SlideShare a Scribd company logo
1 of 113
Download to read offline
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
vkbZ ,l vks : 9001-2008
ISO: 9001-2008
CIN-U40109MP2001SGC014880, Email-mdtransco.nic.in
STATE LOAD DESPATCH CENTRE, Nayagaon, Rampur, Jabalpur
Telephone: (0761) 2970089 Fax: (0761) 2664343 e-mail sldcmpjbp@gmail.com
No.07-05/REG-201/W&S-DSM/299 Jabalpur, dtd:-06/02/2019
As Per Distibrution List
Sub: DSM Account of Wind and Solar Pooling Stations for the month of October, 2018 on the basis of MPERC
(Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating
Stations) Regulations, 2018.
In pursuance to MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind
and Solar Generating Stations) Regulations, 2018, SLDC has prepared the DSM Account of Wind Pooling Stations having
combined installed capacity of 10MW and above and Solar Pooling Stations with an installed capacity of 5MW and above
including Wind and Solar Pooling Stations selling InterState and having combined installed capcity less than 10MW and 5
MW.
The ABT meter data of the following Pooling Stations has not been received by SLDC neither through AMR nor
through mail from concerned Discoms, despite repeated persuance. As such, the actual generation was replaced with
scheduled generation and accordingly the Deviation Charges of the Pooling Stations are computed by SLDC during the
period of monthly and partially missing data.
A) Monthly Missing data of Pooling Stations:
i. 14.99MW Ujjas-I Susner.
B) Partial missing data of the Pooling stations:
i. 11.5MW M/S Sai Subari Makdon (25st
to 31th
Octomber 2018).
ii. 30MW M/S Clean solar Alot- I&II (29th
October 2018).
iii. 10MW M/S Marut Shakti Chandwasa (16th
October 2018).
iv. 14.97MW M/S Ujjas-I Agar (26th
& 27th
October 2018).
The Generators / Developers / QCA of the following Pooling stations have not furnished the Forecasting and
Availability data for the month of October 2018 to the SLDC. As such, SLDC has computed the Deviation Charges of these
Pooling Stations considering the Availability and Schedules as “Zero”.
i. 10MW Designco Manufacturer & Exporter (1St
Octomber 2018 to 18th
September 20180.
ii. 15MW MP Wind Nagda Hill Dewas.
The Generators of the following Pooling stations have not appoitment QCA, therefore the DSM account is issued to
the Developers / Generators for settlement of deviaton charges –
i. 50MW NTPC Ltd. Rajgarh.
ii. 250MW Mandhsaur Solar PV Power Project (Gujarkhedi).
iii. 15.2MW Enercon (I) Ltd. - II RatediHill, Bagli.
iv. 11.95MW Wincom Jaroa.
v. 20MW Globus Steel Power Project.
vi. 4MW Ramesh Steels.
It is observed that some of the ABT meters installed at the pooling station are not time synchronized; SLDC has
taken up the matter with the Generators / QCA for time synchronization. Some Generators / QCA have intimated that they
have taken up the matter with meter manufacturer for time time synchronization; meanwhile they have also furnished the
time sync data, the time sync data furnished by the QCA / Generators has been considered for computation of Deviation
Charges. However, Generators / Developers / QCA of the the following pooling stations have neither responded to SLDC
request not furnished the time sync data, as such, the data recorded in the meters have been considered to compute
Deviation Charges.
- 1 -
Sr.No. FEEDER NAME LOCATION NAME LOCATION
VOLTAGE
LEVEL
METER No. QCA NAME
1
33KV BHADRESH
SUSNER
132KV S/S SUSNER Grid S/s End 33 XB593639
REConnect
2 33KV UJAAS-1 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59595
REConnect
3 33KV UJAAS-2 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59596
REConnect
The ABT meters installed at the following Solar Generating Stations are recording 15 minutes block wise data on
sliding window principal instead of load survey, thus, blockwise data does not match with midnight data recorded by the
meters. The midnight values are correct; this has been confirmed by M/s Secure Meters Ltd. As such, the monthly
midnight data has been distributed in 15 minutes time block as per injection pattern of solar generation and accordingly
the Deviation Charges have been computed.
i. 5MW Designco Manufacturer & Exporter connected at 132KV S/s Arniyakala.
ii. 12MW Avenger solar pvt Ltd. connected at 132KV S/s Suwasara.
As per Clause 9.0 of MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind
and Solar Generating Stations) Regulations, 2018, payment to the DSM Account shall be made within 10 days from the date
of issue of this statement. DSM Payments are to be made on the basis of this account only and no further invoicing is
required by SLDC. Payment received after 12 days shall attract simple interest @ 0.04% for each day of delay. SLDC shall
pay to the entities entitled to receive payment on account of Deviation Charges within 2 working days of receipt of the
payments in the “State Deviation Pool Account”. The settlement of Deviation Charges shall be done through State Pool
Account maintained by SLDC. The bank account details are as under:
1. Name of the Bank - BANK OF INDIA
2. Branch - CIVIL LINES BRANCH JABALPUR.
3. Title of the Account - MPPTCL SLDC DSM A/C
4. Bank account No - 940220110000263
5. IFS Code - BKID0009402
6. Branch Code - 9402
7. Type of Account - Current Account.
All QCA’s / Generators are requested to pay the Deviation Charges to the above State Pool Account maintained by
SLDC.
The signed copy of the above DSM account alongwith block-wise details are being sent through email. The DSM
account shall be also be made available on SLDC website www.sldcmpindia.com shortly for downloading by QCA. The
verification, if required, can be done at SLDC.
All the QCA’s / Generators are requested to check and verify the State DSM Account and intimate the
discrepancies observed if any within a period of 15 days.
Chief Engineer (LD)
SLDC MPPTCL, Jabalpur
- 2 -
- 3 -
Distribution List
1. The Chief General Manager (Comml-3), Regional Office, MPPMCL, E-4, Arera Colony, Prakash Parisar, Near Bhojpur
Club, Bhopal-462016, M.P. Jabalpur. Email – rajeevkeskar@gmail.com
2. The Chief General Manager (Comml.), MPMKVVCL, Govindpura, Bhopal, Email-ce.commercial@mpmkvvc.com,
3. The Chief Engineer (Comml.), MPPaKVVCL, GPH Compound, Polo Ground, Indore, Email- cecomwz@gmail.com,
4. The Chief Financial Officer, MPPTCL, Jabalpur.
5. The Suptdg Engineer (MT-1), Corporate Office, M.P. Pashchim Kshetra Vidyut Vitaran Co. Ltd., GPH Compound,
Polo Ground, Indore. Email-achal.jain@mpwz.co.in
6. The General Manager (Comml.-III), O/o MD (CZ) MPMKVVCL, Nistha Parisar., MPMKVVCL, Govindpura, Bhopal,
Email-khanooja@gmail.com, mpczc3@gmail.com
7. M/s Malwa Solar Power Generation Pvt Ltd. 4th Floor, Dr. Gopaldas Bhawan, 28, Barakhamba Road, Cannaught
Place, New Delhi – 110001, Fax: 0124-4716120. India. Email:keshav.prasad@ilfsindia.com,
pradeep.chauhan@ilfsindia.com.
8. M/s WAANPEEP Solar Pvt. Ltd., 602, Western Edge-I, Western Express Highway, Borivali (E), Mumbai-400066, Fax:
022-66444400, Email- kamalmarwah@waaneep.com
9. M/s Focal Energy Solar One India Pvt Ltd., 308 Third Floor, Rectangle One Building D-4, Commercial Complex,
Saket, New Delhi -110017, Fax -011-41704901, Email – kvikas@focal_energy.com
10. M/s Focal Renewable Energy Two India Pvt Ltd., 308, third Floor, Rectangle One Building D-4, Commercial
Complex, Saket, New Delhi -110017, Fax -011-41704901, Email – kvikas@focal_energy.com
11. M/s Solar EnrgyCorroration Of India, D-3, First Floor , Wing-a, ReligareBuliding, Distrcit Centre , Saket, New Delhi
110017,Fax-011-71989244, Email – corporate@seci.gov.in
12. M/s Manikaran Analytics Ltd., 2nd Floor, D21, Corporate Park, Sector-21, Dwarika, New Delhi – 110075 , Email –
contactus@manikarananalytics.in,rakesh@manikarananalytics.in, bd.mp@manikarananalytics.in
13. M/s REConnect Energy Solutions Pvt Ltd.,173,A Sector, Scheme No.54, Indore M P-452010,Email –
info@reconnectenergy.com, mithun.dubey@reconnectenergy.com,piyush.joshi@reconnectenergy.com
14. M/s Statkraft Markets Private Ltd., 403, 4th Floor, SalconRasvilas Building, Saket District Centre, New Delhi –
110017, Email – anwar.alam@statkraft.com
15. M/s ACME Solar Energy (MP) Private Ltd., Plot No.152, Sector-44, Gurgaon-122002(Haryana), Email –
planthead.khilchipur.solar@acme.in
16. M/s Alfa Infraprop Pvt Ltd., NamanMidtown,’A’ Wing, 21st Floor, Senapati Bapat Marg, Elephinstone Road West,
Mumbai-400013, Email –Sanjay.Shah@alfainfraprop.com
17. M/s Regent Climate Connect Knowledge Solutions Pvt Ltd., Appt. 215, Green Tower Society, Plot 7 C, Sector-23,
Dwarka, New Delhi-110075Email - info@climate-connect.com, Pranav.vohra@climate-connect.com
18. M/s NTPC Ltd., E-1/72, Arera Colony, Bhopal – 462016, M.P. EMAIL:- pbvenkatesh@ntpc.co.in
19. M/s Mandsaur Solar PV Project, NTPC -Shamgarh,dist- Mandsaur, Dimple Chauraha, Garaut Road, In front of Swaraj
Tractor, Shamgarh – 458883.MP, Email – skdutta03@ntpc.co.in, pbvenkatesh@ntpc.co.in
20. M/s M.P. WIND FARM NAGDA HILL, ENERGY TOWER, 64, B-Sector, Kasturba Nagar,Bhopal-462023, Email-
info@cecl.in, windpoweindia@gmail.com,mpwlindia@gmail.com
21. M/s Globus Steel & Power Pvt. Ltd, 308, Third Floor, Rectangle One Building, D-4, Commercial Complex,
Saket N.Delhi-110017, Email: kvikas@focal-energy.com
22. M/s PoineerWincomTamaraiTechpark, 7th Floor, S.P. Plot No. 16-20 and 20A, Thiru Vi Ka Industrial
Etate,Enerring Road, Guindy, Chainai -600032 ,Email-mp@poineerwincom.com
23. M/s Designco Manufacturer & Exporter, LakriFazalpur, Delhi Road, Moradabad-244001, Email:
info@designco-india.com, vivekasthana.79@gmail.com
24. M/s Mittal Processor Pvt. Ltd, 1002-1004, Antriksh Bhawan, 22K. G. Marg, Cannought Place, New Delhi
-110001, email – Mayank.gupta@kreatenergy.com, controlroom@mittalgroup.com – (On
behalf of M/s Ramesh Steels).
25. M/s Vedenjay Power Pvt Ltd., Plot No.4/F/53, Above BOI-Bank, Nai Sadak, Scheme No.78, B Road, Indore-
452010, Email – vedanjaypower@gmail.com
………
All Figures in `
INTRA STATE DEVIATION
CHARGES
PAYABLE PAYABLE RECEIVABLE
20MW_FOCAL_ONE_SOLAR 214,457 214,457
40MW_IL&FS_Solar 15,083 (15,083)
Ramesh_Steels_Pachama_Ganj_Basoda 179,095 (179,095)
MANIKARAN ANALYTICS LTD. 529,261 529,261
ACME SOLAR ENERGY PVT. LTD. 22,607 22,607
ALFA INFRAPROP PVT LTD 6,239 6,239
MANIKARAN ANALYTICS LTD. 3,473,509 3,473,509
GLOBUS_STEEL_S_SITAMAU_20MW 30,019 30,019
MANDSAUR_SOLAR_POWER_SOLAR_220_GUJARKHEDI 224,582 224,582
NTPC_RAJGARH 30,157 30,157
WINCON_W_JAORA_11.95MW 46,782 46,782
WIND_WORLD_II_WIND_33_CHAPDA 29,516 29,516
RECONNECT 24,507,632 24,507,632
REGENT CLIMATE 10,831 10,831
STATKRAFT MARKETS PVT LTD 2,131,918 2,131,918
VEDANJAY POWER 43,427 43,427
TOTAL 30,557,219 743,718 194,178 31,106,759
() RECEIVABLE
Assistant Engineer(LD) Executive Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY
QCA / DEVELOPERS / GENERATOR
NET DSM
RECEIVABLE/PAYABLE
INTER STATE DEVIATION CHARGES
STATE LOAD DESPATCH CENTRE - JABALPUR
QCA WISE SUMMERY REPORT OF DEVIATION CHARGES OF WIND & SOLAR POOLING STATIONS FOR October-2018
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
01/10/2018 63,007 59,275 20,593
02/10/2018 63,076 58,116 27,280
03/10/2018 59,223 43,107 99,402
04/10/2018 52,161 53,707 -8,292
05/10/2018 56,926 52,587 26,778
06/10/2018 54,383 53,440 5,963
07/10/2018 57,683 50,396 41,696
08/10/2018 58,222 48,823 54,062
09/10/2018 53,413 56,252 -15,324
10/10/2018 53,603 49,759 22,245
11/10/2018 56,038 52,837 17,668
12/10/2018 52,598 49,106 19,526
13/10/2018 56,537 50,352 34,585
14/10/2018 53,250 51,723 8,501
15/10/2018 51,417 50,344 6,004
16/10/2018 53,913 48,691 29,669
17/10/2018 53,486 51,561 10,588
18/10/2018 53,498 50,089 19,242
19/10/2018 53,091 48,144 29,039
20/10/2018 49,791 53,153 -18,491
21/10/2018 52,927 55,585 -14,619
22/10/2018 53,493 50,689 15,422
23/10/2018 50,580 51,846 -6,963
24/10/2018 51,733 51,395 1,956
25/10/2018 53,681 44,759 52,424
26/10/2018 49,812 51,721 -10,474
27/10/2018 51,007 44,351 39,920
28/10/2018 52,320 51,907 2,272
29/10/2018 51,518 51,425 512
30/10/2018 53,843 54,902 -5,824
31/10/2018 53,869 55,410 -8,476
TOTAL 1,680,099 1,595,452 496,884
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- M/s FOCAL RENEWABLE ENERGY TWO INDIA PVT. LTD.
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
01/10/2018 122,314 117,426 26,884
02/10/2018 115,770 113,530 12,320
03/10/2018 113,250 86,244 163,200
04/10/2018 106,983 101,495 31,481
05/10/2018 105,781 102,874 19,466
06/10/2018 100,496 104,223 -18,708
07/10/2018 98,163 99,277 -5,785
08/10/2018 83,266 94,932 -61,292
09/10/2018 100,143 105,869 -30,815
10/10/2018 102,872 94,958 46,118
11/10/2018 99,400 100,296 -4,928
12/10/2018 98,711 93,607 28,125
13/10/2018 97,130 95,911 6,995
14/10/2018 95,648 97,930 -12,551
15/10/2018 94,096 95,149 -5,172
16/10/2018 92,796 92,690 635
17/10/2018 92,708 96,647 -21,664
18/10/2018 92,952 94,867 -10,470
19/10/2018 93,543 87,830 31,928
20/10/2018 93,766 97,785 -22,104
21/10/2018 93,681 97,136 -19,002
22/10/2018 97,229 88,027 50,611
23/10/2018 95,043 91,747 18,128
24/10/2018 95,152 93,630 8,416
25/10/2018 95,047 80,489 84,169
26/10/2018 84,843 95,215 -55,872
27/10/2018 90,641 80,666 57,819
28/10/2018 83,849 93,148 -49,662
29/10/2018 86,367 90,120 -20,642
30/10/2018 89,076 95,025 -32,720
31/10/2018 95,741 95,823 -451
TOTAL 3,006,457 2,974,566 214,457
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- M/s FOCAL ENERGY SOLAR ONE INDIA PVT. LTD.
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- NOT QCA APPOINTMENT
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
01/10/2018 267,597 289,500 -120,197
02/10/2018 272,292 247,160 150,608
03/10/2018 273,388 249,970 131,733
04/10/2018 267,370 194,550 428,047
05/10/2018 263,158 286,750 -128,382
06/10/2018 283,494 299,840 -89,903
07/10/2018 268,980 265,240 22,973
08/10/2018 270,745 228,060 251,544
09/10/2018 276,303 302,060 -141,595
10/10/2018 282,702 295,730 -71,654
11/10/2018 281,238 272,760 46,863
12/10/2018 267,058 296,600 -162,481
13/10/2018 284,405 296,480 -66,412
14/10/2018 284,171 288,820 -25,570
15/10/2018 274,507 276,160 -8,045
16/10/2018 295,556 265,610 169,450
17/10/2018 246,542 255,750 -48,974
18/10/2018 262,009 242,740 107,930
19/10/2018 261,941 276,680 -81,064
20/10/2018 277,307 250,500 155,372
21/10/2018 268,644 271,890 -17,853
22/10/2018 272,819 287,070 -78,380
23/10/2018 259,426 275,680 -89,397
24/10/2018 259,407 267,180 -41,850
25/10/2018 270,164 273,320 -16,760
26/10/2018 263,557 272,430 -47,171
27/10/2018 276,086 297,160 -115,907
28/10/2018 285,322 291,320 -32,989
29/10/2018 290,474 299,150 -47,718
30/10/2018 281,718 290,060 -45,881
31/10/2018 297,011 288,640 46,040
TOTAL 8,485,391 8,494,860 32,377
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- M/s WAANEEP Solar Pvt. Ltd
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
01/10/2018 272,484 270,832 9,086
02/10/2018 264,618 257,220 40,897
03/10/2018 259,514 217,182 248,261
04/10/2018 231,158 195,500 212,845
05/10/2018 238,092 263,354 -138,941
06/10/2018 246,885 271,314 -134,360
07/10/2018 251,736 254,376 -14,100
08/10/2018 252,328 237,882 85,520
09/10/2018 234,442 255,474 -115,142
10/10/2018 249,587 261,032 -62,948
11/10/2018 243,617 234,392 51,558
12/10/2018 245,661 245,844 -1,006
13/10/2018 245,661 247,002 -7,376
14/10/2018 245,307 244,200 6,088
15/10/2018 245,071 248,372 -18,156
16/10/2018 240,822 231,670 53,649
17/10/2018 245,071 244,608 2,546
18/10/2018 239,584 246,052 -35,574
19/10/2018 240,223 237,460 15,949
20/10/2018 240,223 239,100 6,176
21/10/2018 245,167 257,302 -66,742
22/10/2018 244,988 243,704 7,062
23/10/2018 242,631 236,808 33,610
24/10/2018 244,988 232,930 69,428
25/10/2018 244,988 247,274 -12,573
26/10/2018 238,745 254,196 -84,980
27/10/2018 239,451 205,048 213,412
28/10/2018 240,793 244,710 -21,544
29/10/2018 234,536 248,066 -74,415
30/10/2018 227,407 252,896 -140,190
31/10/2018 226,436 252,606 -143,123
TOTAL 7,562,214 7,578,406 -15,083
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- M/s Malwa Solar Power Generation Ltd.(IL and FS)
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- NOT QCA APPOINTMENT
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
01/10/2018 19,526 22,538 -10,617
02/10/2018 19,421 21,957 -8,907
03/10/2018 18,893 19,412 -1,714
04/10/2018 18,786 18,977 -593
05/10/2018 18,761 21,404 -9,213
06/10/2018 18,893 20,732 -6,461
07/10/2018 17,489 17,525 620
08/10/2018 18,799 19,501 -2,478
09/10/2018 18,116 19,801 -5,732
10/10/2018 17,820 17,645 667
11/10/2018 13,877 19,460 -18,981
12/10/2018 17,073 20,427 -11,836
13/10/2018 19,908 20,567 -2,296
14/10/2018 19,321 20,086 -2,700
15/10/2018 19,877 19,857 71
16/10/2018 19,772 19,088 2,442
17/10/2018 18,366 17,213 4,215
18/10/2018 17,565 18,356 -2,626
19/10/2018 18,415 19,577 -4,101
20/10/2018 18,936 17,235 6,122
21/10/2018 18,605 20,374 -6,245
22/10/2018 19,169 22,159 -10,555
23/10/2018 18,495 19,760 -4,220
24/10/2018 18,179 21,116 -10,361
25/10/2018 18,340 21,792 -12,184
26/10/2018 18,282 19,974 -5,854
27/10/2018 18,180 21,686 -12,311
28/10/2018 18,600 19,670 -3,640
29/10/2018 18,647 22,662 -14,167
30/10/2018 18,782 22,328 -12,517
31/10/2018 18,700 22,362 -12,927
TOTAL 573,593 625,241 -179,099
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
Name of Pooling Station - Ramesh_Steels_Pachama_Ganj_Basoda
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- NOT QCA APPOINTMENT
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 114,624 159,487 5,844
02/10/2018 145,492 153,956 71
03/10/2018 133,382 142,544 248
04/10/2018 133,436 137,657 291
05/10/2018 136,322 147,408 3,153
06/10/2018 135,669 141,187 7,098
07/10/2018 134,472 142,555 655
08/10/2018 134,694 146,692 79
09/10/2018 136,426 153,921 44
10/10/2018 138,024 152,199 30
11/10/2018 114,203 124,870 3,258
12/10/2018 134,668 146,294 346
13/10/2018 135,345 150,111 0
14/10/2018 121,662 144,423 524
15/10/2018 133,840 145,848 131
16/10/2018 130,033 142,694 47
17/10/2018 132,029 141,400 0
18/10/2018 127,865 145,977 215
19/10/2018 127,865 140,267 408
20/10/2018 128,431 137,444 29
21/10/2018 133,209 149,116 0
22/10/2018 132,193 141,739 0
23/10/2018 129,321 137,707 0
24/10/2018 129,552 135,658 136
25/10/2018 133,709 147,384 0
26/10/2018 130,927 144,498 0
27/10/2018 131,282 140,968 0
28/10/2018 129,532 139,930 0
29/10/2018 132,855 144,143 0
30/10/2018 130,655 144,805 0
31/10/2018 130,126 143,301 0
TOTAL 4,071,843 4,466,183 22,607
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- ACME SOLAR ENERGY PVT. LTD.
NAME OF POOLING STATION :- ACME_KHILCHIPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 123,408 123,964 0
02/10/2018 123,408 118,992 710
03/10/2018 123,408 110,402 504
04/10/2018 123,408 119,930 0
05/10/2018 123,408 122,016 0
06/10/2018 123,408 121,057 0
07/10/2018 123,408 121,416 0
08/10/2018 123,408 111,946 376
09/10/2018 120,497 119,552 0
10/10/2018 120,497 107,831 2,801
11/10/2018 120,323 106,506 1,040
12/10/2018 120,497 108,540 0
13/10/2018 120,497 112,021 0
14/10/2018 120,497 114,073 0
15/10/2018 120,497 118,440 0
16/10/2018 120,497 114,389 0
17/10/2018 120,497 111,924 0
18/10/2018 120,497 107,625 184
19/10/2018 107,096 110,150 0
20/10/2018 107,096 104,615 0
21/10/2018 107,096 103,388 132
22/10/2018 107,096 118,180 0
23/10/2018 107,096 117,874 0
24/10/2018 107,096 116,025 0
25/10/2018 107,096 115,565 0
26/10/2018 107,096 112,217 0
27/10/2018 107,096 105,977 492
28/10/2018 107,096 113,385 0
29/10/2018 107,096 112,586 0
30/10/2018 107,096 113,810 0
31/10/2018 107,096 111,519 0
TOTAL 3,584,308 3,525,915 6,239
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- ALFA INFRAPROP PVT LTD
NAME OF POOLING STATION :- ALPHA_KUKSHI
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 22,731 2,167 0
02/10/2018 25,121 5,837 0
03/10/2018 35,446 7,069 0
04/10/2018 26,062 17,922 2,842
05/10/2018 29,374 5,412 0
06/10/2018 10,528 31 0
07/10/2018 11,513 4,301 0
08/10/2018 28,513 11,782 4
09/10/2018 34,525 16,668 0
10/10/2018 30,354 21,279 124
11/10/2018 34,369 21,192 677
12/10/2018 37,094 17,559 15
13/10/2018 34,228 9,679 0
14/10/2018 34,463 10,907 26
15/10/2018 34,636 8,741 0
16/10/2018 31,353 37,373 384
17/10/2018 36,791 21,706 104
18/10/2018 46,428 39,655 146
19/10/2018 48,581 30,484 0
20/10/2018 40,169 17,611 20
21/10/2018 39,281 41,116 196
22/10/2018 40,628 15,511 0
23/10/2018 40,026 6,188 0
24/10/2018 40,677 9,625 0
25/10/2018 36,655 22,395 338
26/10/2018 37,831 5,478 64
27/10/2018 37,397 9,833 1,005
28/10/2018 44,293 21,081 0
29/10/2018 64,261 48,592 674
30/10/2018 62,851 54,859 2,503
31/10/2018 72,175 74,263 3,975
TOTAL 1,148,354 616,316 13,097
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SUZLON_IV_W_JAORA_13.5MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 69,356 67,358 254
02/10/2018 65,809 68,786 0
03/10/2018 74,415 64,458 141
04/10/2018 57,220 44,308 1,510
05/10/2018 60,358 67,998 186
06/10/2018 64,214 70,714 0
07/10/2018 66,333 65,018 0
08/10/2018 66,333 65,152 0
09/10/2018 68,356 69,622 184
10/10/2018 63,507 69,486 0
11/10/2018 64,602 62,284 19
12/10/2018 65,836 67,904 6
13/10/2018 66,522 69,222 0
14/10/2018 66,427 67,680 0
15/10/2018 66,597 62,984 0
16/10/2018 66,045 62,474 19
17/10/2018 61,247 58,902 62
18/10/2018 59,997 56,070 50
19/10/2018 62,071 64,252 33
20/10/2018 62,498 57,934 307
21/10/2018 60,554 64,930 0
22/10/2018 64,327 68,814 0
23/10/2018 68,269 61,672 795
24/10/2018 61,173 64,520 0
25/10/2018 62,170 64,846 0
26/10/2018 63,401 65,242 0
27/10/2018 65,687 69,422 0
28/10/2018 65,316 68,624 0
29/10/2018 65,937 70,294 0
30/10/2018 67,584 68,030 0
31/10/2018 66,163 68,250 0
TOTAL 2,008,324 2,017,250 3,566
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- M&B_ICHHAWAR-II
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 68,520 13,758 0
02/10/2018 45,356 22,031 0
03/10/2018 52,432 21,393 0
04/10/2018 118,687 90,633 30,685
05/10/2018 60,818 52,227 18,278
06/10/2018 36,915 12,250 0
07/10/2018 43,098 20,195 0
08/10/2018 56,183 60,512 0
09/10/2018 97,895 73,125 0
10/10/2018 55,536 53,979 0
11/10/2018 103,801 157,858 4,836
12/10/2018 220,298 260,482 29,376
13/10/2018 195,262 214,397 1,664
14/10/2018 103,206 84,220 0
15/10/2018 62,491 51,249 0
16/10/2018 70,361 73,359 76
17/10/2018 83,562 101,327 292
18/10/2018 158,866 156,949 1,566
19/10/2018 138,532 126,146 7
20/10/2018 95,914 87,897 0
21/10/2018 129,921 146,978 2,006
22/10/2018 115,155 94,977 0
23/10/2018 68,097 31,307 0
24/10/2018 86,172 60,793 12
25/10/2018 59,935 23,300 0
26/10/2018 45,212 14,641 0
27/10/2018 148,250 179,068 111
28/10/2018 219,777 240,393 3,292
29/10/2018 167,327 194,980 460
30/10/2018 140,609 164,902 840
31/10/2018 222,235 258,277 10,712
TOTAL 3,270,423 3,143,603 104,213
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD_III_WIND_132_CHAPDA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 25,980 7,253 0
02/10/2018 25,972 4,807 0
03/10/2018 40,096 21,338 4,720
04/10/2018 36,419 24,520 1,254
05/10/2018 24,185 3,517 0
06/10/2018 20,181 5,512 0
07/10/2018 22,903 2,289 0
08/10/2018 28,145 5,577 0
09/10/2018 34,471 15,299 0
10/10/2018 25,159 11,665 0
11/10/2018 36,817 31,121 10
12/10/2018 42,722 39,375 20
13/10/2018 34,716 25,912 0
14/10/2018 30,793 14,779 0
15/10/2018 30,248 8,088 0
16/10/2018 30,777 22,422 86
17/10/2018 47,566 38,131 285
18/10/2018 46,920 38,431 0
19/10/2018 38,482 17,916 0
20/10/2018 43,236 34,058 78
21/10/2018 50,061 51,981 1,087
22/10/2018 34,156 19,058 0
23/10/2018 37,009 12,712 0
24/10/2018 40,691 27,340 1,680
25/10/2018 39,164 21,214 0
26/10/2018 38,411 13,125 0
27/10/2018 32,552 19,686 0
28/10/2018 36,309 22,446 0
29/10/2018 43,553 41,272 0
30/10/2018 45,336 44,985 1,590
31/10/2018 42,492 30,968 0
TOTAL 1,105,522 676,797 10,810
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND WORLD AGAR-I
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 350,424 325,720 8,512
02/10/2018 347,202 321,870 7,582
03/10/2018 348,513 335,060 0
04/10/2018 343,784 335,570 532
05/10/2018 334,865 315,760 2,236
06/10/2018 340,793 335,410 0
07/10/2018 339,103 309,090 9,846
08/10/2018 330,445 303,390 2,648
09/10/2018 330,216 348,040 0
10/10/2018 336,479 335,300 0
11/10/2018 333,273 321,800 0
12/10/2018 325,112 322,080 0
13/10/2018 326,027 319,620 0
14/10/2018 323,786 322,520 0
15/10/2018 286,048 261,920 13,294
16/10/2018 315,679 273,780 18,129
17/10/2018 231,492 193,080 5,630
18/10/2018 287,485 302,940 182
19/10/2018 293,330 299,500 0
20/10/2018 289,966 283,590 0
21/10/2018 289,966 280,740 0
22/10/2018 289,548 288,020 1,029
23/10/2018 306,078 320,610 0
24/10/2018 319,857 313,060 0
25/10/2018 280,211 244,880 24,279
26/10/2018 308,929 305,370 0
27/10/2018 297,944 312,080 0
28/10/2018 305,687 317,000 0
29/10/2018 311,649 298,090 0
30/10/2018 311,292 313,430 0
31/10/2018 311,760 309,370 0
TOTAL 9,746,943 9,468,690 93,899
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SKY_POWER_SOLAR_132_CHHEGAON
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 21,825 3,379 0
02/10/2018 23,384 5,665 0
03/10/2018 28,404 7,561 2
04/10/2018 27,703 13,625 1,506
05/10/2018 26,236 5,672 0
06/10/2018 7,134 79 0
07/10/2018 12,445 4,382 0
08/10/2018 28,309 10,465 125
09/10/2018 34,398 18,683 0
10/10/2018 28,213 20,384 117
11/10/2018 39,451 22,790 1,615
12/10/2018 34,241 19,779 0
13/10/2018 38,829 11,775 31
14/10/2018 30,029 10,556 0
15/10/2018 33,166 9,153 228
16/10/2018 31,498 35,593 526
17/10/2018 35,820 18,712 0
18/10/2018 49,380 34,417 343
19/10/2018 43,817 28,040 0
20/10/2018 37,022 16,856 0
21/10/2018 37,703 35,981 265
22/10/2018 35,993 17,511 2
23/10/2018 38,564 6,613 279
24/10/2018 34,133 9,009 0
25/10/2018 34,188 18,138 260
26/10/2018 36,277 7,134 4
27/10/2018 35,713 12,064 1,804
28/10/2018 37,335 24,745 281
29/10/2018 57,738 60,295 4,097
30/10/2018 54,506 66,302 4,070
31/10/2018 79,808 81,415 1,874
TOTAL 1,093,262 636,773 17,429
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SUZLON_V_W_JAORA_12MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 363,635 370,260 0
02/10/2018 378,869 371,670 0
03/10/2018 357,033 363,110 0
04/10/2018 343,720 353,860 1,821
05/10/2018 369,080 356,450 3,752
06/10/2018 361,500 348,760 1,868
07/10/2018 354,224 288,600 17,562
08/10/2018 354,948 343,670 1,431
09/10/2018 363,393 355,880 495
10/10/2018 360,934 335,570 6,616
11/10/2018 363,642 288,660 19,545
12/10/2018 303,815 347,560 1,892
13/10/2018 331,618 346,510 0
14/10/2018 353,968 339,950 0
15/10/2018 344,598 339,380 0
16/10/2018 352,724 336,260 0
17/10/2018 333,248 305,670 1,906
18/10/2018 329,140 336,540 483
19/10/2018 325,847 328,350 0
20/10/2018 321,027 260,010 23,149
21/10/2018 334,508 309,770 1,226
22/10/2018 324,258 318,240 0
23/10/2018 316,431 304,740 0
24/10/2018 319,936 304,160 3,736
25/10/2018 316,143 333,250 241
26/10/2018 318,153 323,420 4,876
27/10/2018 321,027 290,350 3,737
28/10/2018 318,065 319,970 0
29/10/2018 337,431 339,130 0
30/10/2018 330,739 334,020 0
31/10/2018 340,051 346,800 0
TOTAL 10,543,705 10,240,570 94,336
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- RENEW_CLEAN_SOLAR_132_KOTHIYA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 59,308 26,839 1,834
02/10/2018 49,325 8,032 0
03/10/2018 75,899 45,000 11,756
04/10/2018 100,036 89,610 21,904
05/10/2018 46,252 13,186 391
06/10/2018 44,097 8,977 0
07/10/2018 40,434 2,844 0
08/10/2018 45,339 4,651 656
09/10/2018 61,514 38,015 596
10/10/2018 47,082 30,913 10
11/10/2018 104,162 129,849 11,258
12/10/2018 156,611 201,386 16,678
13/10/2018 107,042 148,409 9,454
14/10/2018 84,733 49,827 602
15/10/2018 51,041 15,552 646
