A Liliana Lopez 2010

993 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
993
On SlideShare
0
From Embeds
0
Number of Embeds
6
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

A Liliana Lopez 2010

  1. 1. A Liliana Lopez Design Portfolio 2000 – 2010
  2. 2. Objective Provide expertise in all phases of the Architectural Practice. Bring a strong work ethic and persistence to provide excellence in every Project. Promote the importance of personal and professional development as well as mentor the younger generations, it is in teaching that we grow and become an asset to any organization. Education Bachelor of Architecture University of Houston Fifth Year Design Studio Ecole dʼArchitecture Paris-Villemin Skills AutoCad Photoshop Microsoft Office Adobe Acrobat Design Space Planning Building Code Review Coordination of Disciplines Construction Documents Bidding and Negotiation Construction Administration Project Closeout Bilingual: English-Spanish For complete resume: www.linkedin.com/in/lilianalopez www.s2-dio.com/Resume.html Overview 1998 - 2010
  3. 3. Project Overview The project consists of a $15,000,000 master planed reconfiguration of the Marathon operations facilities including new offices, operations and laboratory facilities along with a new maintenance building and security command center. This project also included a large utility component where all major utilities were either relocated or extended. Role in this Project Team Leader in the Design, Production and Construction Administration. Managed the Project and mentored young Architects through the process from Schematic Design through Construction Administration and Project Closeout. Marathon Petroleum Company – Texas Refining Division Facilities Siting 2007 – 2008
  4. 4. Maintenance Office Building First Floor Plan N.T.S. Site Plan N.T.S. Maintenance Office Building Second Floor Plan N.T.S. Marathon Petroleum Company – Texas Refining Division Facilities Siting Architectural Drawings
  5. 5. Employee Facilities / E&I Shops N.T.S. Machine and Fabrication Shops N.T.S. Marathon Petroleum Company – Texas Refining Division Facilities Siting Architectural Drawings
  6. 6. Maintenance Office Building Display at Lobby Marathon Petroleum Company – Texas Refining Division Facilities Siting Architectural Drawings
  7. 7. Project Overview Project Cost: $13,000,000 Project Size: 100,000 SF The High School is designed to provide for an optimum capacity of 600 students. The design consists of classrooms supporting the Districtʼs required instructional programs. A publicly accessible Library and Media Center acts as a community- wide information and learning center. The Commons area/Dinning Hall with a capability of 200-300 students. The UIL Competition Gym is supported by Athletic and PE dressing rooms. The Music, Drama and Art programs are enhanced by a formal auditorium and stage. Role in this Project Team Leader in the Design and Production of Construction Documents and Specifications. The New Franklin High School was published in the November 2006 Issue of The American School and University Magazine as part of the “Works in Progress – Outstanding Designs” Franklin ISD – New Franklin High School 2005 – 2006
  8. 8. Site Plan N.T.S. Franklin ISD – New Franklin High School Architectural Drawings
  9. 9. Floor Plan N.T.S. Franklin ISD – New Franklin High School Architectural Drawings
  10. 10. Exterior Elevation N.T.S. Section through Auditorium N.T.S. Section through Main Entry N.T.S. Section through Library N.T.S. Franklin ISD – New Franklin High School Architectural Drawings
  11. 11. Project Overview The project consists of an $8,000,000 new Junior High School. The first LEED Certified Public School in the State of Texas. The 92,000 SF school th serves 600 students in grades 7 and th 8 Features include optimal use of natural light throughout the school, exposed structure using glue-lam wood members as well as sustainable materials throughout. Role in this Project As a Junior Designer for the West Brazos Junior High, I implemented my knowledge and experience to coordinate Consultants and Engineers in order to comply with the Design intent. Provided Design presentations and assisted the Owner in material and color selections for the Project. I coordinated efforts with the Project Architect and LEED AP to create a school that promoted Sustainability, as well as excellent Design features.. Columbia Brazoria ISD – West Brazos Junior High 2004 – 2005
  12. 12. Site Plan N.T.S Columbia Brazoria ISD – West Brazos Junior High Architectural Drawings
  13. 13. Exterior Elevations N.T.S Columbia Brazoria ISD – West Brazos Junior High Architectural Drawings
  14. 14. Project Overview The project consists of a $2,000,000 New Support Facilities for the Columbia-Brazoria Independent School District. This included Offices, Training Kitchen, Bus Parking and Service bays and a Fueling Station Role in this Project Project Architect and Designer. Responsible for Coordination of Disciplines. Provided Design presentations and assisted the Owner in material and color selections for the Project Columbia Brazoria ISD – Support Facilities 2004
  15. 15. Floor Plan N.T.S Exterior Elevations N.T.S Columbia Brazoria ISD – Support Facilities Architectural Drawings
  16. 16. Project Overview A New Elementary School in Monterrey Mexico. The school consists of a two story building housing classrooms cafeteria, and support. A two story parking area is provided. Role in this Project Project Architect for the Design of the American School Foundation Elementary School in Monterrey. My role in this project was key to the communication between our team of Architects and Engineers and the Construction Manager in Mexico. Provided services through Design Development. American School Foundation of Monterrey – New Elementary School 2005
  17. 17. Project Overview Various Projects throughout the District including, but not limited to Seabrook Intermediate School Renovations, Casework Replacement at Various Campuses, Clearview Center, ESC Office and Lobby Renovations, Role in this Project Acted as Project Architect / Project Manager and Designer for various Projects throughout the District. Provided client meetings, color selections, coordination of disciplines among other roles. Education Support Center N.T.S Seabrook Intermediate School N.T.S Seabrook Intermediate School N.T.S Clear Creek ISD – Miscellaneous Projects 2007 – 2010

×