Capital Project • Negative Customer Experience • Limited available platform space for customers • Difficult to maneuver around work zone • Construction site with equipment blocking access • Clutter and mess • Low daily productivity due to set up and take down time • Rebuilding platforms at just two stations took three years
  • 6. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY6 • Providing 24/7 track access substantially reduces project duration, is safer, and costs less Efficiency Comparison WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY Station Platform Reconstruction Capital Project 0 2 4 6 8 10 12 14 16 18 20 Continuous Work Series of Weekend Shutdowns During Non-Passenger Hours Only Time to Complete One Station Months
  • 7. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY7 If Federal Employee John takes Metro to work and back home five days/week, he’ll be inconvenienced by platform repairs at his station during 130 trips in three months vs. 1,560 trips in 3 years. Minimizing Commuter Impact WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY Station Platform Reconstruction Capital Project Three months Three Years
  • 8. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY8  Complete 20 stations between May 2019 – September 2021 utilizing continuous work plan  $300-$500 million in capital project costs over three years  Extended summer shutdowns on portions of the system each year between Memorial Day and Labor Day (when ridership lighter)  Work continues at other times of year with limited single tracking or shorter track outages to minimize service impacts  Advance planning to coordinate with jurisdictions and partner agencies; provide customers at least three months advance notice of service impacts and mitigation options for riders Project Plan WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY Station Platform Reconstruction Capital Project
  • 9. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY9  Solicited industry input for rebuilding platforms • Two responses agreed – 3 stations in 90 days  Grouping stations based on platform conditions and location  Evaluating station configurations and service impacts: • Side platform vs. center platform • Examining cross-over proximity to stations and station proximity to the end of a line • Considering impact of work at any one station on the remainder of the line • Goal is to maximize service across the whole system Implementation Strategy WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY Station Platform Reconstruction Capital Project
  • 10. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY10  Complete work on nearby tracks and infrastructure: • Demolish Huntington Parking Garage • Repair rail bridge near the Van Dorn Station • Install a new crossover north of King Street Station • Replace traction power equipment for three substations • Conduct a repair blitz of the Alexandria Rail Yard • Commence invasive work for the Potomac Yard Station • Repair crossover at Huntington Station  Improve stations and customer amenities during shutdowns Additional Work During Summer 2019 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY Station Platform Reconstruction Capital Project
  • 11. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY11 Planning/contracting underway for the following:  Summer 2019: Braddock Road, King Street & Eisenhower Ave (Memorial to Labor Day) Shutdown BL/YL south of National Airport  September 2019: Van Dorn Street Continuous single tracking affecting Blue Line only  October – December 2019: Franconia-Springfield No significant service impacts expected  January – May 2020: National Airport & Huntington No significant service impacts expected Phase I WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY Station Platform Reconstruction Capital Project
  • 12. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY12  Virginia (VDOT) contract to add toll lanes to I-66 outside the Beltway • Widening will impact all bridges from Beltway to Vienna Station • Bridge work over Orange Line will impact service at Dunn Loring and Vienna Stations • Preliminary plans of I-66 contractor include numerous service shutdowns over three to four years  I-395 Construction • Project extending the I-395 Express Lanes by eight miles from Turkeycock Run to Eads Street • Impact of I-395 project construction during summer 2019 platform work Other Service Impacts: I-66 Widening and I-395 Construction WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY Station Platform Reconstruction Capital Project
  • 13. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY13 Next Steps  Coordinate with jurisdictions and transportation partners to begin developing service alternatives for customers during summer 2019  Initial Virginia coordination meeting held on May 24 and follow up conference call held on July 12  Will continue to hold regular conference calls with Virginia stakeholders organized by NVTC and WMATA WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY Station Platform Reconstruction Capital Project