Menenttukan W
                Waktu Get  tar Alam
                                  mi (Tc) Ba
                                           angunan : RSNI 03  3‐
                    2847‐220XX & AASCE 7‐10 0 
    (Determ
          mine approx. fund
                          damenta al buildingg period : RSNI 03
                                                              3‐
                    2847‐220XX & ASCE 7‐10  0) 
                                  
                                  
                                  
                                  
                                  
                                  




                                                                    
                                  
                                  
                                  
                                  
                                  
                                  
                                  
                                  
                                  

                  Denpasa
                  D     ar Bali ‐
                                ‐ Indone
                                       esia 
                           20122 
                                                      Edi Supriyanto, ST 
                                                  edi@supriyanto.w
                                                                 web.id 
Waktu getar alami fundamental (T1) yang di dap
    W                                                 patkan dari h
                                                                  hasil analisa modal progr ram 
    sttruktur dibat
                  tasi tidak bo
                              oleh lebih be
                                          esar dari Cu x
                                                       x Ta (ASCE 7
                                                                  7‐10 pasal 122.8.2) atau R
                                                                                           RSNI 
    03‐1726‐201X  X pasal 7.8.2
                              2, dan tabel 14 berikut in
                                                       ni. 
     




                                                                          
                                                   




                                                                                     
                                              
    Untuk wilayah Denpasar Bali dengan SD1=0.36 g
    U                                           g, maka dari tabel diatas 
                                                                          di peroleh 
    Cu=1.4 
     




                                                                                 




                                                                             Edi Supriyanto, ST 
                                                                         edi@supriyanto.w
                                                                                        web.id 
 
     
    Sttruktur yang
                 g sedang kita
                             a analisa kali
                                          i ini adalah s
                                                       struktur dual system yan ng dinding 
    geesernya hannya berada d
                            di arah Y. Seh
                                         hingga akan ada dua nila  ai Ta yaitu ar
                                                                                rah X dan arrah Y. 
         • Arah X a=Ct x hn  (SRPMK) 
                  X: T       x


                       0.9
                 6⋅
            0.0466⋅ 15.5     = 0.54 sec
                                  49

           Tx max yang di ijinkan = Cu x Ta = 1.4 x 0.549 = 0.77 sec arah-x
                  y                                            7

       •   Arah X a=Ct x hnx (System Ga
                  X: T                   anda) 
                 ⋅ 15.5
           0.0488 1
                       0.75
                            = 0.38 sec
                                 81
                                        
                                        

           Ty max yang di ijinkan = Cu x Ta = 1.4 x 0.381 = 0.53 sec arah-y
                  y                                            3



            Waktu getar alami struktur hasil analisa moda dengan pro
                              s                         al         ogram computer untuk kon
                                                                                          ndisi
    pe
     enampak reta sesuai ket
                ak,           tentuan ACI 318-11 pasal 10.10.4.1 ata SNI 03-284
                                            3                      au         47-2002 pasaal
     2.11.1 
    12




                                                                               




                                                                                  Edi Supriyanto, ST 
                                                                              edi@supriyanto.w
                                                                                             web.id 
 
       Catatan :  
       a. Untuk penampang ba      alok T bila tid
                                                dak di hitung
                                                            g dengan tel liti dapat di dekati dengan 
          mengamb  bil nilai Ie= 2x
                                  x 0.35 Ig balook persegi, =
                                                            = 0.70 Ig balo
                                                                         ok persegi. 
       b. Ie dinding
                   g geser (wall) ) pada strukt tur dengan KKDS A, B dan n C dapat dig gunakan Ie= 
          0.70Ig 
       c. Ie dinding
        .          g geser (wall) ) pada strukt tur dengan KKDS D, E dan n F dapat diggunakan Ie= 
          0.35Ig, hal ini dilakukaan untuk me  engantisipas i retakan yang lebih par  rah dibandin
                                                                                                 ngkan 
          struktur d
                   dengan KDS A, B dan C 

Hasil out
        tput program
                   m computer kondisi crac
                                         ck, modal pa
                                                    articipating m
                                                                 mass ratio un
                                                                             ntuk 12 mod
                                                                                       de 
pertama: 




                                                                                                       
                    dapat:  
Pada tabel diatas did

           •   T1x= 0
                    0.6226    <       Tx allowab
                                               ble SNI= 0.77

           •   T1y= 0
                    0.3557    <       Ty allowab
                                               ble SNI= 0.53


