CONTENTS
LETTER FROM PETE CORTELYOU
RIGHTER GROUP HISTORY
SPOTLIGHT: HAROLD RIGHTER
RIGHTER GROUP BY THE NUMBERS
PROJECT HIGHLIGHTS
CONTACTS & TERRITORIES
2-3
4-5
6-7
8-9
10-13
14-15
2
LETTER
“Problem Solving in Construction”
The Righter Group recognized that new steel and retrofit projects
needed a corrosion-resistant primer that would protect more
than a typical alkyd or acrylic coating but would be lower in cost
than zinc-rich primers. With help from the representatives in
Boston and NewYork,Tnemec formulated the one-component,
moisture-cured MIO/zinc-filled polyurethane primer, Series
394 PerimePrime, for these applications. In the architectural
market, Series 394 offers superior bonding to marginally
prepared steel and old coatings and is combatable with several
high-performance topcoats, fireproofing systems, and thermal
insulating coatings.
Vivamus metus velit, vestibulum placerat placerat
convallis, tristique eu ex. Suspendisse in turpis pel-
lentesque, euismod quam sit amet, placerat magna.
“
“
3
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Maecenas ornare elementum urna feugiat tempus. Donec ac
lacus sapien. Pellentesque commodo, quam quis sodales rutrum, tellus quam eleifend ligula, at lacinia urna turpis
quis neque. Cras vel odio eu ligula pellentesque interdum ac sed nisl. Morbi libero leo, volutpat ut rhoncus et, tinci-
dunt volutpat orci. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. Pel-
lentesque nec mi eget libero luctus consectetur in ac dui. Donec rutrum velit quis sapien sollicitudin, sed tincidunt
justo faucibus. Proin arcu leo, fermentum nec enim a, iaculis lacinia nibh. Etiam
molestie massa a nisi dictum, vitae posuere nibh auctor. Pellentesque a consequat
turpis.
Vestibulum condimentum odio mauris. Quisque tincidunt, nisl sit amet convallis
pulvinar, lectus nisi tempus ex, id varius nisi sem ut risus. Ut sollicitudin purus
eget justo ullamcorper, eu ultrices velit placerat. Duis at cursus augue. Donec
sit amet dolor mollis, tempus risus sed, facilisis sapien. Nulla ultricies vel odio
ut ornare. Curabitur semper ante eu purus tristique elementum. Mauris eleifend
magna ex, id euismod ipsum dignissim vel. Etiam finibus viverra mi. Morbi odio
diam, dictum vitae nunc at, mattis pellentesque eros. Vivamus metus velit, ves-
tibulum placerat placerat convallis, tristique eu ex. Suspendisse in turpis pellen-
tesque, euismod quam sit amet, placerat magna. Etiam a viverra orci, vitae congue
elit. Aenean non sapien eget nibh facilisis hendrerit. Suspendisse porta sem eu
odio luctus rutrum.
Sed ut lacus efficitur, ultrices lectus quis, pharetra tellus. Fusce nisl libero, mollis
at rutrum in, dignissim in nisi. Donec rutrum augue vel mi vestibulum ultricies.
Fusce eleifend, leo in dignissim pharetra, enim enim bibendum metus, eu iaculis
diam augue ut ligula. Vivamus laoreet, ligula vitae porta hendrerit, leo velit tempor
nisi, mattis semper erat metus fermentum diam. Nunc tempor turpis sit amet velit pulvinar viverra. Ut sem dui, luctus
eget varius eu, tempor at nisi. Ut congue lectus at sagittis volutpat. Curabitur tristique varius hendrerit. Morbi in velit
dictum, vehicula purus et, ullamcorper velit. Nulla euismod urna et nunc efficitur feugiat. Nullam quis tortor nec ligula
rutrum laoreet.
Pete Cortelyou
President,Tnemec Company, Inc.
4
BACKGROUND
For the last 60 years, Righter Group, Inc. has offered coating and lining
consultation for a wide variety of customers, with one goal always in mind –
problem solving. From industrial floors to architectural high-rises, the team at
Righter Group provides unmatched technical service while supplying architects,
engineers, applicators and OEM professionals with high-performance coating
technology.The coating consultants and customer service experts take pride in
recommending the best possible systems for an array of substrates, budgets,
and design intents, and have been involved in innumerable successful projects
across the U.S. and Canada.
Primarily serving the Northeast, Righter Group provides customers with
innovative solutions that target project-specific problems. For six decades, the
firm has proudly provided tailor-made coating systems, along with technical
support in the field from highly-trained staff, in every market of the coatings
world, including specialty architectural and industrial projects, marine
applications, processing and manufacturing facilities, water and wastewater
treatment plants and water storage tanks.
What is the Righter Group?
RIGHTER GROUP INC.
Problem Solving in Construction
5
H. Righter Company opened its doors in 1955 with a drive to supply the construction
industry in the Northeast with the best available products for priming and finishing steel.
Originally founded by creative-minded construction expert, Harold Righter, who partnered
withTnemec Company, H. Righter Company made an immediate impact in the Boston area,
regularly providing coatings for high-profile projects, such as the Longfellow Bridge, the
Federal Reserve Bank, and General Motors’ Framingham Assembly Plant.
Decades later, H. Righter Company combined forces with nearby agencies,Tnemec East
and Righter Interior Surfaces, to cover a larger territory and serve a wider range of clients.
With a constant exchange between Harold Righter andTnemec about the most recent
advancements in coating technology, both companies grew to new heights, providing top-
of-the-line paint from New Jersey to Maine.
