SlideShare a Scribd company logo
1 of 12
Download to read offline
1   LA COUNTY HIGH DESERT MACC   LBL - 2010-11
Los Angeles County High Desert
Multi-Ambulatory Care Center

Lancaster requires a new ambulatory care center to service the Antelope Valley, and the MACC will serve as a replacement hospital for the
current care facility on 60th Avenue in Lancaster. The new location is 4th and I Streets in Lancaster, in the middle of a residential neighbor-
hood.

The center will serve to reinvigorate the suburban landscape and be open to the public for any Emergency, surgical and outpatient procedures.

Lee, Burkhart, Liu was commissioned to carry this project from Schecmatic Design to Construction Documents, and guide a Design Buld firm
in the Construction Documentation in order to retain the integrity of the User Group Agreements.

                                                                                          As a public project, we were concerned with address-
                                                                                          ing public issues such as landscaping, environmental
                                                                                          awareness, and of course, health. The building is a
                                                                                          model of sustainability and will achieve LEED Silver
                                                                                          when it is completed in Summer 2014.

                                                                                          I was responsible for drawing the Building Information
                                                                                          Model in Revit under the project management of ar-
                                                                                          chitects and planners. As a designer, I presented the
                                                                                          project in the majority of User Group meetings and
                                                                                          coordinated the Revit effort with engineers, architec-
                                                                                          tural draftsman, and client interpretation.
The Revit Model was a deliverable, along with paper documentation, to the County of Los Angeles in January of 2011. LBL was awarded a
Commendation from the County for its efforts on this project, and the Revit model was used for animations to the residents of the City of Lan-
caster, where it was lauded and served to excite the residents about the prospect of renewal in their desert landscape.


Views of Atrium




Process....


OPTION ONE




OPTION TWO
2   BUILDING 22C AT UNIVERSITY OF CALIFORNIA, IRVINE   LBL - 2011
existing                        demolition                    2-story design                    3-story design




Building 22C UC Irvine Medical Center

The CDDC (Comprehensive Digestive Disease Center) is a tenant on UC Irvine’s Medical Campus and as a highly regarded practice tied to
the newly renovated Douglas Hospital, the UC Regents and the client agreed to upgrade the facilities and upgrade new corridor along the
campus in the City of Orange.

The existing facility is sandwiched between Building 23 and Building 22A; the 24,600 SF building steps back to the south from the main drive.
As the building sits on a North-South axis and looks clear across a plaza to Douglas Hospital, we took pains to maintain its status as a campus
thoroughfare while upgrading the ground-floor corridors. The finished design adds a third floor and provides six new operating rooms for the
practice in a 34,921 SF envelope.
                                                                       Due to funding concerns, LBL was asked to design two options for the
                                                                       renovation, seen above. The third floor was optioned in the Bid Docu-
                                                                       ments as either a shell or a full build out. A creative use of phasing in
                                                                       Revit allowed us to build one Revit model with three options all the way
                                                                       through to 100% CD Submittal.

                                                                       My responsibilities for the project at LBL were to build and maintain the
                                                                       Building Information Model through the medical planning, and Schemat-
                                                                       ic Design to Construction Documentation phases.

                                                                       In addition to planning and architectural services, LBL was asked to
                                                                       present our design to potential donors for the project; my renderings
                                                                       - seen to the left and right - were used in conjuction with NavisWorks
                                                                       animations and impressed the donors enough to provide full funding for
                                                                       the project with a sizable grant. We completed 100% CD documents in
                                                                       October of 2011. Construction is scheduled for 2015.
3   TELEMEDICINE LAB - UNIVERSITY OF CALIFRNIA AT LOS ANGELES   LBL - 2010-11
Dgraves 2012 Portfolio Online S
Dgraves 2012 Portfolio Online S
Dgraves 2012 Portfolio Online S
Dgraves 2012 Portfolio Online S
Dgraves 2012 Portfolio Online S
Dgraves 2012 Portfolio Online S