 

 

 


                                                                                   Edi Supriyanto, ST 
                                                                               edi@supriyanto.w
                                                                                              web.id 
Hasil out
        tput program
                   m computer kondisi uncr
                                         rack, modal participating mass ratio
                                                                            o untuk 12 m
                                                                                       mode 
pertama: 




                                                                                                           
Pada tabel diatas did
                    dapat:  

            •   T1x= 0
                     0.5287     
            •   T1y= 0
                     0.2753   

Dari  ketig kondisi  an
          ga          nalisis  perhit
                                    tungan  waktu getar  alam fundamental  diatas  da
                                                u           mi                      apat    disimp
                                                                                                 pulkan 
sebagai  b
         berikut: 

                                                   Analisis P         mputer 
                                                            Program Kom
                           SNI 03‐17
                                   726‐201X
                                                kondisi crack
                                                            k     kondis
                                                                       si uncrack 
                    T1x 
                     1             0.77            0.6226               0.5287 
                    T1y 
                     1             0.53            0.3557               0.2753 
                                                        

Batas wak ktu getar maksimum adalah hasil perhhitungan SNI  03‐1726‐201 1X, namun tid dak lebih kecil dari 
hasil analisis program komputer kondisi uncrack
                                              k dan tidak leb
                                                            bih besar kon
                                                                        ndisi crack. 

Sehingga digunakan : 

    •   T1x= 0.6226 sec 
    •   T1y= 0.3557se  
                    ec
         




                                                                                      Edi Supriyanto, ST 
                                                                                  edi@supriyanto.w
                                                                                                 web.id 

More Related Content

What's hot

Teknik fondasi 1 - uji sondir
Teknik fondasi 1 - uji sondirTeknik fondasi 1 - uji sondir
Teknik fondasi 1 - uji sondirnoussevarenna
 
kapasitas daya dukung friksi pondasi tiang pancang_ayufatimahzahra
kapasitas daya dukung friksi pondasi tiang pancang_ayufatimahzahrakapasitas daya dukung friksi pondasi tiang pancang_ayufatimahzahra
kapasitas daya dukung friksi pondasi tiang pancang_ayufatimahzahraAyu Fatimah Zahra
 
Peraturan Pembebanan Indonesia Untuk Gedung PPIUG 1983
Peraturan Pembebanan Indonesia Untuk Gedung PPIUG 1983Peraturan Pembebanan Indonesia Untuk Gedung PPIUG 1983
Peraturan Pembebanan Indonesia Untuk Gedung PPIUG 1983Yusrizal Mahendra
 
Struktur baja-dasar
Struktur baja-dasarStruktur baja-dasar
Struktur baja-dasarUmar Fathoni
 
Bab iii analisis geser
Bab iii analisis geserBab iii analisis geser
Bab iii analisis geserKetut Swandana
 
Pelat lantai kendaraan
Pelat lantai kendaraanPelat lantai kendaraan
Pelat lantai kendaraanAgam Agam
 
7. fender dan alat penambat
7. fender dan alat penambat7. fender dan alat penambat
7. fender dan alat penambatOkiDwipriyatno
 
Daya dukung tanah berlapis 1
Daya dukung tanah berlapis 1Daya dukung tanah berlapis 1
Daya dukung tanah berlapis 1aanqwerty
 
perencanaan-breakwater
perencanaan-breakwaterperencanaan-breakwater
perencanaan-breakwaterHasrul Raizo
 
4 portal-dan-pelengkung-tiga-sendi
4 portal-dan-pelengkung-tiga-sendi4 portal-dan-pelengkung-tiga-sendi
4 portal-dan-pelengkung-tiga-sendiIgorTherik
 
Tugas beton plat 2 arah
Tugas beton plat 2 arah Tugas beton plat 2 arah
Tugas beton plat 2 arah IbnuElM1
 
Pondasi Cerucuk kayu serta metode pelaksanaannya
Pondasi Cerucuk kayu serta metode pelaksanaannyaPondasi Cerucuk kayu serta metode pelaksanaannya
Pondasi Cerucuk kayu serta metode pelaksanaannyaMAdekPutra
 
Perhitungan rumah tinggal (beton1)
Perhitungan rumah tinggal (beton1)Perhitungan rumah tinggal (beton1)
Perhitungan rumah tinggal (beton1)Rojulil Fadli
 