Officially renamed Righter Group in 1995, the team has continued to push innovation as
their founder did before them. Righter Group is still one ofTnemec’s top agencies and
a true driving force towards the future, providing the coatings company with needed
intelligence on the desires in the field while building invaluable relationships with satisfied
customers. Now offering products for every modern application, the team at Righter Group
is persistent in its attempts to advance the coatings industry beyond the norm.
Where did the Righter Group come from?
“Problem Solving in Construction”
When the medical industries in New England needed a wall
coating capable of withstanding consistent chemical and
steam cleaning, the team at Righter Group helped introduce
the industry toTnemec’s fiberglass-reinforced Stranlok prod-
ucts. Now installed in hospitals, veterinary and pharmaceutical
facilities across the region, the Stranlok wall system continues
to perform in the toughest environments.
6
SPOTLIGHT
HAROLDRIGHTER
Who was Harold Righter?
Aside from creating the most knowledgeable paint and coatings team
in New England, Righter Group’s founder and former president was
a visionary that helped shapeTnemec into its current state. Righter
consistently offered his opinions on the needs of the construction industry
and served as a catalyst to the invention of new technology. He made
regular trips to Kansas City – the location ofTnemec’s plant and corporate
office – to relay his findings in the field and became instrumental in the
branding and rebranding of products, such as Series 15 Uni-Bond, a one-
coat rust-inhibitive primer and finish that was applied to overhead decking
across the U.S. Aside from products, Righter’s close connection with the
art community – being an artist and art-lover himself – was a fundamental
reason thatTnemec rebranded itself in the late 1960s, using a new logo,
tagline, and label that originated from his ideas and the design of his close
friend at a Boston marketing firm.
Harold Righter - top row, 8th from left
7
8
STATS
Righter Group
720
months open
for business
1,528
miles from Long Beach, NY to
Northern tip of Quebec
13,500
gallons of Tnemec Series 75
Uni-Bond used on Boston
Convention Center
13
22
total current staff
at Righter Group
years average experience of representatives
9
By The Numbers
7
4,509,558
11
product manufacturers offered
by Righter Group
sq.ft. covered with Tnemec
Series 394 in 2014
states and territories currently served
8
172
total current reps
at Righter Group
years combined
expierence of
current reps
10
PROJECTSBranded as the first building of the 21st century, the original WorldTrade Center was
completed in 1973. Architecturally, the structure was revolutionary in its concept, design
and engineering.The WorldTrade Center introduced, for the first time, one central
location for government agencies, private firms and international business to take place.
The Righter Group providedTnemec 99 Red Metal Primer for the major portion of the
twin towers’ steel.This coating selection was made because of the product’s durability,
ease of application and abrasion-resistance. With more steel used in this project than the
Golden Gate Bridge, the WorldTrade Center required a sizable amount ofTnemec’s time-
tested primer.
One WorldTrade Center started construction in 2006, and Righter Group was again
chosen to coat the steel for the building.
For the new building, the Righter
Group supplied Series 90-97Tneme-
Zinc for the steel coating. Series 90-97
Tneme-Zinc was chosen because of the
product’s extraordinary performance,
user friendliness and rapid curing ability.
The tallest building in the Western
Hemisphere, One WorldTrade Center
required an enormous amountTneme-
Zinc. Finished in 2014, the structure is
recognized throughout the world and is
also known asThe FreedomTower.
World Trade Centers
11
Deemed the largest public assembly hall in the Western Hemisphere during its construction,The
Jacob K. Javits Convention Center in NewYork is a remarkable example of space frame technology.
During the original construction between 1981 and 1985, the steel space frame was primed and
protected with shop-applied Series 66 Epoxoline.The Righter Group sold more than 16,000 gallons
of Series 66, applied to the exposed steel space frame consisting of 76,000 individual pipe tubes and
19,000 connecting nodes. Series 90-93Tneme-Zinc was also used to prime coat the support columns
throughout the structure. The initial structure was a sophisticated, three-dimensional engineering
design that was made popular by I.M. Pei in the 1980s.
Thirty years after the original construction,The Jacob K. Javits Convention Center underwent a
$463 million renovation and again chose the Righter Group to coat the steel.The renovated center
has been used to host the biggest events in NewYork, and is known for its spectacular views. For
the renovation, the structural frame and underside deck were modernized and recoated with nearly
12,000 gallons of light gray Series 115 Uni-Bond DF.This product was chosen because it provides
high-performance corrosion resistance and reduces the potential for overspray issues.The structural
steel outside the building was primed with Series 90-97, followed by a coat of Series 27 F.C.Typoxy
and finished with Series 73 Endura-Shield.The Javits Center is now considered one of the busiest