16/10/2018 89,494 101,065 24,630
17/10/2018 102,836 105,214 1,888
18/10/2018 107,281 83,364 187
19/10/2018 88,206 54,865 294
20/10/2018 85,033 76,198 1,153
21/10/2018 140,420 157,914 3,716
22/10/2018 113,186 56,846 3,548
23/10/2018 77,566 49,267 1,375
24/10/2018 124,902 131,259 42,310
25/10/2018 84,745 49,912 4,526
26/10/2018 87,674 40,177 0
27/10/2018 94,396 73,927 1,086
28/10/2018 78,959 80,200 4,653
29/10/2018 196,623 219,083 28,176
30/10/2018 187,188 235,130 43,814
31/10/2018 231,860 246,393 19,422
TOTAL 2,963,244 2,573,904 256,563
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SUZLON_GUJRAT_WIND_33_BADOD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 0 25,692 30,830
02/10/2018 0 25,133 30,160
03/10/2018 0 21,568 25,882
04/10/2018 0 15,644 18,773
05/10/2018 0 24,340 29,208
06/10/2018 0 23,811 28,573
07/10/2018 0 23,637 28,364
08/10/2018 0 28,349 34,019
09/10/2018 0 30,180 36,216
10/10/2018 0 30,852 37,022
11/10/2018 0 29,451 35,341
12/10/2018 0 30,193 36,232
13/10/2018 0 29,912 35,894
14/10/2018 0 29,183 35,020
15/10/2018 0 28,890 34,668
16/10/2018 0 27,749 33,299
17/10/2018 0 26,339 31,607
18/10/2018 0 26,732 32,078
19/10/2018 18,544 27,370 2,718
20/10/2018 15,005 21,838 1,750
21/10/2018 18,149 27,434 3,070
22/10/2018 18,200 28,554 3,531
23/10/2018 25,709 27,688 28
24/10/2018 27,906 22,776 753
25/10/2018 27,906 26,137 216
26/10/2018 26,514 27,483 31
27/10/2018 27,906 28,340 84
28/10/2018 29,395 27,159 99
29/10/2018 27,430 28,424 18
30/10/2018 27,798 27,830 0
31/10/2018 0 27,653 26,946
TOTAL 290,462 826,341 612,430
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- DESIGNCO_MANF_EXP_1_S_ARNIYAKALA_5MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 72,181 71,687 0
02/10/2018 69,365 65,487 781
03/10/2018 64,434 58,743 1,659
04/10/2018 57,730 50,189 2,666
05/10/2018 66,568 70,072 0
06/10/2018 69,466 70,002 54
07/10/2018 67,176 66,597 906
08/10/2018 67,176 64,430 647
09/10/2018 64,162 67,875 14
10/10/2018 65,357 67,756 98
11/10/2018 66,736 61,250 1,209
12/10/2018 62,263 64,813 0
13/10/2018 64,942 64,266 0
14/10/2018 63,922 64,743 0
15/10/2018 63,629 64,922 0
16/10/2018 63,635 61,181 162
17/10/2018 60,967 64,100 55
18/10/2018 61,045 63,706 107
19/10/2018 60,756 60,242 717
20/10/2018 59,460 62,283 0
21/10/2018 59,608 65,705 73
22/10/2018 61,532 62,868 0
23/10/2018 60,240 61,998 0
24/10/2018 58,024 61,279 392
25/10/2018 60,240 63,820 0
26/10/2018 60,415 65,082 0
27/10/2018 55,754 53,456 1,526
28/10/2018 61,501 60,842 393
29/10/2018 22,863 27,852 2,609
30/10/2018 63,540 65,154 0
31/10/2018 64,232 65,205 0
TOTAL 1,918,919 1,937,605 14,068
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- M&B_BAROD_II
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 58,376 60,144 0
02/10/2018 58,264 58,720 0
03/10/2018 59,143 43,509 9,270
04/10/2018 55,154 53,508 382
05/10/2018 56,450 52,349 3,215
06/10/2018 53,603 53,313 1,271
07/10/2018 52,350 50,368 643
08/10/2018 50,620 47,700 1,293
09/10/2018 53,566 54,187 444
10/10/2018 54,369 47,876 2,204
11/10/2018 51,512 50,636 182
12/10/2018 49,749 47,505 378
13/10/2018 49,675 49,462 63
14/10/2018 49,442 51,269 63
15/10/2018 50,203 50,834 5
16/10/2018 51,032 49,358 512
17/10/2018 50,498 51,585 19
18/10/2018 51,031 50,491 246
19/10/2018 50,878 48,612 913
20/10/2018 50,773 54,071 0
21/10/2018 51,935 57,022 0
22/10/2018 52,999 52,083 0
23/10/2018 52,654 53,359 0
24/10/2018 54,131 53,002 96
25/10/2018 51,925 45,999 2,246
26/10/2018 52,185 53,270 105
27/10/2018 53,521 46,377 2,970
28/10/2018 53,191 53,566 0
29/10/2018 52,468 52,482 0
30/10/2018 54,029 55,824 0
31/10/2018 53,526 55,771 0
TOTAL 1,639,252 1,604,252 26,520
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- FOCAL_PHOTOVOLTAIC_10MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 31,050 12,289 18,620
02/10/2018 31,050 31,278 0
03/10/2018 31,050 23,016 4,390
04/10/2018 31,050 22,928 4,201
05/10/2018 31,050 31,840 0
06/10/2018 31,470 32,220 0
07/10/2018 31,470 30,968 0
08/10/2018 24,623 31,240 1,867
09/10/2018 31,470 31,864 0
10/10/2018 31,145 31,019 31
11/10/2018 60,212 29,749 25,417
12/10/2018 29,364 30,507 220
13/10/2018 31,470 30,477 0
14/10/2018 31,470 30,108 0
15/10/2018 31,470 29,341 34
16/10/2018 31,470 29,098 97
17/10/2018 31,470 29,765 0
18/10/2018 31,470 28,583 498
19/10/2018 31,470 28,007 402
20/10/2018 31,470 29,024 58
21/10/2018 31,470 30,543 0
22/10/2018 31,470 29,952 0
23/10/2018 31,470 29,676 0
24/10/2018 31,012 29,340 81
25/10/2018 31,012 30,251 0
26/10/2018 31,012 28,533 460
27/10/2018 31,012 29,237 207
28/10/2018 31,012 29,784 0
29/10/2018 31,012 30,593 0
30/10/2018 31,012 30,730 0
31/10/2018 31,012 30,441 0
TOTAL 989,270 902,401 56,583
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- PORWAL_AUTO_MAKDON
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 320,748 325,210 0
02/10/2018 325,695 311,320 168
03/10/2018 313,564 228,850 40,558
04/10/2018 288,681 249,600 5,256
05/10/2018 307,149 287,430 4,342
06/10/2018 305,184 300,290 2,155
07/10/2018 310,633 271,140 19,410
08/10/2018 277,037 248,330 9,895
09/10/2018 280,435 296,450 0
10/10/2018 290,375 275,600 4,118
11/10/2018 287,809 272,410 0
12/10/2018 256,742 262,810 0
13/10/2018 287,425 268,410 1,240
14/10/2018 273,836 274,150 0
15/10/2018 281,745 270,200 50
16/10/2018 276,027 260,680 3,136
17/10/2018 270,819 273,230 108
18/10/2018 271,738 271,380 155
19/10/2018 271,368 252,980 3,200
20/10/2018 268,309 282,710 0
21/10/2018 273,249 293,470 0
22/10/2018 271,046 266,030 0
23/10/2018 273,540 268,640 0
24/10/2018 271,260 263,600 2,030
25/10/2018 262,182 243,610 7,460
26/10/2018 272,314 270,730 2,786
27/10/2018 272,597 241,150 14,696
28/10/2018 273,797 273,050 242
29/10/2018 264,642 260,420 0
30/10/2018 272,177 282,150 0
31/10/2018 279,779 284,210 135
TOTAL 8,751,902 8,430,240 121,140
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SEIL_SITARA_SITAMAU_50MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 74,415 70,930 483
02/10/2018 70,374 73,432 0
03/10/2018 74,415 68,828 95
04/10/2018 58,321 48,066 32
05/10/2018 68,469 73,072 246
06/10/2018 68,525 75,960 96
07/10/2018 73,098 69,804 0
08/10/2018 73,098 70,794 35
09/10/2018 74,061 76,520 0
10/10/2018 68,670 76,582 22
11/10/2018 70,163 69,562 0
12/10/2018 71,895 76,222 0
13/10/2018 73,122 75,780 0
14/10/2018 73,016 73,212 0
15/10/2018 73,171 67,598 10
16/10/2018 72,386 66,992 96
17/10/2018 67,416 62,904 354
18/10/2018 67,483 58,918 406
19/10/2018 67,024 68,386 0
20/10/2018 67,037 60,592 298
21/10/2018 64,437 68,078 130
22/10/2018 69,979 71,498 0
23/10/2018 70,916 65,068 154
24/10/2018 64,452 66,480 30
25/10/2018 65,085 62,232 390
26/10/2018 65,140 64,994 0
27/10/2018 67,291 71,288 0
28/10/2018 67,441 69,642 0
29/10/2018 68,042 72,170 36
30/10/2018 69,289 70,090 12
31/10/2018 67,958 70,980 0
TOTAL 2,146,189 2,136,674 2,925
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- M&B_ICHHAWAR-I
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 0 421 474
02/10/2018 0 3,084 3,469
03/10/2018 0 76 85
04/10/2018 0 23,585 26,533
05/10/2018 0 4,717 5,307
06/10/2018 0 153 172
07/10/2018 0 2,499 2,811
08/10/2018 0 5,772 6,493
09/10/2018 0 6,417 7,219
10/10/2018 0 14,718 16,558
11/10/2018 0 32,553 36,622
12/10/2018 0 70,775 79,622
13/10/2018 0 51,081 57,466
14/10/2018 0 16,100 18,112
15/10/2018 0 9,474 10,658
16/10/2018 0 12,860 14,467
17/10/2018 0 6,327 7,118
18/10/2018 0 24,023 27,026
19/10/2018 0 14,175 15,947
20/10/2018 0 3,141 3,534
21/10/2018 0 28,931 32,547
22/10/2018 0 15,362 17,282
23/10/2018 0 1,880 2,115
24/10/2018 0 5,621 6,324
25/10/2018 0 787 885
26/10/2018 0 6,439 7,244
27/10/2018 0 29,450 33,131
28/10/2018 0 42,653 47,985
29/10/2018 0 48,964 55,084
30/10/2018 0 42,065 47,323
31/10/2018 0 60,623 68,201
TOTAL 0 584,726 657,814
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- MP_WIND_FARM_NAGDA_HILL_WIND_33_DEWAS
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 27,216 7,839 0
02/10/2018 26,102 4,518 0
03/10/2018 37,928 24,835 4,640
04/10/2018 38,424 31,968 3,696
05/10/2018 26,598 5,385 0
06/10/2018 30,530 5,264 0
07/10/2018 22,158 2,453 0
08/10/2018 32,202 4,899 0
09/10/2018 34,900 14,943 0
10/10/2018 25,918 11,344 0
11/10/2018 36,279 32,753 0
12/10/2018 48,761 45,810 8
13/10/2018 37,534 29,580 0
14/10/2018 36,733 17,583 0
15/10/2018 34,029 9,340 7
16/10/2018 31,678 19,903 0
17/10/2018 46,972 42,127 45
18/10/2018 49,852 31,597 0
19/10/2018 41,535 16,420 0
20/10/2018 44,659 36,940 200
21/10/2018 49,680 51,530 642
22/10/2018 36,583 18,178 0
23/10/2018 42,889 14,966 0
24/10/2018 49,192 29,437 1,210
25/10/2018 41,105 22,590 0
26/10/2018 38,729 10,925 0
27/10/2018 38,133 21,414 0
28/10/2018 40,931 24,997 0
29/10/2018 47,240 43,085 0
30/10/2018 44,970 48,326 0
31/10/2018 56,421 38,779 0
TOTAL 1,195,881 719,728 10,448
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD-II_33_AGAR_15.2MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 85,410 100,133 342
02/10/2018 93,603 94,209 0
03/10/2018 98,542 81,314 1,786
04/10/2018 88,863 74,646 4,925
05/10/2018 92,534 96,702 0
06/10/2018 90,855 97,741 168
07/10/2018 95,834 92,155 513
08/10/2018 74,647 92,073 1,036
09/10/2018 65,674 92,407 3,964
10/10/2018 88,518 94,956 14
11/10/2018 86,980 88,491 430
12/10/2018 87,698 88,757 0
13/10/2018 81,465 88,193 0
14/10/2018 83,101 88,820 0
15/10/2018 79,726 89,256 0
16/10/2018 84,815 83,335 297
17/10/2018 86,528 88,040 213
18/10/2018 86,518 90,156 0
19/10/2018 87,498 84,912 82
20/10/2018 86,168 89,148 0
21/10/2018 86,815 95,695 0
22/10/2018 86,464 91,255 0
23/10/2018 88,170 91,916 0
24/10/2018 87,472 90,882 0
25/10/2018 89,566 95,239 0
26/10/2018 90,669 96,712 0
27/10/2018 87,939 81,647 1,803
28/10/2018 92,277 96,699 0
29/10/2018 90,346 82,202 3,216
30/10/2018 93,983 98,855 0
31/10/2018 92,828 100,063 0
TOTAL 2,711,506 2,816,609 18,789
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- TODAY_CLEAN_SOLAR_33KV_BAROD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 40,010 43,720 26
02/10/2018 40,015 43,120 5
03/10/2018 40,038 38,980 74
04/10/2018 39,577 36,490 205
05/10/2018 38,182 42,660 136
06/10/2018 38,951 42,490 0
07/10/2018 38,536 38,470 1,210
08/10/2018 38,199 38,620 55
09/10/2018 38,150 41,780 6
10/10/2018 38,695 42,000 0
11/10/2018 39,692 38,130 199
12/10/2018 39,599 39,520 0
13/10/2018 39,293 40,990 0
14/10/2018 39,409 39,880 0
15/10/2018 39,489 39,700 0
16/10/2018 39,697 38,230 260
17/10/2018 39,096 38,980 0
18/10/2018 38,764 40,190 0
19/10/2018 39,093 37,310 363
20/10/2018 38,694 38,850 9
21/10/2018 38,629 40,490 0
22/10/2018 38,461 38,860 0
23/10/2018 38,594 37,800 0
24/10/2018 38,416 35,790 722
25/10/2018 37,816 40,280 10
26/10/2018 37,342 39,470 19
27/10/2018 37,487 38,720 41
28/10/2018 37,543 40,340 0
29/10/2018 39,131 41,430 0
30/10/2018 37,758 40,580 0
31/10/2018 39,173 40,590 0
TOTAL 1,203,529 1,234,460 3,340
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- UJAAS_II_S_RAJGARH_BIORA_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 459,482 238,350 267
02/10/2018 472,043 161,350 4,152
03/10/2018 394,493 61,540 0
04/10/2018 326,047 211,990 46,934
05/10/2018 426,737 121,410 30
06/10/2018 394,233 102,090 0
07/10/2018 382,941 121,310 0
08/10/2018 414,606 275,090 0
09/10/2018 480,304 504,360 0
10/10/2018 603,478 457,720 238
11/10/2018 498,367 409,290 0
12/10/2018 616,965 646,710 4,034
13/10/2018 714,950 577,010 328
14/10/2018 543,118 404,690 18,027
15/10/2018 365,892 195,000 0
16/10/2018 485,073 329,570 262
17/10/2018 504,011 375,220 70
18/10/2018 640,009 672,610 2,110
19/10/2018 625,322 410,580 0
20/10/2018 503,593 278,760 0
21/10/2018 699,688 665,390 4,342
22/10/2018 576,517 384,670 0
23/10/2018 560,133 161,260 134
24/10/2018 534,926 181,230 0
25/10/2018 665,258 411,310 11,342
26/10/2018 595,751 250,860 0
27/10/2018 539,222 265,920 0
28/10/2018 518,064 471,020 16,341
29/10/2018 1,441,022 1,395,100 57,804
30/10/2018 1,204,268 1,403,910 45,089
31/10/2018 1,583,127 1,816,010 168,796
TOTAL 18,769,640 13,961,330 380,300
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- KSHEMA_295.3MW_AMBA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 72,181 74,693 0
02/10/2018 71,973 68,087 1,324
03/10/2018 65,729 59,514 1,314
04/10/2018 57,980 53,351 1,734
05/10/2018 69,206 73,913 0
06/10/2018 71,438 75,030 39
07/10/2018 67,208 69,965 343
08/10/2018 67,208 67,902 296
09/10/2018 68,422 68,546 100
10/10/2018 68,491 68,809 507
11/10/2018 67,911 60,952 1,613
12/10/2018 60,958 66,185 0
13/10/2018 66,118 69,251 0
14/10/2018 65,706 68,359 0
15/10/2018 65,248 69,454 0
16/10/2018 65,100 66,888 37
17/10/2018 64,159 69,081 0
18/10/2018 65,288 68,200 140
19/10/2018 65,435 65,094 302
20/10/2018 64,361 67,293 0
21/10/2018 64,094 72,110 5
22/10/2018 66,354 67,983 0
23/10/2018 64,849 67,254 0
24/10/2018 63,635 66,476 671
25/10/2018 63,966 69,531 23
26/10/2018 65,539 70,661 0
27/10/2018 58,143 59,885 633
28/10/2018 66,414 68,469 87
29/10/2018 25,094 30,326 2,304
30/10/2018 68,880 71,205 0
31/10/2018 69,027 70,882 0
TOTAL 2,006,115 2,065,349 11,472
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- M&B_BAROD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 55,150 57,262 0
02/10/2018 55,847 56,138 0
03/10/2018 56,131 55,857 0
04/10/2018 56,157 52,045 321
05/10/2018 55,980 52,103 176
06/10/2018 55,567 55,596 0
07/10/2018 55,739 53,353 0
08/10/2018 54,969 50,692 212
09/10/2018 53,838 54,726 0
10/10/2018 53,743 54,282 0
11/10/2018 49,433 46,168 49
12/10/2018 51,669 54,002 0
13/10/2018 52,556 56,694 0
14/10/2018 52,797 55,121 0
15/10/2018 52,664 52,324 0
16/10/2018 52,435 50,317 1,104
17/10/2018 45,887 40,052 1,586
18/10/2018 48,891 52,910 69
19/10/2018 51,005 52,431 43
20/10/2018 50,741 51,372 35
21/10/2018 49,968 52,325 0
22/10/2018 49,099 56,085 222
23/10/2018 53,278 56,105 0
24/10/2018 52,513 56,119 0
25/10/2018 50,755 49,805 484
26/10/2018 53,927 55,788 0
27/10/2018 51,122 46,930 2,239
28/10/2018 54,183 56,024 0
29/10/2018 55,197 57,757 0
30/10/2018 53,943 56,695 0
31/10/2018 57,080 57,314 0
TOTAL 1,642,264 1,654,392 6,540
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- BHARAT_ELECTRONICS_LTD_OFI_S_ITARSI_10MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 29,515 7,674 0
02/10/2018 26,802 4,161 0
03/10/2018 43,847 20,236 4,894
04/10/2018 33,363 38,424 6,044
05/10/2018 26,207 5,905 0
06/10/2018 31,390 5,140 0
07/10/2018 21,824 2,249 0
08/10/2018 35,322 5,231 0
09/10/2018 33,876 14,435 0
10/10/2018 25,145 12,072 0
11/10/2018 40,259 35,947 0
12/10/2018 47,740 45,261 76
13/10/2018 38,555 30,316 0
14/10/2018 35,456 16,552 0
15/10/2018 31,590 8,141 0
16/10/2018 32,132 22,257 0
17/10/2018 42,538 39,309 164
18/10/2018 44,599 32,001 0
19/10/2018 38,779 17,732 0
20/10/2018 45,103 35,802 52
21/10/2018 45,078 52,132 334
22/10/2018 37,764 21,729 0
23/10/2018 40,807 15,431 0
24/10/2018 47,588 27,832 847
25/10/2018 40,785 24,179 0
26/10/2018 42,978 12,386 0
27/10/2018 40,641 19,820 0
28/10/2018 38,223 25,976 0
29/10/2018 51,168 46,344 32
30/10/2018 40,232 49,321 767
31/10/2018 52,000 36,976 0
TOTAL 1,181,306 730,971 13,210
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD-III_33_AGAR_14.4MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 300,161 4,160 12,898
02/10/2018 239,069 68,510 0
03/10/2018 281,412 103,310 11,318
04/10/2018 272,144 245,530 45,930
05/10/2018 286,142 52,980 0
06/10/2018 226,732 7,150 0
07/10/2018 235,469 64,270 0
08/10/2018 320,494 203,180 0
09/10/2018 485,483 302,700 4,962
10/10/2018 302,593 172,440 838
11/10/2018 449,881 550,890 114,164
12/10/2018 783,827 679,490 20,101
13/10/2018 623,796 536,770 20,016
14/10/2018 527,575 365,570 4,943
15/10/2018 393,846 117,410 0
16/10/2018 334,733 85,800 958
17/10/2018 345,606 159,280 0
18/10/2018 548,568 367,040 0
19/10/2018 481,427 295,750 0
20/10/2018 509,010 200,990 12
21/10/2018 646,014 584,450 8,658
22/10/2018 436,278 237,350 0
23/10/2018 426,187 17,860 0
24/10/2018 497,725 167,720 4
25/10/2018 429,551 83,100 0
26/10/2018 553,775 203,260 68
27/10/2018 555,877 433,840 5,018
28/10/2018 467,716 678,360 91,831
29/10/2018 695,495 634,260 2,668
30/10/2018 625,434 743,410 45,468
31/10/2018 1,013,459 1,103,640 48,975
TOTAL 14,295,479 9,470,470 438,830
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- GAMESHA_SHAJAPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 29,162 10,166 0
02/10/2018 24,916 4,850 0
03/10/2018 32,183 22,166 2,736
04/10/2018 28,111 26,754 8,820
05/10/2018 25,585 23,619 13,634
06/10/2018 31,621 9,122 420
07/10/2018 29,189 2,458 0
08/10/2018 27,329 6,340 296
09/10/2018 32,459 15,612 90
10/10/2018 29,194 9,184 0
11/10/2018 42,399 30,763 302
12/10/2018 51,139 52,240 362
13/10/2018 39,292 32,320 0
14/10/2018 38,656 23,286 0
15/10/2018 37,178 9,301 0
16/10/2018 36,314 14,753 0
17/10/2018 54,932 44,883 0
18/10/2018 46,074 36,440 111
19/10/2018 39,338 16,615 0
20/10/2018 41,893 29,046 96
21/10/2018 42,167 52,305 920
22/10/2018 37,241 33,415 834
23/10/2018 43,483 14,849 0
24/10/2018 49,699 40,866 3,210
25/10/2018 44,197 25,229 256
26/10/2018 44,559 12,222 0
27/10/2018 40,716 22,021 0
28/10/2018 41,176 19,985 0
29/10/2018 54,502 52,000 934
30/10/2018 47,867 59,587 1,763
31/10/2018 57,377 55,955 468
TOTAL 1,219,948 808,352 35,252
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD-IV_33_SUSNER_14.4MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 383,826 112,050 4,354
02/10/2018 287,103 105,890 1,506
03/10/2018 439,532 242,410 32,320
04/10/2018 408,009 338,790 29,038
05/10/2018 408,009 136,850 0
06/10/2018 311,077 69,880 0
07/10/2018 289,591 116,430 11,638
08/10/2018 450,666 252,360 0
09/10/2018 458,431 324,950 0
10/10/2018 367,165 262,190 0
11/10/2018 576,591 796,890 146,287
12/10/2018 987,373 1,054,850 15,212
13/10/2018 753,767 711,450 9,549
14/10/2018 739,990 517,160 3,688
15/10/2018 369,467 125,690 0
16/10/2018 327,982 94,140 0
17/10/2018 513,202 349,480 520
18/10/2018 655,654 450,640 0
19/10/2018 527,832 265,590 0
20/10/2018 448,603 439,460 19,862
21/10/2018 763,984 839,910 56,720
22/10/2018 600,953 381,590 0
23/10/2018 452,242 72,170 0
24/10/2018 559,421 501,810 40,069
25/10/2018 522,448 299,450 0
26/10/2018 557,572 296,820 460
27/10/2018 687,666 602,020 18,219
28/10/2018 857,934 818,130 2,882
29/10/2018 764,665 710,710 33,712
30/10/2018 726,297 534,390 8,591
31/10/2018 28,838 67,790 5,822
TOTAL 16,225,890 11,891,940 440,449
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- INOX_200MW_SHAJAPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 70,506 79,220 0
02/10/2018 70,191 78,110 0
03/10/2018 70,738 72,380 0
04/10/2018 70,390 66,950 28
05/10/2018 66,165 78,430 639
06/10/2018 70,815 78,060 0
07/10/2018 68,806 72,730 704
08/10/2018 68,806 71,110 114
09/10/2018 68,270 77,850 0
10/10/2018 69,631 78,130 0
11/10/2018 71,600 69,950 29
12/10/2018 71,297 75,420 0
13/10/2018 71,284 77,170 0
14/10/2018 71,737 74,290 0
15/10/2018 71,872 74,290 0
16/10/2018 72,407 71,990 0
17/10/2018 71,355 72,250 0
18/10/2018 70,645 75,280 0
19/10/2018 71,514 70,450 164
20/10/2018 70,514 72,400 0
21/10/2018 70,037 76,660 0
22/10/2018 69,782 73,190 0
23/10/2018 70,997 70,400 0
24/10/2018 69,920 68,200 548
25/10/2018 69,012 76,230 30
26/10/2018 69,281 73,700 20
27/10/2018 68,574 72,840 0
28/10/2018 68,801 75,780 0
29/10/2018 70,916 77,800 0
30/10/2018 69,119 76,670 0
31/10/2018 70,109 76,820 0
TOTAL 2,175,091 2,304,750 2,276
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- UJAAS_I_S_RAJGARH_BIORA_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 72,197 79,924 0
02/10/2018 72,827 78,009 0
03/10/2018 71,924 63,937 504
04/10/2018 59,841 48,323 2,425
05/10/2018 66,093 70,385 51
06/10/2018 66,952 77,081 51
07/10/2018 76,303 74,803 0
08/10/2018 73,018 71,943 169
09/10/2018 74,666 76,281 93
10/10/2018 70,676 76,744 16
11/10/2018 67,667 71,750 149
12/10/2018 70,325 51,927 15,770
13/10/2018 71,292 74,544 0
14/10/2018 71,175 73,816 0
15/10/2018 70,755 73,466 0
16/10/2018 70,746 69,612 0
17/10/2018 69,665 70,205 134
18/10/2018 69,164 70,450 0
19/10/2018 68,880 69,983 0
20/10/2018 67,748 68,089 65
21/10/2018 66,987 72,783 6
22/10/2018 66,792 73,602 0
23/10/2018 67,026 70,637 0
24/10/2018 67,206 70,645 0
25/10/2018 67,835 73,399 0
26/10/2018 66,920 69,321 166
27/10/2018 71,074 69,815 750
28/10/2018 67,235 73,205 25
29/10/2018 70,471 72,633 0
30/10/2018 62,025 55,832 6,836
31/10/2018 73,618 73,890 0
TOTAL 2,149,103 2,187,034 27,210
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- UJAAS_33KV_BERCHA
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- MANIKARAN
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 1,217,783 1,217,797 0
02/10/2018 1,225,577 1,121,893 0
03/10/2018 1,222,280 1,062,374 4,124
04/10/2018 1,129,306 969,279 2,984
05/10/2018 1,077,602 1,116,824 3,469
06/10/2018 975,620 1,188,562 20,440
07/10/2018 1,217,783 1,075,098 36,408
08/10/2018 1,193,772 1,128,979 616
09/10/2018 1,193,772 1,163,985 0
10/10/2018 1,139,962 1,083,054 1,284
11/10/2018 1,175,395 1,017,655 1,177
12/10/2018 1,086,785 1,092,814 0
13/10/2018 1,017,148 1,110,560 1,683
14/10/2018 1,099,867 1,091,709 0
15/10/2018 1,099,867 1,108,312 0
16/10/2018 1,112,315 1,076,605 190
17/10/2018 1,076,140 1,071,377 24,627
18/10/2018 1,083,645 1,086,318 862
19/10/2018 1,072,785 1,056,227 6,940
20/10/2018 1,086,433 1,116,570 0
21/10/2018 1,061,320 1,188,003 23,231
22/10/2018 1,117,810 1,118,564 0
23/10/2018 1,192,856 1,086,781 0
24/10/2018 1,117,870 1,052,675 892
25/10/2018 1,089,840 983,582 0
26/10/2018 1,050,460 1,170,875 8,469
27/10/2018 1,089,840 1,014,995 21,835
28/10/2018 1,174,840 1,124,637 0
29/10/2018 1,022,995 1,141,666 32,175
30/10/2018 1,088,480 1,156,186 33,176
31/10/2018 1,133,090 1,176,340 0
TOTAL 34,643,238 34,170,296 224,582
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- NOT QCA APPOINTMENT
NAME OF POOLING STATION :- MANDSAUR_SOLAR_POWER_SOLAR_220_GUJARKHEDI
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 129,647 121,117 433
02/10/2018 118,836 119,546 0
03/10/2018 103,528 97,407 5,858
04/10/2018 109,277 111,296 322
05/10/2018 108,709 102,861 1,734
06/10/2018 109,803 110,015 665
07/10/2018 102,862 103,976 200
08/10/2018 83,273 95,031 3,259
09/10/2018 103,321 115,244 876
10/10/2018 106,854 100,269 1,746
11/10/2018 113,905 107,533 0
12/10/2018 106,489 100,370 167
13/10/2018 104,633 102,038 182
14/10/2018 102,855 105,863 0
15/10/2018 103,528 103,619 0
16/10/2018 108,113 101,211 202
17/10/2018 105,806 104,143 0
18/10/2018 105,289 104,593 0
19/10/2018 106,340 100,467 253
20/10/2018 104,861 107,701 0
21/10/2018 106,667 113,257 0
22/10/2018 108,884 104,412 0
23/10/2018 107,531 105,379 0
24/10/2018 108,494 104,826 69
25/10/2018 107,046 92,289 5,624
26/10/2018 100,664 107,444 1,165
27/10/2018 103,142 92,389 2,781
28/10/2018 95,798 107,392 3,818
29/10/2018 98,896 105,862 608
30/10/2018 104,068 112,373 57
31/10/2018 111,796 112,947 0
TOTAL 3,290,915 3,272,870 30,019
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- NOT QCA APPOINTMENT
NAME OF POOLING STATION :- GLOBUS_STEEL_S_SITAMAU_20MW
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 0 634 713
02/10/2018 0 554 623
03/10/2018 0 511 575
04/10/2018 0 516 581
05/10/2018 0 830 934
06/10/2018 0 301 339
07/10/2018 0 343 386
08/10/2018 0 1,261 1,419
09/10/2018 0 1,447 1,628
10/10/2018 0 1,129 1,270
11/10/2018 0 1,592 1,791
12/10/2018 0 1,943 2,186
13/10/2018 0 1,569 1,765
14/10/2018 0 537 604
15/10/2018 0 842 947
16/10/2018 0 1,132 1,274
17/10/2018 0 1,403 1,578
18/10/2018 0 3,130 3,521
19/10/2018 0 2,325 2,616
20/10/2018 0 1,090 1,226
21/10/2018 0 2,180 2,453
22/10/2018 0 576 648
23/10/2018 0 545 613
24/10/2018 0 701 789
25/10/2018 0 2,067 2,325
26/10/2018 0 10 11
27/10/2018 0 156 175
28/10/2018 0 876 985
29/10/2018 0 2,700 3,038
30/10/2018 0 3,278 3,688
31/10/2018 0 5,405 6,081
TOTAL 0 41,583 46,782
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- NOT QCA APPOINTMENT
NAME OF POOLING STATION :- WINCON_W_JAORA_11.95MW
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 284,032 255,762 0
02/10/2018 267,630 251,165 0
03/10/2018 267,630 223,253 3,180
04/10/2018 258,142 214,256 3,106
05/10/2018 255,956 254,225 0
06/10/2018 218,846 246,392 1,443
07/10/2018 217,349 221,098 9,246
08/10/2018 225,267 239,033 750
09/10/2018 241,615 250,893 626
10/10/2018 244,025 249,488 518
11/10/2018 244,025 225,355 2,786
12/10/2018 242,236 243,610 292
13/10/2018 249,133 245,985 0
14/10/2018 249,083 237,370 8
15/10/2018 249,083 236,705 12
16/10/2018 249,333 227,695 1,194
17/10/2018 248,833 231,655 12
18/10/2018 237,729 240,279 0
19/10/2018 237,729 226,119 1,262
20/10/2018 238,979 223,988 300
21/10/2018 238,979 239,633 0
22/10/2018 238,979 232,399 0
23/10/2018 238,979 225,907 0
24/10/2018 238,979 217,058 3,028
25/10/2018 238,979 241,828 0
26/10/2018 238,979 234,416 0
27/10/2018 238,979 222,103 2,394
28/10/2018 238,229 236,663 0
29/10/2018 237,974 241,858 0
30/10/2018 235,805 239,595 0
31/10/2018 236,055 239,518 0
TOTAL 7,547,571 7,315,304 30,157
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- NOT QCA APPOINTMENT
NAME OF POOLING STATION :- NTPC_RAJGARH
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 17,588 3,412 0
02/10/2018 11,656 4,529 0
03/10/2018 13,473 4,682 0
04/10/2018 30,479 27,259 7,530
05/10/2018 15,614 14,763 7,232
06/10/2018 9,485 2,259 0
07/10/2018 11,071 4,567 0
08/10/2018 14,420 13,578 0
09/10/2018 25,131 19,407 0
10/10/2018 14,261 14,722 0
11/10/2018 26,631 37,752 1,844
12/10/2018 56,550 65,545 6,696
13/10/2018 50,120 56,162 324
14/10/2018 26,496 21,501 20
15/10/2018 16,040 10,655 0
16/10/2018 18,063 9,206 89
17/10/2018 21,447 20,023 0
18/10/2018 40,787 38,968 434
19/10/2018 35,566 30,518 0
20/10/2018 24,628 17,109 0
21/10/2018 33,354 36,575 200
22/10/2018 29,566 21,573 0
23/10/2018 17,494 10,094 0
24/10/2018 22,127 12,687 0
25/10/2018 15,390 6,631 0
26/10/2018 11,610 4,333 0
27/10/2018 38,067 47,227 74
28/10/2018 56,430 59,131 1,298
29/10/2018 42,982 50,331 14
30/10/2018 36,100 40,419 253
31/10/2018 57,056 71,810 3,508
TOTAL 839,682 777,428 29,516
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- NOT QCA APPOINTMENT
NAME OF POOLING STATION :- WIND_WORLD_II_WIND_33_CHAPDA
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 12,280 29,350 243
02/10/2018 3,131 8,080 0
03/10/2018 424 75,230 60,737
04/10/2018 1,269 102,600 41,344
05/10/2018 3,254 45,980 3,330
06/10/2018 6,245 1,940 101
07/10/2018 2,889 5,700 102
08/10/2018 2,173 6,080 0
09/10/2018 11,415 81,190 16,826
10/10/2018 42,444 144,860 19,222
11/10/2018 78,472 154,790 52,512
12/10/2018 131,449 410,390 200,484
13/10/2018 125,232 220,360 59,725
14/10/2018 87,649 159,320 29,342
15/10/2018 42,178 21,100 0
16/10/2018 50,462 61,260 2,146
17/10/2018 16,238 76,400 4,865
18/10/2018 40,769 94,800 8,646
19/10/2018 11,036 47,600 772
20/10/2018 17,552 42,960 269
21/10/2018 29,874 100,140 12,101
22/10/2018 22,411 83,640 5,069
23/10/2018 16,629 29,700 166
24/10/2018 22,373 22,500 2,678
25/10/2018 14,852 7,690 0
26/10/2018 20,327 88,690 10,338
27/10/2018 33,308 222,270 55,696
28/10/2018 73,570 276,050 66,734
29/10/2018 70,392 369,600 204,610
30/10/2018 84,550 395,400 242,724
31/10/2018 118,153 490,200 269,372
TOTAL 1,193,000 3,875,870 1,370,154
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUZLON_GUJ_96.6MW_BADNAGAR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 21,558 22,475 1,595
02/10/2018 10,393 34,668 8,639
03/10/2018 11,819 37,984 3,608
04/10/2018 5,193 71,958 22,788
05/10/2018 3,919 17,693 4
06/10/2018 21,354 13,760 0
07/10/2018 18,893 15,503 20
08/10/2018 15,677 22,982 0
09/10/2018 28,973 57,903 1,872