Konstruksi gudang-baja
Konstruksi gudang-bajaKonstruksi gudang-baja
Konstruksi gudang-bajaekobudi27
 

What's hot (20)

Teknik fondasi 1 - uji sondir
Teknik fondasi 1 - uji sondirTeknik fondasi 1 - uji sondir
Teknik fondasi 1 - uji sondir
 
kapasitas daya dukung friksi pondasi tiang pancang_ayufatimahzahra
kapasitas daya dukung friksi pondasi tiang pancang_ayufatimahzahrakapasitas daya dukung friksi pondasi tiang pancang_ayufatimahzahra
kapasitas daya dukung friksi pondasi tiang pancang_ayufatimahzahra
 
Peraturan Pembebanan Indonesia Untuk Gedung PPIUG 1983
Peraturan Pembebanan Indonesia Untuk Gedung PPIUG 1983Peraturan Pembebanan Indonesia Untuk Gedung PPIUG 1983
Peraturan Pembebanan Indonesia Untuk Gedung PPIUG 1983
 
Struktur baja-dasar
Struktur baja-dasarStruktur baja-dasar
Struktur baja-dasar
 
STRUKTUR JEMBATAN
STRUKTUR JEMBATANSTRUKTUR JEMBATAN
STRUKTUR JEMBATAN
 
Bab iii analisis geser
Bab iii analisis geserBab iii analisis geser
Bab iii analisis geser
 
Pelat lantai kendaraan
Pelat lantai kendaraanPelat lantai kendaraan
Pelat lantai kendaraan
 
7. fender dan alat penambat
7. fender dan alat penambat7. fender dan alat penambat
7. fender dan alat penambat
 
Analisa pada bangunan gedung bertingakat
Analisa pada bangunan gedung bertingakatAnalisa pada bangunan gedung bertingakat
Analisa pada bangunan gedung bertingakat
 
Daya dukung tanah berlapis 1
Daya dukung tanah berlapis 1Daya dukung tanah berlapis 1
Daya dukung tanah berlapis 1
 
perencanaan-breakwater
perencanaan-breakwaterperencanaan-breakwater
perencanaan-breakwater
 
4 portal-dan-pelengkung-tiga-sendi
4 portal-dan-pelengkung-tiga-sendi4 portal-dan-pelengkung-tiga-sendi
4 portal-dan-pelengkung-tiga-sendi
 
Tugas beton plat 2 arah
Tugas beton plat 2 arah Tugas beton plat 2 arah
Tugas beton plat 2 arah
 
Pondasi Cerucuk kayu serta metode pelaksanaannya
Pondasi Cerucuk kayu serta metode pelaksanaannyaPondasi Cerucuk kayu serta metode pelaksanaannya
Pondasi Cerucuk kayu serta metode pelaksanaannya
 
Perhitungan rumah tinggal (beton1)
Perhitungan rumah tinggal (beton1)Perhitungan rumah tinggal (beton1)
Perhitungan rumah tinggal (beton1)
 
Contoh baja
Contoh bajaContoh baja
Contoh baja
 
Perencanaan balok
Perencanaan balokPerencanaan balok
Perencanaan balok
 
Penyaluran tulangan beton
Penyaluran tulangan betonPenyaluran tulangan beton
Penyaluran tulangan beton
 
Konstruksi gudang-baja
Konstruksi gudang-bajaKonstruksi gudang-baja
Konstruksi gudang-baja
 
Analisa matriks
Analisa matriksAnalisa matriks
Analisa matriks
 

Viewers also liked

Desain respon spektrum (respon spectra design) rsni 03 2847-20 xx & asce 7-10
Desain respon spektrum (respon spectra design) rsni 03 2847-20 xx & asce 7-10Desain respon spektrum (respon spectra design) rsni 03 2847-20 xx & asce 7-10
Desain respon spektrum (respon spectra design) rsni 03 2847-20 xx & asce 7-10Edi Supriyanto
 
Training Sap2000 Indonesia
Training Sap2000 Indonesia Training Sap2000 Indonesia
Training Sap2000 Indonesia Edi Supriyanto
 
Civil engineering perhitungan beban gempa pada sap 2000
Civil engineering  perhitungan beban gempa pada sap 2000Civil engineering  perhitungan beban gempa pada sap 2000
Civil engineering perhitungan beban gempa pada sap 2000Muhamad Abdul Hamid
 
Laporan prancangan struktur
Laporan prancangan strukturLaporan prancangan struktur
Laporan prancangan strukturKomang Satriawan
 