convention centers in the United States and its construction has paved the way for limitless
geometric design possibilities in convention centers.
Jacob K. Javits Convention Center
12
PROJECTSBetter known as the horizontal skyscraper, Center Plaza is a distinctive mixed-use complex
located in downtown Boston.Totaling 717,128 square feet, Center Plaza is unlike traditional high-
rise office towers because it’s much longer horizontally than it is vertically. Built between 1965
and 1969, the horizontal skyscraper is nine-stories high and can provide up to 75,000 square feet
of continuous office space on any one floor.The multipurpose skyscraper is situated between City
Hall Plaza and Pemberton Square in Boston’s Financial District. Center Plaza occupies 900 square
feet of retail along Cambridge Street, and its location makes it an attractive option for occupants
that require office space near government buildings, hospitals and financial buildings.
The Righter Group providedTnemec 99 Red Metal Primer to coat the enormous amount of steel
used in the skyscraper for the original construction. Center Plaza is so long that it stretches the
length of a 90-story building, and is made up of three interconnected structures that are arranged
in an arced shape. The complex has floor plates, high ceilings and hundreds of windows that
offer natural light and views from all floors. Center Plaza was extremely modern for its time, and
the Righter Group had a part in constructing a building that’s been termed a unique architectural
expression of beauty, grace and purpose.
Horizontal Skyscraper
13
Built in 1967, the north terminal in the Boston-Logan International Airport was an innovative
example of wedding glass, concrete and steel. Located in Boston, Massachusetts, the design of
the building was meant to give the feeling of soaring flight simply from its appearance. With a
wing concept on the roof, the architectural design of the terminal was unquestionably modern for
its time.
During the time of this construction, the Righter Group was known as H. Righter Company, Inc.
For this project, the company recommendedTnemec 99 Red Metal Primer for the steel. Eighteen
hundred tons of steel were used to construct the north terminal and the amount of steel used
allowed for 125,000 square feet of floor space in two stories, alongside electric stairways and
elevators. Due to the innovative design of the building, the steel had to be curved to different
radii.This was an engineering feet, and allowed for the crescent shaped roof trusses.
The $9,500,000 structure was expensive for its time and it afforded a substantial amount of glass
windows which gave passengers unobstructed views of field operations and flying planes. While
the Righter Group has changed its name, the northern terminal at the Boston-Logan International
Airport has stayed relatively the same for the last 48 years.
Boston-Logan International Airport
14
CONTACTUS
Righter Group’s territory serves
Connecticut, Maine, Massachusetts, New
Hampshire, northern New Jersey, eastern
NewYork and Rhode Island in the U.S.,
and the Canadian provinces of Quebec,
Nova Scotia, Newfoundland and New
Brunswick.
With an ever-growing knowledge of high-performance coatings, specialty paints,
and seamless flooring and wall protection systems, representatives at Righter
Group make it their mission to find customers the best products available to meet
the needs of any given project. Each representative in the company offers years of
coatings and construction experience, averaging 22 years of work at the Righter
Group alone. All representatives make it a priority to stay up-to-date on coatings-
and construction-related affairs, staying involved in local and national organizations
that help improve the industries they care so much about. All consultants at the
agency are either NACE-certified, members of the Construction Specifiers Institute
(CSI), participants in the Society for Protective Coatings (SSPC), or all of the above.
Each member of the Righter Group staff knows the products and coating systems
that perform the best in their given territory and take pride in offering the most all-
around service available to their local coatings customers.
15
“Problem Solving in Construction”
In 2012,Tnemec introduced a thermal insulating coating
formulated with aerogel particles – the first of its kind in the
nation. With the help of Righter Group, Aerolon was integrated
into several new markets when it was discovered that the
spray-applied coating could perform better than other widely
used construction products. By controlling condensation and
surface temperature, Aerolon can be used as a non-structural
thermal break on wall or roof penetrations, such as I-beams,
fins, roof davits, parapets, or window frames.
President:
Don Miller – Eastern MA, ME
Representatives:
Phil Gonnella – NYC & Long Island Areas, Northern NJ, Fairfield County CT
201-401-5300
Larry Mitkus – Eastern MA, ME, RI
978-697-0153
Greg Pope – Eastern MA, ME, NH, New Brunswick, Nova Scotia, Quebec
978-697-2045
Mike Woessner – MA, ME, NH, NY (North Country), VT
978-697-0152
Ed Leach – Flooring Specialist/Contractor Liaison, All Areas
978-697-1951
David Pope – CT, NYC, Long Island Areas, Albany
203-247-8218
Raymond Quirion – Quebec City, Montreal
418-520-3765
187 Ballardvale Street
Suite A190
Wilmington, MA 01887
tel: 800.533.3003
fax: 800.988.9824
rightergroup@tnemec.com
43b7d0_7146033eab584b08895c65a74d803dda

