Sinalyzer PROJECT
1. Enertria, S.L. www.enertria.com/tools 1
Sinalyzer PROJECT
What’s Sinalyzer PROJECT ?
It’s an Excel based tool to calculate the project costs and to
analyze the resources needs based on schedule of the projects.
What can I do with Sinalyzer:
•Make an accurate calculation of the bid to your
client.
•Have an excellent outcome of the project cash-
flow.
•Analyze several project scenarios based on
schedule & cost changes and its impact on your
resources, costs and cash-flow.
•Make a detailed study of your resources.
2. Enertria, S.L. www.enertria.com/tools 2
Sinalyzer PROJECT
Project costs: Purchases
Up to 120 entries of
purchases of equipment /
services, payment
milestones and terms.
3. Enertria, S.L. www.enertria.com/tools 3
Sinalyzer PROJECT
Project costs: Man-hours
Up to 120 entries of man-hour tasks with many selectable options.
Analysis per week, month, quarter, semester or year.
4. Enertria, S.L. www.enertria.com/tools 4
Sinalyzer PROJECT
Summary of costs
Each cost entry can be assign to two category levels to get a customized cost matrix.
These categories are defined by the user.
6. Enertria, S.L. www.enertria.com/tools 6
Sinalyzer PROJECT
Payment milestones for bid to the client
Three options to analyze different payment milestones.
10. Enertria, S.L. www.enertria.com/tools 10
Sinalyzer PROJECT
Analysis of resources based on projects, profiles or disciplines
Powerful functions to enter man-hours: up to 10 groups and 10 costs, shift the project date, shift hours of
the projects/profiles, include/exclude hours (cost and/or cash-flow), etc.
Functions for the analysis of the man-hours and working load based on profiles (project manager,
project engineer, etc.), disciplines (electrical, mechanical, I&C, etc.), projects, etc.
12. Enertria, S.L. www.enertria.com/tools 12
Sinalyzer PROJECT
Analysis of resources: example with 9 ongoing projects and sales forecast
Hours needs for
coming new projects
Scenario for 2 month
delay on Project 9 and
new projects.
Scenario with 30%
sales reduction.
Total available
resources
Total man-hour
needs for all
projects
13. Enertria, S.L. www.enertria.com/tools
Sinalyzer PROJECT
Analysis of resources: example of junior profile
Junior profile: total man-hour needs based on 9 ongoing projects and sales forecast:
Scenario 2: two month delay of new projects and 20% sales reduction.
Hours needs for
coming new projects
Available resources: 4
junior engineers
Simple and
powerful functions
to delay or change.
Total junior engineer
hour needs for all
projects