221096408 dasar-dasar-sap-2000-puski-its
221096408 dasar-dasar-sap-2000-puski-its221096408 dasar-dasar-sap-2000-puski-its
221096408 dasar-dasar-sap-2000-puski-itsRoni Fauzi
 
Tutorial perhitungan struktur dengan sap 2000 v
Tutorial perhitungan struktur dengan sap 2000 vTutorial perhitungan struktur dengan sap 2000 v
Tutorial perhitungan struktur dengan sap 2000 vMatriks Oscar H
 
Perancangan struktur beton perpustakaan 4 lantai
Perancangan struktur beton perpustakaan 4 lantaiPerancangan struktur beton perpustakaan 4 lantai
Perancangan struktur beton perpustakaan 4 lantaiAfret Nobel
 
Implikasi peraturan rsni3 03 1726 201x terhadap perencanaan struktur bangunan...
Implikasi peraturan rsni3 03 1726 201x terhadap perencanaan struktur bangunan...Implikasi peraturan rsni3 03 1726 201x terhadap perencanaan struktur bangunan...
Implikasi peraturan rsni3 03 1726 201x terhadap perencanaan struktur bangunan...Edi Supriyanto
 
Training Autodesk Inventor Indonesia
Training Autodesk Inventor IndonesiaTraining Autodesk Inventor Indonesia
Training Autodesk Inventor IndonesiaEdi Supriyanto
 
Training civil 3 d indonesia
Training civil 3 d indonesiaTraining civil 3 d indonesia
Training civil 3 d indonesiaEdi Supriyanto
 
Training civil 3 d indonesia
Training civil 3 d indonesiaTraining civil 3 d indonesia
Training civil 3 d indonesiaEdi Supriyanto
 
Short course visual studio (draft)
Short course visual studio (draft)Short course visual studio (draft)
Short course visual studio (draft)Edi Supriyanto
 
Menentukan beban seismik dasar & distribusi vertikal gaya gempa rsni 03 2847...
Menentukan beban seismik dasar & distribusi vertikal gaya gempa  rsni 03 2847...Menentukan beban seismik dasar & distribusi vertikal gaya gempa  rsni 03 2847...
Menentukan beban seismik dasar & distribusi vertikal gaya gempa rsni 03 2847...Edi Supriyanto
 
Training Etabs Indonesia
Training Etabs IndonesiaTraining Etabs Indonesia
Training Etabs IndonesiaEdi Supriyanto
 
EVALUASI KINERJA KOLOM PIPIH DENGAN ANALISA PUSH OVER
EVALUASI KINERJA KOLOM PIPIH DENGAN ANALISA PUSH OVEREVALUASI KINERJA KOLOM PIPIH DENGAN ANALISA PUSH OVER
EVALUASI KINERJA KOLOM PIPIH DENGAN ANALISA PUSH OVEREdi Supriyanto
 
Buildings in earthquakes
Buildings in earthquakesBuildings in earthquakes
Buildings in earthquakesamir shahzad
 
Billboard design & analysis calculation
Billboard design & analysis calculationBillboard design & analysis calculation
Billboard design & analysis calculationEdi Supriyanto
 
Sandcone Test Report (Draft)
Sandcone Test Report (Draft)Sandcone Test Report (Draft)
Sandcone Test Report (Draft)Edi Supriyanto
 
Sap2000 frame verification
Sap2000 frame verificationSap2000 frame verification
Sap2000 frame verificationEdi Supriyanto
 

Viewers also liked (20)

Desain respon spektrum (respon spectra design) rsni 03 2847-20 xx & asce 7-10
Desain respon spektrum (respon spectra design) rsni 03 2847-20 xx & asce 7-10Desain respon spektrum (respon spectra design) rsni 03 2847-20 xx & asce 7-10
Desain respon spektrum (respon spectra design) rsni 03 2847-20 xx & asce 7-10
 
Training Sap2000 Indonesia
Training Sap2000 Indonesia Training Sap2000 Indonesia
Training Sap2000 Indonesia
 
Civil engineering perhitungan beban gempa pada sap 2000
Civil engineering  perhitungan beban gempa pada sap 2000Civil engineering  perhitungan beban gempa pada sap 2000
Civil engineering perhitungan beban gempa pada sap 2000
 
Laporan prancangan struktur
Laporan prancangan strukturLaporan prancangan struktur
Laporan prancangan struktur
 