More Related Content

Viewers also liked

Direct filetopicdownload (4)
Direct filetopicdownload (4)Direct filetopicdownload (4)
Direct filetopicdownload (4)Patrick Hui
 
l-ward-ed554-unit-plan-template-7-25-2015
l-ward-ed554-unit-plan-template-7-25-2015l-ward-ed554-unit-plan-template-7-25-2015
l-ward-ed554-unit-plan-template-7-25-2015Lorene Ward
 
Connecticut Hospital Consolidation Report 10.13.14 (2) (2)
Connecticut Hospital Consolidation Report 10.13.14 (2) (2)Connecticut Hospital Consolidation Report 10.13.14 (2) (2)
Connecticut Hospital Consolidation Report 10.13.14 (2) (2)Jeremy Mand
 
ЗЕЙНЕТАҚЬI ЗАҢНАМАСЬIНДАҒЬI ЖАҢАЛЬIҚТАР
ЗЕЙНЕТАҚЬI ЗАҢНАМАСЬIНДАҒЬI ЖАҢАЛЬIҚТАРЗЕЙНЕТАҚЬI ЗАҢНАМАСЬIНДАҒЬI ЖАҢАЛЬIҚТАР
ЗЕЙНЕТАҚЬI ЗАҢНАМАСЬIНДАҒЬI ЖАҢАЛЬIҚТАРYelnur Shalkibayev
 
Ib0010 international financial management
Ib0010 international financial managementIb0010 international financial management
Ib0010 international financial managementconsult4solutions
 
Mf0018 insurance and risk management
Mf0018 insurance and risk managementMf0018 insurance and risk management
Mf0018 insurance and risk managementconsult4solutions
 
Mk0018 international marketing
Mk0018 international marketingMk0018 international marketing
Mk0018 international marketingconsult4solutions
 

