                         Building a new home can be the most complicated and expensive transaction of an
envIronMental            individual’s life – one that is often entered into with little preparation or experience. here are a number of
& lanD use
                         considerations to keep in mind.
BusIness
                         Plans and specifications. a successful project starts with a good set of plans and specifications. these are the
taxatIon                 instructions the builder will follow in constructing the home. a comprehensive and thorough set of plans and
                         specifications leaves guesswork out of the equation and minimizes the possibility of misunderstandings about
elDer laW
                         the scope of the project. also, the plans are used to price the project. It is therefore critical to make sure that
asset ProtectIon         every feature and component expected in construction is set forth in these documents. you should assume that
                         anything not included will not be provided and will cost extra if requested later.

                         the contract. the construction contract sets forth the rights and responsibilities of the owner and the builder
attorneys                and should always be reviewed by an attorney before signing. When properly drafted, the contract must cover a
earl Drayton farr, jr.   number of critical elements. a few are discussed below.
(senior counsel)
                         Price. the most basic element of the contract is the price term which is typically addressed in one of two ways.
guy s. eMerIch
                         each approach carries its own advantages and disadvantages.
jacK o. hacKett II
                         fixed Price. Most residential contracts are for a set price that includes the builder’s cost of construction plus
MIchael P. hayMans
                         an undisclosed margin for overhead and profit. under a fixed price contract the risk of inflation is borne by the
charles t. Boyle         builder. thus, the margin the builder includes in the fixed price typically includes an allowance for unexpected
Darol h.M. carr          increases in the cost of labor or materials and for unforeseen contingencies. If neither occurs, the builder real-
                         izes additional profit. If such conditions do arise, the owner is protected from incurring additional cost.
connIe M. schIDer

DavID a. holMes          cost Plus. under this arrangement, the owner agrees to pay the actual cost of construction plus a set fee which
                         can either be a fixed amount or a percentage of the cost of construction. an owner can usually negotiate a fee
gary a. Kahle            that is significantly lower than the builder’s margin under a fixed price contract where the builder bears the risk
jennIfer r. hoWell       of inflation. this advantage comes at the price of the owner bearing the risk of inflation. It also removes the
                         builder’s incentive to negotiate the best possible prices with subcontractors and material suppliers. the key
roger h. MIller III
                         to success in a cost plus project is to have a well-defined scope of work backed by comprehensive plans and
Dorothy l. KorsZen       specifications and a budget where the costs of the major divisions of construction are known going in. When
                         these critical elements are missing, costs can quickly exceed what was expected.
jIll c. Mccrory

tIna M. Mays             Price Increase Provisions. the construction industry in florida experienced tremendous inflation in the wake
                         of the hurricanes of 2004. Many builders working under fixed price contracts sought to protect themselves by
WIll W. sunter
                         developing contract provisions that allow the builder to pass on significant price increases to the owner. Many
anthony c. DuBBaneh      owners, believing they were working under a fixed price contract, were surprised when they received bills for
                         price increase items. obviously, an unexpected price increase can drastically affect the budget of a construc-
aretI g. tsItsaKIs
                         tion project. Make certain you know whether your contract includes provisions and how they can impact you.
Personal Injury &
Wrongful Death

lItIgatIon
                        Warranty. every construction contract should include a warranty with respect to materials and workmanship.
estate PlannIng
                        Many builders attempt to impose a time limitation on warranty claims. there are a number of technical issues
real estate & tItle     regarding how such limitations work. nevertheless, make sure you understand any time limitations in the con-
Insurance               tract warranty, and make certain you notify the builder of known warranty issues within that time. If a dispute
                        arises, be sure to consult with an attorney.
MarItal & faMIly

envIronMental           time for completion. to an owner, delay can be one of the most frustrating parts of the construction process.
& lanD use              the form contract used by most residential builders will have no guarantee of completion within a stated time.
                        In the absence of such a provision, remedies for delay can be difficult. consider negotiating a guaranteed
BusIness                completion date with an agreed amount to be deducted from the contract price for each day of delay thereafter.
taxatIon
                        Progress Payments and liens. florida law imposes a number of significant responsibilities on owners to see
elDer laW               that payments to the builder, subcontractor, and suppliers are properly administered during the construction
                        process. such matters are beyond the scope of this article. see farr newsletter: “the aBc’s of florida’s con-
asset ProtectIon        struction lien law” by Will W. sunter, august 2006.