221096408 dasar-dasar-sap-2000-puski-its
221096408 dasar-dasar-sap-2000-puski-its221096408 dasar-dasar-sap-2000-puski-its
221096408 dasar-dasar-sap-2000-puski-its
 
Tutorial perhitungan struktur dengan sap 2000 v
Tutorial perhitungan struktur dengan sap 2000 vTutorial perhitungan struktur dengan sap 2000 v
Tutorial perhitungan struktur dengan sap 2000 v
 
Perancangan struktur beton perpustakaan 4 lantai
Perancangan struktur beton perpustakaan 4 lantaiPerancangan struktur beton perpustakaan 4 lantai
Perancangan struktur beton perpustakaan 4 lantai
 
Implikasi peraturan rsni3 03 1726 201x terhadap perencanaan struktur bangunan...
Implikasi peraturan rsni3 03 1726 201x terhadap perencanaan struktur bangunan...Implikasi peraturan rsni3 03 1726 201x terhadap perencanaan struktur bangunan...
Implikasi peraturan rsni3 03 1726 201x terhadap perencanaan struktur bangunan...
 
Training Autodesk Inventor Indonesia
Training Autodesk Inventor IndonesiaTraining Autodesk Inventor Indonesia
Training Autodesk Inventor Indonesia
 
Training civil 3 d indonesia
Training civil 3 d indonesiaTraining civil 3 d indonesia
Training civil 3 d indonesia
 
Training civil 3 d indonesia
Training civil 3 d indonesiaTraining civil 3 d indonesia
Training civil 3 d indonesia
 
Short course visual studio (draft)
Short course visual studio (draft)Short course visual studio (draft)
Short course visual studio (draft)
 
Menentukan beban seismik dasar & distribusi vertikal gaya gempa rsni 03 2847...
Menentukan beban seismik dasar & distribusi vertikal gaya gempa  rsni 03 2847...Menentukan beban seismik dasar & distribusi vertikal gaya gempa  rsni 03 2847...
Menentukan beban seismik dasar & distribusi vertikal gaya gempa rsni 03 2847...
 
Structure detailing
Structure detailingStructure detailing
Structure detailing
 
Training Etabs Indonesia
Training Etabs IndonesiaTraining Etabs Indonesia
Training Etabs Indonesia
 
EVALUASI KINERJA KOLOM PIPIH DENGAN ANALISA PUSH OVER
EVALUASI KINERJA KOLOM PIPIH DENGAN ANALISA PUSH OVEREVALUASI KINERJA KOLOM PIPIH DENGAN ANALISA PUSH OVER
EVALUASI KINERJA KOLOM PIPIH DENGAN ANALISA PUSH OVER
 
Buildings in earthquakes
Buildings in earthquakesBuildings in earthquakes
Buildings in earthquakes
 
Billboard design & analysis calculation
Billboard design & analysis calculationBillboard design & analysis calculation
Billboard design & analysis calculation
 
Sandcone Test Report (Draft)
Sandcone Test Report (Draft)Sandcone Test Report (Draft)
Sandcone Test Report (Draft)
 
Sap2000 frame verification
Sap2000 frame verificationSap2000 frame verification
Sap2000 frame verification
 