Viewers also liked (10)

Direct filetopicdownload (4)
Direct filetopicdownload (4)Direct filetopicdownload (4)
Direct filetopicdownload (4)
 
l-ward-ed554-unit-plan-template-7-25-2015
l-ward-ed554-unit-plan-template-7-25-2015l-ward-ed554-unit-plan-template-7-25-2015
l-ward-ed554-unit-plan-template-7-25-2015
 
Connecticut Hospital Consolidation Report 10.13.14 (2) (2)
Connecticut Hospital Consolidation Report 10.13.14 (2) (2)Connecticut Hospital Consolidation Report 10.13.14 (2) (2)
Connecticut Hospital Consolidation Report 10.13.14 (2) (2)
 
Evaluation
EvaluationEvaluation
Evaluation
 
ЗЕЙНЕТАҚЬI ЗАҢНАМАСЬIНДАҒЬI ЖАҢАЛЬIҚТАР
ЗЕЙНЕТАҚЬI ЗАҢНАМАСЬIНДАҒЬI ЖАҢАЛЬIҚТАРЗЕЙНЕТАҚЬI ЗАҢНАМАСЬIНДАҒЬI ЖАҢАЛЬIҚТАР
ЗЕЙНЕТАҚЬI ЗАҢНАМАСЬIНДАҒЬI ЖАҢАЛЬIҚТАР
 
Ib0010 international financial management
Ib0010 international financial managementIb0010 international financial management
Ib0010 international financial management
 
Mf0018 insurance and risk management
Mf0018 insurance and risk managementMf0018 insurance and risk management
Mf0018 insurance and risk management
 
Resume - Deepti
Resume - DeeptiResume - Deepti
Resume - Deepti
 
Mf0016 treasury management
Mf0016 treasury managementMf0016 treasury management
Mf0016 treasury management
 
Mk0018 international marketing
Mk0018 international marketingMk0018 international marketing
Mk0018 international marketing
 

Similar to 43b7d0_7146033eab584b08895c65a74d803dda

Capabilities Brochure
Capabilities BrochureCapabilities Brochure
Capabilities BrochureKa Man Tang
 
Industrial Pressure Washing Detroit.pptx
Industrial Pressure Washing Detroit.pptxIndustrial Pressure Washing Detroit.pptx
Industrial Pressure Washing Detroit.pptxelishaalysa
 
Best Ready Mix Concrete Supplier in Lahore - Tetra Engineers
Best Ready Mix Concrete Supplier in Lahore - Tetra EngineersBest Ready Mix Concrete Supplier in Lahore - Tetra Engineers
Best Ready Mix Concrete Supplier in Lahore - Tetra EngineersTetra Engineering
 
Peter Gray's Asia Breakthrough Projects
Peter Gray's Asia Breakthrough ProjectsPeter Gray's Asia Breakthrough Projects
Peter Gray's Asia Breakthrough Projectsptgray
 
Metal Roof Painting Mi.pptx
Metal Roof Painting Mi.pptxMetal Roof Painting Mi.pptx
Metal Roof Painting Mi.pptxelishaalysa
 
NSG15 164 Nasmyth OVERVIEW brochure update lo_res
NSG15 164 Nasmyth OVERVIEW brochure update lo_resNSG15 164 Nasmyth OVERVIEW brochure update lo_res
NSG15 164 Nasmyth OVERVIEW brochure update lo_resMike Nolan
 
Trust-Pro-Contracting-company-profile
Trust-Pro-Contracting-company-profileTrust-Pro-Contracting-company-profile
Trust-Pro-Contracting-company-profileManar Farid Koutrach
 
Roofing Contractors Mi.pptx
Roofing Contractors Mi.pptxRoofing Contractors Mi.pptx
Roofing Contractors Mi.pptxelishaalysa
 
Constellium C-TEC brochure
Constellium C-TEC brochureConstellium C-TEC brochure
Constellium C-TEC brochureConstellium
 
Painting Company Detroit Michigan.pptx
Painting Company Detroit Michigan.pptxPainting Company Detroit Michigan.pptx
Painting Company Detroit Michigan.pptxariaemily
 