                        changes in the Work. Inevitably, as construction progresses, there will be items that the owner wants to add to
                        or delete from the project. Most contracts simply state the change in the contract price (increase or decrease)
                        must be agreed to at the time the change is requested. negotiating the price of a major change in mid-con-
                        struction can be difficult. for this reason, even in a fixed price contract, consider adding a provision stating
                        that all changes in the work will be priced on a cost plus basis.

                        communication is Key. By necessity, building a house creates a long term relationship between the owner and
                        contractor. as in any relationship, good communication is essential. too often frustration leads to animosity and
                        a breakdown in communication which inevitably results in major problems between owner and builder. choose a
                        builder you can get along with. even when difficult problems arise, do your best to maintain good lines of com-
                        munication. following this and the other suggestions herein, can contribute to a successful project.




Punta gorda office:
                                   to subscribe to our monthly newsletters, please visit our website at www.farr.com
99 nesbit street
Punta gorda, fl 33950
Phone: 941.639.1158                       this newsletter is for general information and education purposes only.
fax: 941.639.0028                                    It is not offered as legal advice or legal opinion.


englewood office:        to the extent this message contains tax advice, the u.s. treasury Department requires us to inform you
33 s. Indiana avenue      that any advice in this letter is not intended or written by our firm to be used, and cannot be used by
englewood, fl 34223      any taxpayer, for the purpose of avoiding any penalties that may be imposed under the Internal revenue
Phone: 941.460.9334
                         code. advice from our firm relating to federal tax matters may not be used in promoting, marketing or
fax: 941.460.9443
                                        recommending any entity, investment plan or arrangement to any taxpayer.

More Related Content

What's hot

3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...Praveen Premkumar
 
Substitute and vicarious_performance
Substitute and vicarious_performanceSubstitute and vicarious_performance
Substitute and vicarious_performanceHafizul Mukhlis
 
Types of contracts
Types of contracts   Types of contracts
Types of contracts MANNU KUMAR
 
types of contracts
 types of contracts types of contracts
types of contractsKEVINMISTRY8
 
Aspects of business and contract law
Aspects of business and contract lawAspects of business and contract law
Aspects of business and contract lawCruddy'Gal Cautioness
 
Construction Defect Claims: The Ins & The Outs, The Do's & The Don'ts
Construction Defect Claims: The Ins & The Outs, The Do's & The Don'tsConstruction Defect Claims: The Ins & The Outs, The Do's & The Don'ts
Construction Defect Claims: The Ins & The Outs, The Do's & The Don'tsSamantha Ip
 
IAS 11
IAS 11IAS 11
IAS 11RS P
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Construction contract
Construction contractConstruction contract
Construction contractAqsa Shafique
 
Extra Work, Changes and Termination of the Contract
Extra Work, Changes and Termination of the ContractExtra Work, Changes and Termination of the Contract
Extra Work, Changes and Termination of the ContractSHKLaw
 
Fi dic silver book
Fi dic silver bookFi dic silver book
Fi dic silver bookmoodlyd
 
Contracts Management
Contracts Management Contracts Management
Contracts Management Mohib Ullah
 
Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011Maatla Moadi
 
110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc ProjectsMy own
 

What's hot (20)

Nce603 mod unit4
Nce603 mod unit4Nce603 mod unit4
Nce603 mod unit4
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
 
Substitute and vicarious_performance
Substitute and vicarious_performanceSubstitute and vicarious_performance
Substitute and vicarious_performance
 
Types of contracts
Types of contracts   Types of contracts
Types of contracts
 
Cost Plus Contract
Cost Plus ContractCost Plus Contract
Cost Plus Contract
 
types of contracts
 types of contracts types of contracts
types of contracts
 
Aspects of business and contract law
Aspects of business and contract lawAspects of business and contract law
Aspects of business and contract law
 
