Liberty Capital International, Inc. (LCI)Presents…………


                           Cementos…the
                           lowest cost -
                           cement
                           production in
                           North America
OS
     ENT
  EM
C
                    Cementos
              Cementos Exportadora S. DE R.L.
    Section I - Executive Overview

    Section II – Plant Management

    Section III - Permitting

    Section IV – In Depth Capabilities

    Section V - Pedigree of Teaming Companies

    Section VI - Market for Cement in California

    Section V - Summary
OS
     ENT
C EM




                   Section I
              Executive Overview
Cementos
         OS
     ENT
C EM
                          Key Corporate Personnel


                     Robert F. Conley, Esq.,
                          Chairman


   Former President of Lockheed Corporation International. Mr. Conley
   established the Lockheed Overseas Network in 120 nations and exported
   more goods and services than anyone in US history.

  Prior to joining Lockheed, Mr. Conley established the General Dynamics
   Overseas Network. He was in involved with Morgan Laws in VTOL
   composite aircraft and encryption designed for the Pentagon, NATO,
   and Asian Nations approved by U.S. Departments of State and
   Commerce. He serves as Chairman of Cementos.
Cementos
         OS
     ENT
  EM
C                     Key Corporate Personnel


                Pedro M. G. Ortiz, LCI Principal
                          Director General


    Mr. Ortiz is a businessman well established in both Mexico
    and the United States. He is involved with Robert Conley,
    Esq. and Morgan Laws in numerous projects including:

     Cementos Exportadora S DE R. L.
     Club Shangri-La
     HalCom – A telephone and internet company.
     Stealthsoft and Shadowsoft Corporations – Encryption
     Diagnostic Resources Corporation – PV solar/capacitor.
     Jordan Energy Corporation – 100 MW solar farms.
Cementos
         OS
     ENT
C EM
                  Key Corporate Personnel


              George R.Gouda, Ph.D.,
                  Vice Chairman


Director of Technology. Dr. Gouda retired as
Principal Engineer from IFC/World Bank
Washington, D.C.
Previously he worked for Fuller Company. He has
been involved in over 155 cement plants during his 44 years
in the cement business. He is considered the “leading
authority”, on cement technology. Dr. Gouda stated that
Cementos was the best cement project he has ever seen.
Cementos
         OS
     ENT
C EM

               Key Corporate Personnel

                David L. Vickers,
                    Vice Chairman


   Mr. Vickers holds a B.S. degree in engineering and an
   MS in business. As president of Fenton Aggregates in
   San Diego, he made Fenton the largest redi-mix
   company in the County. He became President of
   Calaveras Cement (now Lehigh Southwest) with cement
   plants in Redding and Tehachapi, CA. He took
   Calaveras from a $50 million loss to a $15 million
   profit during his first year at the helm. He
   became Chairman of the National Redi-Mix
   Association.
Cementos
         OS
     ENT
C EM
                  Key Corporate Personnel



                 C. Cortland Hooper
                   Chief Financial Officer


  Mr. Hooper was the former owner of Old Town
  Financial in La Jolla, California. The company
  financed shopping centers office buildings, resorts,
  master planned communities, condominiums,
  apartments and a myriad of other business entities.
  He is currently CEO of LCI.
Cementos
         OS
     ENT
C EM
                   Key Corporate Personnel



                  Julio Heckmuller
                         Controller

* Julio is a former VP of Corporate Finance for G.E.
  Capital, and Grupo Financiero Serfin.

* MS in Business from Cornell University, Gothe
  Institut Mittelstuf II Certification, BS in industrial
  Science Instituto Technology Monterrey – He is
  fluent in English, Spanish & German.
Cementos
         OS
     ENT
C EM
                 Cementos Key Construction Personnel



                    David Salzborn, P.E.
                        Project Engineer

Mr. Salzborn oversaw the construction of the cement plant
in Vancouver B.C. and a cement plant in Thailand.
He worked for David Vickers as manager of Calaveras
Cement in Tehachapi, California.