RDL Company Profile low res
RDL Company Profile low resRDL Company Profile low res
RDL Company Profile low resPhilip Leonard
 
ROYD Insights | Q2 2021
ROYD Insights | Q2 2021ROYD Insights | Q2 2021
ROYD Insights | Q2 2021Olivia Busby
 
Ejot building fasteners catalogue
Ejot building fasteners catalogueEjot building fasteners catalogue
Ejot building fasteners catalogueNathan Handley
 
Rocore overview web site version
Rocore overview   web site versionRocore overview   web site version
Rocore overview web site versionAnthony Coats
 

Similar to 43b7d0_7146033eab584b08895c65a74d803dda (20)

Capabilities Brochure
Capabilities BrochureCapabilities Brochure
Capabilities Brochure
 
International paint surfaces 23
International paint surfaces 23International paint surfaces 23
International paint surfaces 23
 
LinkedIn
LinkedInLinkedIn
LinkedIn
 
Industrial Pressure Washing Detroit.pptx
Industrial Pressure Washing Detroit.pptxIndustrial Pressure Washing Detroit.pptx
Industrial Pressure Washing Detroit.pptx
 
Best Ready Mix Concrete Supplier in Lahore - Tetra Engineers
Best Ready Mix Concrete Supplier in Lahore - Tetra EngineersBest Ready Mix Concrete Supplier in Lahore - Tetra Engineers
Best Ready Mix Concrete Supplier in Lahore - Tetra Engineers
 
Peter Gray's Asia Breakthrough Projects
Peter Gray's Asia Breakthrough ProjectsPeter Gray's Asia Breakthrough Projects
Peter Gray's Asia Breakthrough Projects
 
Metal Roof Painting Mi.pptx
Metal Roof Painting Mi.pptxMetal Roof Painting Mi.pptx
Metal Roof Painting Mi.pptx
 
NSG15 164 Nasmyth OVERVIEW brochure update lo_res
NSG15 164 Nasmyth OVERVIEW brochure update lo_resNSG15 164 Nasmyth OVERVIEW brochure update lo_res
NSG15 164 Nasmyth OVERVIEW brochure update lo_res
 
unique-brochure final
unique-brochure finalunique-brochure final
unique-brochure final
 
Trust-Pro-Contracting-company-profile
Trust-Pro-Contracting-company-profileTrust-Pro-Contracting-company-profile
Trust-Pro-Contracting-company-profile
 
Roofing Contractors Mi.pptx
Roofing Contractors Mi.pptxRoofing Contractors Mi.pptx
Roofing Contractors Mi.pptx
 
profile ALSANABEL
profile ALSANABELprofile ALSANABEL
profile ALSANABEL
 
Constellium C-TEC brochure
Constellium C-TEC brochureConstellium C-TEC brochure
Constellium C-TEC brochure
 
Sunil rajput
Sunil rajputSunil rajput
Sunil rajput
 
Sunil rajput
Sunil rajputSunil rajput
Sunil rajput
 
Painting Company Detroit Michigan.pptx
Painting Company Detroit Michigan.pptxPainting Company Detroit Michigan.pptx
Painting Company Detroit Michigan.pptx
 
RDL Company Profile low res
RDL Company Profile low resRDL Company Profile low res
RDL Company Profile low res
 
ROYD Insights | Q2 2021
ROYD Insights | Q2 2021ROYD Insights | Q2 2021
ROYD Insights | Q2 2021
 
Ejot building fasteners catalogue
Ejot building fasteners catalogueEjot building fasteners catalogue
Ejot building fasteners catalogue
 
Rocore overview web site version
Rocore overview   web site versionRocore overview   web site version
Rocore overview web site version
 