More from Edi Supriyanto

Jasa tukang kontraktor bangunan bali house builder bali
Jasa tukang kontraktor bangunan bali house builder baliJasa tukang kontraktor bangunan bali house builder bali
Jasa tukang kontraktor bangunan bali house builder baliEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali tiny house builder bali
Jasa tukang kontraktor bangunan bali tiny house builder baliJasa tukang kontraktor bangunan bali tiny house builder bali
Jasa tukang kontraktor bangunan bali tiny house builder baliEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali bali villa construction
Jasa tukang kontraktor bangunan bali bali villa constructionJasa tukang kontraktor bangunan bali bali villa construction
Jasa tukang kontraktor bangunan bali bali villa constructionEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali 4 bedroom house builder
Jasa tukang kontraktor bangunan bali 4 bedroom house builderJasa tukang kontraktor bangunan bali 4 bedroom house builder
Jasa tukang kontraktor bangunan bali 4 bedroom house builderEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali 1 house builder
Jasa tukang kontraktor bangunan bali 1 house builderJasa tukang kontraktor bangunan bali 1 house builder
Jasa tukang kontraktor bangunan bali 1 house builderEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali builders w/house
Jasa tukang kontraktor bangunan bali builders w/houseJasa tukang kontraktor bangunan bali builders w/house
Jasa tukang kontraktor bangunan bali builders w/houseEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali house builder warranty
Jasa tukang kontraktor bangunan bali house builder warrantyJasa tukang kontraktor bangunan bali house builder warranty
Jasa tukang kontraktor bangunan bali house builder warrantyEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali builder house wall
Jasa tukang kontraktor bangunan bali builder house wallJasa tukang kontraktor bangunan bali builder house wall
Jasa tukang kontraktor bangunan bali builder house wallEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali house builder quality
Jasa tukang kontraktor bangunan bali house builder qualityJasa tukang kontraktor bangunan bali house builder quality
Jasa tukang kontraktor bangunan bali house builder qualityEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali home builder package
Jasa tukang kontraktor bangunan bali home builder packageJasa tukang kontraktor bangunan bali home builder package
Jasa tukang kontraktor bangunan bali home builder packageEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali builder house new
Jasa tukang kontraktor bangunan bali builder house newJasa tukang kontraktor bangunan bali builder house new
Jasa tukang kontraktor bangunan bali builder house newEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali builder house near me
Jasa tukang kontraktor bangunan bali builder house near meJasa tukang kontraktor bangunan bali builder house near me
Jasa tukang kontraktor bangunan bali builder house near meEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali house builder estimate
Jasa tukang kontraktor bangunan bali house builder estimateJasa tukang kontraktor bangunan bali house builder estimate
Jasa tukang kontraktor bangunan bali house builder estimateEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali 3d house builder
Jasa tukang kontraktor bangunan bali 3d house builderJasa tukang kontraktor bangunan bali 3d house builder
Jasa tukang kontraktor bangunan bali 3d house builderEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali building a builder architect
Jasa tukang kontraktor bangunan bali building a builder architectJasa tukang kontraktor bangunan bali building a builder architect
Jasa tukang kontraktor bangunan bali building a builder architectEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali building builder online
Jasa tukang kontraktor bangunan bali building builder onlineJasa tukang kontraktor bangunan bali building builder online
Jasa tukang kontraktor bangunan bali building builder onlineEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali jasa desain rumah 3 kamar
Jasa tukang kontraktor bangunan bali jasa desain rumah 3 kamarJasa tukang kontraktor bangunan bali jasa desain rumah 3 kamar
Jasa tukang kontraktor bangunan bali jasa desain rumah 3 kamarEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali jasa desain rumah untuk imb
Jasa tukang kontraktor bangunan bali jasa desain rumah untuk imb Jasa tukang kontraktor bangunan bali jasa desain rumah untuk imb
Jasa tukang kontraktor bangunan bali jasa desain rumah untuk imb Edi Supriyanto
 
Jasa tukang kontraktor bangunan bali jasa bangun rumah kayu
Jasa tukang kontraktor bangunan bali jasa bangun rumah kayuJasa tukang kontraktor bangunan bali jasa bangun rumah kayu
Jasa tukang kontraktor bangunan bali jasa bangun rumah kayuEdi Supriyanto
 
Jasa tukang kontraktor bangunan bali jasa desain rumah klasik
Jasa tukang kontraktor bangunan bali jasa desain rumah klasikJasa tukang kontraktor bangunan bali jasa desain rumah klasik
Jasa tukang kontraktor bangunan bali jasa desain rumah klasikEdi Supriyanto
 

More from Edi Supriyanto (20)

Jasa tukang kontraktor bangunan bali house builder bali
Jasa tukang kontraktor bangunan bali house builder baliJasa tukang kontraktor bangunan bali house builder bali
Jasa tukang kontraktor bangunan bali house builder bali
 
Jasa tukang kontraktor bangunan bali tiny house builder bali
Jasa tukang kontraktor bangunan bali tiny house builder baliJasa tukang kontraktor bangunan bali tiny house builder bali
Jasa tukang kontraktor bangunan bali tiny house builder bali
 
Jasa tukang kontraktor bangunan bali bali villa construction
Jasa tukang kontraktor bangunan bali bali villa constructionJasa tukang kontraktor bangunan bali bali villa construction
Jasa tukang kontraktor bangunan bali bali villa construction
 