More Related Content

What's hot

Brooklyn Greenway-Design-Principles
Brooklyn Greenway-Design-PrinciplesBrooklyn Greenway-Design-Principles
Brooklyn Greenway-Design-Principlesjpetr0s
 
C2CNetwork Newsletter 1
C2CNetwork Newsletter 1C2CNetwork Newsletter 1
C2CNetwork Newsletter 1OVAM
 
Summary of Downtown Charlotte Amalie Revitalization Projects as of September ...
Summary of Downtown Charlotte Amalie Revitalization Projects as of September ...Summary of Downtown Charlotte Amalie Revitalization Projects as of September ...
Summary of Downtown Charlotte Amalie Revitalization Projects as of September ...Downtown Revitalization, Inc
 
GSA Goes Macro BIM: Using 5D BIM Technology for Feasibility Studies
GSA Goes Macro BIM: Using 5D BIM Technology for Feasibility StudiesGSA Goes Macro BIM: Using 5D BIM Technology for Feasibility Studies
GSA Goes Macro BIM: Using 5D BIM Technology for Feasibility StudiesBeck Technology, Ltd.
 
5D Macro BIM Project Profiles Using DProfiler
5D Macro BIM Project Profiles Using DProfiler5D Macro BIM Project Profiles Using DProfiler
5D Macro BIM Project Profiles Using DProfilerBeck Technology, Ltd.
 
A Conceptual Model for Building Requirements Processing
A Conceptual Model for Building Requirements ProcessingA Conceptual Model for Building Requirements Processing
A Conceptual Model for Building Requirements ProcessingCyril MAUGER
 
Peter Barlow: Portfolio + Resume
Peter Barlow: Portfolio + ResumePeter Barlow: Portfolio + Resume
Peter Barlow: Portfolio + ResumePBArchitecture
 

What's hot (8)

Brooklyn Greenway-Design-Principles
Brooklyn Greenway-Design-PrinciplesBrooklyn Greenway-Design-Principles
Brooklyn Greenway-Design-Principles
 
LCP Team
LCP Team LCP Team
LCP Team
 
C2CNetwork Newsletter 1
C2CNetwork Newsletter 1C2CNetwork Newsletter 1
C2CNetwork Newsletter 1
 
Summary of Downtown Charlotte Amalie Revitalization Projects as of September ...
Summary of Downtown Charlotte Amalie Revitalization Projects as of September ...Summary of Downtown Charlotte Amalie Revitalization Projects as of September ...
Summary of Downtown Charlotte Amalie Revitalization Projects as of September ...
 
GSA Goes Macro BIM: Using 5D BIM Technology for Feasibility Studies
GSA Goes Macro BIM: Using 5D BIM Technology for Feasibility StudiesGSA Goes Macro BIM: Using 5D BIM Technology for Feasibility Studies
GSA Goes Macro BIM: Using 5D BIM Technology for Feasibility Studies
 
5D Macro BIM Project Profiles Using DProfiler
5D Macro BIM Project Profiles Using DProfiler5D Macro BIM Project Profiles Using DProfiler
5D Macro BIM Project Profiles Using DProfiler
 
A Conceptual Model for Building Requirements Processing
A Conceptual Model for Building Requirements ProcessingA Conceptual Model for Building Requirements Processing
A Conceptual Model for Building Requirements Processing
 
Peter Barlow: Portfolio + Resume
Peter Barlow: Portfolio + ResumePeter Barlow: Portfolio + Resume
Peter Barlow: Portfolio + Resume
 

Similar to Dgraves 2012 Portfolio Online S

Ud studio sp2013_assignment3_ht
Ud studio sp2013_assignment3_htUd studio sp2013_assignment3_ht
Ud studio sp2013_assignment3_htHenning Thomsen
 
portfolio.compressed
portfolio.compressedportfolio.compressed
portfolio.compressedDonald Olsen
 
