Content Using the project, you outlined in the Wk 3: Summative Assessment: Project Scoping Outline, in 525- to 700-words: Assess impact and probability for each risk. For those risks that have a risk exposure of greater than 60, determine a strategy and response. Remember, if a strategy can be implemented immediately, the project should be changed rather than wait for the risk to be realized; therefore, each response should be based on.