10/10/2018 22,731 59,820 13,861
11/10/2018 33,915 152,445 41,240
12/10/2018 67,944 240,183 74,488
13/10/2018 47,350 134,847 13,550
14/10/2018 13,775 70,845 12,614
15/10/2018 3,517 13,666 0
16/10/2018 12,239 36,162 456
17/10/2018 6,511 65,994 6,244
18/10/2018 27,056 74,771 3,456
19/10/2018 17,439 45,704 1,234
20/10/2018 12,221 98,906 31,559
21/10/2018 34,592 139,295 22,464
22/10/2018 32,370 48,731 2,514
23/10/2018 16,520 13,463 0
24/10/2018 16,853 32,140 1,505
25/10/2018 13,678 56,468 5,947
26/10/2018 21,895 49,386 1,157
27/10/2018 35,908 109,756 13,842
28/10/2018 58,626 131,970 28,471
29/10/2018 53,296 181,756 58,217
30/10/2018 58,796 210,088 91,000
31/10/2018 79,004 206,930 64,716
TOTAL 824,015 2,468,252 527,061
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- KSHEMA_GHOSLA_30MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 3,051 4,773 0
02/10/2018 265 20,520 1,412
03/10/2018 3,153 22,871 412
04/10/2018 1,500 14,913 3,481
05/10/2018 7,621 16,847 2,657
06/10/2018 9,517 11,255 216
07/10/2018 2,970 12,350 141
08/10/2018 244 23,564 1,120
09/10/2018 6,791 41,678 4,114
10/10/2018 3,295 26,875 3,912
11/10/2018 15,394 59,027 16,748
12/10/2018 14,361 50,510 4,491
13/10/2018 8,780 40,486 2,992
14/10/2018 7,738 24,510 890
15/10/2018 7,842 23,881 1,005
16/10/2018 8,515 56,549 7,174
17/10/2018 11,730 41,658 2,562
18/10/2018 12,498 66,679 11,111
19/10/2018 4,348 61,699 12,867
20/10/2018 4,893 38,967 2,161
21/10/2018 15,032 81,611 21,004
22/10/2018 4,252 33,921 1,531
23/10/2018 6,510 21,630 1,333
24/10/2018 9,731 20,619 0
25/10/2018 3,259 64,676 25,540
26/10/2018 4,191 28,552 3,003
27/10/2018 15,452 17,879 536
28/10/2018 14,654 27,355 2,134
29/10/2018 19,132 86,539 34,999
30/10/2018 27,065 89,083 24,178
31/10/2018 35,217 121,994 49,771
TOTAL 289,001 1,253,471 243,495
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SHANKHESWAR_NAGRI_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 611 14,589 1,255
02/10/2018 674 6,535 100
03/10/2018 1,723 1,087 0
04/10/2018 192 9,256 3,132
05/10/2018 192 10,512 4,469
06/10/2018 1,511 5,913 0
07/10/2018 322 5,839 0
08/10/2018 327 14,646 908
09/10/2018 2,103 19,288 581
10/10/2018 5,522 25,972 1,196
11/10/2018 6,896 29,044 6,826
12/10/2018 5,752 66,381 27,300
13/10/2018 4,680 55,791 23,365
14/10/2018 569 28,230 2,433
15/10/2018 3,860 7,351 0
16/10/2018 192 10,263 0
17/10/2018 192 8,332 0
18/10/2018 1,424 22,611 58
19/10/2018 5,798 12,682 0
20/10/2018 192 2,982 0
21/10/2018 6,342 28,768 1,348
22/10/2018 1,934 20,667 552
23/10/2018 192 2,937 0
24/10/2018 1,878 3,302 0
25/10/2018 2,209 22,004 3,466
26/10/2018 1,116 7,553 166
27/10/2018 11,374 25,836 1,102
28/10/2018 10,467 33,904 1,290
29/10/2018 13,467 95,882 42,869
30/10/2018 16,265 105,913 47,296
31/10/2018 28,661 131,320 68,612
TOTAL 136,637 835,390 238,324
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUZLON_I_W_SAILANA_14.4MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 65,091 56,295 23,938
02/10/2018 61,150 53,057 31,756
03/10/2018 57,814 47,400 25,336
04/10/2018 49,817 45,253 31,628
05/10/2018 63,230 55,616 34,810
06/10/2018 62,762 52,933 31,013
07/10/2018 57,265 50,922 34,881
08/10/2018 60,458 51,142 31,267
09/10/2018 57,904 53,973 34,318
10/10/2018 51,595 53,909 43,160
11/10/2018 51,690 50,037 44,274
12/10/2018 50,951 49,801 45,451
13/10/2018 59,896 49,274 39,152
14/10/2018 58,348 48,937 37,460
15/10/2018 57,908 46,186 37,646
16/10/2018 56,020 46,686 37,200
17/10/2018 54,536 48,561 40,702
18/10/2018 51,651 44,300 31,760
19/10/2018 51,698 45,525 34,671
20/10/2018 51,380 46,837 33,438
21/10/2018 56,994 49,734 38,130
22/10/2018 58,308 46,276 38,960
23/10/2018 57,158 45,656 36,422
24/10/2018 52,695 44,333 26,552
25/10/2018 52,713 49,232 33,072
26/10/2018 54,103 49,884 31,250
27/10/2018 52,225 42,060 25,692
28/10/2018 53,968 45,728 29,135
29/10/2018 56,401 46,191 30,618
30/10/2018 56,522 47,580 31,328
31/10/2018 55,235 47,722 30,116
TOTAL 1,737,486 1,511,040 1,055,136
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- BHADRESH_SOLAR_33_10MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 63,465 78,536 1,000
02/10/2018 63,283 75,714 0
03/10/2018 60,332 61,601 2,894
04/10/2018 58,578 57,696 695
05/10/2018 57,242 71,003 320
06/10/2018 3,997 71,623 51,533
07/10/2018 15,901 58,271 41,060
08/10/2018 57,333 66,897 1,836
09/10/2018 63,589 71,760 1,852
10/10/2018 65,091 64,427 475
11/10/2018 68,363 68,412 272
12/10/2018 82,014 72,850 0
13/10/2018 82,592 74,885 0
14/10/2018 82,051 74,462 0
15/10/2018 80,504 75,192 0
16/10/2018 80,305 73,661 26
17/10/2018 73,592 63,057 3,100
18/10/2018 74,021 70,799 1,234
19/10/2018 67,203 74,016 1,667
20/10/2018 68,464 67,200 946
21/10/2018 72,273 75,555 36
22/10/2018 78,940 78,368 0
23/10/2018 78,027 74,820 0
24/10/2018 69,922 76,920 1,346
25/10/2018 73,416 73,227 178
26/10/2018 70,414 64,294 231
27/10/2018 70,769 69,675 1,522
28/10/2018 74,770 65,604 559
29/10/2018 78,388 75,959 0
30/10/2018 64,005 75,470 541
31/10/2018 74,330 75,433 0
TOTAL 2,073,174 2,197,387 113,323
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SIMCON_SOLAR_33_GANJBASODA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 4,131 2,681 0
02/10/2018 1,382 25,440 0
03/10/2018 8,161 23,620 0
04/10/2018 8,392 15,628 0
05/10/2018 7,855 32,494 2,949
06/10/2018 9,653 7,631 0
07/10/2018 4,709 18,400 0
08/10/2018 1,739 32,177 1,260
09/10/2018 17,756 97,182 9,256
10/10/2018 11,274 34,388 792
11/10/2018 16,056 55,958 333
12/10/2018 14,031 66,148 1,762
13/10/2018 10,838 44,833 752
14/10/2018 15,577 36,577 0
15/10/2018 22,125 82,461 5,423
16/10/2018 15,434 71,983 4,176
17/10/2018 24,843 126,467 17,030
18/10/2018 26,056 142,686 30,038
19/10/2018 11,991 125,396 30,949
20/10/2018 9,236 75,204 8,694
21/10/2018 35,891 127,770 30,173
22/10/2018 8,720 54,642 466
23/10/2018 8,114 37,584 1,804
24/10/2018 23,763 41,500 1,254
25/10/2018 9,002 94,351 29,830
26/10/2018 11,672 35,302 0
27/10/2018 21,987 23,680 2,840
28/10/2018 20,503 26,257 0
29/10/2018 34,439 132,272 18,622
30/10/2018 31,412 95,521 7,030
31/10/2018 59,778 173,489 32,404
TOTAL 506,520 1,959,722 237,837
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- RENEW WIND_ENERGY_MP_TWO_WIND_33_DALODA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 3,868 352 0
02/10/2018 2,521 6,419 0
03/10/2018 4,750 10,384 0
04/10/2018 1,753 17,976 0
05/10/2018 2,514 6,432 0
06/10/2018 34,883 7,907 5,187
07/10/2018 47,065 9,833 7,876
08/10/2018 10,728 4,423 0
09/10/2018 14,301 73,483 1,580
10/10/2018 33,925 90,990 17,784
11/10/2018 96,548 153,204 15,358
12/10/2018 177,921 163,051 3,932
13/10/2018 82,290 95,297 5,414
14/10/2018 41,103 27,875 0
15/10/2018 22,215 14,047 155
16/10/2018 5,147 30,875 0
17/10/2018 6,410 25,934 0
18/10/2018 12,272 13,503 0
19/10/2018 10,853 23,146 34
20/10/2018 2,391 6,720 0
21/10/2018 9,936 12,209 0
22/10/2018 18,032 87,738 9,990
23/10/2018 18,198 27,417 0
24/10/2018 5,336 9,989 0
25/10/2018 13,627 38,528 0
26/10/2018 21,991 57,060 1,052
27/10/2018 25,190 34,057 0
28/10/2018 70,210 55,434 3,638
29/10/2018 73,867 81,836 1,840
30/10/2018 80,271 104,935 13,491
31/10/2018 96,781 86,367 78
TOTAL 1,046,897 1,377,421 87,409
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- INOX_WIND_132_GUDGAON_28M
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 281 4,627 22
02/10/2018 214 328 0
03/10/2018 192 18,054 6,097
04/10/2018 190 38,683 23,520
05/10/2018 192 2,486 42
06/10/2018 192 334 0
07/10/2018 192 407 0
08/10/2018 192 1,681 0
09/10/2018 1,803 10,674 754
10/10/2018 2,319 6,390 0
11/10/2018 363 39,314 16,048
12/10/2018 3,877 42,384 4,810
13/10/2018 1,324 25,898 112
14/10/2018 192 12,184 172
15/10/2018 192 4,050 312
16/10/2018 192 29,803 5,381
17/10/2018 192 48,925 18,893
18/10/2018 1,238 45,959 13,724
19/10/2018 192 21,814 1,750
20/10/2018 227 33,234 5,022
21/10/2018 2,699 64,849 23,354
22/10/2018 192 20,432 3,552
23/10/2018 274 9,552 0
24/10/2018 192 36,467 19,628
25/10/2018 4,120 25,031 3,936
26/10/2018 2,860 7,044 0
27/10/2018 6,881 12,561 123
28/10/2018 12,420 22,889 1,097
29/10/2018 3,099 55,678 22,270
30/10/2018 1,869 67,038 29,272
31/10/2018 5,022 40,063 7,452
TOTAL 53,384 748,833 207,343
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUZLON_II_W_SUSNER_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 97,012 84,545 212
02/10/2018 92,196 78,396 2,052
03/10/2018 86,695 61,838 10,608
04/10/2018 90,731 76,235 288
05/10/2018 94,273 70,210 5,556
06/10/2018 94,052 76,365 3,682
07/10/2018 90,225 71,799 4,286
08/10/2018 86,366 65,855 6,145
09/10/2018 80,380 80,611 844
10/10/2018 82,817 69,183 1,145
11/10/2018 80,960 74,963 1,674
12/10/2018 80,514 70,128 1,262
13/10/2018 89,407 71,619 901
14/10/2018 87,337 74,479 250
15/10/2018 87,332 71,541 391
16/10/2018 85,940 70,007 904
17/10/2018 78,557 74,373 674
18/10/2018 65,623 70,941 2,137
19/10/2018 80,773 72,589 245
20/10/2018 79,999 77,140 147
21/10/2018 85,367 80,666 39
22/10/2018 86,689 74,322 126
23/10/2018 84,966 75,296 0
24/10/2018 81,516 74,731 142
25/10/2018 80,821 65,080 3,014
26/10/2018 80,319 76,354 0
27/10/2018 79,468 66,040 4,313
28/10/2018 82,884 75,865 0
29/10/2018 83,814 74,640 0
30/10/2018 84,261 78,635 0
31/10/2018 82,502 78,000 0
TOTAL 2,623,796 2,282,446 51,037
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- UJAAS_SOLAR_33KV_SITAMAU-I
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 48,244 8,203 31,797
02/10/2018 46,089 7,794 29,927
03/10/2018 44,336 6,738 29,366
04/10/2018 44,508 6,558 29,953
05/10/2018 47,440 8,151 31,318
06/10/2018 45,027 8,261 27,986
07/10/2018 44,214 7,608 29,207
08/10/2018 41,024 7,705 23,550
09/10/2018 42,501 7,956 25,298
10/10/2018 42,510 7,894 25,568
11/10/2018 42,013 7,346 25,324
12/10/2018 42,563 7,469 25,961
13/10/2018 45,012 7,421 29,083
14/10/2018 44,555 7,336 28,578
15/10/2018 44,004 7,428 27,822
16/10/2018 39,584 6,972 22,772
17/10/2018 42,867 7,173 27,041
18/10/2018 36,865 7,286 19,604
19/10/2018 39,591 7,130 23,107
20/10/2018 37,529 7,094 20,108
21/10/2018 42,403 7,514 26,103
22/10/2018 43,571 7,085 28,148
23/10/2018 42,633 5,923 28,642
24/10/2018 35,287 6,157 19,254
25/10/2018 38,319 6,754 22,700
26/10/2018 39,988 6,475 24,437
27/10/2018 36,715 6,426 19,812
28/10/2018 41,689 6,903 26,144
29/10/2018 42,440 7,124 26,728
30/10/2018 42,122 7,259 26,157
31/10/2018 41,110 7,212 24,993
TOTAL 1,306,753 224,355 806,488
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- FSWAI_BTCL_NP_SUSNER
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 18,583 17,457 22
02/10/2018 5,272 7,940 0
03/10/2018 3,324 19,569 6,333
04/10/2018 2,833 32,611 9,651
05/10/2018 2,004 11,676 1,693
06/10/2018 1,125 5,184 0
07/10/2018 3,269 7,738 0
08/10/2018 4,349 11,899 0
09/10/2018 4,136 21,270 204
10/10/2018 30,837 28,104 250
11/10/2018 39,540 48,167 408
12/10/2018 43,143 107,410 24,086
13/10/2018 23,035 49,778 10,970
14/10/2018 12,796 28,024 68
15/10/2018 2,545 6,175 0
16/10/2018 4,314 11,219 0
17/10/2018 8,194 19,690 134
18/10/2018 12,743 24,286 90
19/10/2018 12,176 18,922 0
20/10/2018 10,146 12,181 0
21/10/2018 20,301 38,392 464
22/10/2018 29,281 41,351 621
23/10/2018 15,209 21,938 176
24/10/2018 3,682 7,671 0
25/10/2018 2,414 11,570 25
26/10/2018 13,852 37,367 1,800
27/10/2018 28,960 76,176 5,163
28/10/2018 53,369 112,549 10,327
29/10/2018 43,829 97,035 13,908
30/10/2018 54,388 101,653 7,948
31/10/2018 61,440 130,895 19,352
TOTAL 571,089 1,165,897 113,693
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- DHAR_RENEWABLE_15MW_DASERA_MAIDAN
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 14,962 6,243 1,280
02/10/2018 34,442 11,229 2,594
03/10/2018 56,587 9,365 7,451
04/10/2018 44,048 16,562 6,767
05/10/2018 15,950 8,045 421
06/10/2018 25,728 2,103 2,605
07/10/2018 21,556 8,646 551
08/10/2018 24,886 19,740 1,421
09/10/2018 61,366 27,239 4,885
10/10/2018 3,942 28,919 5,432
11/10/2018 34,541 42,437 2,923
12/10/2018 56,219 44,386 1,849
13/10/2018 47,954 21,806 4,566
14/10/2018 42,014 15,835 13,321
15/10/2018 18,449 17,716 1,994
16/10/2018 27,874 52,829 7,064
17/10/2018 36,317 33,074 2,846
18/10/2018 1,070 48,487 8,913
19/10/2018 28,429 46,710 7,047
20/10/2018 77,252 27,423 13,784
21/10/2018 27,822 56,365 2,867
22/10/2018 19,645 22,585 175
23/10/2018 24,270 14,005 1,228
24/10/2018 41,251 12,089 4,091
25/10/2018 29,220 27,257 858
26/10/2018 9,341 13,568 0
27/10/2018 26,600 14,792 6,030
28/10/2018 46,890 24,039 6,542
29/10/2018 54,069 57,277 1,069
30/10/2018 48,185 55,924 9,145
31/10/2018 55,823 67,594 7,134
TOTAL 1,056,702 854,289 136,853
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- CHOKSI_ENERGY_WIND_33_RIGDOD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 156,240 141,288 0
02/10/2018 157,695 139,151 10
03/10/2018 146,585 134,229 0
04/10/2018 156,605 119,874 13,787
05/10/2018 156,362 68,097 49,622
06/10/2018 155,830 136,972 0
07/10/2018 137,448 133,497 724
08/10/2018 145,909 130,718 98
09/10/2018 148,645 129,453 202
10/10/2018 143,276 131,729 1,218
11/10/2018 136,913 127,157 0
12/10/2018 135,557 119,982 1,915
13/10/2018 146,697 120,198 3,334
14/10/2018 147,040 127,005 134
15/10/2018 145,338 130,803 0
16/10/2018 144,774 126,922 0
17/10/2018 127,125 125,597 2,517
18/10/2018 124,798 128,330 231
19/10/2018 128,958 124,198 26
20/10/2018 126,835 129,593 1,143
21/10/2018 143,643 133,629 0
22/10/2018 139,075 121,316 207
23/10/2018 135,090 123,539 0
24/10/2018 125,415 123,233 857
25/10/2018 133,441 120,616 1,829
26/10/2018 128,839 128,980 0
27/10/2018 119,776 117,233 161
28/10/2018 130,880 127,219 0
29/10/2018 132,370 120,646 0
30/10/2018 133,571 127,867 0
31/10/2018 131,826 131,104 0
TOTAL 4,322,556 3,900,175 78,015
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- 25MW_WELSPUN_RATANGARH
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 891 11,063 0
02/10/2018 5,141 18,365 0
03/10/2018 5,522 30,553 0
04/10/2018 4,297 50,815 0
05/10/2018 8,216 37,604 768
06/10/2018 20,582 14,119 0
07/10/2018 23,929 33,901 0
08/10/2018 13,387 6,986 0
09/10/2018 24,956 135,994 4,191
10/10/2018 43,755 147,520 13,007
11/10/2018 125,211 350,697 82,581
12/10/2018 235,140 404,785 23,046
13/10/2018 122,188 282,610 46,115
14/10/2018 50,340 81,301 0
15/10/2018 31,714 21,612 0
16/10/2018 16,060 48,633 0
17/10/2018 9,582 50,061 0
18/10/2018 20,486 34,132 0
19/10/2018 19,981 41,873 105
20/10/2018 1,900 13,217 0
21/10/2018 13,977 31,884 0
22/10/2018 26,806 171,732 14,814
23/10/2018 18,603 68,816 223
24/10/2018 8,671 21,493 0
25/10/2018 25,272 71,900 0
26/10/2018 30,008 114,120 1,716
27/10/2018 32,596 82,609 643
28/10/2018 104,973 158,527 13,748
29/10/2018 112,967 227,615 23,322
30/10/2018 138,278 302,145 93,071
31/10/2018 150,269 248,723 20,168
TOTAL 1,445,698 3,315,405 337,518
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- BETUL_WIND_FARM
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 192 992 0
02/10/2018 310 20,463 1,238
03/10/2018 285 28,547 14,329
04/10/2018 590 57,830 28,585
05/10/2018 1,779 13,933 131
06/10/2018 720 3,172 0
07/10/2018 288 17,326 2,100
08/10/2018 192 61,104 8,662
09/10/2018 19,618 74,819 9,704
10/10/2018 13,706 41,854 520
11/10/2018 14,716 108,983 39,368
12/10/2018 53,097 185,764 30,806
13/10/2018 31,887 135,919 26,256
14/10/2018 1,742 79,669 11,121
15/10/2018 192 32,053 4,527
16/10/2018 1,826 29,433 6,750
17/10/2018 3,344 35,214 730
18/10/2018 17,113 93,184 19,012
19/10/2018 5,298 77,376 13,940
20/10/2018 192 43,524 95
21/10/2018 10,019 149,675 71,171
22/10/2018 20,330 57,110 4,374
23/10/2018 2,559 3,888 0
24/10/2018 9,467 43,716 4,893
25/10/2018 431 19,169 0
26/10/2018 7,057 41,609 1,615
27/10/2018 18,201 102,817 16,304
28/10/2018 50,445 144,951 34,592
29/10/2018 18,156 143,734 47,764
30/10/2018 26,107 156,691 38,394
31/10/2018 72,351 231,051 85,579
TOTAL 402,210 2,235,570 522,560
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- BADONI_POWER_WIND_33_MAXI
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 518 1,553 0
02/10/2018 3,197 12,235 0
03/10/2018 5,565 21,224 0
04/10/2018 1,375 49,110 0
05/10/2018 6,061 27,653 1,354
06/10/2018 24,587 11,625 0
07/10/2018 28,642 33,230 0
08/10/2018 15,629 5,131 0
09/10/2018 31,689 89,514 232
10/10/2018 63,750 106,972 7,380
11/10/2018 186,856 288,292 68,768
12/10/2018 344,844 327,695 8,432
13/10/2018 180,072 196,511 19,306
14/10/2018 71,028 61,632 0
15/10/2018 43,229 22,580 0
16/10/2018 17,649 57,563 604
17/10/2018 9,759 39,775 0
18/10/2018 23,221 18,324 0
19/10/2018 21,853 33,087 249
20/10/2018 1,243 12,020 0
21/10/2018 15,210 27,148 0
22/10/2018 34,731 147,257 9,424
23/10/2018 22,844 38,156 0
24/10/2018 9,206 14,038 0
25/10/2018 31,355 89,374 3,660
26/10/2018 39,065 103,954 1,672
27/10/2018 43,419 71,767 0
28/10/2018 155,744 110,268 9,757
29/10/2018 165,988 178,336 6,910
30/10/2018 205,085 281,171 101,908
31/10/2018 224,308 222,255 3,166
TOTAL 2,027,722 2,699,450 242,822
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- KUKARU_DEDHPANI_50MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 2,859 13,730 556
02/10/2018 10,135 7,147 113
03/10/2018 10,143 7,084 80
04/10/2018 5,220 9,652 180
05/10/2018 17,262 23,056 7,290
06/10/2018 17,029 4,402 1,998
07/10/2018 24,663 8,771 1,675
08/10/2018 4,122 10,968 98
09/10/2018 11,068 23,398 1,477
10/10/2018 17,783 35,551 6,879
11/10/2018 31,197 43,763 8,460
12/10/2018 47,219 119,358 41,215
13/10/2018 54,315 68,695 4,605
14/10/2018 22,473 44,238 4,099
15/10/2018 11,007 12,878 843
16/10/2018 15,870 27,754 918
17/10/2018 13,365 24,040 173
18/10/2018 19,573 39,611 1,985
19/10/2018 8,949 28,909 2,241
20/10/2018 8,341 13,216 235
21/10/2018 17,402 38,409 2,582
22/10/2018 11,777 26,638 2,661
23/10/2018 7,734 10,091 128
24/10/2018 11,799 7,944 0
25/10/2018 7,531 8,936 0
26/10/2018 9,977 14,742 477
27/10/2018 18,769 43,797 1,936
28/10/2018 33,049 44,331 2,909
29/10/2018 38,650 98,271 28,933
30/10/2018 47,748 114,192 38,734
31/10/2018 56,076 145,292 54,648
TOTAL 613,105 1,118,864 218,128
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUZLON_SANDALA_I_KHACHROD_14.7MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 575 10,547 903
02/10/2018 484 5,460 13
03/10/2018 848 512 0
04/10/2018 192 4,585 377
05/10/2018 192 6,074 1,098
06/10/2018 1,557 6,629 0
07/10/2018 203 4,967 0
08/10/2018 213 14,944 791
09/10/2018 754 20,544 864
10/10/2018 3,791 21,300 680
11/10/2018 5,810 32,023 11,018
12/10/2018 4,960 51,603 17,303
13/10/2018 3,423 43,460 13,582
14/10/2018 727 16,041 188
15/10/2018 3,294 6,792 0
16/10/2018 296 12,143 0
17/10/2018 192 10,508 81
18/10/2018 1,351 27,983 319
19/10/2018 3,196 18,331 47
20/10/2018 192 4,664 0
21/10/2018 4,497 24,023 997
22/10/2018 1,860 15,668 937
23/10/2018 192 1,234 0
24/10/2018 1,800 4,282 0
25/10/2018 1,904 19,441 3,178
26/10/2018 761 6,051 67
27/10/2018 10,232 24,595 1,233
28/10/2018 9,052 31,769 2,714
29/10/2018 12,002 91,221 40,562
30/10/2018 15,153 117,261 68,881
31/10/2018 25,491 142,341 92,629
TOTAL 115,194 796,996 258,462
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUZLON_III_W_SAILANA_14.1MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 2,924 8,622 26
02/10/2018 253 22,948 1,222
03/10/2018 3,058 23,991 367
04/10/2018 1,405 19,773 6,172
05/10/2018 7,472 19,514 5,579
06/10/2018 9,298 11,119 14
07/10/2018 2,837 13,486 1
08/10/2018 242 25,949 1,654
09/10/2018 6,501 45,216 5,370
10/10/2018 3,177 27,421 3,693
11/10/2018 14,856 62,274 19,084
12/10/2018 13,832 55,763 7,266
13/10/2018 8,408 57,284 10,342
14/10/2018 7,478 30,055 1,329
15/10/2018 7,574 28,964 2,082
16/10/2018 8,335 52,184 12,859
17/10/2018 11,678 55,953 9,488
18/10/2018 12,517 85,818 25,132
19/10/2018 4,348 79,746 28,829
20/10/2018 4,893 50,208 5,831
21/10/2018 15,052 86,671 28,421
22/10/2018 4,260 35,795 2,858
23/10/2018 6,515 30,521 6,474
24/10/2018 9,734 22,798 170
25/10/2018 3,261 71,722 36,016
26/10/2018 4,190 22,189 850
27/10/2018 15,460 19,321 600
28/10/2018 14,663 31,536 4,452
29/10/2018 19,156 112,763 57,078
30/10/2018 27,073 90,869 27,252
31/10/2018 35,256 134,370 69,807
TOTAL 285,706 1,434,843 380,318
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SHANKHESWAR_DHAMNAR_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 281 4,684 22
02/10/2018 214 417 0
03/10/2018 192 18,495 5,900
04/10/2018 190 47,862 31,531
05/10/2018 192 2,571 14
06/10/2018 192 664 0
07/10/2018 192 382 0
08/10/2018 192 2,492 48
09/10/2018 1,803 11,709 1,225
10/10/2018 2,319 5,895 0
11/10/2018 363 44,126 21,208
12/10/2018 3,877 53,642 10,392
13/10/2018 1,324 35,764 1,546
14/10/2018 192 17,350 990
15/10/2018 192 3,549 6
16/10/2018 192 39,524 12,077
17/10/2018 192 64,183 36,306
18/10/2018 1,238 56,888 26,824
19/10/2018 192 29,551 5,625
20/10/2018 227 36,327 7,793
21/10/2018 2,699 78,209 39,910
22/10/2018 192 23,081 5,024
23/10/2018 274 14,910 244
24/10/2018 192 46,649 29,192
25/10/2018 4,120 21,734 2,710
26/10/2018 2,860 7,317 0
27/10/2018 6,881 13,334 104
28/10/2018 12,420 27,901 3,334
29/10/2018 3,099 67,995 31,447
30/10/2018 1,869 82,306 44,558
31/10/2018 5,022 56,050 19,812
TOTAL 53,384 915,561 337,842
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUZLON_I_W_SUSNER_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 1,898 9,643 54
02/10/2018 1,425 4,914 0
03/10/2018 2,901 40,856 4,882
04/10/2018 294 45,634 15,234
05/10/2018 2,903 23,212 854
06/10/2018 2,764 8,046 0
07/10/2018 2,948 13,248 0
08/10/2018 4,332 58,469 5,370
09/10/2018 21,021 72,707 3,200
10/10/2018 15,915 30,290 240
11/10/2018 17,688 65,616 11,340
12/10/2018 42,361 120,074 14,907
13/10/2018 25,439 102,298 13,094
14/10/2018 6,934 96,009 23,320
15/10/2018 946 18,792 0
16/10/2018 1,523 21,646 970
17/10/2018 4,262 38,311 230
18/10/2018 16,495 52,738 742
19/10/2018 5,865 43,370 98
20/10/2018 1,040 52,941 2,414
21/10/2018 9,187 87,559 18,239
22/10/2018 15,632 55,917 1,981
23/10/2018 4,841 9,636 0
24/10/2018 5,508 44,633 9,668
25/10/2018 887 44,800 940
26/10/2018 10,230 36,002 838
27/10/2018 18,310 74,678 3,746
28/10/2018 32,321 105,637 13,008
29/10/2018 18,301 108,271 21,154
30/10/2018 22,460 125,978 20,508
31/10/2018 43,505 179,230 50,686
TOTAL 360,136 1,791,155 237,717
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUDHEER_30MW_BERCHHA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 5,030 17,493 7,907
02/10/2018 772 22,218 2,334
03/10/2018 2,340 17,849 344
04/10/2018 3,416 22,833 5,908
05/10/2018 6,662 20,888 4,059
06/10/2018 8,201 14,013 800
07/10/2018 3,875 11,919 24
08/10/2018 1,329 18,482 404
09/10/2018 2,641 36,379 4,230
10/10/2018 2,831 19,326 814
11/10/2018 12,802 59,555 18,996
12/10/2018 12,177 57,130 10,820
13/10/2018 9,431 64,832 17,668
14/10/2018 6,547 29,414 1,331
15/10/2018 5,690 23,287 1,594
16/10/2018 7,894 63,813 10,995
17/10/2018 10,354 51,295 6,924
18/10/2018 7,320 68,523 15,704
19/10/2018 2,848 69,946 20,135
20/10/2018 3,489 42,557 2,979
21/10/2018 15,890 68,011 17,849
22/10/2018 5,745 29,945 1,264
23/10/2018 6,488 28,806 6,802
24/10/2018 8,754 14,532 0
25/10/2018 2,995 62,806 24,445
26/10/2018 4,501 20,171 125
27/10/2018 20,627 17,152 270
28/10/2018 18,835 28,400 2,599
29/10/2018 20,843 106,667 54,371
30/10/2018 27,658 91,128 26,747
31/10/2018 38,331 100,441 36,137
TOTAL 286,316 1,299,811 304,579
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- GIRIRAJ_AFJALPUR_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 5,364 10,733 331
02/10/2018 862 17,742 740
03/10/2018 2,487 18,699 502
04/10/2018 3,692 22,878 6,800
05/10/2018 6,932 12,170 164
06/10/2018 8,504 7,356 0
07/10/2018 4,192 12,379 5
08/10/2018 1,424 25,072 621
09/10/2018 2,942 33,211 1,544
10/10/2018 3,077 30,039 5,420
11/10/2018 13,683 48,183 7,054
12/10/2018 13,011 50,849 4,982
13/10/2018 10,065 31,400 1,627
14/10/2018 6,963 24,744 966
15/10/2018 6,044 24,263 1,095
16/10/2018 8,253 57,658 11,226
17/10/2018 10,919 48,391 7,068
18/10/2018 7,979 77,341 23,754
19/10/2018 3,151 67,271 18,201
20/10/2018 3,738 40,833 4,056
21/10/2018 16,619 75,728 18,660
22/10/2018 5,918 29,569 1,104
23/10/2018 6,680 27,550 2,642
24/10/2018 9,265 19,127 402
25/10/2018 3,092 56,543 25,274
26/10/2018 4,679 19,592 264
27/10/2018 21,321 15,779 980
28/10/2018 19,571 35,469 7,258
29/10/2018 21,789 87,912 31,119
30/10/2018 28,994 88,699 26,174
31/10/2018 40,087 102,432 35,378
TOTAL 301,297 1,219,612 245,411
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- GIRIRAJ_MANDVI_15MW
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 16,865 5,002 9
02/10/2018 19,195 445 0
03/10/2018 21,661 18,486 4,616
04/10/2018 19,384 25,524 7,764
05/10/2018 17,702 226 0
06/10/2018 18,053 533 0
07/10/2018 17,969 789 0
08/10/2018 19,693 539 0
09/10/2018 16,174 8,725 313
10/10/2018 15,976 5,866 0
11/10/2018 14,266 33,322 9,476
12/10/2018 13,435 40,760 2,372
13/10/2018 15,247 20,216 191
14/10/2018 17,708 8,576 0
15/10/2018 19,618 4,587 0
16/10/2018 21,221 19,957 1,456
17/10/2018 19,526 40,651 6,237
18/10/2018 13,242 42,686 8,369
19/10/2018 18,412 11,406 164
20/10/2018 20,262 32,918 3,918
21/10/2018 13,942 59,147 11,143
22/10/2018 14,534 20,614 556
23/10/2018 17,118 2,267 0
24/10/2018 21,751 37,991 20,168
25/10/2018 16,701 20,314 605
26/10/2018 13,887 9,200 0
27/10/2018 15,612 17,864 150
28/10/2018 16,787 24,263 4,158
29/10/2018 10,712 49,659 24,445
30/10/2018 9,729 67,127 30,952
31/10/2018 7,659 28,389 1,193
TOTAL 514,041 658,049 138,255
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUZLON_IV_W_AGAR_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 7,405 13,030 60
02/10/2018 1,784 3,050 0
03/10/2018 291 32,420 19,088
04/10/2018 818 50,900 18,744
05/10/2018 2,046 22,070 2,029
06/10/2018 3,694 260 0
07/10/2018 1,844 3,010 0
08/10/2018 1,410 3,150 0
09/10/2018 7,341 44,010 10,516
10/10/2018 15,743 69,840 12,090
11/10/2018 17,359 78,640 37,969
12/10/2018 28,826 207,320 133,452
13/10/2018 13,191 104,060 49,340
14/10/2018 13,017 75,820 21,825
15/10/2018 4,166 9,720 0
16/10/2018 7,402 29,990 1,434
17/10/2018 3,068 37,180 2,431
18/10/2018 6,128 42,350 3,338
19/10/2018 4,466 21,100 576
20/10/2018 5,751 19,750 112
21/10/2018 14,218 45,370 3,919
22/10/2018 10,254 40,710 2,128
23/10/2018 5,146 12,860 15
24/10/2018 6,794 9,260 422
25/10/2018 907 3,430 0
26/10/2018 9,938 43,670 6,639
27/10/2018 17,300 112,620 25,598
28/10/2018 47,838 141,660 25,024
29/10/2018 43,000 183,850 88,350
30/10/2018 52,305 205,800 111,288
31/10/2018 63,095 242,440 138,642
TOTAL 416,545 1,909,340 715,029
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SARJAN_25.2MW_BADNAGAR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/10/2018 3,413 12,625 405
02/10/2018 8,705 8,388 70
03/10/2018 3,813 10,460 496
04/10/2018 247 39,708 18,038
05/10/2018 257 20,685 2,207
06/10/2018 14,565 2,572 0
07/10/2018 11,253 3,035 0
08/10/2018 1,132 16,206 954
09/10/2018 7,761 47,490 4,995
10/10/2018 7,255 57,635 21,921
11/10/2018 26,671 65,996 18,001
12/10/2018 36,578 110,441 21,485
13/10/2018 22,452 75,562 8,121
14/10/2018 10,509 55,418 6,418
15/10/2018 6,292 15,249 1,014
16/10/2018 12,738 53,073 4,926
17/10/2018 11,156 61,450 9,564
18/10/2018 20,236 81,288 17,842
19/10/2018 6,241 54,566 8,130
20/10/2018 7,416 40,343 2,608
21/10/2018 16,825 85,369 15,562
22/10/2018 8,040 36,850 3,172
23/10/2018 8,371 29,590 909
24/10/2018 9,755 28,077 3,474
25/10/2018 6,474 16,364 0
26/10/2018 7,585 36,563 3,342
27/10/2018 15,351 52,250 1,946
28/10/2018 27,003 70,520 10,059
29/10/2018 29,600 121,441 52,397
30/10/2018 35,774 154,487 81,385
31/10/2018 42,771 158,905 79,284
TOTAL 426,239 1,622,606 398,725
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- RENEW_WIND_AP4_30MW_KHACHROD
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018