Mr. Salzborn will inspect the Shenyang Heavy Machine
Group cement plants in China and will serve as
Project Engineer for Cementos plant in Baja California.
Cementos
         OS
     ENT                    Key Corporate Personnel
C EM




                      Richard L. Reyburn, P.E
                      Chief Mining Engineer and Quarry Manager


    Richard L. Reyburn, P.E., former Executive Director of the Department
   of Minerals, State of Nevada. Mr. Reyburn will interface with Cruz
   Azul, he will oversee all quarry operations and personnel. His assistant
   will be hired from another cement company by Krupp Engineering in
   Mexico, D.F. Mr. Reyburn is a licensed geologist in three states and is
   the owner of RAM Project Management Associates.

  Geophysical operations usually precedes mining engineering at the
  quarry by at least 6 months.
NT
         OS                   Cementos
     E
C EM
                        Key Corporate Personnel



                      Patrick Alan Conley
                         Chief Liaison Officer


   Former Assistant to the President of Royal Jordanian
   Airlines. Patrick Conley will interface with Mexican
   officials, the project developer, turnkey contractor and other
   companies involved with Cementos.

   Patrick attended universities in France, Germany and Spain.
    He is a director of Shadowsoft™ Corporation, an
   encryption company. He is fluent in English, Spanish,
   French and
   German.
OS
     ENT
C EM




                  Section II
              Plant Management
Cementos
         OS
     ENT
  EM
C
                   Plant Management
              Cementos Plant will Managed by

                     Cruz Azul

   This 24 year old Mexican cement
   manufacturer has gone head to head
   with Cemex in Mexico, and won, with
   cleaner, more efficient operating plants.
Cementos
         OS
     ENT
  EM
C
               Plant Management

   Cruz Azul will oversee the labor intensive
   functions of the cement plant operations,
   including: Running the quarry, the plant and
   silo storage discharging to ships or barges.

   The concept was recommended by Price
   Waterhouse Coopers. Plant operations will
   be on a cost plus basis.
Cementos
         OS
     ENT
  EM
C
              Corporate Management

   Corporate management including permitting,
   purchasing of fuel, feedstock, and sales of
   Portland cement will be overseen by
   Cementos.

   Cementos has a letter of intent to purchase 1
   million s/tons per year from a NYSE group,
   and is negotiating for additional sales of the
   residue balance of 1.1 million s/t/y of
   Portland cement.
OS
     ENT
C EM




              Section III
              Permitting
Cementos
         OS
      NT
C EM
     E                Permitting


                Environmental Permit

   The environmental permit will be done by
   Cirdubadir Tecnico-Division Pataologia Y
   Biotecnicnologia Ambiental from Guadalajara,
   Mexico.

   Some 20 plants in Mexico in the past 20 years.
   Have been environmental permitted in 60 to 90 days
   from application to issued permit.
Cementos
         OS
     ENT
C EM
                          Permitting
                          Permitting Officer
     Permitting is an on-going item. Permits are required for
     all personnel, all imported vehicles, and each major phase
     of the project.

     Lic. Enrique Gastelum, is the former General Manager of
     Desorollo de Baja California. All permits issued in Baja
     California Norte are issued from this office, except the
     environmental permit. Enrique has agreed to work for
     Cementos as it’s Permitting Officer. In most cases,
     Enrique will obtain permits on the same day they are
     applied for, including work permits for expatriates.
Cementos
         OS
     ENT
C EM
                         Key Quarry Personnel Continued


                             Geological Survey

   In addition to the 80 million metric tons of limestone in place at the
   proposed plant site, there is an additional 100 to 200 million tons,
   available, on the property that will be surveyed.

   Richard L. Reyburn, P.E., of RAM Project Management Associates
   will oversee the blocking out and testing of all of the mineral reserves at
   Rancho Oculto.

  Bore samples will be sent to KSHMG in Shenyang, China for moisture
   and hardness testing to design the custom made primary stage crushers
   for Cementos.
Cementos
         OS
     ENT
C EM
                                 Water Survey




  RBF, the oldest engineering company in southern California will oversee
   the water survey.

  RBF has been involved in most of the water engineering and
   conservation projects in the southwest for the past 56 years.

  The company implemented numerous concepts for water conservation on
   the Los Angeles, Santa Ana and other rivers in Southern California.

