SlideShare a Scribd company logo
1 of 22
Once there was a Pakistani rowing team
Pakistan and Japan agreed to do an annual rowing 
race. Each team should contain 8 men.
Both teams worked really hard to get in the best shape. The 
day the race started both teams were in similar condition. 
....the Japanese won by 1 mile.
FINISH
The mood in the Pakistani team was really close to the freeze point. 
The top management decided to win the race next year. So they 
established a team of analysts to observe the situation and 
recommend an appropriate solution.
After several detailed analysis the team found out that Japanese 
had 7 rowers and only one captain.
Of course the Pakistani team had 7 captains but only one rower.
Facing such critical scenario the management showed an unexpected 
wisdom: they hired the consulting company to restructure the Pakistani 
team.
After several months the consultants came up with the 
conclusion that there were too many captains and too few 
rowers in the Pakistani team. A solution was proposed based 
on this analysis: the structure of the Pakistani team has to 
be changed!
As of today there will be only 4 captains in the team led by 2 
managers, one top-manager and one rower. Besides that, they 
suggested to improve the rower’s working environment and to give 
him higher competencies.
Next year the Japanese won by 2 miles.
FINISH
The Pakistani team immediatelly displaced the rower from the 
team based on his unsatisfactory performance.
But the bonus award was paid to the management 
for the strong motivation the the team showed 
during the preparation phase.
The consulting company prepared a 
new analysis, which showed that the 
strategy was good, the motivation was 
O.K. but the used tool has to be 
improved. 
Performed by ROCE
Currently the Pakistani team is also designing a new boat.

More Related Content

Similar to Pakistan management (20)

Race.ppt
Race.pptRace.ppt
Race.ppt
 
The race
The raceThe race
The race
 
Team race
Team raceTeam race
Team race
 
Malaysia boleh 2
Malaysia boleh 2Malaysia boleh 2
Malaysia boleh 2
 
Malaysia boleh 2
Malaysia boleh 2Malaysia boleh 2
Malaysia boleh 2
 
The Race
The RaceThe Race
The Race
 
Rowers 1 .Pps
Rowers 1 .PpsRowers 1 .Pps
Rowers 1 .Pps
 
race
racerace
race
 
The race
The raceThe race
The race
 
Consulting Team
Consulting TeamConsulting Team
Consulting Team
 
Indian management
Indian managementIndian management
Indian management
 
The N H S Race
The  N H S  RaceThe  N H S  Race
The N H S Race
 
the theory of canoe management
the theory of canoe managementthe theory of canoe management
the theory of canoe management
 
The Canoe Race
The Canoe RaceThe Canoe Race
The Canoe Race
 
Indian Management
Indian ManagementIndian Management
Indian Management
 
The Malaysian Rowing Team
The Malaysian Rowing TeamThe Malaysian Rowing Team
The Malaysian Rowing Team
 
The Management Rowing Race
The Management Rowing RaceThe Management Rowing Race
The Management Rowing Race
 
5. 7a74 teamrace
5. 7a74 teamrace5. 7a74 teamrace
5. 7a74 teamrace
 
Team race 1
Team race 1Team race 1
Team race 1
 
The Race
The RaceThe Race
The Race
 

More from Gulfam Hussain

Tensile, Impact and Hardness Testing of Mild Steel
Tensile, Impact and Hardness Testing of Mild SteelTensile, Impact and Hardness Testing of Mild Steel
Tensile, Impact and Hardness Testing of Mild SteelGulfam Hussain
 
Fuel cladding materials
Fuel cladding materialsFuel cladding materials
Fuel cladding materialsGulfam Hussain
 
Properties of materials / Mechanical Properties of materials
Properties of materials / Mechanical Properties of materialsProperties of materials / Mechanical Properties of materials
Properties of materials / Mechanical Properties of materialsGulfam Hussain
 
Intergranular Corrosion
Intergranular CorrosionIntergranular Corrosion
Intergranular CorrosionGulfam Hussain
 
Hardening (Heat treatment) Quenching
Hardening (Heat treatment)  QuenchingHardening (Heat treatment)  Quenching
Hardening (Heat treatment) QuenchingGulfam Hussain
 
Cathode Ray Oscilloscope CRO
Cathode Ray Oscilloscope CROCathode Ray Oscilloscope CRO
Cathode Ray Oscilloscope CROGulfam Hussain
 
Eight forms of corrosion
Eight  forms of corrosionEight  forms of corrosion
Eight forms of corrosionGulfam Hussain
 
Non-destructive Testing
Non-destructive TestingNon-destructive Testing
Non-destructive TestingGulfam Hussain
 