More Related Content

Similar to MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018

Msedcl aar 2018-19
Msedcl aar 2018-19Msedcl aar 2018-19
Msedcl aar 2018-19ZahidManiyar
 
GSM Besed prepaid energy meter
GSM Besed prepaid energy meterGSM Besed prepaid energy meter
GSM Besed prepaid energy meterGovil sharma
 
New grid connected solar photo voltaic power projects 500 mw capacity under...
New grid connected solar photo voltaic power projects 500   mw capacity under...New grid connected solar photo voltaic power projects 500   mw capacity under...
New grid connected solar photo voltaic power projects 500 mw capacity under...ank_
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012Bakul Haria
 
LPM of Safe Solar Power.pdf
LPM of Safe Solar Power.pdfLPM of Safe Solar Power.pdf
LPM of Safe Solar Power.pdfssuser62f0b5
 
CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..Keshari Mishra
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabHeadway Solar
 
Dual Axis Solar Tracker Using Microcontroller
Dual Axis Solar Tracker Using MicrocontrollerDual Axis Solar Tracker Using Microcontroller
Dual Axis Solar Tracker Using MicrocontrollerIRJET Journal
 
Resume for Electrical design engineer
Resume for Electrical design engineerResume for Electrical design engineer
Resume for Electrical design engineerNISHITKUMAR JOSHI
 
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen Ozukum
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen OzukumWORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen Ozukum
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen OzukumIPPAI
 
Optimization towards cost effective solar mini grids in bangladesh
Optimization towards cost effective solar mini grids in bangladeshOptimization towards cost effective solar mini grids in bangladesh
Optimization towards cost effective solar mini grids in bangladeshDipta Majumder
 
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...Sayanti Sanyal
 
Forecasting commercial services from S2M - Juan Liria (Sun2Market)
Forecasting commercial services from S2M - Juan Liria (Sun2Market)Forecasting commercial services from S2M - Juan Liria (Sun2Market)
Forecasting commercial services from S2M - Juan Liria (Sun2Market)IrSOLaV Pomares
 
EFFICACY OF NET METER IN ACE SOLAR POWER PLANT
EFFICACY OF NET METER IN ACE SOLAR POWER PLANTEFFICACY OF NET METER IN ACE SOLAR POWER PLANT
EFFICACY OF NET METER IN ACE SOLAR POWER PLANTIRJET Journal
 
O&M and Troubleshooting Hydro Power Plants
O&M and Troubleshooting Hydro Power PlantsO&M and Troubleshooting Hydro Power Plants
O&M and Troubleshooting Hydro Power PlantsMarcep Inc.
 

Similar to MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018 (20)

Msedcl aar 2018-19
Msedcl aar 2018-19Msedcl aar 2018-19
Msedcl aar 2018-19
 
GSM Besed prepaid energy meter
GSM Besed prepaid energy meterGSM Besed prepaid energy meter
GSM Besed prepaid energy meter
 
New grid connected solar photo voltaic power projects 500 mw capacity under...
New grid connected solar photo voltaic power projects 500   mw capacity under...New grid connected solar photo voltaic power projects 500   mw capacity under...
New grid connected solar photo voltaic power projects 500 mw capacity under...
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
 
Company profile
Company profileCompany profile
Company profile
 
LPM of Safe Solar Power.pdf
LPM of Safe Solar Power.pdfLPM of Safe Solar Power.pdf
LPM of Safe Solar Power.pdf
 
CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in Punjab
 
Report its
Report itsReport its
Report its
 
Dual Axis Solar Tracker Using Microcontroller
Dual Axis Solar Tracker Using MicrocontrollerDual Axis Solar Tracker Using Microcontroller
Dual Axis Solar Tracker Using Microcontroller
 
Resume for Electrical design engineer
Resume for Electrical design engineerResume for Electrical design engineer
Resume for Electrical design engineer
 
Tata Power-DDL Transforming Lives !
Tata Power-DDL Transforming Lives !Tata Power-DDL Transforming Lives !
Tata Power-DDL Transforming Lives !
 
Resume-Smita
Resume-SmitaResume-Smita
Resume-Smita
 
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen Ozukum
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen OzukumWORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen Ozukum
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen Ozukum
 
Optimization towards cost effective solar mini grids in bangladesh
Optimization towards cost effective solar mini grids in bangladeshOptimization towards cost effective solar mini grids in bangladesh
Optimization towards cost effective solar mini grids in bangladesh
 
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
 
Forecasting commercial services from S2M - Juan Liria (Sun2Market)
Forecasting commercial services from S2M - Juan Liria (Sun2Market)Forecasting commercial services from S2M - Juan Liria (Sun2Market)
Forecasting commercial services from S2M - Juan Liria (Sun2Market)
 
EFFICACY OF NET METER IN ACE SOLAR POWER PLANT
EFFICACY OF NET METER IN ACE SOLAR POWER PLANTEFFICACY OF NET METER IN ACE SOLAR POWER PLANT
EFFICACY OF NET METER IN ACE SOLAR POWER PLANT
 
Cesc limited
Cesc limitedCesc limited
Cesc limited
 
O&M and Troubleshooting Hydro Power Plants
O&M and Troubleshooting Hydro Power PlantsO&M and Troubleshooting Hydro Power Plants
O&M and Troubleshooting Hydro Power Plants
 

More from Das A. K.

Rajasthan SLDC - RE DSM Statement -Jan 2020
Rajasthan SLDC - RE DSM Statement -Jan 2020Rajasthan SLDC - RE DSM Statement -Jan 2020
Rajasthan SLDC - RE DSM Statement -Jan 2020Das A. K.
 
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019Das A. K.
 
Rajasthan SLDC - RE DSM Statement -July 2019
Rajasthan SLDC - RE DSM Statement -July 2019Rajasthan SLDC - RE DSM Statement -July 2019
Rajasthan SLDC - RE DSM Statement -July 2019Das A. K.
 
Rajasthan DSM April 2019
Rajasthan DSM April 2019Rajasthan DSM April 2019
Rajasthan DSM April 2019Das A. K.
 
Rajasthan DSM May 2019
Rajasthan DSM May 2019Rajasthan DSM May 2019
Rajasthan DSM May 2019Das A. K.
 
Rajasthan DSM June 2019
Rajasthan DSM June 2019Rajasthan DSM June 2019
Rajasthan DSM June 2019Das A. K.
 
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...Das A. K.
 
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...Das A. K.
 
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...Das A. K.
 
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 ...
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT  FOR THE WEEK  29-Jul-2019 ...Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT  FOR THE WEEK  29-Jul-2019 ...
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 ...Das A. K.
 
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...Das A. K.
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...Das A. K.
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...Das A. K.
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...Das A. K.
 
Reply to reconnect's defamation notice - One can love it or hate it, but we r...
Reply to reconnect's defamation notice - One can love it or hate it, but we r...Reply to reconnect's defamation notice - One can love it or hate it, but we r...
Reply to reconnect's defamation notice - One can love it or hate it, but we r...Das A. K.
 
normalized parametric model for wind turbine power curve
normalized parametric model for wind turbine power curvenormalized parametric model for wind turbine power curve
normalized parametric model for wind turbine power curveDas A. K.
 
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....Das A. K.
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...Das A. K.
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)Das A. K.
 
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)Das A. K.
 

More from Das A. K. (20)

Rajasthan SLDC - RE DSM Statement -Jan 2020
Rajasthan SLDC - RE DSM Statement -Jan 2020Rajasthan SLDC - RE DSM Statement -Jan 2020
Rajasthan SLDC - RE DSM Statement -Jan 2020
 
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
 
Rajasthan SLDC - RE DSM Statement -July 2019
Rajasthan SLDC - RE DSM Statement -July 2019Rajasthan SLDC - RE DSM Statement -July 2019
Rajasthan SLDC - RE DSM Statement -July 2019
 
Rajasthan DSM April 2019
Rajasthan DSM April 2019Rajasthan DSM April 2019
Rajasthan DSM April 2019
 
Rajasthan DSM May 2019
Rajasthan DSM May 2019Rajasthan DSM May 2019
Rajasthan DSM May 2019
 
Rajasthan DSM June 2019
Rajasthan DSM June 2019Rajasthan DSM June 2019
Rajasthan DSM June 2019
 
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
 
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
 
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
 
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 ...
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT  FOR THE WEEK  29-Jul-2019 ...Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT  FOR THE WEEK  29-Jul-2019 ...
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 ...
 