   Separately, a Reverse Osmosis concept offered by TTEC is being
   considered by Cementos for purification of Pacific Ocean water for use
   at the plant and for employee housing.
Cementos
         OS
     ENT
C EM
                   Infrastructure Design Engineering




                       RBF, would:

        Fly over, and photograph, Cementos property

        Develop 2’ contour maps

        Design the infrastructure including access roads
Cementos
         OS
     ENT
C EM
                      Marine Engineering



   Moffat & Nichol Engineering of Long Beach,
   California would oversee the Marine Engineering,
   including:

   Location site for floating buoy for receiving liquid 6
   fuel and for shipping of cement via barges.
   Alternative, breakwater study, and design.
   The company has built over 25 miles of
   breakwater.
OS
     ENT
C EM




               Section V
                Pedigree
              of Teaming
               Companies
OS
     ENT                    Cementos
C EM




              Teaming Companies selected are:

         Among the largest

         The oldest

         The best in their respective fields
Cementos
         OS
     ENT
C EM                   Teaming companies selected




    LLB Bank, Zurich, Switzerland

   Bank of America, U.S.

    SHENYANG HEAVY MACHINE GROUP

     RBF – a 1944 Civil Engineering Company

   Moffat & Nichol Marine Engineering, a 61 year old firm.

   Cruz Azul & Productos Cementos Mexicanna, S.A.
Cementos
         OS
     ENT
C EM
                    Teaming companies selected



                       Turnkey Contractor
         Shenyang Heavy Machine Group (SHMG)
   SHMG is one of Asia’s largest heavy machine
   manufacturing groups. Headquartered in Shenyang,
   China, the company has over 8,000 employees.

   Manufactured the first rotary kilns for cement in China.
   SHMG would turnkey the Cementos plant for $165 million
   SHMG would finance 60% or $99 million
Cementos
         OS
     ENT
C EM
                 Teaming companies selected



               Equipment Design & Supplier




        Shenyang Heavy Machine Group,
        Shenyang, China.
Cementos
         OS
     ENT
C EM
                      Teaming companies selected


              Infrastructure Design Engineering

                    RBF - Irvine, California
   Since 1944, oldest engineering company in So. CA. In the
   past 61 years RBF has done most of the infrastructure
   design and engineering for cities and counties in Southern
   California. Morgan Laws has done private sector business
   with RBF since 1965.

   RBF has extensive experience in Mexico.
Cementos
         OS
     ENT
C EM
                      Teaming companies selected


                        Performance Bond

    A.I.G. Insurance Company would issue a turnkey
    performance bond, that would be obtained through San
    Clemente Insurance Agency, Lee Mayers, Insurance Agent
    of Record. The bond would be issued to SHMG for
    US$165 million.

-   The performance bond would guarantee production of the
    Cementos Plant.
-   Time…..……… 18 months after funding.
-   Quantity……….10,000 mtpd.
-   Quality…………Type I – II/V Portland Cement.
OS
     ENT
C EM




              Section VII
                   SS
              Summary
OS
     ENT
  EM
C                 Cementos Summary




   Cementos SHMG cement plant would produce
   10,000 mt/d of Type I – II/V at a lower cost than
   any company in North America.

   Cementos can ship cement via self-discharging
   ships on the Pacific Ocean, 110 miles (177 km),
   from Cementos plant, to distribution terminals in
   San Diego and Long Beach, California, U.S.
OS
     ENT
C EM
                   Cementos Summary




   Because Cementos production is totally for
   export, anti-dumping laws would not apply to
   Cementos import into the U.S.
   In 20011, all cement imported into the U.S. by
   Cemex carried a penalty tariff.
   (ref: The Jones Act) anti-dumping legislation.
OS                 CEMENTOS Summary
     ENT
C EM




 Prior to meeting SHMG, Cementos had planned to use Polysius Krupp
  of Germany as the turnkey contractor.
 The 6,000 ton per day plant costing $300 million was to be financed by
  Deutsche Bank, Madrid.
  In January 2007 Terry Plummer of SHMG, Canada visited Cementos
  Directors and made an offer to turnkey a 10,000 mt/d Portland
  Cement plant for Cementos for US$165 million.
CEMENTOS
    Exportadora
Cementos Exportadora S DE R.L
Liberty Capital International, Inc.