LA BIMstorm - AIA Bim Awards Jury's Choice Award 2008
LA BIMstorm - AIA Bim Awards Jury's Choice Award 2008LA BIMstorm - AIA Bim Awards Jury's Choice Award 2008
LA BIMstorm - AIA Bim Awards Jury's Choice Award 2008Mike Bordenaro
 
Leonidas Milas Architecture Portfolio
Leonidas Milas Architecture PortfolioLeonidas Milas Architecture Portfolio
Leonidas Milas Architecture PortfolioLeonidas Milas
 
Internship Report
Internship ReportInternship Report
Internship Reportdtan97
 
Using Geotechnical Data in a 3D Space Whitepaper
Using Geotechnical Data in a 3D Space WhitepaperUsing Geotechnical Data in a 3D Space Whitepaper
Using Geotechnical Data in a 3D Space WhitepaperAmy Heffner
 
Harvard Application Portfolio
Harvard Application PortfolioHarvard Application Portfolio
Harvard Application PortfolioKelvin Xuna
 
BIM for substainable design-white paper
BIM for substainable design-white paperBIM for substainable design-white paper
BIM for substainable design-white paperMuhannad AbdulRaouf
 
Joseph A. Schettino\’s Portfolio
Joseph A. Schettino\’s PortfolioJoseph A. Schettino\’s Portfolio
Joseph A. Schettino\’s Portfoliosublime1486
 
Kaustav gupta portfolio 2012 web
Kaustav gupta portfolio 2012 webKaustav gupta portfolio 2012 web
Kaustav gupta portfolio 2012 webKaustav Gupta
 
Bringing Digital Curation to Architects to promote innovation in the Construc...
Bringing Digital Curation to Architects to promote innovation in the Construc...Bringing Digital Curation to Architects to promote innovation in the Construc...
Bringing Digital Curation to Architects to promote innovation in the Construc...Ruggero Lancia
 
Architectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj IyengarArchitectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj IyengarBharathwaj Iyengar
 
Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Rob Madill
 

Similar to Dgraves 2012 Portfolio Online S (20)

Ud studio sp2013_assignment3_ht
Ud studio sp2013_assignment3_htUd studio sp2013_assignment3_ht
Ud studio sp2013_assignment3_ht
 
portfolio.compressed
portfolio.compressedportfolio.compressed
portfolio.compressed
 
design of g building.pdf
design of g building.pdfdesign of g building.pdf
design of g building.pdf
 
Nova Architecture
Nova ArchitectureNova Architecture
Nova Architecture
 
LA BIMstorm - AIA Bim Awards Jury's Choice Award 2008
LA BIMstorm - AIA Bim Awards Jury's Choice Award 2008LA BIMstorm - AIA Bim Awards Jury's Choice Award 2008
LA BIMstorm - AIA Bim Awards Jury's Choice Award 2008
 
Practice and work
Practice and workPractice and work
Practice and work
 
Leonidas Milas Architecture Portfolio
Leonidas Milas Architecture PortfolioLeonidas Milas Architecture Portfolio
Leonidas Milas Architecture Portfolio
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Using Geotechnical Data in a 3D Space Whitepaper
Using Geotechnical Data in a 3D Space WhitepaperUsing Geotechnical Data in a 3D Space Whitepaper
Using Geotechnical Data in a 3D Space Whitepaper
 
Nova architecture
Nova architectureNova architecture
Nova architecture
 
Cloud computing
Cloud computingCloud computing
Cloud computing
 
Harvard Application Portfolio
Harvard Application PortfolioHarvard Application Portfolio
Harvard Application Portfolio
 
BIM for substainable design-white paper
BIM for substainable design-white paperBIM for substainable design-white paper
BIM for substainable design-white paper
 
Revit architecture
Revit architectureRevit architecture
Revit architecture
 
Joseph A. Schettino\’s Portfolio
Joseph A. Schettino\’s PortfolioJoseph A. Schettino\’s Portfolio
Joseph A. Schettino\’s Portfolio
 
Kaustav gupta portfolio 2012 web
Kaustav gupta portfolio 2012 webKaustav gupta portfolio 2012 web
Kaustav gupta portfolio 2012 web
 
Bringing Digital Curation to Architects to promote innovation in the Construc...
Bringing Digital Curation to Architects to promote innovation in the Construc...Bringing Digital Curation to Architects to promote innovation in the Construc...
Bringing Digital Curation to Architects to promote innovation in the Construc...
 