Jasa tukang kontraktor bangunan bali 4 bedroom house builder
Jasa tukang kontraktor bangunan bali 4 bedroom house builderJasa tukang kontraktor bangunan bali 4 bedroom house builder
Jasa tukang kontraktor bangunan bali 4 bedroom house builder
 
Jasa tukang kontraktor bangunan bali 1 house builder
Jasa tukang kontraktor bangunan bali 1 house builderJasa tukang kontraktor bangunan bali 1 house builder
Jasa tukang kontraktor bangunan bali 1 house builder
 
Jasa tukang kontraktor bangunan bali builders w/house
Jasa tukang kontraktor bangunan bali builders w/houseJasa tukang kontraktor bangunan bali builders w/house
Jasa tukang kontraktor bangunan bali builders w/house
 
Jasa tukang kontraktor bangunan bali house builder warranty
Jasa tukang kontraktor bangunan bali house builder warrantyJasa tukang kontraktor bangunan bali house builder warranty
Jasa tukang kontraktor bangunan bali house builder warranty
 
Jasa tukang kontraktor bangunan bali builder house wall
Jasa tukang kontraktor bangunan bali builder house wallJasa tukang kontraktor bangunan bali builder house wall
Jasa tukang kontraktor bangunan bali builder house wall
 
Jasa tukang kontraktor bangunan bali house builder quality
Jasa tukang kontraktor bangunan bali house builder qualityJasa tukang kontraktor bangunan bali house builder quality
Jasa tukang kontraktor bangunan bali house builder quality
 
Jasa tukang kontraktor bangunan bali home builder package
Jasa tukang kontraktor bangunan bali home builder packageJasa tukang kontraktor bangunan bali home builder package
Jasa tukang kontraktor bangunan bali home builder package
 
Jasa tukang kontraktor bangunan bali builder house new
Jasa tukang kontraktor bangunan bali builder house newJasa tukang kontraktor bangunan bali builder house new
Jasa tukang kontraktor bangunan bali builder house new
 
Jasa tukang kontraktor bangunan bali builder house near me
Jasa tukang kontraktor bangunan bali builder house near meJasa tukang kontraktor bangunan bali builder house near me
Jasa tukang kontraktor bangunan bali builder house near me
 
Jasa tukang kontraktor bangunan bali house builder estimate
Jasa tukang kontraktor bangunan bali house builder estimateJasa tukang kontraktor bangunan bali house builder estimate
Jasa tukang kontraktor bangunan bali house builder estimate
 
Jasa tukang kontraktor bangunan bali 3d house builder
Jasa tukang kontraktor bangunan bali 3d house builderJasa tukang kontraktor bangunan bali 3d house builder
Jasa tukang kontraktor bangunan bali 3d house builder
 
Jasa tukang kontraktor bangunan bali building a builder architect
Jasa tukang kontraktor bangunan bali building a builder architectJasa tukang kontraktor bangunan bali building a builder architect
Jasa tukang kontraktor bangunan bali building a builder architect
 
Jasa tukang kontraktor bangunan bali building builder online
Jasa tukang kontraktor bangunan bali building builder onlineJasa tukang kontraktor bangunan bali building builder online
Jasa tukang kontraktor bangunan bali building builder online
 
Jasa tukang kontraktor bangunan bali jasa desain rumah 3 kamar
Jasa tukang kontraktor bangunan bali jasa desain rumah 3 kamarJasa tukang kontraktor bangunan bali jasa desain rumah 3 kamar
Jasa tukang kontraktor bangunan bali jasa desain rumah 3 kamar
 
Jasa tukang kontraktor bangunan bali jasa desain rumah untuk imb
Jasa tukang kontraktor bangunan bali jasa desain rumah untuk imb Jasa tukang kontraktor bangunan bali jasa desain rumah untuk imb
Jasa tukang kontraktor bangunan bali jasa desain rumah untuk imb
 
Jasa tukang kontraktor bangunan bali jasa bangun rumah kayu
Jasa tukang kontraktor bangunan bali jasa bangun rumah kayuJasa tukang kontraktor bangunan bali jasa bangun rumah kayu
Jasa tukang kontraktor bangunan bali jasa bangun rumah kayu
 
Jasa tukang kontraktor bangunan bali jasa desain rumah klasik
Jasa tukang kontraktor bangunan bali jasa desain rumah klasikJasa tukang kontraktor bangunan bali jasa desain rumah klasik
Jasa tukang kontraktor bangunan bali jasa desain rumah klasik
 