More Related Content

Similar to Cementos updated power point presentation as of 121212

Travis Stout Resume
Travis Stout ResumeTravis Stout Resume
Travis Stout ResumeTravis Stout
 
Oscar P. Juarez-RESUME
Oscar P. Juarez-RESUMEOscar P. Juarez-RESUME
Oscar P. Juarez-RESUMEOscar Juarez
 
Andrew Squires Oil BIO
Andrew Squires  Oil BIOAndrew Squires  Oil BIO
Andrew Squires Oil BIOAndrew Squires
 
R. Gene Farley Cv 2010.Doc
R. Gene Farley Cv  2010.DocR. Gene Farley Cv  2010.Doc
R. Gene Farley Cv 2010.Docgenefarley
 
Exxpand Energy Credentials (2)
Exxpand Energy Credentials (2)Exxpand Energy Credentials (2)
Exxpand Energy Credentials (2)David Scales
 
Bruce LaCour's Resume
Bruce  LaCour's ResumeBruce  LaCour's Resume
Bruce LaCour's ResumeBruce LaCour
 
12th Annual Discussions of The Round Table - Reviewed
12th Annual Discussions of The Round Table - Reviewed12th Annual Discussions of The Round Table - Reviewed
12th Annual Discussions of The Round Table - ReviewedLOESCHE
 
Edramirezresume
EdramirezresumeEdramirezresume
Edramirezresumeed ramirez
 
Canada Gold Shareholder Presentation June 2009
Canada Gold Shareholder Presentation June 2009Canada Gold Shareholder Presentation June 2009
Canada Gold Shareholder Presentation June 2009mcchad
 
Resume for tony_kettlewell
Resume for tony_kettlewellResume for tony_kettlewell
Resume for tony_kettlewellConfidential
 
SLFraley Resumeex 2015
SLFraley Resumeex 2015SLFraley Resumeex 2015
SLFraley Resumeex 2015Stan Fraley
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public ResumeLee Riopel
 
43b7d0_7146033eab584b08895c65a74d803dda
43b7d0_7146033eab584b08895c65a74d803dda43b7d0_7146033eab584b08895c65a74d803dda
43b7d0_7146033eab584b08895c65a74d803ddaKaitlyn Wallace
 
5 Vital Steps to Investing in Oil and Gas
5 Vital Steps to Investing in Oil and Gas5 Vital Steps to Investing in Oil and Gas
5 Vital Steps to Investing in Oil and GasSean P.
 

Similar to Cementos updated power point presentation as of 121212 (20)

Travis Stout Resume
Travis Stout ResumeTravis Stout Resume
Travis Stout Resume
 
Oscar P. Juarez-RESUME
Oscar P. Juarez-RESUMEOscar P. Juarez-RESUME
Oscar P. Juarez-RESUME
 
Andrew Squires Oil BIO
Andrew Squires  Oil BIOAndrew Squires  Oil BIO
Andrew Squires Oil BIO
 
R. Gene Farley Cv 2010.Doc
R. Gene Farley Cv  2010.DocR. Gene Farley Cv  2010.Doc
R. Gene Farley Cv 2010.Doc
 
Exxpand Energy Credentials (2)
Exxpand Energy Credentials (2)Exxpand Energy Credentials (2)
Exxpand Energy Credentials (2)
 
Bruce LaCour's Resume
Bruce  LaCour's ResumeBruce  LaCour's Resume
Bruce LaCour's Resume
 
Mark annis
Mark annisMark annis
Mark annis
 
12th Annual Discussions of The Round Table - Reviewed
12th Annual Discussions of The Round Table - Reviewed12th Annual Discussions of The Round Table - Reviewed
12th Annual Discussions of The Round Table - Reviewed
 
Edramirezresume
EdramirezresumeEdramirezresume
Edramirezresume
 
Canada Gold Shareholder Presentation June 2009
Canada Gold Shareholder Presentation June 2009Canada Gold Shareholder Presentation June 2009
Canada Gold Shareholder Presentation June 2009
 
Resume for tony_kettlewell
Resume for tony_kettlewellResume for tony_kettlewell
Resume for tony_kettlewell
 