Arunava Sarkar Cv
Arunava Sarkar  CvArunava Sarkar  Cv
Arunava Sarkar Cv
 
Architectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj IyengarArchitectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj Iyengar
 
Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics
 

Dgraves 2012 Portfolio Online S

  • 1. 1 LA COUNTY HIGH DESERT MACC LBL - 2010-11
  • 2. Los Angeles County High Desert Multi-Ambulatory Care Center Lancaster requires a new ambulatory care center to service the Antelope Valley, and the MACC will serve as a replacement hospital for the current care facility on 60th Avenue in Lancaster. The new location is 4th and I Streets in Lancaster, in the middle of a residential neighbor- hood. The center will serve to reinvigorate the suburban landscape and be open to the public for any Emergency, surgical and outpatient procedures. Lee, Burkhart, Liu was commissioned to carry this project from Schecmatic Design to Construction Documents, and guide a Design Buld firm in the Construction Documentation in order to retain the integrity of the User Group Agreements. As a public project, we were concerned with address- ing public issues such as landscaping, environmental awareness, and of course, health. The building is a model of sustainability and will achieve LEED Silver when it is completed in Summer 2014. I was responsible for drawing the Building Information Model in Revit under the project management of ar- chitects and planners. As a designer, I presented the project in the majority of User Group meetings and coordinated the Revit effort with engineers, architec- tural draftsman, and client interpretation.
  • 3. The Revit Model was a deliverable, along with paper documentation, to the County of Los Angeles in January of 2011. LBL was awarded a Commendation from the County for its efforts on this project, and the Revit model was used for animations to the residents of the City of Lan- caster, where it was lauded and served to excite the residents about the prospect of renewal in their desert landscape. Views of Atrium Process.... OPTION ONE OPTION TWO
  • 4. 2 BUILDING 22C AT UNIVERSITY OF CALIFORNIA, IRVINE LBL - 2011
  • 5. existing demolition 2-story design 3-story design Building 22C UC Irvine Medical Center The CDDC (Comprehensive Digestive Disease Center) is a tenant on UC Irvine’s Medical Campus and as a highly regarded practice tied to the newly renovated Douglas Hospital, the UC Regents and the client agreed to upgrade the facilities and upgrade new corridor along the campus in the City of Orange. The existing facility is sandwiched between Building 23 and Building 22A; the 24,600 SF building steps back to the south from the main drive. As the building sits on a North-South axis and looks clear across a plaza to Douglas Hospital, we took pains to maintain its status as a campus thoroughfare while upgrading the ground-floor corridors. The finished design adds a third floor and provides six new operating rooms for the practice in a 34,921 SF envelope. Due to funding concerns, LBL was asked to design two options for the renovation, seen above. The third floor was optioned in the Bid Docu- ments as either a shell or a full build out. A creative use of phasing in Revit allowed us to build one Revit model with three options all the way through to 100% CD Submittal. My responsibilities for the project at LBL were to build and maintain the Building Information Model through the medical planning, and Schemat- ic Design to Construction Documentation phases. In addition to planning and architectural services, LBL was asked to present our design to potential donors for the project; my renderings - seen to the left and right - were used in conjuction with NavisWorks animations and impressed the donors enough to provide full funding for the project with a sizable grant. We completed 100% CD documents in October of 2011. Construction is scheduled for 2015.
  • 6. 3 TELEMEDICINE LAB - UNIVERSITY OF CALIFRNIA AT LOS ANGELES LBL - 2010-11