Non-traditional manufacturing processes
Non-traditional manufacturing processesNon-traditional manufacturing processes
Non-traditional manufacturing processesGulfam Hussain
 
Terrorism in pakistan causes & remedies
Terrorism in pakistan causes & remediesTerrorism in pakistan causes & remedies
Terrorism in pakistan causes & remediesGulfam Hussain
 
Metallurgical properties of cast irons
Metallurgical properties of cast ironsMetallurgical properties of cast irons
Metallurgical properties of cast ironsGulfam Hussain
 

More from Gulfam Hussain (20)

Tensile, Impact and Hardness Testing of Mild Steel
Tensile, Impact and Hardness Testing of Mild SteelTensile, Impact and Hardness Testing of Mild Steel
Tensile, Impact and Hardness Testing of Mild Steel
 
Fuel cladding materials
Fuel cladding materialsFuel cladding materials
Fuel cladding materials
 
Definitions
Definitions Definitions
Definitions
 
Properties of materials / Mechanical Properties of materials
Properties of materials / Mechanical Properties of materialsProperties of materials / Mechanical Properties of materials
Properties of materials / Mechanical Properties of materials
 
Intergranular Corrosion
Intergranular CorrosionIntergranular Corrosion
Intergranular Corrosion
 
Hardening (Heat treatment) Quenching
Hardening (Heat treatment)  QuenchingHardening (Heat treatment)  Quenching
Hardening (Heat treatment) Quenching
 
Extrusion
ExtrusionExtrusion
Extrusion
 
Cathode Ray Oscilloscope CRO
Cathode Ray Oscilloscope CROCathode Ray Oscilloscope CRO
Cathode Ray Oscilloscope CRO
 
Eight forms of corrosion
Eight  forms of corrosionEight  forms of corrosion
Eight forms of corrosion
 
Non-destructive Testing
Non-destructive TestingNon-destructive Testing
Non-destructive Testing
 
Non-traditional manufacturing processes
Non-traditional manufacturing processesNon-traditional manufacturing processes
Non-traditional manufacturing processes
 
Pakistan
PakistanPakistan
Pakistan
 
Terrorism in pakistan causes & remedies
Terrorism in pakistan causes & remediesTerrorism in pakistan causes & remedies
Terrorism in pakistan causes & remedies
 
Heat Treatment
Heat TreatmentHeat Treatment
Heat Treatment
 
Atomic Bonding
Atomic BondingAtomic Bonding
Atomic Bonding
 
Metallurgical properties of cast irons
Metallurgical properties of cast ironsMetallurgical properties of cast irons
Metallurgical properties of cast irons
 
PYROMETER
PYROMETER PYROMETER
PYROMETER
 
Muffle furnace
Muffle furnaceMuffle furnace
Muffle furnace
 
Atmospheric Corrosion
Atmospheric CorrosionAtmospheric Corrosion
Atmospheric Corrosion
 
Erosion Corrosion
Erosion Corrosion Erosion Corrosion
Erosion Corrosion
 

Pakistan management

  • 1.
  • 2. Once there was a Pakistani rowing team
  • 3. Pakistan and Japan agreed to do an annual rowing race. Each team should contain 8 men.
  • 4. Both teams worked really hard to get in the best shape. The day the race started both teams were in similar condition. ....the Japanese won by 1 mile.
  • 6. The mood in the Pakistani team was really close to the freeze point. The top management decided to win the race next year. So they established a team of analysts to observe the situation and recommend an appropriate solution.
  • 7.
  • 8. After several detailed analysis the team found out that Japanese had 7 rowers and only one captain.
  • 9.
  • 10. Of course the Pakistani team had 7 captains but only one rower.
  • 11.
  • 12. Facing such critical scenario the management showed an unexpected wisdom: they hired the consulting company to restructure the Pakistani team.
  • 13.
  • 14. After several months the consultants came up with the conclusion that there were too many captains and too few rowers in the Pakistani team. A solution was proposed based on this analysis: the structure of the Pakistani team has to be changed!
  • 15. As of today there will be only 4 captains in the team led by 2 managers, one top-manager and one rower. Besides that, they suggested to improve the rower’s working environment and to give him higher competencies.
  • 16.
  • 17. Next year the Japanese won by 2 miles.
  • 19. The Pakistani team immediatelly displaced the rower from the team based on his unsatisfactory performance.
  • 20. But the bonus award was paid to the management for the strong motivation the the team showed during the preparation phase.
  • 21. The consulting company prepared a new analysis, which showed that the strategy was good, the motivation was O.K. but the used tool has to be improved. Performed by ROCE
  • 22. Currently the Pakistani team is also designing a new boat.