Archer Powerpoint Feb 19
Archer Powerpoint Feb 19Archer Powerpoint Feb 19
Archer Powerpoint Feb 19
 
SLFraley Resumeex 2015
SLFraley Resumeex 2015SLFraley Resumeex 2015
SLFraley Resumeex 2015
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public Resume
 
43b7d0_7146033eab584b08895c65a74d803dda
43b7d0_7146033eab584b08895c65a74d803dda43b7d0_7146033eab584b08895c65a74d803dda
43b7d0_7146033eab584b08895c65a74d803dda
 
BC rare earth development
BC rare earth developmentBC rare earth development
BC rare earth development
 
Archer PowerPoint Feb 9
Archer PowerPoint Feb 9Archer PowerPoint Feb 9
Archer PowerPoint Feb 9
 
CredentialsOLJV (1)
CredentialsOLJV (1)CredentialsOLJV (1)
CredentialsOLJV (1)
 
5 Vital Steps to Investing in Oil and Gas
5 Vital Steps to Investing in Oil and Gas5 Vital Steps to Investing in Oil and Gas
5 Vital Steps to Investing in Oil and Gas
 
Fortunate Sun Mining Presentations Feb 2012
Fortunate Sun Mining Presentations Feb 2012Fortunate Sun Mining Presentations Feb 2012
Fortunate Sun Mining Presentations Feb 2012
 