Waktu getar alami bangunan (approx fundamental building period)= rsni 03 2847-20 xx & asce 7-10

  • 1. Menenttukan W Waktu Get tar Alam mi (Tc) Ba angunan : RSNI 03 3‐ 2847‐220XX & AASCE 7‐10 0  (Determ mine approx. fund damenta al buildingg period : RSNI 03 3‐ 2847‐220XX & ASCE 7‐10 0)                                  Denpasa D ar Bali ‐ ‐ Indone esia  20122    Edi Supriyanto, ST  edi@supriyanto.w web.id 
  • 2. Waktu getar alami fundamental (T1) yang di dap W patkan dari h hasil analisa modal progr ram  sttruktur dibat tasi tidak bo oleh lebih be esar dari Cu x x Ta (ASCE 7 7‐10 pasal 122.8.2) atau R RSNI  03‐1726‐201X X pasal 7.8.2 2, dan tabel 14 berikut in ni.            Untuk wilayah Denpasar Bali dengan SD1=0.36 g U g, maka dari tabel diatas   di peroleh  Cu=1.4        Edi Supriyanto, ST  edi@supriyanto.w web.id 
  • 3.     Sttruktur yang g sedang kita a analisa kali i ini adalah s struktur dual system yan ng dinding  geesernya hannya berada d di arah Y. Seh hingga akan ada dua nila ai Ta yaitu ar rah X dan arrah Y.  • Arah X a=Ct x hn  (SRPMK)  X: T x 0.9 6⋅ 0.0466⋅ 15.5 = 0.54 sec 49 Tx max yang di ijinkan = Cu x Ta = 1.4 x 0.549 = 0.77 sec arah-x y 7 • Arah X a=Ct x hnx (System Ga X: T anda)  ⋅ 15.5 0.0488 1 0.75 = 0.38 sec 81     Ty max yang di ijinkan = Cu x Ta = 1.4 x 0.381 = 0.53 sec arah-y y 3 Waktu getar alami struktur hasil analisa moda dengan pro s al ogram computer untuk kon ndisi pe enampak reta sesuai ket ak, tentuan ACI 318-11 pasal 10.10.4.1 ata SNI 03-284 3 au 47-2002 pasaal 2.11.1  12     Edi Supriyanto, ST  edi@supriyanto.w web.id 
  • 4.   Catatan :   a. Untuk penampang ba alok T bila tid dak di hitung g dengan tel liti dapat di dekati dengan  mengamb bil nilai Ie= 2x x 0.35 Ig balook persegi, = = 0.70 Ig balo ok persegi.  b. Ie dinding g geser (wall) ) pada strukt tur dengan KKDS A, B dan n C dapat dig gunakan Ie=  0.70Ig  c. Ie dinding . g geser (wall) ) pada strukt tur dengan KKDS D, E dan n F dapat diggunakan Ie=  0.35Ig, hal ini dilakukaan untuk me engantisipas i retakan yang lebih par rah dibandin ngkan  struktur d dengan KDS A, B dan C  Hasil out tput program m computer kondisi crac ck, modal pa articipating m mass ratio un ntuk 12 mod de  pertama:    dapat:   Pada tabel diatas did • T1x= 0 0.6226    <   Tx allowab ble SNI= 0.77 • T1y= 0 0.3557    <   Ty allowab ble SNI= 0.53         Edi Supriyanto, ST  edi@supriyanto.w web.id 
  • 5. Hasil out tput program m computer kondisi uncr rack, modal participating mass ratio o untuk 12 m mode  pertama:    Pada tabel diatas did dapat:   • T1x= 0 0.5287      • T1y= 0 0.2753    Dari  ketig kondisi  an ga  nalisis  perhit tungan  waktu getar  alam fundamental  diatas  da u  mi  apat    disimp pulkan  sebagai  b berikut:  Analisis P mputer  Program Kom SNI 03‐17 726‐201X    kondisi crack k  kondis si uncrack  T1x  1 0.77  0.6226  0.5287  T1y  1 0.53  0.3557  0.2753    Batas wak ktu getar maksimum adalah hasil perhhitungan SNI  03‐1726‐201 1X, namun tid dak lebih kecil dari  hasil analisis program komputer kondisi uncrack k dan tidak leb bih besar kon ndisi crack.  Sehingga digunakan :  • T1x= 0.6226 sec  • T1y= 0.3557se   ec     Edi Supriyanto, ST  edi@supriyanto.w web.id