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
 
Reply to reconnect's defamation notice - One can love it or hate it, but we r...
Reply to reconnect's defamation notice - One can love it or hate it, but we r...Reply to reconnect's defamation notice - One can love it or hate it, but we r...
Reply to reconnect's defamation notice - One can love it or hate it, but we r...
 
normalized parametric model for wind turbine power curve
normalized parametric model for wind turbine power curvenormalized parametric model for wind turbine power curve
normalized parametric model for wind turbine power curve
 
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
 
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
 

Recently uploaded

如何办理(UoM毕业证书)曼彻斯特大学毕业证学位证书
如何办理(UoM毕业证书)曼彻斯特大学毕业证学位证书如何办理(UoM毕业证书)曼彻斯特大学毕业证学位证书
如何办理(UoM毕业证书)曼彻斯特大学毕业证学位证书srst S
 
Good Governance Practices for protection of Human Rights (Discuss Transparen...
Good Governance Practices for protection  of Human Rights (Discuss Transparen...Good Governance Practices for protection  of Human Rights (Discuss Transparen...
Good Governance Practices for protection of Human Rights (Discuss Transparen...shubhuc963
 
如何办理提赛德大学毕业证(本硕)Teesside学位证书
如何办理提赛德大学毕业证(本硕)Teesside学位证书如何办理提赛德大学毕业证(本硕)Teesside学位证书
如何办理提赛德大学毕业证(本硕)Teesside学位证书Fir L
 
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTSVIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTSDr. Oliver Massmann
 
Arbitration, mediation and conciliation in India
Arbitration, mediation and conciliation in IndiaArbitration, mediation and conciliation in India
Arbitration, mediation and conciliation in IndiaNafiaNazim
 
如何办理密德萨斯大学毕业证(本硕)Middlesex学位证书
如何办理密德萨斯大学毕业证(本硕)Middlesex学位证书如何办理密德萨斯大学毕业证(本硕)Middlesex学位证书
如何办理密德萨斯大学毕业证(本硕)Middlesex学位证书FS LS
 
定制(BU文凭证书)美国波士顿大学毕业证成绩单原版一比一
定制(BU文凭证书)美国波士顿大学毕业证成绩单原版一比一定制(BU文凭证书)美国波士顿大学毕业证成绩单原版一比一
定制(BU文凭证书)美国波士顿大学毕业证成绩单原版一比一st Las
 
如何办理(CQU毕业证书)中央昆士兰大学毕业证学位证书
如何办理(CQU毕业证书)中央昆士兰大学毕业证学位证书如何办理(CQU毕业证书)中央昆士兰大学毕业证学位证书
如何办理(CQU毕业证书)中央昆士兰大学毕业证学位证书SD DS
 
Key Factors That Influence Property Tax Rates
Key Factors That Influence Property Tax RatesKey Factors That Influence Property Tax Rates
Key Factors That Influence Property Tax RatesHome Tax Saver
 
POLICE ACT, 1861 the details about police system.pptx
POLICE ACT, 1861 the details about police system.pptxPOLICE ACT, 1861 the details about police system.pptx
POLICE ACT, 1861 the details about police system.pptxAbhishekchatterjee248859
 
如何办理美国波士顿大学(BU)毕业证学位证书
如何办理美国波士顿大学(BU)毕业证学位证书如何办理美国波士顿大学(BU)毕业证学位证书
如何办理美国波士顿大学(BU)毕业证学位证书Fir L
 
昆士兰科技大学毕业证学位证成绩单-补办步骤澳洲毕业证书
昆士兰科技大学毕业证学位证成绩单-补办步骤澳洲毕业证书昆士兰科技大学毕业证学位证成绩单-补办步骤澳洲毕业证书
昆士兰科技大学毕业证学位证成绩单-补办步骤澳洲毕业证书1k98h0e1
 
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...Dr. Oliver Massmann
 
Comparison of GenAI benchmarking models for legal use cases
Comparison of GenAI benchmarking models for legal use casesComparison of GenAI benchmarking models for legal use cases
Comparison of GenAI benchmarking models for legal use casesritwikv20
 
Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝soniya singh
 
如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书
如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书
如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书Fs Las
 
Special Accounting Areas - Hire purchase agreement
Special Accounting Areas - Hire purchase agreementSpecial Accounting Areas - Hire purchase agreement
Special Accounting Areas - Hire purchase agreementShubhiSharma858417
 
John Hustaix - The Legal Profession: A History
John Hustaix - The Legal Profession:  A HistoryJohn Hustaix - The Legal Profession:  A History
John Hustaix - The Legal Profession: A HistoryJohn Hustaix
 
如何办理(ISU毕业证书)爱荷华州立大学毕业证学位证书
如何办理(ISU毕业证书)爱荷华州立大学毕业证学位证书如何办理(ISU毕业证书)爱荷华州立大学毕业证学位证书
如何办理(ISU毕业证书)爱荷华州立大学毕业证学位证书SD DS
 

Recently uploaded (20)

如何办理(UoM毕业证书)曼彻斯特大学毕业证学位证书
如何办理(UoM毕业证书)曼彻斯特大学毕业证学位证书如何办理(UoM毕业证书)曼彻斯特大学毕业证学位证书
如何办理(UoM毕业证书)曼彻斯特大学毕业证学位证书
 
Good Governance Practices for protection of Human Rights (Discuss Transparen...
Good Governance Practices for protection  of Human Rights (Discuss Transparen...Good Governance Practices for protection  of Human Rights (Discuss Transparen...
Good Governance Practices for protection of Human Rights (Discuss Transparen...
 
young Call Girls in Pusa Road🔝 9953330565 🔝 escort Service
young Call Girls in  Pusa Road🔝 9953330565 🔝 escort Serviceyoung Call Girls in  Pusa Road🔝 9953330565 🔝 escort Service
young Call Girls in Pusa Road🔝 9953330565 🔝 escort Service
 
如何办理提赛德大学毕业证(本硕)Teesside学位证书
如何办理提赛德大学毕业证(本硕)Teesside学位证书如何办理提赛德大学毕业证(本硕)Teesside学位证书
如何办理提赛德大学毕业证(本硕)Teesside学位证书
 
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTSVIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
 
Arbitration, mediation and conciliation in India
Arbitration, mediation and conciliation in IndiaArbitration, mediation and conciliation in India
Arbitration, mediation and conciliation in India
 
如何办理密德萨斯大学毕业证(本硕)Middlesex学位证书
如何办理密德萨斯大学毕业证(本硕)Middlesex学位证书如何办理密德萨斯大学毕业证(本硕)Middlesex学位证书
如何办理密德萨斯大学毕业证(本硕)Middlesex学位证书
 
定制(BU文凭证书)美国波士顿大学毕业证成绩单原版一比一
定制(BU文凭证书)美国波士顿大学毕业证成绩单原版一比一定制(BU文凭证书)美国波士顿大学毕业证成绩单原版一比一
定制(BU文凭证书)美国波士顿大学毕业证成绩单原版一比一
 
如何办理(CQU毕业证书)中央昆士兰大学毕业证学位证书
如何办理(CQU毕业证书)中央昆士兰大学毕业证学位证书如何办理(CQU毕业证书)中央昆士兰大学毕业证学位证书
如何办理(CQU毕业证书)中央昆士兰大学毕业证学位证书
 
Key Factors That Influence Property Tax Rates
Key Factors That Influence Property Tax RatesKey Factors That Influence Property Tax Rates
Key Factors That Influence Property Tax Rates
 
POLICE ACT, 1861 the details about police system.pptx
POLICE ACT, 1861 the details about police system.pptxPOLICE ACT, 1861 the details about police system.pptx
POLICE ACT, 1861 the details about police system.pptx
 
如何办理美国波士顿大学(BU)毕业证学位证书
如何办理美国波士顿大学(BU)毕业证学位证书如何办理美国波士顿大学(BU)毕业证学位证书
如何办理美国波士顿大学(BU)毕业证学位证书
 
昆士兰科技大学毕业证学位证成绩单-补办步骤澳洲毕业证书
昆士兰科技大学毕业证学位证成绩单-补办步骤澳洲毕业证书昆士兰科技大学毕业证学位证成绩单-补办步骤澳洲毕业证书
昆士兰科技大学毕业证学位证成绩单-补办步骤澳洲毕业证书
 
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
 
Comparison of GenAI benchmarking models for legal use cases
Comparison of GenAI benchmarking models for legal use casesComparison of GenAI benchmarking models for legal use cases
Comparison of GenAI benchmarking models for legal use cases
 
Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝
 
如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书
如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书
如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书
 
Special Accounting Areas - Hire purchase agreement
Special Accounting Areas - Hire purchase agreementSpecial Accounting Areas - Hire purchase agreement
Special Accounting Areas - Hire purchase agreement
 
John Hustaix - The Legal Profession: A History
John Hustaix - The Legal Profession:  A HistoryJohn Hustaix - The Legal Profession:  A History
John Hustaix - The Legal Profession: A History
 
如何办理(ISU毕业证书)爱荷华州立大学毕业证学位证书
如何办理(ISU毕业证书)爱荷华州立大学毕业证学位证书如何办理(ISU毕业证书)爱荷华州立大学毕业证学位证书
如何办理(ISU毕业证书)爱荷华州立大学毕业证学位证书
 

MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of October, 2018

  • 1. MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED vkbZ ,l vks : 9001-2008 ISO: 9001-2008 CIN-U40109MP2001SGC014880, Email-mdtransco.nic.in STATE LOAD DESPATCH CENTRE, Nayagaon, Rampur, Jabalpur Telephone: (0761) 2970089 Fax: (0761) 2664343 e-mail sldcmpjbp@gmail.com No.07-05/REG-201/W&S-DSM/299 Jabalpur, dtd:-06/02/2019 As Per Distibrution List Sub: DSM Account of Wind and Solar Pooling Stations for the month of October, 2018 on the basis of MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating Stations) Regulations, 2018. In pursuance to MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating Stations) Regulations, 2018, SLDC has prepared the DSM Account of Wind Pooling Stations having combined installed capacity of 10MW and above and Solar Pooling Stations with an installed capacity of 5MW and above including Wind and Solar Pooling Stations selling InterState and having combined installed capcity less than 10MW and 5 MW. The ABT meter data of the following Pooling Stations has not been received by SLDC neither through AMR nor through mail from concerned Discoms, despite repeated persuance. As such, the actual generation was replaced with scheduled generation and accordingly the Deviation Charges of the Pooling Stations are computed by SLDC during the period of monthly and partially missing data. A) Monthly Missing data of Pooling Stations: i. 14.99MW Ujjas-I Susner. B) Partial missing data of the Pooling stations: i. 11.5MW M/S Sai Subari Makdon (25st to 31th Octomber 2018). ii. 30MW M/S Clean solar Alot- I&II (29th October 2018). iii. 10MW M/S Marut Shakti Chandwasa (16th October 2018). iv. 14.97MW M/S Ujjas-I Agar (26th & 27th October 2018). The Generators / Developers / QCA of the following Pooling stations have not furnished the Forecasting and Availability data for the month of October 2018 to the SLDC. As such, SLDC has computed the Deviation Charges of these Pooling Stations considering the Availability and Schedules as “Zero”. i. 10MW Designco Manufacturer & Exporter (1St Octomber 2018 to 18th September 20180. ii. 15MW MP Wind Nagda Hill Dewas. The Generators of the following Pooling stations have not appoitment QCA, therefore the DSM account is issued to the Developers / Generators for settlement of deviaton charges – i. 50MW NTPC Ltd. Rajgarh. ii. 250MW Mandhsaur Solar PV Power Project (Gujarkhedi). iii. 15.2MW Enercon (I) Ltd. - II RatediHill, Bagli. iv. 11.95MW Wincom Jaroa. v. 20MW Globus Steel Power Project. vi. 4MW Ramesh Steels. It is observed that some of the ABT meters installed at the pooling station are not time synchronized; SLDC has taken up the matter with the Generators / QCA for time synchronization. Some Generators / QCA have intimated that they have taken up the matter with meter manufacturer for time time synchronization; meanwhile they have also furnished the time sync data, the time sync data furnished by the QCA / Generators has been considered for computation of Deviation Charges. However, Generators / Developers / QCA of the the following pooling stations have neither responded to SLDC request not furnished the time sync data, as such, the data recorded in the meters have been considered to compute Deviation Charges. - 1 -
  • 2. Sr.No. FEEDER NAME LOCATION NAME LOCATION VOLTAGE LEVEL METER No. QCA NAME 1 33KV BHADRESH SUSNER 132KV S/S SUSNER Grid S/s End 33 XB593639 REConnect 2 33KV UJAAS-1 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59595 REConnect 3 33KV UJAAS-2 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59596 REConnect The ABT meters installed at the following Solar Generating Stations are recording 15 minutes block wise data on sliding window principal instead of load survey, thus, blockwise data does not match with midnight data recorded by the meters. The midnight values are correct; this has been confirmed by M/s Secure Meters Ltd. As such, the monthly midnight data has been distributed in 15 minutes time block as per injection pattern of solar generation and accordingly the Deviation Charges have been computed. i. 5MW Designco Manufacturer & Exporter connected at 132KV S/s Arniyakala. ii. 12MW Avenger solar pvt Ltd. connected at 132KV S/s Suwasara. As per Clause 9.0 of MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating Stations) Regulations, 2018, payment to the DSM Account shall be made within 10 days from the date of issue of this statement. DSM Payments are to be made on the basis of this account only and no further invoicing is required by SLDC. Payment received after 12 days shall attract simple interest @ 0.04% for each day of delay. SLDC shall pay to the entities entitled to receive payment on account of Deviation Charges within 2 working days of receipt of the payments in the “State Deviation Pool Account”. The settlement of Deviation Charges shall be done through State Pool Account maintained by SLDC. The bank account details are as under: 1. Name of the Bank - BANK OF INDIA 2. Branch - CIVIL LINES BRANCH JABALPUR. 3. Title of the Account - MPPTCL SLDC DSM A/C 4. Bank account No - 940220110000263 5. IFS Code - BKID0009402 6. Branch Code - 9402 7. Type of Account - Current Account. All QCA’s / Generators are requested to pay the Deviation Charges to the above State Pool Account maintained by SLDC. The signed copy of the above DSM account alongwith block-wise details are being sent through email. The DSM account shall be also be made available on SLDC website www.sldcmpindia.com shortly for downloading by QCA. The verification, if required, can be done at SLDC. All the QCA’s / Generators are requested to check and verify the State DSM Account and intimate the discrepancies observed if any within a period of 15 days. Chief Engineer (LD) SLDC MPPTCL, Jabalpur - 2 -
  • 3. - 3 - Distribution List 1. The Chief General Manager (Comml-3), Regional Office, MPPMCL, E-4, Arera Colony, Prakash Parisar, Near Bhojpur Club, Bhopal-462016, M.P. Jabalpur. Email – rajeevkeskar@gmail.com 2. The Chief General Manager (Comml.), MPMKVVCL, Govindpura, Bhopal, Email-ce.commercial@mpmkvvc.com, 3. The Chief Engineer (Comml.), MPPaKVVCL, GPH Compound, Polo Ground, Indore, Email- cecomwz@gmail.com, 4. The Chief Financial Officer, MPPTCL, Jabalpur. 5. The Suptdg Engineer (MT-1), Corporate Office, M.P. Pashchim Kshetra Vidyut Vitaran Co. Ltd., GPH Compound, Polo Ground, Indore. Email-achal.jain@mpwz.co.in 6. The General Manager (Comml.-III), O/o MD (CZ) MPMKVVCL, Nistha Parisar., MPMKVVCL, Govindpura, Bhopal, Email-khanooja@gmail.com, mpczc3@gmail.com 7. M/s Malwa Solar Power Generation Pvt Ltd. 4th Floor, Dr. Gopaldas Bhawan, 28, Barakhamba Road, Cannaught Place, New Delhi – 110001, Fax: 0124-4716120. India. Email:keshav.prasad@ilfsindia.com, pradeep.chauhan@ilfsindia.com. 8. M/s WAANPEEP Solar Pvt. Ltd., 602, Western Edge-I, Western Express Highway, Borivali (E), Mumbai-400066, Fax: 022-66444400, Email- kamalmarwah@waaneep.com 9. M/s Focal Energy Solar One India Pvt Ltd., 308 Third Floor, Rectangle One Building D-4, Commercial Complex, Saket, New Delhi -110017, Fax -011-41704901, Email – kvikas@focal_energy.com 10. M/s Focal Renewable Energy Two India Pvt Ltd., 308, third Floor, Rectangle One Building D-4, Commercial Complex, Saket, New Delhi -110017, Fax -011-41704901, Email – kvikas@focal_energy.com 11. M/s Solar EnrgyCorroration Of India, D-3, First Floor , Wing-a, ReligareBuliding, Distrcit Centre , Saket, New Delhi 110017,Fax-011-71989244, Email – corporate@seci.gov.in 12. M/s Manikaran Analytics Ltd., 2nd Floor, D21, Corporate Park, Sector-21, Dwarika, New Delhi – 110075 , Email – contactus@manikarananalytics.in,rakesh@manikarananalytics.in, bd.mp@manikarananalytics.in 13. M/s REConnect Energy Solutions Pvt Ltd.,173,A Sector, Scheme No.54, Indore M P-452010,Email – info@reconnectenergy.com, mithun.dubey@reconnectenergy.com,piyush.joshi@reconnectenergy.com 14. M/s Statkraft Markets Private Ltd., 403, 4th Floor, SalconRasvilas Building, Saket District Centre, New Delhi – 110017, Email – anwar.alam@statkraft.com 15. M/s ACME Solar Energy (MP) Private Ltd., Plot No.152, Sector-44, Gurgaon-122002(Haryana), Email – planthead.khilchipur.solar@acme.in 16. M/s Alfa Infraprop Pvt Ltd., NamanMidtown,’A’ Wing, 21st Floor, Senapati Bapat Marg, Elephinstone Road West, Mumbai-400013, Email –Sanjay.Shah@alfainfraprop.com 17. M/s Regent Climate Connect Knowledge Solutions Pvt Ltd., Appt. 215, Green Tower Society, Plot 7 C, Sector-23, Dwarka, New Delhi-110075Email - info@climate-connect.com, Pranav.vohra@climate-connect.com 18. M/s NTPC Ltd., E-1/72, Arera Colony, Bhopal – 462016, M.P. EMAIL:- pbvenkatesh@ntpc.co.in 19. M/s Mandsaur Solar PV Project, NTPC -Shamgarh,dist- Mandsaur, Dimple Chauraha, Garaut Road, In front of Swaraj Tractor, Shamgarh – 458883.MP, Email – skdutta03@ntpc.co.in, pbvenkatesh@ntpc.co.in 20. M/s M.P. WIND FARM NAGDA HILL, ENERGY TOWER, 64, B-Sector, Kasturba Nagar,Bhopal-462023, Email- info@cecl.in, windpoweindia@gmail.com,mpwlindia@gmail.com 21. M/s Globus Steel & Power Pvt. Ltd, 308, Third Floor, Rectangle One Building, D-4, Commercial Complex, Saket N.Delhi-110017, Email: kvikas@focal-energy.com 22. M/s PoineerWincomTamaraiTechpark, 7th Floor, S.P. Plot No. 16-20 and 20A, Thiru Vi Ka Industrial Etate,Enerring Road, Guindy, Chainai -600032 ,Email-mp@poineerwincom.com 23. M/s Designco Manufacturer & Exporter, LakriFazalpur, Delhi Road, Moradabad-244001, Email: info@designco-india.com, vivekasthana.79@gmail.com 24. M/s Mittal Processor Pvt. Ltd, 1002-1004, Antriksh Bhawan, 22K. G. Marg, Cannought Place, New Delhi -110001, email – Mayank.gupta@kreatenergy.com, controlroom@mittalgroup.com – (On behalf of M/s Ramesh Steels). 25. M/s Vedenjay Power Pvt Ltd., Plot No.4/F/53, Above BOI-Bank, Nai Sadak, Scheme No.78, B Road, Indore- 452010, Email – vedanjaypower@gmail.com ………
  • 4. All Figures in ` INTRA STATE DEVIATION CHARGES PAYABLE PAYABLE RECEIVABLE 20MW_FOCAL_ONE_SOLAR 214,457 214,457 40MW_IL&FS_Solar 15,083 (15,083) Ramesh_Steels_Pachama_Ganj_Basoda 179,095 (179,095) MANIKARAN ANALYTICS LTD. 529,261 529,261 ACME SOLAR ENERGY PVT. LTD. 22,607 22,607 ALFA INFRAPROP PVT LTD 6,239 6,239 MANIKARAN ANALYTICS LTD. 3,473,509 3,473,509 GLOBUS_STEEL_S_SITAMAU_20MW 30,019 30,019 MANDSAUR_SOLAR_POWER_SOLAR_220_GUJARKHEDI 224,582 224,582 NTPC_RAJGARH 30,157 30,157 WINCON_W_JAORA_11.95MW 46,782 46,782 WIND_WORLD_II_WIND_33_CHAPDA 29,516 29,516 RECONNECT 24,507,632 24,507,632 REGENT CLIMATE 10,831 10,831 STATKRAFT MARKETS PVT LTD 2,131,918 2,131,918 VEDANJAY POWER 43,427 43,427 TOTAL 30,557,219 743,718 194,178 31,106,759 () RECEIVABLE Assistant Engineer(LD) Executive Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY QCA / DEVELOPERS / GENERATOR NET DSM RECEIVABLE/PAYABLE INTER STATE DEVIATION CHARGES STATE LOAD DESPATCH CENTRE - JABALPUR QCA WISE SUMMERY REPORT OF DEVIATION CHARGES OF WIND & SOLAR POOLING STATIONS FOR October-2018
  • 5. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 63,007 59,275 20,593 02/10/2018 63,076 58,116 27,280 03/10/2018 59,223 43,107 99,402 04/10/2018 52,161 53,707 -8,292 05/10/2018 56,926 52,587 26,778 06/10/2018 54,383 53,440 5,963 07/10/2018 57,683 50,396 41,696 08/10/2018 58,222 48,823 54,062 09/10/2018 53,413 56,252 -15,324 10/10/2018 53,603 49,759 22,245 11/10/2018 56,038 52,837 17,668 12/10/2018 52,598 49,106 19,526 13/10/2018 56,537 50,352 34,585 14/10/2018 53,250 51,723 8,501 15/10/2018 51,417 50,344 6,004 16/10/2018 53,913 48,691 29,669 17/10/2018 53,486 51,561 10,588 18/10/2018 53,498 50,089 19,242 19/10/2018 53,091 48,144 29,039 20/10/2018 49,791 53,153 -18,491 21/10/2018 52,927 55,585 -14,619 22/10/2018 53,493 50,689 15,422 23/10/2018 50,580 51,846 -6,963 24/10/2018 51,733 51,395 1,956 25/10/2018 53,681 44,759 52,424 26/10/2018 49,812 51,721 -10,474 27/10/2018 51,007 44,351 39,920 28/10/2018 52,320 51,907 2,272 29/10/2018 51,518 51,425 512 30/10/2018 53,843 54,902 -5,824 31/10/2018 53,869 55,410 -8,476 TOTAL 1,680,099 1,595,452 496,884 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- M/s FOCAL RENEWABLE ENERGY TWO INDIA PVT. LTD. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN
  • 6. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 122,314 117,426 26,884 02/10/2018 115,770 113,530 12,320 03/10/2018 113,250 86,244 163,200 04/10/2018 106,983 101,495 31,481 05/10/2018 105,781 102,874 19,466 06/10/2018 100,496 104,223 -18,708 07/10/2018 98,163 99,277 -5,785 08/10/2018 83,266 94,932 -61,292 09/10/2018 100,143 105,869 -30,815 10/10/2018 102,872 94,958 46,118 11/10/2018 99,400 100,296 -4,928 12/10/2018 98,711 93,607 28,125 13/10/2018 97,130 95,911 6,995 14/10/2018 95,648 97,930 -12,551 15/10/2018 94,096 95,149 -5,172 16/10/2018 92,796 92,690 635 17/10/2018 92,708 96,647 -21,664 18/10/2018 92,952 94,867 -10,470 19/10/2018 93,543 87,830 31,928 20/10/2018 93,766 97,785 -22,104 21/10/2018 93,681 97,136 -19,002 22/10/2018 97,229 88,027 50,611 23/10/2018 95,043 91,747 18,128 24/10/2018 95,152 93,630 8,416 25/10/2018 95,047 80,489 84,169 26/10/2018 84,843 95,215 -55,872 27/10/2018 90,641 80,666 57,819 28/10/2018 83,849 93,148 -49,662 29/10/2018 86,367 90,120 -20,642 30/10/2018 89,076 95,025 -32,720 31/10/2018 95,741 95,823 -451 TOTAL 3,006,457 2,974,566 214,457 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- M/s FOCAL ENERGY SOLAR ONE INDIA PVT. LTD. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- NOT QCA APPOINTMENT
  • 7. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 267,597 289,500 -120,197 02/10/2018 272,292 247,160 150,608 03/10/2018 273,388 249,970 131,733 04/10/2018 267,370 194,550 428,047 05/10/2018 263,158 286,750 -128,382 06/10/2018 283,494 299,840 -89,903 07/10/2018 268,980 265,240 22,973 08/10/2018 270,745 228,060 251,544 09/10/2018 276,303 302,060 -141,595 10/10/2018 282,702 295,730 -71,654 11/10/2018 281,238 272,760 46,863 12/10/2018 267,058 296,600 -162,481 13/10/2018 284,405 296,480 -66,412 14/10/2018 284,171 288,820 -25,570 15/10/2018 274,507 276,160 -8,045 16/10/2018 295,556 265,610 169,450 17/10/2018 246,542 255,750 -48,974 18/10/2018 262,009 242,740 107,930 19/10/2018 261,941 276,680 -81,064 20/10/2018 277,307 250,500 155,372 21/10/2018 268,644 271,890 -17,853 22/10/2018 272,819 287,070 -78,380 23/10/2018 259,426 275,680 -89,397 24/10/2018 259,407 267,180 -41,850 25/10/2018 270,164 273,320 -16,760 26/10/2018 263,557 272,430 -47,171 27/10/2018 276,086 297,160 -115,907 28/10/2018 285,322 291,320 -32,989 29/10/2018 290,474 299,150 -47,718 30/10/2018 281,718 290,060 -45,881 31/10/2018 297,011 288,640 46,040 TOTAL 8,485,391 8,494,860 32,377 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- M/s WAANEEP Solar Pvt. Ltd STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN
  • 8. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 272,484 270,832 9,086 02/10/2018 264,618 257,220 40,897 03/10/2018 259,514 217,182 248,261 04/10/2018 231,158 195,500 212,845 05/10/2018 238,092 263,354 -138,941 06/10/2018 246,885 271,314 -134,360 07/10/2018 251,736 254,376 -14,100 08/10/2018 252,328 237,882 85,520 09/10/2018 234,442 255,474 -115,142 10/10/2018 249,587 261,032 -62,948 11/10/2018 243,617 234,392 51,558 12/10/2018 245,661 245,844 -1,006 13/10/2018 245,661 247,002 -7,376 14/10/2018 245,307 244,200 6,088 15/10/2018 245,071 248,372 -18,156 16/10/2018 240,822 231,670 53,649 17/10/2018 245,071 244,608 2,546 18/10/2018 239,584 246,052 -35,574 19/10/2018 240,223 237,460 15,949 20/10/2018 240,223 239,100 6,176 21/10/2018 245,167 257,302 -66,742 22/10/2018 244,988 243,704 7,062 23/10/2018 242,631 236,808 33,610 24/10/2018 244,988 232,930 69,428 25/10/2018 244,988 247,274 -12,573 26/10/2018 238,745 254,196 -84,980 27/10/2018 239,451 205,048 213,412 28/10/2018 240,793 244,710 -21,544 29/10/2018 234,536 248,066 -74,415 30/10/2018 227,407 252,896 -140,190 31/10/2018 226,436 252,606 -143,123 TOTAL 7,562,214 7,578,406 -15,083 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- M/s Malwa Solar Power Generation Ltd.(IL and FS) STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- NOT QCA APPOINTMENT
  • 9. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 19,526 22,538 -10,617 02/10/2018 19,421 21,957 -8,907 03/10/2018 18,893 19,412 -1,714 04/10/2018 18,786 18,977 -593 05/10/2018 18,761 21,404 -9,213 06/10/2018 18,893 20,732 -6,461 07/10/2018 17,489 17,525 620 08/10/2018 18,799 19,501 -2,478 09/10/2018 18,116 19,801 -5,732 10/10/2018 17,820 17,645 667 11/10/2018 13,877 19,460 -18,981 12/10/2018 17,073 20,427 -11,836 13/10/2018 19,908 20,567 -2,296 14/10/2018 19,321 20,086 -2,700 15/10/2018 19,877 19,857 71 16/10/2018 19,772 19,088 2,442 17/10/2018 18,366 17,213 4,215 18/10/2018 17,565 18,356 -2,626 19/10/2018 18,415 19,577 -4,101 20/10/2018 18,936 17,235 6,122 21/10/2018 18,605 20,374 -6,245 22/10/2018 19,169 22,159 -10,555 23/10/2018 18,495 19,760 -4,220 24/10/2018 18,179 21,116 -10,361 25/10/2018 18,340 21,792 -12,184 26/10/2018 18,282 19,974 -5,854 27/10/2018 18,180 21,686 -12,311 28/10/2018 18,600 19,670 -3,640 29/10/2018 18,647 22,662 -14,167 30/10/2018 18,782 22,328 -12,517 31/10/2018 18,700 22,362 -12,927 TOTAL 573,593 625,241 -179,099 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur Name of Pooling Station - Ramesh_Steels_Pachama_Ganj_Basoda STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- NOT QCA APPOINTMENT
  • 10. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 114,624 159,487 5,844 02/10/2018 145,492 153,956 71 03/10/2018 133,382 142,544 248 04/10/2018 133,436 137,657 291 05/10/2018 136,322 147,408 3,153 06/10/2018 135,669 141,187 7,098 07/10/2018 134,472 142,555 655 08/10/2018 134,694 146,692 79 09/10/2018 136,426 153,921 44 10/10/2018 138,024 152,199 30 11/10/2018 114,203 124,870 3,258 12/10/2018 134,668 146,294 346 13/10/2018 135,345 150,111 0 14/10/2018 121,662 144,423 524 15/10/2018 133,840 145,848 131 16/10/2018 130,033 142,694 47 17/10/2018 132,029 141,400 0 18/10/2018 127,865 145,977 215 19/10/2018 127,865 140,267 408 20/10/2018 128,431 137,444 29 21/10/2018 133,209 149,116 0 22/10/2018 132,193 141,739 0 23/10/2018 129,321 137,707 0 24/10/2018 129,552 135,658 136 25/10/2018 133,709 147,384 0 26/10/2018 130,927 144,498 0 27/10/2018 131,282 140,968 0 28/10/2018 129,532 139,930 0 29/10/2018 132,855 144,143 0 30/10/2018 130,655 144,805 0 31/10/2018 130,126 143,301 0 TOTAL 4,071,843 4,466,183 22,607 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- ACME SOLAR ENERGY PVT. LTD. NAME OF POOLING STATION :- ACME_KHILCHIPUR
  • 11. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 123,408 123,964 0 02/10/2018 123,408 118,992 710 03/10/2018 123,408 110,402 504 04/10/2018 123,408 119,930 0 05/10/2018 123,408 122,016 0 06/10/2018 123,408 121,057 0 07/10/2018 123,408 121,416 0 08/10/2018 123,408 111,946 376 09/10/2018 120,497 119,552 0 10/10/2018 120,497 107,831 2,801 11/10/2018 120,323 106,506 1,040 12/10/2018 120,497 108,540 0 13/10/2018 120,497 112,021 0 14/10/2018 120,497 114,073 0 15/10/2018 120,497 118,440 0 16/10/2018 120,497 114,389 0 17/10/2018 120,497 111,924 0 18/10/2018 120,497 107,625 184 19/10/2018 107,096 110,150 0 20/10/2018 107,096 104,615 0 21/10/2018 107,096 103,388 132 22/10/2018 107,096 118,180 0 23/10/2018 107,096 117,874 0 24/10/2018 107,096 116,025 0 25/10/2018 107,096 115,565 0 26/10/2018 107,096 112,217 0 27/10/2018 107,096 105,977 492 28/10/2018 107,096 113,385 0 29/10/2018 107,096 112,586 0 30/10/2018 107,096 113,810 0 31/10/2018 107,096 111,519 0 TOTAL 3,584,308 3,525,915 6,239 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- ALFA INFRAPROP PVT LTD NAME OF POOLING STATION :- ALPHA_KUKSHI
  • 12. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 22,731 2,167 0 02/10/2018 25,121 5,837 0 03/10/2018 35,446 7,069 0 04/10/2018 26,062 17,922 2,842 05/10/2018 29,374 5,412 0 06/10/2018 10,528 31 0 07/10/2018 11,513 4,301 0 08/10/2018 28,513 11,782 4 09/10/2018 34,525 16,668 0 10/10/2018 30,354 21,279 124 11/10/2018 34,369 21,192 677 12/10/2018 37,094 17,559 15 13/10/2018 34,228 9,679 0 14/10/2018 34,463 10,907 26 15/10/2018 34,636 8,741 0 16/10/2018 31,353 37,373 384 17/10/2018 36,791 21,706 104 18/10/2018 46,428 39,655 146 19/10/2018 48,581 30,484 0 20/10/2018 40,169 17,611 20 21/10/2018 39,281 41,116 196 22/10/2018 40,628 15,511 0 23/10/2018 40,026 6,188 0 24/10/2018 40,677 9,625 0 25/10/2018 36,655 22,395 338 26/10/2018 37,831 5,478 64 27/10/2018 37,397 9,833 1,005 28/10/2018 44,293 21,081 0 29/10/2018 64,261 48,592 674 30/10/2018 62,851 54,859 2,503 31/10/2018 72,175 74,263 3,975 TOTAL 1,148,354 616,316 13,097 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SUZLON_IV_W_JAORA_13.5MW
  • 13. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 69,356 67,358 254 02/10/2018 65,809 68,786 0 03/10/2018 74,415 64,458 141 04/10/2018 57,220 44,308 1,510 05/10/2018 60,358 67,998 186 06/10/2018 64,214 70,714 0 07/10/2018 66,333 65,018 0 08/10/2018 66,333 65,152 0 09/10/2018 68,356 69,622 184 10/10/2018 63,507 69,486 0 11/10/2018 64,602 62,284 19 12/10/2018 65,836 67,904 6 13/10/2018 66,522 69,222 0 14/10/2018 66,427 67,680 0 15/10/2018 66,597 62,984 0 16/10/2018 66,045 62,474 19 17/10/2018 61,247 58,902 62 18/10/2018 59,997 56,070 50 19/10/2018 62,071 64,252 33 20/10/2018 62,498 57,934 307 21/10/2018 60,554 64,930 0 22/10/2018 64,327 68,814 0 23/10/2018 68,269 61,672 795 24/10/2018 61,173 64,520 0 25/10/2018 62,170 64,846 0 26/10/2018 63,401 65,242 0 27/10/2018 65,687 69,422 0 28/10/2018 65,316 68,624 0 29/10/2018 65,937 70,294 0 30/10/2018 67,584 68,030 0 31/10/2018 66,163 68,250 0 TOTAL 2,008,324 2,017,250 3,566 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- M&B_ICHHAWAR-II
  • 14. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 68,520 13,758 0 02/10/2018 45,356 22,031 0 03/10/2018 52,432 21,393 0 04/10/2018 118,687 90,633 30,685 05/10/2018 60,818 52,227 18,278 06/10/2018 36,915 12,250 0 07/10/2018 43,098 20,195 0 08/10/2018 56,183 60,512 0 09/10/2018 97,895 73,125 0 10/10/2018 55,536 53,979 0 11/10/2018 103,801 157,858 4,836 12/10/2018 220,298 260,482 29,376 13/10/2018 195,262 214,397 1,664 14/10/2018 103,206 84,220 0 15/10/2018 62,491 51,249 0 16/10/2018 70,361 73,359 76 17/10/2018 83,562 101,327 292 18/10/2018 158,866 156,949 1,566 19/10/2018 138,532 126,146 7 20/10/2018 95,914 87,897 0 21/10/2018 129,921 146,978 2,006 22/10/2018 115,155 94,977 0 23/10/2018 68,097 31,307 0 24/10/2018 86,172 60,793 12 25/10/2018 59,935 23,300 0 26/10/2018 45,212 14,641 0 27/10/2018 148,250 179,068 111 28/10/2018 219,777 240,393 3,292 29/10/2018 167,327 194,980 460 30/10/2018 140,609 164,902 840 31/10/2018 222,235 258,277 10,712 TOTAL 3,270,423 3,143,603 104,213 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD_III_WIND_132_CHAPDA
  • 15. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 25,980 7,253 0 02/10/2018 25,972 4,807 0 03/10/2018 40,096 21,338 4,720 04/10/2018 36,419 24,520 1,254 05/10/2018 24,185 3,517 0 06/10/2018 20,181 5,512 0 07/10/2018 22,903 2,289 0 08/10/2018 28,145 5,577 0 09/10/2018 34,471 15,299 0 10/10/2018 25,159 11,665 0 11/10/2018 36,817 31,121 10 12/10/2018 42,722 39,375 20 13/10/2018 34,716 25,912 0 14/10/2018 30,793 14,779 0 15/10/2018 30,248 8,088 0 16/10/2018 30,777 22,422 86 17/10/2018 47,566 38,131 285 18/10/2018 46,920 38,431 0 19/10/2018 38,482 17,916 0 20/10/2018 43,236 34,058 78 21/10/2018 50,061 51,981 1,087 22/10/2018 34,156 19,058 0 23/10/2018 37,009 12,712 0 24/10/2018 40,691 27,340 1,680 25/10/2018 39,164 21,214 0 26/10/2018 38,411 13,125 0 27/10/2018 32,552 19,686 0 28/10/2018 36,309 22,446 0 29/10/2018 43,553 41,272 0 30/10/2018 45,336 44,985 1,590 31/10/2018 42,492 30,968 0 TOTAL 1,105,522 676,797 10,810 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND WORLD AGAR-I
  • 16. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 350,424 325,720 8,512 02/10/2018 347,202 321,870 7,582 03/10/2018 348,513 335,060 0 04/10/2018 343,784 335,570 532 05/10/2018 334,865 315,760 2,236 06/10/2018 340,793 335,410 0 07/10/2018 339,103 309,090 9,846 08/10/2018 330,445 303,390 2,648 09/10/2018 330,216 348,040 0 10/10/2018 336,479 335,300 0 11/10/2018 333,273 321,800 0 12/10/2018 325,112 322,080 0 13/10/2018 326,027 319,620 0 14/10/2018 323,786 322,520 0 15/10/2018 286,048 261,920 13,294 16/10/2018 315,679 273,780 18,129 17/10/2018 231,492 193,080 5,630 18/10/2018 287,485 302,940 182 19/10/2018 293,330 299,500 0 20/10/2018 289,966 283,590 0 21/10/2018 289,966 280,740 0 22/10/2018 289,548 288,020 1,029 23/10/2018 306,078 320,610 0 24/10/2018 319,857 313,060 0 25/10/2018 280,211 244,880 24,279 26/10/2018 308,929 305,370 0 27/10/2018 297,944 312,080 0 28/10/2018 305,687 317,000 0 29/10/2018 311,649 298,090 0 30/10/2018 311,292 313,430 0 31/10/2018 311,760 309,370 0 TOTAL 9,746,943 9,468,690 93,899 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SKY_POWER_SOLAR_132_CHHEGAON
  • 17. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 21,825 3,379 0 02/10/2018 23,384 5,665 0 03/10/2018 28,404 7,561 2 04/10/2018 27,703 13,625 1,506 05/10/2018 26,236 5,672 0 06/10/2018 7,134 79 0 07/10/2018 12,445 4,382 0 08/10/2018 28,309 10,465 125 09/10/2018 34,398 18,683 0 10/10/2018 28,213 20,384 117 11/10/2018 39,451 22,790 1,615 12/10/2018 34,241 19,779 0 13/10/2018 38,829 11,775 31 14/10/2018 30,029 10,556 0 15/10/2018 33,166 9,153 228 16/10/2018 31,498 35,593 526 17/10/2018 35,820 18,712 0 18/10/2018 49,380 34,417 343 19/10/2018 43,817 28,040 0 20/10/2018 37,022 16,856 0 21/10/2018 37,703 35,981 265 22/10/2018 35,993 17,511 2 23/10/2018 38,564 6,613 279 24/10/2018 34,133 9,009 0 25/10/2018 34,188 18,138 260 26/10/2018 36,277 7,134 4 27/10/2018 35,713 12,064 1,804 28/10/2018 37,335 24,745 281 29/10/2018 57,738 60,295 4,097 30/10/2018 54,506 66,302 4,070 31/10/2018 79,808 81,415 1,874 TOTAL 1,093,262 636,773 17,429 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SUZLON_V_W_JAORA_12MW
  • 18. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 363,635 370,260 0 02/10/2018 378,869 371,670 0 03/10/2018 357,033 363,110 0 04/10/2018 343,720 353,860 1,821 05/10/2018 369,080 356,450 3,752 06/10/2018 361,500 348,760 1,868 07/10/2018 354,224 288,600 17,562 08/10/2018 354,948 343,670 1,431 09/10/2018 363,393 355,880 495 10/10/2018 360,934 335,570 6,616 11/10/2018 363,642 288,660 19,545 12/10/2018 303,815 347,560 1,892 13/10/2018 331,618 346,510 0 14/10/2018 353,968 339,950 0 15/10/2018 344,598 339,380 0 16/10/2018 352,724 336,260 0 17/10/2018 333,248 305,670 1,906 18/10/2018 329,140 336,540 483 19/10/2018 325,847 328,350 0 20/10/2018 321,027 260,010 23,149 21/10/2018 334,508 309,770 1,226 22/10/2018 324,258 318,240 0 23/10/2018 316,431 304,740 0 24/10/2018 319,936 304,160 3,736 25/10/2018 316,143 333,250 241 26/10/2018 318,153 323,420 4,876 27/10/2018 321,027 290,350 3,737 28/10/2018 318,065 319,970 0 29/10/2018 337,431 339,130 0 30/10/2018 330,739 334,020 0 31/10/2018 340,051 346,800 0 TOTAL 10,543,705 10,240,570 94,336 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- RENEW_CLEAN_SOLAR_132_KOTHIYA
  • 19. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 59,308 26,839 1,834 02/10/2018 49,325 8,032 0 03/10/2018 75,899 45,000 11,756 04/10/2018 100,036 89,610 21,904 05/10/2018 46,252 13,186 391 06/10/2018 44,097 8,977 0 07/10/2018 40,434 2,844 0 08/10/2018 45,339 4,651 656 09/10/2018 61,514 38,015 596 10/10/2018 47,082 30,913 10 11/10/2018 104,162 129,849 11,258 12/10/2018 156,611 201,386 16,678 13/10/2018 107,042 148,409 9,454 14/10/2018 84,733 49,827 602 15/10/2018 51,041 15,552 646 16/10/2018 89,494 101,065 24,630 17/10/2018 102,836 105,214 1,888 18/10/2018 107,281 83,364 187 19/10/2018 88,206 54,865 294 20/10/2018 85,033 76,198 1,153 21/10/2018 140,420 157,914 3,716 22/10/2018 113,186 56,846 3,548 23/10/2018 77,566 49,267 1,375 24/10/2018 124,902 131,259 42,310 25/10/2018 84,745 49,912 4,526 26/10/2018 87,674 40,177 0 27/10/2018 94,396 73,927 1,086 28/10/2018 78,959 80,200 4,653 29/10/2018 196,623 219,083 28,176 30/10/2018 187,188 235,130 43,814 31/10/2018 231,860 246,393 19,422 TOTAL 2,963,244 2,573,904 256,563 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SUZLON_GUJRAT_WIND_33_BADOD