Cementos updated power point presentation as of 121212

  • 1. Liberty Capital International, Inc. (LCI)Presents………… Cementos…the lowest cost - cement production in North America
  • 2. OS ENT EM C Cementos Cementos Exportadora S. DE R.L. Section I - Executive Overview Section II – Plant Management Section III - Permitting Section IV – In Depth Capabilities Section V - Pedigree of Teaming Companies Section VI - Market for Cement in California Section V - Summary
  • 3. OS ENT C EM Section I Executive Overview
  • 4. Cementos OS ENT C EM Key Corporate Personnel Robert F. Conley, Esq., Chairman Former President of Lockheed Corporation International. Mr. Conley established the Lockheed Overseas Network in 120 nations and exported more goods and services than anyone in US history. Prior to joining Lockheed, Mr. Conley established the General Dynamics Overseas Network. He was in involved with Morgan Laws in VTOL composite aircraft and encryption designed for the Pentagon, NATO, and Asian Nations approved by U.S. Departments of State and Commerce. He serves as Chairman of Cementos.
  • 5. Cementos OS ENT EM C Key Corporate Personnel Pedro M. G. Ortiz, LCI Principal Director General Mr. Ortiz is a businessman well established in both Mexico and the United States. He is involved with Robert Conley, Esq. and Morgan Laws in numerous projects including: Cementos Exportadora S DE R. L. Club Shangri-La HalCom – A telephone and internet company. Stealthsoft and Shadowsoft Corporations – Encryption Diagnostic Resources Corporation – PV solar/capacitor. Jordan Energy Corporation – 100 MW solar farms.
  • 6. Cementos OS ENT C EM Key Corporate Personnel George R.Gouda, Ph.D., Vice Chairman Director of Technology. Dr. Gouda retired as Principal Engineer from IFC/World Bank Washington, D.C. Previously he worked for Fuller Company. He has been involved in over 155 cement plants during his 44 years in the cement business. He is considered the “leading authority”, on cement technology. Dr. Gouda stated that Cementos was the best cement project he has ever seen.
  • 7. Cementos OS ENT C EM Key Corporate Personnel David L. Vickers, Vice Chairman Mr. Vickers holds a B.S. degree in engineering and an MS in business. As president of Fenton Aggregates in San Diego, he made Fenton the largest redi-mix company in the County. He became President of Calaveras Cement (now Lehigh Southwest) with cement plants in Redding and Tehachapi, CA. He took Calaveras from a $50 million loss to a $15 million profit during his first year at the helm. He became Chairman of the National Redi-Mix Association.
  • 8. Cementos OS ENT C EM Key Corporate Personnel C. Cortland Hooper Chief Financial Officer Mr. Hooper was the former owner of Old Town Financial in La Jolla, California. The company financed shopping centers office buildings, resorts, master planned communities, condominiums, apartments and a myriad of other business entities. He is currently CEO of LCI.
  • 9. Cementos OS ENT C EM Key Corporate Personnel Julio Heckmuller Controller * Julio is a former VP of Corporate Finance for G.E. Capital, and Grupo Financiero Serfin. * MS in Business from Cornell University, Gothe Institut Mittelstuf II Certification, BS in industrial Science Instituto Technology Monterrey – He is fluent in English, Spanish & German.
  • 10. Cementos OS ENT C EM Cementos Key Construction Personnel David Salzborn, P.E. Project Engineer Mr. Salzborn oversaw the construction of the cement plant in Vancouver B.C. and a cement plant in Thailand. He worked for David Vickers as manager of Calaveras Cement in Tehachapi, California. Mr. Salzborn will inspect the Shenyang Heavy Machine Group cement plants in China and will serve as Project Engineer for Cementos plant in Baja California.
  • 11. Cementos OS ENT Key Corporate Personnel C EM Richard L. Reyburn, P.E Chief Mining Engineer and Quarry Manager Richard L. Reyburn, P.E., former Executive Director of the Department of Minerals, State of Nevada. Mr. Reyburn will interface with Cruz Azul, he will oversee all quarry operations and personnel. His assistant will be hired from another cement company by Krupp Engineering in Mexico, D.F. Mr. Reyburn is a licensed geologist in three states and is the owner of RAM Project Management Associates. Geophysical operations usually precedes mining engineering at the quarry by at least 6 months.
  • 12. NT OS Cementos E C EM Key Corporate Personnel Patrick Alan Conley Chief Liaison Officer Former Assistant to the President of Royal Jordanian Airlines. Patrick Conley will interface with Mexican officials, the project developer, turnkey contractor and other companies involved with Cementos. Patrick attended universities in France, Germany and Spain. He is a director of Shadowsoft™ Corporation, an encryption company. He is fluent in English, Spanish, French and German.
  • 13. OS ENT C EM Section II Plant Management
  • 14. Cementos OS ENT EM C Plant Management Cementos Plant will Managed by Cruz Azul This 24 year old Mexican cement manufacturer has gone head to head with Cemex in Mexico, and won, with cleaner, more efficient operating plants.
  • 15. Cementos OS ENT EM C Plant Management Cruz Azul will oversee the labor intensive functions of the cement plant operations, including: Running the quarry, the plant and silo storage discharging to ships or barges. The concept was recommended by Price Waterhouse Coopers. Plant operations will be on a cost plus basis.
  • 16. Cementos OS ENT EM C Corporate Management Corporate management including permitting, purchasing of fuel, feedstock, and sales of Portland cement will be overseen by Cementos. Cementos has a letter of intent to purchase 1 million s/tons per year from a NYSE group, and is negotiating for additional sales of the residue balance of 1.1 million s/t/y of Portland cement.