Construction Defect Claims: The Ins & The Outs, The Do's & The Don'ts
Construction Defect Claims: The Ins & The Outs, The Do's & The Don'tsConstruction Defect Claims: The Ins & The Outs, The Do's & The Don'ts
Construction Defect Claims: The Ins & The Outs, The Do's & The Don'ts
 
Newsletter TE&A
Newsletter TE&ANewsletter TE&A
Newsletter TE&A
 
IAS 11
IAS 11IAS 11
IAS 11
 
Lump Sum Contract
Lump Sum ContractLump Sum Contract
Lump Sum Contract
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Lawyer-Monthly_Metehan-Sonbahar
Lawyer-Monthly_Metehan-SonbaharLawyer-Monthly_Metehan-Sonbahar
Lawyer-Monthly_Metehan-Sonbahar
 
Construction contract
Construction contractConstruction contract
Construction contract
 
Fidic
FidicFidic
Fidic
 
Extra Work, Changes and Termination of the Contract
Extra Work, Changes and Termination of the ContractExtra Work, Changes and Termination of the Contract
Extra Work, Changes and Termination of the Contract
 
Fi dic silver book
Fi dic silver bookFi dic silver book
Fi dic silver book
 
Contracts Management
Contracts Management Contracts Management
Contracts Management
 
Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011
 
110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects
 

Similar to Building a New Home?

5 Risks Construction Owners Face
5 Risks Construction Owners Face5 Risks Construction Owners Face
5 Risks Construction Owners FaceMark McCarthy
 
10 Essentials For An Effective Construction Contract
10 Essentials For An Effective Construction Contract10 Essentials For An Effective Construction Contract
10 Essentials For An Effective Construction ContractSarah Fox
 
What is a Guaranteed Maximum Price Construction Contract in Arizona?
What is a Guaranteed Maximum Price Construction Contract in Arizona?What is a Guaranteed Maximum Price Construction Contract in Arizona?
What is a Guaranteed Maximum Price Construction Contract in Arizona?Charles Lotzar
 
Construction Contract Issues for Owners of Residences
Construction Contract Issues for Owners of ResidencesConstruction Contract Issues for Owners of Residences
Construction Contract Issues for Owners of ResidencesConstruction Cicerone
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closuresrinivas2036
 
Ipwea inspire-issue-12- nov-2019- managing contractors (1)
Ipwea inspire-issue-12- nov-2019- managing contractors (1)Ipwea inspire-issue-12- nov-2019- managing contractors (1)
Ipwea inspire-issue-12- nov-2019- managing contractors (1)James Baker
 
2.12 procurement management 1
2.12  procurement management 12.12  procurement management 1
2.12 procurement management 1reddvise
 
Group 1 presentation intro to cpm
Group 1 presentation intro to cpmGroup 1 presentation intro to cpm
Group 1 presentation intro to cpmKaila Turla
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentationelliotfus
 
Project management chapter 8
Project management chapter 8Project management chapter 8
Project management chapter 8VancityInstitute
 
Your Construction Subcontract. The 23 Points That Matter Most
Your Construction Subcontract. The 23 Points That Matter MostYour Construction Subcontract. The 23 Points That Matter Most
Your Construction Subcontract. The 23 Points That Matter MostAlex Barthet
 
HW - Preconstruction phase
HW - Preconstruction phaseHW - Preconstruction phase
HW - Preconstruction phaseHARLAND MIMS
 
Systech insights edition-Mark Woodward Smith
Systech insights edition-Mark Woodward Smith Systech insights edition-Mark Woodward Smith
Systech insights edition-Mark Woodward Smith mark woodward-smith
 
Behold The Construction Contract
Behold The Construction ContractBehold The Construction Contract
Behold The Construction ContractGarrettLudwig
 

Similar to Building a New Home? (20)

5 Risks Construction Owners Face
5 Risks Construction Owners Face5 Risks Construction Owners Face
5 Risks Construction Owners Face
 
10 Essentials For An Effective Construction Contract
10 Essentials For An Effective Construction Contract10 Essentials For An Effective Construction Contract
10 Essentials For An Effective Construction Contract
 
What is a Guaranteed Maximum Price Construction Contract in Arizona?
What is a Guaranteed Maximum Price Construction Contract in Arizona?What is a Guaranteed Maximum Price Construction Contract in Arizona?
What is a Guaranteed Maximum Price Construction Contract in Arizona?
 