  • 20. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 0 25,692 30,830 02/10/2018 0 25,133 30,160 03/10/2018 0 21,568 25,882 04/10/2018 0 15,644 18,773 05/10/2018 0 24,340 29,208 06/10/2018 0 23,811 28,573 07/10/2018 0 23,637 28,364 08/10/2018 0 28,349 34,019 09/10/2018 0 30,180 36,216 10/10/2018 0 30,852 37,022 11/10/2018 0 29,451 35,341 12/10/2018 0 30,193 36,232 13/10/2018 0 29,912 35,894 14/10/2018 0 29,183 35,020 15/10/2018 0 28,890 34,668 16/10/2018 0 27,749 33,299 17/10/2018 0 26,339 31,607 18/10/2018 0 26,732 32,078 19/10/2018 18,544 27,370 2,718 20/10/2018 15,005 21,838 1,750 21/10/2018 18,149 27,434 3,070 22/10/2018 18,200 28,554 3,531 23/10/2018 25,709 27,688 28 24/10/2018 27,906 22,776 753 25/10/2018 27,906 26,137 216 26/10/2018 26,514 27,483 31 27/10/2018 27,906 28,340 84 28/10/2018 29,395 27,159 99 29/10/2018 27,430 28,424 18 30/10/2018 27,798 27,830 0 31/10/2018 0 27,653 26,946 TOTAL 290,462 826,341 612,430 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- DESIGNCO_MANF_EXP_1_S_ARNIYAKALA_5MW
  • 21. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 72,181 71,687 0 02/10/2018 69,365 65,487 781 03/10/2018 64,434 58,743 1,659 04/10/2018 57,730 50,189 2,666 05/10/2018 66,568 70,072 0 06/10/2018 69,466 70,002 54 07/10/2018 67,176 66,597 906 08/10/2018 67,176 64,430 647 09/10/2018 64,162 67,875 14 10/10/2018 65,357 67,756 98 11/10/2018 66,736 61,250 1,209 12/10/2018 62,263 64,813 0 13/10/2018 64,942 64,266 0 14/10/2018 63,922 64,743 0 15/10/2018 63,629 64,922 0 16/10/2018 63,635 61,181 162 17/10/2018 60,967 64,100 55 18/10/2018 61,045 63,706 107 19/10/2018 60,756 60,242 717 20/10/2018 59,460 62,283 0 21/10/2018 59,608 65,705 73 22/10/2018 61,532 62,868 0 23/10/2018 60,240 61,998 0 24/10/2018 58,024 61,279 392 25/10/2018 60,240 63,820 0 26/10/2018 60,415 65,082 0 27/10/2018 55,754 53,456 1,526 28/10/2018 61,501 60,842 393 29/10/2018 22,863 27,852 2,609 30/10/2018 63,540 65,154 0 31/10/2018 64,232 65,205 0 TOTAL 1,918,919 1,937,605 14,068 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- M&B_BAROD_II
  • 22. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 58,376 60,144 0 02/10/2018 58,264 58,720 0 03/10/2018 59,143 43,509 9,270 04/10/2018 55,154 53,508 382 05/10/2018 56,450 52,349 3,215 06/10/2018 53,603 53,313 1,271 07/10/2018 52,350 50,368 643 08/10/2018 50,620 47,700 1,293 09/10/2018 53,566 54,187 444 10/10/2018 54,369 47,876 2,204 11/10/2018 51,512 50,636 182 12/10/2018 49,749 47,505 378 13/10/2018 49,675 49,462 63 14/10/2018 49,442 51,269 63 15/10/2018 50,203 50,834 5 16/10/2018 51,032 49,358 512 17/10/2018 50,498 51,585 19 18/10/2018 51,031 50,491 246 19/10/2018 50,878 48,612 913 20/10/2018 50,773 54,071 0 21/10/2018 51,935 57,022 0 22/10/2018 52,999 52,083 0 23/10/2018 52,654 53,359 0 24/10/2018 54,131 53,002 96 25/10/2018 51,925 45,999 2,246 26/10/2018 52,185 53,270 105 27/10/2018 53,521 46,377 2,970 28/10/2018 53,191 53,566 0 29/10/2018 52,468 52,482 0 30/10/2018 54,029 55,824 0 31/10/2018 53,526 55,771 0 TOTAL 1,639,252 1,604,252 26,520 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- FOCAL_PHOTOVOLTAIC_10MW
  • 23. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 31,050 12,289 18,620 02/10/2018 31,050 31,278 0 03/10/2018 31,050 23,016 4,390 04/10/2018 31,050 22,928 4,201 05/10/2018 31,050 31,840 0 06/10/2018 31,470 32,220 0 07/10/2018 31,470 30,968 0 08/10/2018 24,623 31,240 1,867 09/10/2018 31,470 31,864 0 10/10/2018 31,145 31,019 31 11/10/2018 60,212 29,749 25,417 12/10/2018 29,364 30,507 220 13/10/2018 31,470 30,477 0 14/10/2018 31,470 30,108 0 15/10/2018 31,470 29,341 34 16/10/2018 31,470 29,098 97 17/10/2018 31,470 29,765 0 18/10/2018 31,470 28,583 498 19/10/2018 31,470 28,007 402 20/10/2018 31,470 29,024 58 21/10/2018 31,470 30,543 0 22/10/2018 31,470 29,952 0 23/10/2018 31,470 29,676 0 24/10/2018 31,012 29,340 81 25/10/2018 31,012 30,251 0 26/10/2018 31,012 28,533 460 27/10/2018 31,012 29,237 207 28/10/2018 31,012 29,784 0 29/10/2018 31,012 30,593 0 30/10/2018 31,012 30,730 0 31/10/2018 31,012 30,441 0 TOTAL 989,270 902,401 56,583 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- PORWAL_AUTO_MAKDON
  • 24. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 320,748 325,210 0 02/10/2018 325,695 311,320 168 03/10/2018 313,564 228,850 40,558 04/10/2018 288,681 249,600 5,256 05/10/2018 307,149 287,430 4,342 06/10/2018 305,184 300,290 2,155 07/10/2018 310,633 271,140 19,410 08/10/2018 277,037 248,330 9,895 09/10/2018 280,435 296,450 0 10/10/2018 290,375 275,600 4,118 11/10/2018 287,809 272,410 0 12/10/2018 256,742 262,810 0 13/10/2018 287,425 268,410 1,240 14/10/2018 273,836 274,150 0 15/10/2018 281,745 270,200 50 16/10/2018 276,027 260,680 3,136 17/10/2018 270,819 273,230 108 18/10/2018 271,738 271,380 155 19/10/2018 271,368 252,980 3,200 20/10/2018 268,309 282,710 0 21/10/2018 273,249 293,470 0 22/10/2018 271,046 266,030 0 23/10/2018 273,540 268,640 0 24/10/2018 271,260 263,600 2,030 25/10/2018 262,182 243,610 7,460 26/10/2018 272,314 270,730 2,786 27/10/2018 272,597 241,150 14,696 28/10/2018 273,797 273,050 242 29/10/2018 264,642 260,420 0 30/10/2018 272,177 282,150 0 31/10/2018 279,779 284,210 135 TOTAL 8,751,902 8,430,240 121,140 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SEIL_SITARA_SITAMAU_50MW
  • 25. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 74,415 70,930 483 02/10/2018 70,374 73,432 0 03/10/2018 74,415 68,828 95 04/10/2018 58,321 48,066 32 05/10/2018 68,469 73,072 246 06/10/2018 68,525 75,960 96 07/10/2018 73,098 69,804 0 08/10/2018 73,098 70,794 35 09/10/2018 74,061 76,520 0 10/10/2018 68,670 76,582 22 11/10/2018 70,163 69,562 0 12/10/2018 71,895 76,222 0 13/10/2018 73,122 75,780 0 14/10/2018 73,016 73,212 0 15/10/2018 73,171 67,598 10 16/10/2018 72,386 66,992 96 17/10/2018 67,416 62,904 354 18/10/2018 67,483 58,918 406 19/10/2018 67,024 68,386 0 20/10/2018 67,037 60,592 298 21/10/2018 64,437 68,078 130 22/10/2018 69,979 71,498 0 23/10/2018 70,916 65,068 154 24/10/2018 64,452 66,480 30 25/10/2018 65,085 62,232 390 26/10/2018 65,140 64,994 0 27/10/2018 67,291 71,288 0 28/10/2018 67,441 69,642 0 29/10/2018 68,042 72,170 36 30/10/2018 69,289 70,090 12 31/10/2018 67,958 70,980 0 TOTAL 2,146,189 2,136,674 2,925 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- M&B_ICHHAWAR-I
  • 26. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 0 421 474 02/10/2018 0 3,084 3,469 03/10/2018 0 76 85 04/10/2018 0 23,585 26,533 05/10/2018 0 4,717 5,307 06/10/2018 0 153 172 07/10/2018 0 2,499 2,811 08/10/2018 0 5,772 6,493 09/10/2018 0 6,417 7,219 10/10/2018 0 14,718 16,558 11/10/2018 0 32,553 36,622 12/10/2018 0 70,775 79,622 13/10/2018 0 51,081 57,466 14/10/2018 0 16,100 18,112 15/10/2018 0 9,474 10,658 16/10/2018 0 12,860 14,467 17/10/2018 0 6,327 7,118 18/10/2018 0 24,023 27,026 19/10/2018 0 14,175 15,947 20/10/2018 0 3,141 3,534 21/10/2018 0 28,931 32,547 22/10/2018 0 15,362 17,282 23/10/2018 0 1,880 2,115 24/10/2018 0 5,621 6,324 25/10/2018 0 787 885 26/10/2018 0 6,439 7,244 27/10/2018 0 29,450 33,131 28/10/2018 0 42,653 47,985 29/10/2018 0 48,964 55,084 30/10/2018 0 42,065 47,323 31/10/2018 0 60,623 68,201 TOTAL 0 584,726 657,814 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- MP_WIND_FARM_NAGDA_HILL_WIND_33_DEWAS
  • 27. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 27,216 7,839 0 02/10/2018 26,102 4,518 0 03/10/2018 37,928 24,835 4,640 04/10/2018 38,424 31,968 3,696 05/10/2018 26,598 5,385 0 06/10/2018 30,530 5,264 0 07/10/2018 22,158 2,453 0 08/10/2018 32,202 4,899 0 09/10/2018 34,900 14,943 0 10/10/2018 25,918 11,344 0 11/10/2018 36,279 32,753 0 12/10/2018 48,761 45,810 8 13/10/2018 37,534 29,580 0 14/10/2018 36,733 17,583 0 15/10/2018 34,029 9,340 7 16/10/2018 31,678 19,903 0 17/10/2018 46,972 42,127 45 18/10/2018 49,852 31,597 0 19/10/2018 41,535 16,420 0 20/10/2018 44,659 36,940 200 21/10/2018 49,680 51,530 642 22/10/2018 36,583 18,178 0 23/10/2018 42,889 14,966 0 24/10/2018 49,192 29,437 1,210 25/10/2018 41,105 22,590 0 26/10/2018 38,729 10,925 0 27/10/2018 38,133 21,414 0 28/10/2018 40,931 24,997 0 29/10/2018 47,240 43,085 0 30/10/2018 44,970 48,326 0 31/10/2018 56,421 38,779 0 TOTAL 1,195,881 719,728 10,448 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD-II_33_AGAR_15.2MW
  • 28. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 85,410 100,133 342 02/10/2018 93,603 94,209 0 03/10/2018 98,542 81,314 1,786 04/10/2018 88,863 74,646 4,925 05/10/2018 92,534 96,702 0 06/10/2018 90,855 97,741 168 07/10/2018 95,834 92,155 513 08/10/2018 74,647 92,073 1,036 09/10/2018 65,674 92,407 3,964 10/10/2018 88,518 94,956 14 11/10/2018 86,980 88,491 430 12/10/2018 87,698 88,757 0 13/10/2018 81,465 88,193 0 14/10/2018 83,101 88,820 0 15/10/2018 79,726 89,256 0 16/10/2018 84,815 83,335 297 17/10/2018 86,528 88,040 213 18/10/2018 86,518 90,156 0 19/10/2018 87,498 84,912 82 20/10/2018 86,168 89,148 0 21/10/2018 86,815 95,695 0 22/10/2018 86,464 91,255 0 23/10/2018 88,170 91,916 0 24/10/2018 87,472 90,882 0 25/10/2018 89,566 95,239 0 26/10/2018 90,669 96,712 0 27/10/2018 87,939 81,647 1,803 28/10/2018 92,277 96,699 0 29/10/2018 90,346 82,202 3,216 30/10/2018 93,983 98,855 0 31/10/2018 92,828 100,063 0 TOTAL 2,711,506 2,816,609 18,789 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- TODAY_CLEAN_SOLAR_33KV_BAROD
  • 29. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 40,010 43,720 26 02/10/2018 40,015 43,120 5 03/10/2018 40,038 38,980 74 04/10/2018 39,577 36,490 205 05/10/2018 38,182 42,660 136 06/10/2018 38,951 42,490 0 07/10/2018 38,536 38,470 1,210 08/10/2018 38,199 38,620 55 09/10/2018 38,150 41,780 6 10/10/2018 38,695 42,000 0 11/10/2018 39,692 38,130 199 12/10/2018 39,599 39,520 0 13/10/2018 39,293 40,990 0 14/10/2018 39,409 39,880 0 15/10/2018 39,489 39,700 0 16/10/2018 39,697 38,230 260 17/10/2018 39,096 38,980 0 18/10/2018 38,764 40,190 0 19/10/2018 39,093 37,310 363 20/10/2018 38,694 38,850 9 21/10/2018 38,629 40,490 0 22/10/2018 38,461 38,860 0 23/10/2018 38,594 37,800 0 24/10/2018 38,416 35,790 722 25/10/2018 37,816 40,280 10 26/10/2018 37,342 39,470 19 27/10/2018 37,487 38,720 41 28/10/2018 37,543 40,340 0 29/10/2018 39,131 41,430 0 30/10/2018 37,758 40,580 0 31/10/2018 39,173 40,590 0 TOTAL 1,203,529 1,234,460 3,340 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- UJAAS_II_S_RAJGARH_BIORA_15MW
  • 30. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 459,482 238,350 267 02/10/2018 472,043 161,350 4,152 03/10/2018 394,493 61,540 0 04/10/2018 326,047 211,990 46,934 05/10/2018 426,737 121,410 30 06/10/2018 394,233 102,090 0 07/10/2018 382,941 121,310 0 08/10/2018 414,606 275,090 0 09/10/2018 480,304 504,360 0 10/10/2018 603,478 457,720 238 11/10/2018 498,367 409,290 0 12/10/2018 616,965 646,710 4,034 13/10/2018 714,950 577,010 328 14/10/2018 543,118 404,690 18,027 15/10/2018 365,892 195,000 0 16/10/2018 485,073 329,570 262 17/10/2018 504,011 375,220 70 18/10/2018 640,009 672,610 2,110 19/10/2018 625,322 410,580 0 20/10/2018 503,593 278,760 0 21/10/2018 699,688 665,390 4,342 22/10/2018 576,517 384,670 0 23/10/2018 560,133 161,260 134 24/10/2018 534,926 181,230 0 25/10/2018 665,258 411,310 11,342 26/10/2018 595,751 250,860 0 27/10/2018 539,222 265,920 0 28/10/2018 518,064 471,020 16,341 29/10/2018 1,441,022 1,395,100 57,804 30/10/2018 1,204,268 1,403,910 45,089 31/10/2018 1,583,127 1,816,010 168,796 TOTAL 18,769,640 13,961,330 380,300 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- KSHEMA_295.3MW_AMBA
  • 31. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 72,181 74,693 0 02/10/2018 71,973 68,087 1,324 03/10/2018 65,729 59,514 1,314 04/10/2018 57,980 53,351 1,734 05/10/2018 69,206 73,913 0 06/10/2018 71,438 75,030 39 07/10/2018 67,208 69,965 343 08/10/2018 67,208 67,902 296 09/10/2018 68,422 68,546 100 10/10/2018 68,491 68,809 507 11/10/2018 67,911 60,952 1,613 12/10/2018 60,958 66,185 0 13/10/2018 66,118 69,251 0 14/10/2018 65,706 68,359 0 15/10/2018 65,248 69,454 0 16/10/2018 65,100 66,888 37 17/10/2018 64,159 69,081 0 18/10/2018 65,288 68,200 140 19/10/2018 65,435 65,094 302 20/10/2018 64,361 67,293 0 21/10/2018 64,094 72,110 5 22/10/2018 66,354 67,983 0 23/10/2018 64,849 67,254 0 24/10/2018 63,635 66,476 671 25/10/2018 63,966 69,531 23 26/10/2018 65,539 70,661 0 27/10/2018 58,143 59,885 633 28/10/2018 66,414 68,469 87 29/10/2018 25,094 30,326 2,304 30/10/2018 68,880 71,205 0 31/10/2018 69,027 70,882 0 TOTAL 2,006,115 2,065,349 11,472 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- M&B_BAROD
  • 32. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 55,150 57,262 0 02/10/2018 55,847 56,138 0 03/10/2018 56,131 55,857 0 04/10/2018 56,157 52,045 321 05/10/2018 55,980 52,103 176 06/10/2018 55,567 55,596 0 07/10/2018 55,739 53,353 0 08/10/2018 54,969 50,692 212 09/10/2018 53,838 54,726 0 10/10/2018 53,743 54,282 0 11/10/2018 49,433 46,168 49 12/10/2018 51,669 54,002 0 13/10/2018 52,556 56,694 0 14/10/2018 52,797 55,121 0 15/10/2018 52,664 52,324 0 16/10/2018 52,435 50,317 1,104 17/10/2018 45,887 40,052 1,586 18/10/2018 48,891 52,910 69 19/10/2018 51,005 52,431 43 20/10/2018 50,741 51,372 35 21/10/2018 49,968 52,325 0 22/10/2018 49,099 56,085 222 23/10/2018 53,278 56,105 0 24/10/2018 52,513 56,119 0 25/10/2018 50,755 49,805 484 26/10/2018 53,927 55,788 0 27/10/2018 51,122 46,930 2,239 28/10/2018 54,183 56,024 0 29/10/2018 55,197 57,757 0 30/10/2018 53,943 56,695 0 31/10/2018 57,080 57,314 0 TOTAL 1,642,264 1,654,392 6,540 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- BHARAT_ELECTRONICS_LTD_OFI_S_ITARSI_10MW
  • 33. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 29,515 7,674 0 02/10/2018 26,802 4,161 0 03/10/2018 43,847 20,236 4,894 04/10/2018 33,363 38,424 6,044 05/10/2018 26,207 5,905 0 06/10/2018 31,390 5,140 0 07/10/2018 21,824 2,249 0 08/10/2018 35,322 5,231 0 09/10/2018 33,876 14,435 0 10/10/2018 25,145 12,072 0 11/10/2018 40,259 35,947 0 12/10/2018 47,740 45,261 76 13/10/2018 38,555 30,316 0 14/10/2018 35,456 16,552 0 15/10/2018 31,590 8,141 0 16/10/2018 32,132 22,257 0 17/10/2018 42,538 39,309 164 18/10/2018 44,599 32,001 0 19/10/2018 38,779 17,732 0 20/10/2018 45,103 35,802 52 21/10/2018 45,078 52,132 334 22/10/2018 37,764 21,729 0 23/10/2018 40,807 15,431 0 24/10/2018 47,588 27,832 847 25/10/2018 40,785 24,179 0 26/10/2018 42,978 12,386 0 27/10/2018 40,641 19,820 0 28/10/2018 38,223 25,976 0 29/10/2018 51,168 46,344 32 30/10/2018 40,232 49,321 767 31/10/2018 52,000 36,976 0 TOTAL 1,181,306 730,971 13,210 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD-III_33_AGAR_14.4MW
  • 34. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 300,161 4,160 12,898 02/10/2018 239,069 68,510 0 03/10/2018 281,412 103,310 11,318 04/10/2018 272,144 245,530 45,930 05/10/2018 286,142 52,980 0 06/10/2018 226,732 7,150 0 07/10/2018 235,469 64,270 0 08/10/2018 320,494 203,180 0 09/10/2018 485,483 302,700 4,962 10/10/2018 302,593 172,440 838 11/10/2018 449,881 550,890 114,164 12/10/2018 783,827 679,490 20,101 13/10/2018 623,796 536,770 20,016 14/10/2018 527,575 365,570 4,943 15/10/2018 393,846 117,410 0 16/10/2018 334,733 85,800 958 17/10/2018 345,606 159,280 0 18/10/2018 548,568 367,040 0 19/10/2018 481,427 295,750 0 20/10/2018 509,010 200,990 12 21/10/2018 646,014 584,450 8,658 22/10/2018 436,278 237,350 0 23/10/2018 426,187 17,860 0 24/10/2018 497,725 167,720 4 25/10/2018 429,551 83,100 0 26/10/2018 553,775 203,260 68 27/10/2018 555,877 433,840 5,018 28/10/2018 467,716 678,360 91,831 29/10/2018 695,495 634,260 2,668 30/10/2018 625,434 743,410 45,468 31/10/2018 1,013,459 1,103,640 48,975 TOTAL 14,295,479 9,470,470 438,830 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- GAMESHA_SHAJAPUR
  • 35. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 29,162 10,166 0 02/10/2018 24,916 4,850 0 03/10/2018 32,183 22,166 2,736 04/10/2018 28,111 26,754 8,820 05/10/2018 25,585 23,619 13,634 06/10/2018 31,621 9,122 420 07/10/2018 29,189 2,458 0 08/10/2018 27,329 6,340 296 09/10/2018 32,459 15,612 90 10/10/2018 29,194 9,184 0 11/10/2018 42,399 30,763 302 12/10/2018 51,139 52,240 362 13/10/2018 39,292 32,320 0 14/10/2018 38,656 23,286 0 15/10/2018 37,178 9,301 0 16/10/2018 36,314 14,753 0 17/10/2018 54,932 44,883 0 18/10/2018 46,074 36,440 111 19/10/2018 39,338 16,615 0 20/10/2018 41,893 29,046 96 21/10/2018 42,167 52,305 920 22/10/2018 37,241 33,415 834 23/10/2018 43,483 14,849 0 24/10/2018 49,699 40,866 3,210 25/10/2018 44,197 25,229 256 26/10/2018 44,559 12,222 0 27/10/2018 40,716 22,021 0 28/10/2018 41,176 19,985 0 29/10/2018 54,502 52,000 934 30/10/2018 47,867 59,587 1,763 31/10/2018 57,377 55,955 468 TOTAL 1,219,948 808,352 35,252 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD-IV_33_SUSNER_14.4MW
  • 36. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 383,826 112,050 4,354 02/10/2018 287,103 105,890 1,506 03/10/2018 439,532 242,410 32,320 04/10/2018 408,009 338,790 29,038 05/10/2018 408,009 136,850 0 06/10/2018 311,077 69,880 0 07/10/2018 289,591 116,430 11,638 08/10/2018 450,666 252,360 0 09/10/2018 458,431 324,950 0 10/10/2018 367,165 262,190 0 11/10/2018 576,591 796,890 146,287 12/10/2018 987,373 1,054,850 15,212 13/10/2018 753,767 711,450 9,549 14/10/2018 739,990 517,160 3,688 15/10/2018 369,467 125,690 0 16/10/2018 327,982 94,140 0 17/10/2018 513,202 349,480 520 18/10/2018 655,654 450,640 0 19/10/2018 527,832 265,590 0 20/10/2018 448,603 439,460 19,862 21/10/2018 763,984 839,910 56,720 22/10/2018 600,953 381,590 0 23/10/2018 452,242 72,170 0 24/10/2018 559,421 501,810 40,069 25/10/2018 522,448 299,450 0 26/10/2018 557,572 296,820 460 27/10/2018 687,666 602,020 18,219 28/10/2018 857,934 818,130 2,882 29/10/2018 764,665 710,710 33,712 30/10/2018 726,297 534,390 8,591 31/10/2018 28,838 67,790 5,822 TOTAL 16,225,890 11,891,940 440,449 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- INOX_200MW_SHAJAPUR
  • 37. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 70,506 79,220 0 02/10/2018 70,191 78,110 0 03/10/2018 70,738 72,380 0 04/10/2018 70,390 66,950 28 05/10/2018 66,165 78,430 639 06/10/2018 70,815 78,060 0 07/10/2018 68,806 72,730 704 08/10/2018 68,806 71,110 114 09/10/2018 68,270 77,850 0 10/10/2018 69,631 78,130 0 11/10/2018 71,600 69,950 29 12/10/2018 71,297 75,420 0 13/10/2018 71,284 77,170 0 14/10/2018 71,737 74,290 0 15/10/2018 71,872 74,290 0 16/10/2018 72,407 71,990 0 17/10/2018 71,355 72,250 0 18/10/2018 70,645 75,280 0 19/10/2018 71,514 70,450 164 20/10/2018 70,514 72,400 0 21/10/2018 70,037 76,660 0 22/10/2018 69,782 73,190 0 23/10/2018 70,997 70,400 0 24/10/2018 69,920 68,200 548 25/10/2018 69,012 76,230 30 26/10/2018 69,281 73,700 20 27/10/2018 68,574 72,840 0 28/10/2018 68,801 75,780 0 29/10/2018 70,916 77,800 0 30/10/2018 69,119 76,670 0 31/10/2018 70,109 76,820 0 TOTAL 2,175,091 2,304,750 2,276 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- UJAAS_I_S_RAJGARH_BIORA_15MW
  • 38. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 72,197 79,924 0 02/10/2018 72,827 78,009 0 03/10/2018 71,924 63,937 504 04/10/2018 59,841 48,323 2,425 05/10/2018 66,093 70,385 51 06/10/2018 66,952 77,081 51 07/10/2018 76,303 74,803 0 08/10/2018 73,018 71,943 169 09/10/2018 74,666 76,281 93 10/10/2018 70,676 76,744 16 11/10/2018 67,667 71,750 149 12/10/2018 70,325 51,927 15,770 13/10/2018 71,292 74,544 0 14/10/2018 71,175 73,816 0 15/10/2018 70,755 73,466 0 16/10/2018 70,746 69,612 0 17/10/2018 69,665 70,205 134 18/10/2018 69,164 70,450 0 19/10/2018 68,880 69,983 0 20/10/2018 67,748 68,089 65 21/10/2018 66,987 72,783 6 22/10/2018 66,792 73,602 0 23/10/2018 67,026 70,637 0 24/10/2018 67,206 70,645 0 25/10/2018 67,835 73,399 0 26/10/2018 66,920 69,321 166 27/10/2018 71,074 69,815 750 28/10/2018 67,235 73,205 25 29/10/2018 70,471 72,633 0 30/10/2018 62,025 55,832 6,836 31/10/2018 73,618 73,890 0 TOTAL 2,149,103 2,187,034 27,210 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- UJAAS_33KV_BERCHA MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- MANIKARAN
  • 39. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 1,217,783 1,217,797 0 02/10/2018 1,225,577 1,121,893 0 03/10/2018 1,222,280 1,062,374 4,124 04/10/2018 1,129,306 969,279 2,984 05/10/2018 1,077,602 1,116,824 3,469 06/10/2018 975,620 1,188,562 20,440 07/10/2018 1,217,783 1,075,098 36,408 08/10/2018 1,193,772 1,128,979 616 09/10/2018 1,193,772 1,163,985 0 10/10/2018 1,139,962 1,083,054 1,284 11/10/2018 1,175,395 1,017,655 1,177 12/10/2018 1,086,785 1,092,814 0 13/10/2018 1,017,148 1,110,560 1,683 14/10/2018 1,099,867 1,091,709 0 15/10/2018 1,099,867 1,108,312 0 16/10/2018 1,112,315 1,076,605 190 17/10/2018 1,076,140 1,071,377 24,627 18/10/2018 1,083,645 1,086,318 862 19/10/2018 1,072,785 1,056,227 6,940 20/10/2018 1,086,433 1,116,570 0 21/10/2018 1,061,320 1,188,003 23,231 22/10/2018 1,117,810 1,118,564 0 23/10/2018 1,192,856 1,086,781 0 24/10/2018 1,117,870 1,052,675 892 25/10/2018 1,089,840 983,582 0 26/10/2018 1,050,460 1,170,875 8,469 27/10/2018 1,089,840 1,014,995 21,835 28/10/2018 1,174,840 1,124,637 0 29/10/2018 1,022,995 1,141,666 32,175 30/10/2018 1,088,480 1,156,186 33,176 31/10/2018 1,133,090 1,176,340 0 TOTAL 34,643,238 34,170,296 224,582 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- NOT QCA APPOINTMENT NAME OF POOLING STATION :- MANDSAUR_SOLAR_POWER_SOLAR_220_GUJARKHEDI STATE LOAD DESPATCH CENTRE - JABALPUR
  • 40. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 129,647 121,117 433 02/10/2018 118,836 119,546 0 03/10/2018 103,528 97,407 5,858 04/10/2018 109,277 111,296 322 05/10/2018 108,709 102,861 1,734 06/10/2018 109,803 110,015 665 07/10/2018 102,862 103,976 200 08/10/2018 83,273 95,031 3,259 09/10/2018 103,321 115,244 876 10/10/2018 106,854 100,269 1,746 11/10/2018 113,905 107,533 0 12/10/2018 106,489 100,370 167 13/10/2018 104,633 102,038 182 14/10/2018 102,855 105,863 0 15/10/2018 103,528 103,619 0 16/10/2018 108,113 101,211 202 17/10/2018 105,806 104,143 0 18/10/2018 105,289 104,593 0 19/10/2018 106,340 100,467 253 20/10/2018 104,861 107,701 0 21/10/2018 106,667 113,257 0 22/10/2018 108,884 104,412 0 23/10/2018 107,531 105,379 0 24/10/2018 108,494 104,826 69 25/10/2018 107,046 92,289 5,624 26/10/2018 100,664 107,444 1,165 27/10/2018 103,142 92,389 2,781 28/10/2018 95,798 107,392 3,818 29/10/2018 98,896 105,862 608 30/10/2018 104,068 112,373 57 31/10/2018 111,796 112,947 0 TOTAL 3,290,915 3,272,870 30,019 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- NOT QCA APPOINTMENT NAME OF POOLING STATION :- GLOBUS_STEEL_S_SITAMAU_20MW STATE LOAD DESPATCH CENTRE - JABALPUR
  • 41. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 0 634 713 02/10/2018 0 554 623 03/10/2018 0 511 575 04/10/2018 0 516 581 05/10/2018 0 830 934 06/10/2018 0 301 339 07/10/2018 0 343 386 08/10/2018 0 1,261 1,419 09/10/2018 0 1,447 1,628 10/10/2018 0 1,129 1,270 11/10/2018 0 1,592 1,791 12/10/2018 0 1,943 2,186 13/10/2018 0 1,569 1,765 14/10/2018 0 537 604 15/10/2018 0 842 947 16/10/2018 0 1,132 1,274 17/10/2018 0 1,403 1,578 18/10/2018 0 3,130 3,521 19/10/2018 0 2,325 2,616 20/10/2018 0 1,090 1,226 21/10/2018 0 2,180 2,453 22/10/2018 0 576 648 23/10/2018 0 545 613 24/10/2018 0 701 789 25/10/2018 0 2,067 2,325 26/10/2018 0 10 11 27/10/2018 0 156 175 28/10/2018 0 876 985 29/10/2018 0 2,700 3,038 30/10/2018 0 3,278 3,688 31/10/2018 0 5,405 6,081 TOTAL 0 41,583 46,782 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- NOT QCA APPOINTMENT NAME OF POOLING STATION :- WINCON_W_JAORA_11.95MW STATE LOAD DESPATCH CENTRE - JABALPUR
  • 42. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 284,032 255,762 0 02/10/2018 267,630 251,165 0 03/10/2018 267,630 223,253 3,180 04/10/2018 258,142 214,256 3,106 05/10/2018 255,956 254,225 0 06/10/2018 218,846 246,392 1,443 07/10/2018 217,349 221,098 9,246 08/10/2018 225,267 239,033 750 09/10/2018 241,615 250,893 626 10/10/2018 244,025 249,488 518 11/10/2018 244,025 225,355 2,786 12/10/2018 242,236 243,610 292 13/10/2018 249,133 245,985 0 14/10/2018 249,083 237,370 8 15/10/2018 249,083 236,705 12 16/10/2018 249,333 227,695 1,194 17/10/2018 248,833 231,655 12 18/10/2018 237,729 240,279 0 19/10/2018 237,729 226,119 1,262 20/10/2018 238,979 223,988 300 21/10/2018 238,979 239,633 0 22/10/2018 238,979 232,399 0 23/10/2018 238,979 225,907 0 24/10/2018 238,979 217,058 3,028 25/10/2018 238,979 241,828 0 26/10/2018 238,979 234,416 0 27/10/2018 238,979 222,103 2,394 28/10/2018 238,229 236,663 0 29/10/2018 237,974 241,858 0 30/10/2018 235,805 239,595 0 31/10/2018 236,055 239,518 0 TOTAL 7,547,571 7,315,304 30,157 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- NOT QCA APPOINTMENT NAME OF POOLING STATION :- NTPC_RAJGARH STATE LOAD DESPATCH CENTRE - JABALPUR
  • 43. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 17,588 3,412 0 02/10/2018 11,656 4,529 0 03/10/2018 13,473 4,682 0 04/10/2018 30,479 27,259 7,530 05/10/2018 15,614 14,763 7,232 06/10/2018 9,485 2,259 0 07/10/2018 11,071 4,567 0 08/10/2018 14,420 13,578 0 09/10/2018 25,131 19,407 0 10/10/2018 14,261 14,722 0 11/10/2018 26,631 37,752 1,844 12/10/2018 56,550 65,545 6,696 13/10/2018 50,120 56,162 324 14/10/2018 26,496 21,501 20 15/10/2018 16,040 10,655 0 16/10/2018 18,063 9,206 89 17/10/2018 21,447 20,023 0 18/10/2018 40,787 38,968 434 19/10/2018 35,566 30,518 0 20/10/2018 24,628 17,109 0 21/10/2018 33,354 36,575 200 22/10/2018 29,566 21,573 0 23/10/2018 17,494 10,094 0 24/10/2018 22,127 12,687 0 25/10/2018 15,390 6,631 0 26/10/2018 11,610 4,333 0 27/10/2018 38,067 47,227 74 28/10/2018 56,430 59,131 1,298 29/10/2018 42,982 50,331 14 30/10/2018 36,100 40,419 253 31/10/2018 57,056 71,810 3,508 TOTAL 839,682 777,428 29,516 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- NOT QCA APPOINTMENT NAME OF POOLING STATION :- WIND_WORLD_II_WIND_33_CHAPDA STATE LOAD DESPATCH CENTRE - JABALPUR
  • 44. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 12,280 29,350 243 02/10/2018 3,131 8,080 0 03/10/2018 424 75,230 60,737 04/10/2018 1,269 102,600 41,344 05/10/2018 3,254 45,980 3,330 06/10/2018 6,245 1,940 101 07/10/2018 2,889 5,700 102 08/10/2018 2,173 6,080 0 09/10/2018 11,415 81,190 16,826 10/10/2018 42,444 144,860 19,222 11/10/2018 78,472 154,790 52,512 12/10/2018 131,449 410,390 200,484 13/10/2018 125,232 220,360 59,725 14/10/2018 87,649 159,320 29,342 15/10/2018 42,178 21,100 0 16/10/2018 50,462 61,260 2,146 17/10/2018 16,238 76,400 4,865 18/10/2018 40,769 94,800 8,646 19/10/2018 11,036 47,600 772 20/10/2018 17,552 42,960 269 21/10/2018 29,874 100,140 12,101 22/10/2018 22,411 83,640 5,069 23/10/2018 16,629 29,700 166 24/10/2018 22,373 22,500 2,678 25/10/2018 14,852 7,690 0 26/10/2018 20,327 88,690 10,338 27/10/2018 33,308 222,270 55,696 28/10/2018 73,570 276,050 66,734 29/10/2018 70,392 369,600 204,610 30/10/2018 84,550 395,400 242,724 31/10/2018 118,153 490,200 269,372 TOTAL 1,193,000 3,875,870 1,370,154 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUZLON_GUJ_96.6MW_BADNAGAR