43b7d0_7146033eab584b08895c65a74d803dda

  • 1. Years Righter Group, Inc. INDEPENDENT REPRESENTATIVE OF TNEMEC COMPANY INCORPORATED Celebrating
  • 2.
  • 3. CONTENTS LETTER FROM PETE CORTELYOU RIGHTER GROUP HISTORY SPOTLIGHT: HAROLD RIGHTER RIGHTER GROUP BY THE NUMBERS PROJECT HIGHLIGHTS CONTACTS & TERRITORIES 2-3 4-5 6-7 8-9 10-13 14-15
  • 4. 2 LETTER “Problem Solving in Construction” The Righter Group recognized that new steel and retrofit projects needed a corrosion-resistant primer that would protect more than a typical alkyd or acrylic coating but would be lower in cost than zinc-rich primers. With help from the representatives in Boston and NewYork,Tnemec formulated the one-component, moisture-cured MIO/zinc-filled polyurethane primer, Series 394 PerimePrime, for these applications. In the architectural market, Series 394 offers superior bonding to marginally prepared steel and old coatings and is combatable with several high-performance topcoats, fireproofing systems, and thermal insulating coatings. Vivamus metus velit, vestibulum placerat placerat convallis, tristique eu ex. Suspendisse in turpis pel- lentesque, euismod quam sit amet, placerat magna. “ “
  • 5. 3 Lorem ipsum dolor sit amet, consectetur adipiscing elit. Maecenas ornare elementum urna feugiat tempus. Donec ac lacus sapien. Pellentesque commodo, quam quis sodales rutrum, tellus quam eleifend ligula, at lacinia urna turpis quis neque. Cras vel odio eu ligula pellentesque interdum ac sed nisl. Morbi libero leo, volutpat ut rhoncus et, tinci- dunt volutpat orci. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. Pel- lentesque nec mi eget libero luctus consectetur in ac dui. Donec rutrum velit quis sapien sollicitudin, sed tincidunt justo faucibus. Proin arcu leo, fermentum nec enim a, iaculis lacinia nibh. Etiam molestie massa a nisi dictum, vitae posuere nibh auctor. Pellentesque a consequat turpis. Vestibulum condimentum odio mauris. Quisque tincidunt, nisl sit amet convallis pulvinar, lectus nisi tempus ex, id varius nisi sem ut risus. Ut sollicitudin purus eget justo ullamcorper, eu ultrices velit placerat. Duis at cursus augue. Donec sit amet dolor mollis, tempus risus sed, facilisis sapien. Nulla ultricies vel odio ut ornare. Curabitur semper ante eu purus tristique elementum. Mauris eleifend magna ex, id euismod ipsum dignissim vel. Etiam finibus viverra mi. Morbi odio diam, dictum vitae nunc at, mattis pellentesque eros. Vivamus metus velit, ves- tibulum placerat placerat convallis, tristique eu ex. Suspendisse in turpis pellen- tesque, euismod quam sit amet, placerat magna. Etiam a viverra orci, vitae congue elit. Aenean non sapien eget nibh facilisis hendrerit. Suspendisse porta sem eu odio luctus rutrum. Sed ut lacus efficitur, ultrices lectus quis, pharetra tellus. Fusce nisl libero, mollis at rutrum in, dignissim in nisi. Donec rutrum augue vel mi vestibulum ultricies. Fusce eleifend, leo in dignissim pharetra, enim enim bibendum metus, eu iaculis diam augue ut ligula. Vivamus laoreet, ligula vitae porta hendrerit, leo velit tempor nisi, mattis semper erat metus fermentum diam. Nunc tempor turpis sit amet velit pulvinar viverra. Ut sem dui, luctus eget varius eu, tempor at nisi. Ut congue lectus at sagittis volutpat. Curabitur tristique varius hendrerit. Morbi in velit dictum, vehicula purus et, ullamcorper velit. Nulla euismod urna et nunc efficitur feugiat. Nullam quis tortor nec ligula rutrum laoreet. Pete Cortelyou President,Tnemec Company, Inc.
  • 6. 4 BACKGROUND For the last 60 years, Righter Group, Inc. has offered coating and lining consultation for a wide variety of customers, with one goal always in mind – problem solving. From industrial floors to architectural high-rises, the team at Righter Group provides unmatched technical service while supplying architects, engineers, applicators and OEM professionals with high-performance coating technology.The coating consultants and customer service experts take pride in recommending the best possible systems for an array of substrates, budgets, and design intents, and have been involved in innumerable successful projects across the U.S. and Canada. Primarily serving the Northeast, Righter Group provides customers with innovative solutions that target project-specific problems. For six decades, the firm has proudly provided tailor-made coating systems, along with technical support in the field from highly-trained staff, in every market of the coatings world, including specialty architectural and industrial projects, marine applications, processing and manufacturing facilities, water and wastewater treatment plants and water storage tanks. What is the Righter Group? RIGHTER GROUP INC. Problem Solving in Construction