  • 17. OS ENT C EM Section III Permitting
  • 18. Cementos OS NT C EM E Permitting Environmental Permit The environmental permit will be done by Cirdubadir Tecnico-Division Pataologia Y Biotecnicnologia Ambiental from Guadalajara, Mexico. Some 20 plants in Mexico in the past 20 years. Have been environmental permitted in 60 to 90 days from application to issued permit.
  • 19. Cementos OS ENT C EM Permitting Permitting Officer Permitting is an on-going item. Permits are required for all personnel, all imported vehicles, and each major phase of the project. Lic. Enrique Gastelum, is the former General Manager of Desorollo de Baja California. All permits issued in Baja California Norte are issued from this office, except the environmental permit. Enrique has agreed to work for Cementos as it’s Permitting Officer. In most cases, Enrique will obtain permits on the same day they are applied for, including work permits for expatriates.
  • 20. Cementos OS ENT C EM Key Quarry Personnel Continued Geological Survey In addition to the 80 million metric tons of limestone in place at the proposed plant site, there is an additional 100 to 200 million tons, available, on the property that will be surveyed. Richard L. Reyburn, P.E., of RAM Project Management Associates will oversee the blocking out and testing of all of the mineral reserves at Rancho Oculto. Bore samples will be sent to KSHMG in Shenyang, China for moisture and hardness testing to design the custom made primary stage crushers for Cementos.
  • 21. Cementos OS ENT C EM Water Survey RBF, the oldest engineering company in southern California will oversee the water survey. RBF has been involved in most of the water engineering and conservation projects in the southwest for the past 56 years. The company implemented numerous concepts for water conservation on the Los Angeles, Santa Ana and other rivers in Southern California. Separately, a Reverse Osmosis concept offered by TTEC is being considered by Cementos for purification of Pacific Ocean water for use at the plant and for employee housing.
  • 22. Cementos OS ENT C EM Infrastructure Design Engineering RBF, would: Fly over, and photograph, Cementos property Develop 2’ contour maps Design the infrastructure including access roads
  • 23. Cementos OS ENT C EM Marine Engineering Moffat & Nichol Engineering of Long Beach, California would oversee the Marine Engineering, including: Location site for floating buoy for receiving liquid 6 fuel and for shipping of cement via barges. Alternative, breakwater study, and design. The company has built over 25 miles of breakwater.
  • 24. OS ENT C EM Section V Pedigree of Teaming Companies
  • 25. OS ENT Cementos C EM Teaming Companies selected are: Among the largest The oldest The best in their respective fields
  • 26. Cementos OS ENT C EM Teaming companies selected LLB Bank, Zurich, Switzerland Bank of America, U.S. SHENYANG HEAVY MACHINE GROUP RBF – a 1944 Civil Engineering Company Moffat & Nichol Marine Engineering, a 61 year old firm. Cruz Azul & Productos Cementos Mexicanna, S.A.
  • 27. Cementos OS ENT C EM Teaming companies selected Turnkey Contractor Shenyang Heavy Machine Group (SHMG) SHMG is one of Asia’s largest heavy machine manufacturing groups. Headquartered in Shenyang, China, the company has over 8,000 employees. Manufactured the first rotary kilns for cement in China. SHMG would turnkey the Cementos plant for $165 million SHMG would finance 60% or $99 million
  • 28. Cementos OS ENT C EM Teaming companies selected Equipment Design & Supplier Shenyang Heavy Machine Group, Shenyang, China.
  • 29. Cementos OS ENT C EM Teaming companies selected Infrastructure Design Engineering RBF - Irvine, California Since 1944, oldest engineering company in So. CA. In the past 61 years RBF has done most of the infrastructure design and engineering for cities and counties in Southern California. Morgan Laws has done private sector business with RBF since 1965. RBF has extensive experience in Mexico.
  • 30. Cementos OS ENT C EM Teaming companies selected Performance Bond A.I.G. Insurance Company would issue a turnkey performance bond, that would be obtained through San Clemente Insurance Agency, Lee Mayers, Insurance Agent of Record. The bond would be issued to SHMG for US$165 million. - The performance bond would guarantee production of the Cementos Plant. - Time…..……… 18 months after funding. - Quantity……….10,000 mtpd. - Quality…………Type I – II/V Portland Cement.
  • 31. OS ENT C EM Section VII SS Summary
  • 32. OS ENT EM C Cementos Summary Cementos SHMG cement plant would produce 10,000 mt/d of Type I – II/V at a lower cost than any company in North America. Cementos can ship cement via self-discharging ships on the Pacific Ocean, 110 miles (177 km), from Cementos plant, to distribution terminals in San Diego and Long Beach, California, U.S.
  • 33. OS ENT C EM Cementos Summary Because Cementos production is totally for export, anti-dumping laws would not apply to Cementos import into the U.S. In 20011, all cement imported into the U.S. by Cemex carried a penalty tariff. (ref: The Jones Act) anti-dumping legislation.
  • 34. OS CEMENTOS Summary ENT C EM Prior to meeting SHMG, Cementos had planned to use Polysius Krupp of Germany as the turnkey contractor. The 6,000 ton per day plant costing $300 million was to be financed by Deutsche Bank, Madrid. In January 2007 Terry Plummer of SHMG, Canada visited Cementos Directors and made an offer to turnkey a 10,000 mt/d Portland Cement plant for Cementos for US$165 million.
  • 35. CEMENTOS Exportadora Cementos Exportadora S DE R.L Liberty Capital International, Inc.