Construction Contract Issues for Owners of Residences
Construction Contract Issues for Owners of ResidencesConstruction Contract Issues for Owners of Residences
Construction Contract Issues for Owners of Residences
 
Ideal Contract for Multi Storey Building Construction
Ideal Contract for Multi Storey Building ConstructionIdeal Contract for Multi Storey Building Construction
Ideal Contract for Multi Storey Building Construction
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
 
Contract
Contract Contract
Contract
 
Against all odds
Against all odds Against all odds
Against all odds
 
Ipwea inspire-issue-12- nov-2019- managing contractors (1)
Ipwea inspire-issue-12- nov-2019- managing contractors (1)Ipwea inspire-issue-12- nov-2019- managing contractors (1)
Ipwea inspire-issue-12- nov-2019- managing contractors (1)
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
2.12 procurement management 1
2.12  procurement management 12.12  procurement management 1
2.12 procurement management 1
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Group 1 presentation intro to cpm
Group 1 presentation intro to cpmGroup 1 presentation intro to cpm
Group 1 presentation intro to cpm
 
Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentation
 
Project management chapter 8
Project management chapter 8Project management chapter 8
Project management chapter 8
 
Your Construction Subcontract. The 23 Points That Matter Most
Your Construction Subcontract. The 23 Points That Matter MostYour Construction Subcontract. The 23 Points That Matter Most
Your Construction Subcontract. The 23 Points That Matter Most
 
HW - Preconstruction phase
HW - Preconstruction phaseHW - Preconstruction phase
HW - Preconstruction phase
 
Systech insights edition-Mark Woodward Smith
Systech insights edition-Mark Woodward Smith Systech insights edition-Mark Woodward Smith
Systech insights edition-Mark Woodward Smith
 
Behold The Construction Contract
Behold The Construction ContractBehold The Construction Contract
Behold The Construction Contract
 

Building a New Home?