  • 45. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 21,558 22,475 1,595 02/10/2018 10,393 34,668 8,639 03/10/2018 11,819 37,984 3,608 04/10/2018 5,193 71,958 22,788 05/10/2018 3,919 17,693 4 06/10/2018 21,354 13,760 0 07/10/2018 18,893 15,503 20 08/10/2018 15,677 22,982 0 09/10/2018 28,973 57,903 1,872 10/10/2018 22,731 59,820 13,861 11/10/2018 33,915 152,445 41,240 12/10/2018 67,944 240,183 74,488 13/10/2018 47,350 134,847 13,550 14/10/2018 13,775 70,845 12,614 15/10/2018 3,517 13,666 0 16/10/2018 12,239 36,162 456 17/10/2018 6,511 65,994 6,244 18/10/2018 27,056 74,771 3,456 19/10/2018 17,439 45,704 1,234 20/10/2018 12,221 98,906 31,559 21/10/2018 34,592 139,295 22,464 22/10/2018 32,370 48,731 2,514 23/10/2018 16,520 13,463 0 24/10/2018 16,853 32,140 1,505 25/10/2018 13,678 56,468 5,947 26/10/2018 21,895 49,386 1,157 27/10/2018 35,908 109,756 13,842 28/10/2018 58,626 131,970 28,471 29/10/2018 53,296 181,756 58,217 30/10/2018 58,796 210,088 91,000 31/10/2018 79,004 206,930 64,716 TOTAL 824,015 2,468,252 527,061 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- KSHEMA_GHOSLA_30MW
  • 46. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 3,051 4,773 0 02/10/2018 265 20,520 1,412 03/10/2018 3,153 22,871 412 04/10/2018 1,500 14,913 3,481 05/10/2018 7,621 16,847 2,657 06/10/2018 9,517 11,255 216 07/10/2018 2,970 12,350 141 08/10/2018 244 23,564 1,120 09/10/2018 6,791 41,678 4,114 10/10/2018 3,295 26,875 3,912 11/10/2018 15,394 59,027 16,748 12/10/2018 14,361 50,510 4,491 13/10/2018 8,780 40,486 2,992 14/10/2018 7,738 24,510 890 15/10/2018 7,842 23,881 1,005 16/10/2018 8,515 56,549 7,174 17/10/2018 11,730 41,658 2,562 18/10/2018 12,498 66,679 11,111 19/10/2018 4,348 61,699 12,867 20/10/2018 4,893 38,967 2,161 21/10/2018 15,032 81,611 21,004 22/10/2018 4,252 33,921 1,531 23/10/2018 6,510 21,630 1,333 24/10/2018 9,731 20,619 0 25/10/2018 3,259 64,676 25,540 26/10/2018 4,191 28,552 3,003 27/10/2018 15,452 17,879 536 28/10/2018 14,654 27,355 2,134 29/10/2018 19,132 86,539 34,999 30/10/2018 27,065 89,083 24,178 31/10/2018 35,217 121,994 49,771 TOTAL 289,001 1,253,471 243,495 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SHANKHESWAR_NAGRI_15MW
  • 47. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 611 14,589 1,255 02/10/2018 674 6,535 100 03/10/2018 1,723 1,087 0 04/10/2018 192 9,256 3,132 05/10/2018 192 10,512 4,469 06/10/2018 1,511 5,913 0 07/10/2018 322 5,839 0 08/10/2018 327 14,646 908 09/10/2018 2,103 19,288 581 10/10/2018 5,522 25,972 1,196 11/10/2018 6,896 29,044 6,826 12/10/2018 5,752 66,381 27,300 13/10/2018 4,680 55,791 23,365 14/10/2018 569 28,230 2,433 15/10/2018 3,860 7,351 0 16/10/2018 192 10,263 0 17/10/2018 192 8,332 0 18/10/2018 1,424 22,611 58 19/10/2018 5,798 12,682 0 20/10/2018 192 2,982 0 21/10/2018 6,342 28,768 1,348 22/10/2018 1,934 20,667 552 23/10/2018 192 2,937 0 24/10/2018 1,878 3,302 0 25/10/2018 2,209 22,004 3,466 26/10/2018 1,116 7,553 166 27/10/2018 11,374 25,836 1,102 28/10/2018 10,467 33,904 1,290 29/10/2018 13,467 95,882 42,869 30/10/2018 16,265 105,913 47,296 31/10/2018 28,661 131,320 68,612 TOTAL 136,637 835,390 238,324 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUZLON_I_W_SAILANA_14.4MW
  • 48. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 65,091 56,295 23,938 02/10/2018 61,150 53,057 31,756 03/10/2018 57,814 47,400 25,336 04/10/2018 49,817 45,253 31,628 05/10/2018 63,230 55,616 34,810 06/10/2018 62,762 52,933 31,013 07/10/2018 57,265 50,922 34,881 08/10/2018 60,458 51,142 31,267 09/10/2018 57,904 53,973 34,318 10/10/2018 51,595 53,909 43,160 11/10/2018 51,690 50,037 44,274 12/10/2018 50,951 49,801 45,451 13/10/2018 59,896 49,274 39,152 14/10/2018 58,348 48,937 37,460 15/10/2018 57,908 46,186 37,646 16/10/2018 56,020 46,686 37,200 17/10/2018 54,536 48,561 40,702 18/10/2018 51,651 44,300 31,760 19/10/2018 51,698 45,525 34,671 20/10/2018 51,380 46,837 33,438 21/10/2018 56,994 49,734 38,130 22/10/2018 58,308 46,276 38,960 23/10/2018 57,158 45,656 36,422 24/10/2018 52,695 44,333 26,552 25/10/2018 52,713 49,232 33,072 26/10/2018 54,103 49,884 31,250 27/10/2018 52,225 42,060 25,692 28/10/2018 53,968 45,728 29,135 29/10/2018 56,401 46,191 30,618 30/10/2018 56,522 47,580 31,328 31/10/2018 55,235 47,722 30,116 TOTAL 1,737,486 1,511,040 1,055,136 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- BHADRESH_SOLAR_33_10MW
  • 49. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 63,465 78,536 1,000 02/10/2018 63,283 75,714 0 03/10/2018 60,332 61,601 2,894 04/10/2018 58,578 57,696 695 05/10/2018 57,242 71,003 320 06/10/2018 3,997 71,623 51,533 07/10/2018 15,901 58,271 41,060 08/10/2018 57,333 66,897 1,836 09/10/2018 63,589 71,760 1,852 10/10/2018 65,091 64,427 475 11/10/2018 68,363 68,412 272 12/10/2018 82,014 72,850 0 13/10/2018 82,592 74,885 0 14/10/2018 82,051 74,462 0 15/10/2018 80,504 75,192 0 16/10/2018 80,305 73,661 26 17/10/2018 73,592 63,057 3,100 18/10/2018 74,021 70,799 1,234 19/10/2018 67,203 74,016 1,667 20/10/2018 68,464 67,200 946 21/10/2018 72,273 75,555 36 22/10/2018 78,940 78,368 0 23/10/2018 78,027 74,820 0 24/10/2018 69,922 76,920 1,346 25/10/2018 73,416 73,227 178 26/10/2018 70,414 64,294 231 27/10/2018 70,769 69,675 1,522 28/10/2018 74,770 65,604 559 29/10/2018 78,388 75,959 0 30/10/2018 64,005 75,470 541 31/10/2018 74,330 75,433 0 TOTAL 2,073,174 2,197,387 113,323 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SIMCON_SOLAR_33_GANJBASODA
  • 50. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 4,131 2,681 0 02/10/2018 1,382 25,440 0 03/10/2018 8,161 23,620 0 04/10/2018 8,392 15,628 0 05/10/2018 7,855 32,494 2,949 06/10/2018 9,653 7,631 0 07/10/2018 4,709 18,400 0 08/10/2018 1,739 32,177 1,260 09/10/2018 17,756 97,182 9,256 10/10/2018 11,274 34,388 792 11/10/2018 16,056 55,958 333 12/10/2018 14,031 66,148 1,762 13/10/2018 10,838 44,833 752 14/10/2018 15,577 36,577 0 15/10/2018 22,125 82,461 5,423 16/10/2018 15,434 71,983 4,176 17/10/2018 24,843 126,467 17,030 18/10/2018 26,056 142,686 30,038 19/10/2018 11,991 125,396 30,949 20/10/2018 9,236 75,204 8,694 21/10/2018 35,891 127,770 30,173 22/10/2018 8,720 54,642 466 23/10/2018 8,114 37,584 1,804 24/10/2018 23,763 41,500 1,254 25/10/2018 9,002 94,351 29,830 26/10/2018 11,672 35,302 0 27/10/2018 21,987 23,680 2,840 28/10/2018 20,503 26,257 0 29/10/2018 34,439 132,272 18,622 30/10/2018 31,412 95,521 7,030 31/10/2018 59,778 173,489 32,404 TOTAL 506,520 1,959,722 237,837 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- RENEW WIND_ENERGY_MP_TWO_WIND_33_DALODA
  • 51. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 3,868 352 0 02/10/2018 2,521 6,419 0 03/10/2018 4,750 10,384 0 04/10/2018 1,753 17,976 0 05/10/2018 2,514 6,432 0 06/10/2018 34,883 7,907 5,187 07/10/2018 47,065 9,833 7,876 08/10/2018 10,728 4,423 0 09/10/2018 14,301 73,483 1,580 10/10/2018 33,925 90,990 17,784 11/10/2018 96,548 153,204 15,358 12/10/2018 177,921 163,051 3,932 13/10/2018 82,290 95,297 5,414 14/10/2018 41,103 27,875 0 15/10/2018 22,215 14,047 155 16/10/2018 5,147 30,875 0 17/10/2018 6,410 25,934 0 18/10/2018 12,272 13,503 0 19/10/2018 10,853 23,146 34 20/10/2018 2,391 6,720 0 21/10/2018 9,936 12,209 0 22/10/2018 18,032 87,738 9,990 23/10/2018 18,198 27,417 0 24/10/2018 5,336 9,989 0 25/10/2018 13,627 38,528 0 26/10/2018 21,991 57,060 1,052 27/10/2018 25,190 34,057 0 28/10/2018 70,210 55,434 3,638 29/10/2018 73,867 81,836 1,840 30/10/2018 80,271 104,935 13,491 31/10/2018 96,781 86,367 78 TOTAL 1,046,897 1,377,421 87,409 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- INOX_WIND_132_GUDGAON_28M
  • 52. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 281 4,627 22 02/10/2018 214 328 0 03/10/2018 192 18,054 6,097 04/10/2018 190 38,683 23,520 05/10/2018 192 2,486 42 06/10/2018 192 334 0 07/10/2018 192 407 0 08/10/2018 192 1,681 0 09/10/2018 1,803 10,674 754 10/10/2018 2,319 6,390 0 11/10/2018 363 39,314 16,048 12/10/2018 3,877 42,384 4,810 13/10/2018 1,324 25,898 112 14/10/2018 192 12,184 172 15/10/2018 192 4,050 312 16/10/2018 192 29,803 5,381 17/10/2018 192 48,925 18,893 18/10/2018 1,238 45,959 13,724 19/10/2018 192 21,814 1,750 20/10/2018 227 33,234 5,022 21/10/2018 2,699 64,849 23,354 22/10/2018 192 20,432 3,552 23/10/2018 274 9,552 0 24/10/2018 192 36,467 19,628 25/10/2018 4,120 25,031 3,936 26/10/2018 2,860 7,044 0 27/10/2018 6,881 12,561 123 28/10/2018 12,420 22,889 1,097 29/10/2018 3,099 55,678 22,270 30/10/2018 1,869 67,038 29,272 31/10/2018 5,022 40,063 7,452 TOTAL 53,384 748,833 207,343 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUZLON_II_W_SUSNER_15MW
  • 53. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 97,012 84,545 212 02/10/2018 92,196 78,396 2,052 03/10/2018 86,695 61,838 10,608 04/10/2018 90,731 76,235 288 05/10/2018 94,273 70,210 5,556 06/10/2018 94,052 76,365 3,682 07/10/2018 90,225 71,799 4,286 08/10/2018 86,366 65,855 6,145 09/10/2018 80,380 80,611 844 10/10/2018 82,817 69,183 1,145 11/10/2018 80,960 74,963 1,674 12/10/2018 80,514 70,128 1,262 13/10/2018 89,407 71,619 901 14/10/2018 87,337 74,479 250 15/10/2018 87,332 71,541 391 16/10/2018 85,940 70,007 904 17/10/2018 78,557 74,373 674 18/10/2018 65,623 70,941 2,137 19/10/2018 80,773 72,589 245 20/10/2018 79,999 77,140 147 21/10/2018 85,367 80,666 39 22/10/2018 86,689 74,322 126 23/10/2018 84,966 75,296 0 24/10/2018 81,516 74,731 142 25/10/2018 80,821 65,080 3,014 26/10/2018 80,319 76,354 0 27/10/2018 79,468 66,040 4,313 28/10/2018 82,884 75,865 0 29/10/2018 83,814 74,640 0 30/10/2018 84,261 78,635 0 31/10/2018 82,502 78,000 0 TOTAL 2,623,796 2,282,446 51,037 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- UJAAS_SOLAR_33KV_SITAMAU-I
  • 54. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 48,244 8,203 31,797 02/10/2018 46,089 7,794 29,927 03/10/2018 44,336 6,738 29,366 04/10/2018 44,508 6,558 29,953 05/10/2018 47,440 8,151 31,318 06/10/2018 45,027 8,261 27,986 07/10/2018 44,214 7,608 29,207 08/10/2018 41,024 7,705 23,550 09/10/2018 42,501 7,956 25,298 10/10/2018 42,510 7,894 25,568 11/10/2018 42,013 7,346 25,324 12/10/2018 42,563 7,469 25,961 13/10/2018 45,012 7,421 29,083 14/10/2018 44,555 7,336 28,578 15/10/2018 44,004 7,428 27,822 16/10/2018 39,584 6,972 22,772 17/10/2018 42,867 7,173 27,041 18/10/2018 36,865 7,286 19,604 19/10/2018 39,591 7,130 23,107 20/10/2018 37,529 7,094 20,108 21/10/2018 42,403 7,514 26,103 22/10/2018 43,571 7,085 28,148 23/10/2018 42,633 5,923 28,642 24/10/2018 35,287 6,157 19,254 25/10/2018 38,319 6,754 22,700 26/10/2018 39,988 6,475 24,437 27/10/2018 36,715 6,426 19,812 28/10/2018 41,689 6,903 26,144 29/10/2018 42,440 7,124 26,728 30/10/2018 42,122 7,259 26,157 31/10/2018 41,110 7,212 24,993 TOTAL 1,306,753 224,355 806,488 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- FSWAI_BTCL_NP_SUSNER
  • 55. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 18,583 17,457 22 02/10/2018 5,272 7,940 0 03/10/2018 3,324 19,569 6,333 04/10/2018 2,833 32,611 9,651 05/10/2018 2,004 11,676 1,693 06/10/2018 1,125 5,184 0 07/10/2018 3,269 7,738 0 08/10/2018 4,349 11,899 0 09/10/2018 4,136 21,270 204 10/10/2018 30,837 28,104 250 11/10/2018 39,540 48,167 408 12/10/2018 43,143 107,410 24,086 13/10/2018 23,035 49,778 10,970 14/10/2018 12,796 28,024 68 15/10/2018 2,545 6,175 0 16/10/2018 4,314 11,219 0 17/10/2018 8,194 19,690 134 18/10/2018 12,743 24,286 90 19/10/2018 12,176 18,922 0 20/10/2018 10,146 12,181 0 21/10/2018 20,301 38,392 464 22/10/2018 29,281 41,351 621 23/10/2018 15,209 21,938 176 24/10/2018 3,682 7,671 0 25/10/2018 2,414 11,570 25 26/10/2018 13,852 37,367 1,800 27/10/2018 28,960 76,176 5,163 28/10/2018 53,369 112,549 10,327 29/10/2018 43,829 97,035 13,908 30/10/2018 54,388 101,653 7,948 31/10/2018 61,440 130,895 19,352 TOTAL 571,089 1,165,897 113,693 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- DHAR_RENEWABLE_15MW_DASERA_MAIDAN
  • 56. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 14,962 6,243 1,280 02/10/2018 34,442 11,229 2,594 03/10/2018 56,587 9,365 7,451 04/10/2018 44,048 16,562 6,767 05/10/2018 15,950 8,045 421 06/10/2018 25,728 2,103 2,605 07/10/2018 21,556 8,646 551 08/10/2018 24,886 19,740 1,421 09/10/2018 61,366 27,239 4,885 10/10/2018 3,942 28,919 5,432 11/10/2018 34,541 42,437 2,923 12/10/2018 56,219 44,386 1,849 13/10/2018 47,954 21,806 4,566 14/10/2018 42,014 15,835 13,321 15/10/2018 18,449 17,716 1,994 16/10/2018 27,874 52,829 7,064 17/10/2018 36,317 33,074 2,846 18/10/2018 1,070 48,487 8,913 19/10/2018 28,429 46,710 7,047 20/10/2018 77,252 27,423 13,784 21/10/2018 27,822 56,365 2,867 22/10/2018 19,645 22,585 175 23/10/2018 24,270 14,005 1,228 24/10/2018 41,251 12,089 4,091 25/10/2018 29,220 27,257 858 26/10/2018 9,341 13,568 0 27/10/2018 26,600 14,792 6,030 28/10/2018 46,890 24,039 6,542 29/10/2018 54,069 57,277 1,069 30/10/2018 48,185 55,924 9,145 31/10/2018 55,823 67,594 7,134 TOTAL 1,056,702 854,289 136,853 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- CHOKSI_ENERGY_WIND_33_RIGDOD
  • 57. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 156,240 141,288 0 02/10/2018 157,695 139,151 10 03/10/2018 146,585 134,229 0 04/10/2018 156,605 119,874 13,787 05/10/2018 156,362 68,097 49,622 06/10/2018 155,830 136,972 0 07/10/2018 137,448 133,497 724 08/10/2018 145,909 130,718 98 09/10/2018 148,645 129,453 202 10/10/2018 143,276 131,729 1,218 11/10/2018 136,913 127,157 0 12/10/2018 135,557 119,982 1,915 13/10/2018 146,697 120,198 3,334 14/10/2018 147,040 127,005 134 15/10/2018 145,338 130,803 0 16/10/2018 144,774 126,922 0 17/10/2018 127,125 125,597 2,517 18/10/2018 124,798 128,330 231 19/10/2018 128,958 124,198 26 20/10/2018 126,835 129,593 1,143 21/10/2018 143,643 133,629 0 22/10/2018 139,075 121,316 207 23/10/2018 135,090 123,539 0 24/10/2018 125,415 123,233 857 25/10/2018 133,441 120,616 1,829 26/10/2018 128,839 128,980 0 27/10/2018 119,776 117,233 161 28/10/2018 130,880 127,219 0 29/10/2018 132,370 120,646 0 30/10/2018 133,571 127,867 0 31/10/2018 131,826 131,104 0 TOTAL 4,322,556 3,900,175 78,015 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- 25MW_WELSPUN_RATANGARH
  • 58. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 891 11,063 0 02/10/2018 5,141 18,365 0 03/10/2018 5,522 30,553 0 04/10/2018 4,297 50,815 0 05/10/2018 8,216 37,604 768 06/10/2018 20,582 14,119 0 07/10/2018 23,929 33,901 0 08/10/2018 13,387 6,986 0 09/10/2018 24,956 135,994 4,191 10/10/2018 43,755 147,520 13,007 11/10/2018 125,211 350,697 82,581 12/10/2018 235,140 404,785 23,046 13/10/2018 122,188 282,610 46,115 14/10/2018 50,340 81,301 0 15/10/2018 31,714 21,612 0 16/10/2018 16,060 48,633 0 17/10/2018 9,582 50,061 0 18/10/2018 20,486 34,132 0 19/10/2018 19,981 41,873 105 20/10/2018 1,900 13,217 0 21/10/2018 13,977 31,884 0 22/10/2018 26,806 171,732 14,814 23/10/2018 18,603 68,816 223 24/10/2018 8,671 21,493 0 25/10/2018 25,272 71,900 0 26/10/2018 30,008 114,120 1,716 27/10/2018 32,596 82,609 643 28/10/2018 104,973 158,527 13,748 29/10/2018 112,967 227,615 23,322 30/10/2018 138,278 302,145 93,071 31/10/2018 150,269 248,723 20,168 TOTAL 1,445,698 3,315,405 337,518 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- BETUL_WIND_FARM
  • 59. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 192 992 0 02/10/2018 310 20,463 1,238 03/10/2018 285 28,547 14,329 04/10/2018 590 57,830 28,585 05/10/2018 1,779 13,933 131 06/10/2018 720 3,172 0 07/10/2018 288 17,326 2,100 08/10/2018 192 61,104 8,662 09/10/2018 19,618 74,819 9,704 10/10/2018 13,706 41,854 520 11/10/2018 14,716 108,983 39,368 12/10/2018 53,097 185,764 30,806 13/10/2018 31,887 135,919 26,256 14/10/2018 1,742 79,669 11,121 15/10/2018 192 32,053 4,527 16/10/2018 1,826 29,433 6,750 17/10/2018 3,344 35,214 730 18/10/2018 17,113 93,184 19,012 19/10/2018 5,298 77,376 13,940 20/10/2018 192 43,524 95 21/10/2018 10,019 149,675 71,171 22/10/2018 20,330 57,110 4,374 23/10/2018 2,559 3,888 0 24/10/2018 9,467 43,716 4,893 25/10/2018 431 19,169 0 26/10/2018 7,057 41,609 1,615 27/10/2018 18,201 102,817 16,304 28/10/2018 50,445 144,951 34,592 29/10/2018 18,156 143,734 47,764 30/10/2018 26,107 156,691 38,394 31/10/2018 72,351 231,051 85,579 TOTAL 402,210 2,235,570 522,560 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- BADONI_POWER_WIND_33_MAXI
  • 60. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 518 1,553 0 02/10/2018 3,197 12,235 0 03/10/2018 5,565 21,224 0 04/10/2018 1,375 49,110 0 05/10/2018 6,061 27,653 1,354 06/10/2018 24,587 11,625 0 07/10/2018 28,642 33,230 0 08/10/2018 15,629 5,131 0 09/10/2018 31,689 89,514 232 10/10/2018 63,750 106,972 7,380 11/10/2018 186,856 288,292 68,768 12/10/2018 344,844 327,695 8,432 13/10/2018 180,072 196,511 19,306 14/10/2018 71,028 61,632 0 15/10/2018 43,229 22,580 0 16/10/2018 17,649 57,563 604 17/10/2018 9,759 39,775 0 18/10/2018 23,221 18,324 0 19/10/2018 21,853 33,087 249 20/10/2018 1,243 12,020 0 21/10/2018 15,210 27,148 0 22/10/2018 34,731 147,257 9,424 23/10/2018 22,844 38,156 0 24/10/2018 9,206 14,038 0 25/10/2018 31,355 89,374 3,660 26/10/2018 39,065 103,954 1,672 27/10/2018 43,419 71,767 0 28/10/2018 155,744 110,268 9,757 29/10/2018 165,988 178,336 6,910 30/10/2018 205,085 281,171 101,908 31/10/2018 224,308 222,255 3,166 TOTAL 2,027,722 2,699,450 242,822 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- KUKARU_DEDHPANI_50MW
  • 61. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 2,859 13,730 556 02/10/2018 10,135 7,147 113 03/10/2018 10,143 7,084 80 04/10/2018 5,220 9,652 180 05/10/2018 17,262 23,056 7,290 06/10/2018 17,029 4,402 1,998 07/10/2018 24,663 8,771 1,675 08/10/2018 4,122 10,968 98 09/10/2018 11,068 23,398 1,477 10/10/2018 17,783 35,551 6,879 11/10/2018 31,197 43,763 8,460 12/10/2018 47,219 119,358 41,215 13/10/2018 54,315 68,695 4,605 14/10/2018 22,473 44,238 4,099 15/10/2018 11,007 12,878 843 16/10/2018 15,870 27,754 918 17/10/2018 13,365 24,040 173 18/10/2018 19,573 39,611 1,985 19/10/2018 8,949 28,909 2,241 20/10/2018 8,341 13,216 235 21/10/2018 17,402 38,409 2,582 22/10/2018 11,777 26,638 2,661 23/10/2018 7,734 10,091 128 24/10/2018 11,799 7,944 0 25/10/2018 7,531 8,936 0 26/10/2018 9,977 14,742 477 27/10/2018 18,769 43,797 1,936 28/10/2018 33,049 44,331 2,909 29/10/2018 38,650 98,271 28,933 30/10/2018 47,748 114,192 38,734 31/10/2018 56,076 145,292 54,648 TOTAL 613,105 1,118,864 218,128 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUZLON_SANDALA_I_KHACHROD_14.7MW
  • 62. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 575 10,547 903 02/10/2018 484 5,460 13 03/10/2018 848 512 0 04/10/2018 192 4,585 377 05/10/2018 192 6,074 1,098 06/10/2018 1,557 6,629 0 07/10/2018 203 4,967 0 08/10/2018 213 14,944 791 09/10/2018 754 20,544 864 10/10/2018 3,791 21,300 680 11/10/2018 5,810 32,023 11,018 12/10/2018 4,960 51,603 17,303 13/10/2018 3,423 43,460 13,582 14/10/2018 727 16,041 188 15/10/2018 3,294 6,792 0 16/10/2018 296 12,143 0 17/10/2018 192 10,508 81 18/10/2018 1,351 27,983 319 19/10/2018 3,196 18,331 47 20/10/2018 192 4,664 0 21/10/2018 4,497 24,023 997 22/10/2018 1,860 15,668 937 23/10/2018 192 1,234 0 24/10/2018 1,800 4,282 0 25/10/2018 1,904 19,441 3,178 26/10/2018 761 6,051 67 27/10/2018 10,232 24,595 1,233 28/10/2018 9,052 31,769 2,714 29/10/2018 12,002 91,221 40,562 30/10/2018 15,153 117,261 68,881 31/10/2018 25,491 142,341 92,629 TOTAL 115,194 796,996 258,462 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUZLON_III_W_SAILANA_14.1MW
  • 63. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 2,924 8,622 26 02/10/2018 253 22,948 1,222 03/10/2018 3,058 23,991 367 04/10/2018 1,405 19,773 6,172 05/10/2018 7,472 19,514 5,579 06/10/2018 9,298 11,119 14 07/10/2018 2,837 13,486 1 08/10/2018 242 25,949 1,654 09/10/2018 6,501 45,216 5,370 10/10/2018 3,177 27,421 3,693 11/10/2018 14,856 62,274 19,084 12/10/2018 13,832 55,763 7,266 13/10/2018 8,408 57,284 10,342 14/10/2018 7,478 30,055 1,329 15/10/2018 7,574 28,964 2,082 16/10/2018 8,335 52,184 12,859 17/10/2018 11,678 55,953 9,488 18/10/2018 12,517 85,818 25,132 19/10/2018 4,348 79,746 28,829 20/10/2018 4,893 50,208 5,831 21/10/2018 15,052 86,671 28,421 22/10/2018 4,260 35,795 2,858 23/10/2018 6,515 30,521 6,474 24/10/2018 9,734 22,798 170 25/10/2018 3,261 71,722 36,016 26/10/2018 4,190 22,189 850 27/10/2018 15,460 19,321 600 28/10/2018 14,663 31,536 4,452 29/10/2018 19,156 112,763 57,078 30/10/2018 27,073 90,869 27,252 31/10/2018 35,256 134,370 69,807 TOTAL 285,706 1,434,843 380,318 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SHANKHESWAR_DHAMNAR_15MW
  • 64. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 281 4,684 22 02/10/2018 214 417 0 03/10/2018 192 18,495 5,900 04/10/2018 190 47,862 31,531 05/10/2018 192 2,571 14 06/10/2018 192 664 0 07/10/2018 192 382 0 08/10/2018 192 2,492 48 09/10/2018 1,803 11,709 1,225 10/10/2018 2,319 5,895 0 11/10/2018 363 44,126 21,208 12/10/2018 3,877 53,642 10,392 13/10/2018 1,324 35,764 1,546 14/10/2018 192 17,350 990 15/10/2018 192 3,549 6 16/10/2018 192 39,524 12,077 17/10/2018 192 64,183 36,306 18/10/2018 1,238 56,888 26,824 19/10/2018 192 29,551 5,625 20/10/2018 227 36,327 7,793 21/10/2018 2,699 78,209 39,910 22/10/2018 192 23,081 5,024 23/10/2018 274 14,910 244 24/10/2018 192 46,649 29,192 25/10/2018 4,120 21,734 2,710 26/10/2018 2,860 7,317 0 27/10/2018 6,881 13,334 104 28/10/2018 12,420 27,901 3,334 29/10/2018 3,099 67,995 31,447 30/10/2018 1,869 82,306 44,558 31/10/2018 5,022 56,050 19,812 TOTAL 53,384 915,561 337,842 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUZLON_I_W_SUSNER_15MW
  • 65. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 1,898 9,643 54 02/10/2018 1,425 4,914 0 03/10/2018 2,901 40,856 4,882 04/10/2018 294 45,634 15,234 05/10/2018 2,903 23,212 854 06/10/2018 2,764 8,046 0 07/10/2018 2,948 13,248 0 08/10/2018 4,332 58,469 5,370 09/10/2018 21,021 72,707 3,200 10/10/2018 15,915 30,290 240 11/10/2018 17,688 65,616 11,340 12/10/2018 42,361 120,074 14,907 13/10/2018 25,439 102,298 13,094 14/10/2018 6,934 96,009 23,320 15/10/2018 946 18,792 0 16/10/2018 1,523 21,646 970 17/10/2018 4,262 38,311 230 18/10/2018 16,495 52,738 742 19/10/2018 5,865 43,370 98 20/10/2018 1,040 52,941 2,414 21/10/2018 9,187 87,559 18,239 22/10/2018 15,632 55,917 1,981 23/10/2018 4,841 9,636 0 24/10/2018 5,508 44,633 9,668 25/10/2018 887 44,800 940 26/10/2018 10,230 36,002 838 27/10/2018 18,310 74,678 3,746 28/10/2018 32,321 105,637 13,008 29/10/2018 18,301 108,271 21,154 30/10/2018 22,460 125,978 20,508 31/10/2018 43,505 179,230 50,686 TOTAL 360,136 1,791,155 237,717 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUDHEER_30MW_BERCHHA
  • 66. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 5,030 17,493 7,907 02/10/2018 772 22,218 2,334 03/10/2018 2,340 17,849 344 04/10/2018 3,416 22,833 5,908 05/10/2018 6,662 20,888 4,059 06/10/2018 8,201 14,013 800 07/10/2018 3,875 11,919 24 08/10/2018 1,329 18,482 404 09/10/2018 2,641 36,379 4,230 10/10/2018 2,831 19,326 814 11/10/2018 12,802 59,555 18,996 12/10/2018 12,177 57,130 10,820 13/10/2018 9,431 64,832 17,668 14/10/2018 6,547 29,414 1,331 15/10/2018 5,690 23,287 1,594 16/10/2018 7,894 63,813 10,995 17/10/2018 10,354 51,295 6,924 18/10/2018 7,320 68,523 15,704 19/10/2018 2,848 69,946 20,135 20/10/2018 3,489 42,557 2,979 21/10/2018 15,890 68,011 17,849 22/10/2018 5,745 29,945 1,264 23/10/2018 6,488 28,806 6,802 24/10/2018 8,754 14,532 0 25/10/2018 2,995 62,806 24,445 26/10/2018 4,501 20,171 125 27/10/2018 20,627 17,152 270 28/10/2018 18,835 28,400 2,599 29/10/2018 20,843 106,667 54,371 30/10/2018 27,658 91,128 26,747 31/10/2018 38,331 100,441 36,137 TOTAL 286,316 1,299,811 304,579 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- GIRIRAJ_AFJALPUR_15MW
  • 67. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 5,364 10,733 331 02/10/2018 862 17,742 740 03/10/2018 2,487 18,699 502 04/10/2018 3,692 22,878 6,800 05/10/2018 6,932 12,170 164 06/10/2018 8,504 7,356 0 07/10/2018 4,192 12,379 5 08/10/2018 1,424 25,072 621 09/10/2018 2,942 33,211 1,544 10/10/2018 3,077 30,039 5,420 11/10/2018 13,683 48,183 7,054 12/10/2018 13,011 50,849 4,982 13/10/2018 10,065 31,400 1,627 14/10/2018 6,963 24,744 966 15/10/2018 6,044 24,263 1,095 16/10/2018 8,253 57,658 11,226 17/10/2018 10,919 48,391 7,068 18/10/2018 7,979 77,341 23,754 19/10/2018 3,151 67,271 18,201 20/10/2018 3,738 40,833 4,056 21/10/2018 16,619 75,728 18,660 22/10/2018 5,918 29,569 1,104 23/10/2018 6,680 27,550 2,642 24/10/2018 9,265 19,127 402 25/10/2018 3,092 56,543 25,274 26/10/2018 4,679 19,592 264 27/10/2018 21,321 15,779 980 28/10/2018 19,571 35,469 7,258 29/10/2018 21,789 87,912 31,119 30/10/2018 28,994 88,699 26,174 31/10/2018 40,087 102,432 35,378 TOTAL 301,297 1,219,612 245,411 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- GIRIRAJ_MANDVI_15MW MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT
  • 68. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 16,865 5,002 9 02/10/2018 19,195 445 0 03/10/2018 21,661 18,486 4,616 04/10/2018 19,384 25,524 7,764 05/10/2018 17,702 226 0 06/10/2018 18,053 533 0 07/10/2018 17,969 789 0 08/10/2018 19,693 539 0 09/10/2018 16,174 8,725 313 10/10/2018 15,976 5,866 0 11/10/2018 14,266 33,322 9,476 12/10/2018 13,435 40,760 2,372 13/10/2018 15,247 20,216 191 14/10/2018 17,708 8,576 0 15/10/2018 19,618 4,587 0 16/10/2018 21,221 19,957 1,456 17/10/2018 19,526 40,651 6,237 18/10/2018 13,242 42,686 8,369 19/10/2018 18,412 11,406 164 20/10/2018 20,262 32,918 3,918 21/10/2018 13,942 59,147 11,143 22/10/2018 14,534 20,614 556 23/10/2018 17,118 2,267 0 24/10/2018 21,751 37,991 20,168 25/10/2018 16,701 20,314 605 26/10/2018 13,887 9,200 0 27/10/2018 15,612 17,864 150 28/10/2018 16,787 24,263 4,158 29/10/2018 10,712 49,659 24,445 30/10/2018 9,729 67,127 30,952 31/10/2018 7,659 28,389 1,193 TOTAL 514,041 658,049 138,255 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUZLON_IV_W_AGAR_15MW
  • 69. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 7,405 13,030 60 02/10/2018 1,784 3,050 0 03/10/2018 291 32,420 19,088 04/10/2018 818 50,900 18,744 05/10/2018 2,046 22,070 2,029 06/10/2018 3,694 260 0 07/10/2018 1,844 3,010 0 08/10/2018 1,410 3,150 0 09/10/2018 7,341 44,010 10,516 10/10/2018 15,743 69,840 12,090 11/10/2018 17,359 78,640 37,969 12/10/2018 28,826 207,320 133,452 13/10/2018 13,191 104,060 49,340 14/10/2018 13,017 75,820 21,825 15/10/2018 4,166 9,720 0 16/10/2018 7,402 29,990 1,434 17/10/2018 3,068 37,180 2,431 18/10/2018 6,128 42,350 3,338 19/10/2018 4,466 21,100 576 20/10/2018 5,751 19,750 112 21/10/2018 14,218 45,370 3,919 22/10/2018 10,254 40,710 2,128 23/10/2018 5,146 12,860 15 24/10/2018 6,794 9,260 422 25/10/2018 907 3,430 0 26/10/2018 9,938 43,670 6,639 27/10/2018 17,300 112,620 25,598 28/10/2018 47,838 141,660 25,024 29/10/2018 43,000 183,850 88,350 30/10/2018 52,305 205,800 111,288 31/10/2018 63,095 242,440 138,642 TOTAL 416,545 1,909,340 715,029 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SARJAN_25.2MW_BADNAGAR
  • 70. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/10/2018 3,413 12,625 405 02/10/2018 8,705 8,388 70 03/10/2018 3,813 10,460 496 04/10/2018 247 39,708 18,038 05/10/2018 257 20,685 2,207 06/10/2018 14,565 2,572 0 07/10/2018 11,253 3,035 0 08/10/2018 1,132 16,206 954 09/10/2018 7,761 47,490 4,995 10/10/2018 7,255 57,635 21,921 11/10/2018 26,671 65,996 18,001 12/10/2018 36,578 110,441 21,485 13/10/2018 22,452 75,562 8,121 14/10/2018 10,509 55,418 6,418 15/10/2018 6,292 15,249 1,014 16/10/2018 12,738 53,073 4,926 17/10/2018 11,156 61,450 9,564 18/10/2018 20,236 81,288 17,842 19/10/2018 6,241 54,566 8,130 20/10/2018 7,416 40,343 2,608 21/10/2018 16,825 85,369 15,562 22/10/2018 8,040 36,850 3,172 23/10/2018 8,371 29,590 909 24/10/2018 9,755 28,077 3,474 25/10/2018 6,474 16,364 0 26/10/2018 7,585 36,563 3,342 27/10/2018 15,351 52,250 1,946 28/10/2018 27,003 70,520 10,059 29/10/2018 29,600 121,441 52,397 30/10/2018 35,774 154,487 81,385 31/10/2018 42,771 158,905 79,284 TOTAL 426,239 1,622,606 398,725 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF October-2018 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- RENEW_WIND_AP4_30MW_KHACHROD