  • 1. Personal Injury & Wrongful Death lItIgatIon estate PlannIng BuIlDIng a neW hoMe? real estate & tItle By: David a. holmes Insurance august 2007 MarItal & faMIly Building a new home can be the most complicated and expensive transaction of an envIronMental individual’s life – one that is often entered into with little preparation or experience. here are a number of & lanD use considerations to keep in mind. BusIness Plans and specifications. a successful project starts with a good set of plans and specifications. these are the taxatIon instructions the builder will follow in constructing the home. a comprehensive and thorough set of plans and specifications leaves guesswork out of the equation and minimizes the possibility of misunderstandings about elDer laW the scope of the project. also, the plans are used to price the project. It is therefore critical to make sure that asset ProtectIon every feature and component expected in construction is set forth in these documents. you should assume that anything not included will not be provided and will cost extra if requested later. the contract. the construction contract sets forth the rights and responsibilities of the owner and the builder attorneys and should always be reviewed by an attorney before signing. When properly drafted, the contract must cover a earl Drayton farr, jr. number of critical elements. a few are discussed below. (senior counsel) Price. the most basic element of the contract is the price term which is typically addressed in one of two ways. guy s. eMerIch each approach carries its own advantages and disadvantages. jacK o. hacKett II fixed Price. Most residential contracts are for a set price that includes the builder’s cost of construction plus MIchael P. hayMans an undisclosed margin for overhead and profit. under a fixed price contract the risk of inflation is borne by the charles t. Boyle builder. thus, the margin the builder includes in the fixed price typically includes an allowance for unexpected Darol h.M. carr increases in the cost of labor or materials and for unforeseen contingencies. If neither occurs, the builder real- izes additional profit. If such conditions do arise, the owner is protected from incurring additional cost. connIe M. schIDer DavID a. holMes cost Plus. under this arrangement, the owner agrees to pay the actual cost of construction plus a set fee which can either be a fixed amount or a percentage of the cost of construction. an owner can usually negotiate a fee gary a. Kahle that is significantly lower than the builder’s margin under a fixed price contract where the builder bears the risk jennIfer r. hoWell of inflation. this advantage comes at the price of the owner bearing the risk of inflation. It also removes the builder’s incentive to negotiate the best possible prices with subcontractors and material suppliers. the key roger h. MIller III to success in a cost plus project is to have a well-defined scope of work backed by comprehensive plans and Dorothy l. KorsZen specifications and a budget where the costs of the major divisions of construction are known going in. When these critical elements are missing, costs can quickly exceed what was expected. jIll c. Mccrory tIna M. Mays Price Increase Provisions. the construction industry in florida experienced tremendous inflation in the wake of the hurricanes of 2004. Many builders working under fixed price contracts sought to protect themselves by WIll W. sunter developing contract provisions that allow the builder to pass on significant price increases to the owner. Many anthony c. DuBBaneh owners, believing they were working under a fixed price contract, were surprised when they received bills for price increase items. obviously, an unexpected price increase can drastically affect the budget of a construc- aretI g. tsItsaKIs tion project. Make certain you know whether your contract includes provisions and how they can impact you.
  • 2. Personal Injury & Wrongful Death lItIgatIon Warranty. every construction contract should include a warranty with respect to materials and workmanship. estate PlannIng Many builders attempt to impose a time limitation on warranty claims. there are a number of technical issues real estate & tItle regarding how such limitations work. nevertheless, make sure you understand any time limitations in the con- Insurance tract warranty, and make certain you notify the builder of known warranty issues within that time. If a dispute arises, be sure to consult with an attorney. MarItal & faMIly envIronMental time for completion. to an owner, delay can be one of the most frustrating parts of the construction process. & lanD use the form contract used by most residential builders will have no guarantee of completion within a stated time. In the absence of such a provision, remedies for delay can be difficult. consider negotiating a guaranteed BusIness completion date with an agreed amount to be deducted from the contract price for each day of delay thereafter. taxatIon Progress Payments and liens. florida law imposes a number of significant responsibilities on owners to see elDer laW that payments to the builder, subcontractor, and suppliers are properly administered during the construction process. such matters are beyond the scope of this article. see farr newsletter: “the aBc’s of florida’s con- asset ProtectIon struction lien law” by Will W. sunter, august 2006. changes in the Work. Inevitably, as construction progresses, there will be items that the owner wants to add to or delete from the project. Most contracts simply state the change in the contract price (increase or decrease) must be agreed to at the time the change is requested. negotiating the price of a major change in mid-con- struction can be difficult. for this reason, even in a fixed price contract, consider adding a provision stating that all changes in the work will be priced on a cost plus basis. communication is Key. By necessity, building a house creates a long term relationship between the owner and contractor. as in any relationship, good communication is essential. too often frustration leads to animosity and a breakdown in communication which inevitably results in major problems between owner and builder. choose a builder you can get along with. even when difficult problems arise, do your best to maintain good lines of com- munication. following this and the other suggestions herein, can contribute to a successful project. Punta gorda office: to subscribe to our monthly newsletters, please visit our website at www.farr.com 99 nesbit street Punta gorda, fl 33950 Phone: 941.639.1158 this newsletter is for general information and education purposes only. fax: 941.639.0028 It is not offered as legal advice or legal opinion. englewood office: to the extent this message contains tax advice, the u.s. treasury Department requires us to inform you 33 s. Indiana avenue that any advice in this letter is not intended or written by our firm to be used, and cannot be used by englewood, fl 34223 any taxpayer, for the purpose of avoiding any penalties that may be imposed under the Internal revenue Phone: 941.460.9334 code. advice from our firm relating to federal tax matters may not be used in promoting, marketing or fax: 941.460.9443 recommending any entity, investment plan or arrangement to any taxpayer.