  • 7. 5 H. Righter Company opened its doors in 1955 with a drive to supply the construction industry in the Northeast with the best available products for priming and finishing steel. Originally founded by creative-minded construction expert, Harold Righter, who partnered withTnemec Company, H. Righter Company made an immediate impact in the Boston area, regularly providing coatings for high-profile projects, such as the Longfellow Bridge, the Federal Reserve Bank, and General Motors’ Framingham Assembly Plant. Decades later, H. Righter Company combined forces with nearby agencies,Tnemec East and Righter Interior Surfaces, to cover a larger territory and serve a wider range of clients. With a constant exchange between Harold Righter andTnemec about the most recent advancements in coating technology, both companies grew to new heights, providing top- of-the-line paint from New Jersey to Maine. Officially renamed Righter Group in 1995, the team has continued to push innovation as their founder did before them. Righter Group is still one ofTnemec’s top agencies and a true driving force towards the future, providing the coatings company with needed intelligence on the desires in the field while building invaluable relationships with satisfied customers. Now offering products for every modern application, the team at Righter Group is persistent in its attempts to advance the coatings industry beyond the norm. Where did the Righter Group come from? “Problem Solving in Construction” When the medical industries in New England needed a wall coating capable of withstanding consistent chemical and steam cleaning, the team at Righter Group helped introduce the industry toTnemec’s fiberglass-reinforced Stranlok prod- ucts. Now installed in hospitals, veterinary and pharmaceutical facilities across the region, the Stranlok wall system continues to perform in the toughest environments.
  • 8. 6 SPOTLIGHT HAROLDRIGHTER Who was Harold Righter? Aside from creating the most knowledgeable paint and coatings team in New England, Righter Group’s founder and former president was a visionary that helped shapeTnemec into its current state. Righter consistently offered his opinions on the needs of the construction industry and served as a catalyst to the invention of new technology. He made regular trips to Kansas City – the location ofTnemec’s plant and corporate office – to relay his findings in the field and became instrumental in the branding and rebranding of products, such as Series 15 Uni-Bond, a one- coat rust-inhibitive primer and finish that was applied to overhead decking across the U.S. Aside from products, Righter’s close connection with the art community – being an artist and art-lover himself – was a fundamental reason thatTnemec rebranded itself in the late 1960s, using a new logo, tagline, and label that originated from his ideas and the design of his close friend at a Boston marketing firm. Harold Righter - top row, 8th from left
  • 9. 7
  • 10. 8 STATS Righter Group 720 months open for business 1,528 miles from Long Beach, NY to Northern tip of Quebec 13,500 gallons of Tnemec Series 75 Uni-Bond used on Boston Convention Center 13 22 total current staff at Righter Group years average experience of representatives
  • 11. 9 By The Numbers 7 4,509,558 11 product manufacturers offered by Righter Group sq.ft. covered with Tnemec Series 394 in 2014 states and territories currently served 8 172 total current reps at Righter Group years combined expierence of current reps
  • 12. 10 PROJECTSBranded as the first building of the 21st century, the original WorldTrade Center was completed in 1973. Architecturally, the structure was revolutionary in its concept, design and engineering.The WorldTrade Center introduced, for the first time, one central location for government agencies, private firms and international business to take place. The Righter Group providedTnemec 99 Red Metal Primer for the major portion of the twin towers’ steel.This coating selection was made because of the product’s durability, ease of application and abrasion-resistance. With more steel used in this project than the Golden Gate Bridge, the WorldTrade Center required a sizable amount ofTnemec’s time- tested primer. One WorldTrade Center started construction in 2006, and Righter Group was again chosen to coat the steel for the building. For the new building, the Righter Group supplied Series 90-97Tneme- Zinc for the steel coating. Series 90-97 Tneme-Zinc was chosen because of the product’s extraordinary performance, user friendliness and rapid curing ability. The tallest building in the Western Hemisphere, One WorldTrade Center required an enormous amountTneme- Zinc. Finished in 2014, the structure is recognized throughout the world and is also known asThe FreedomTower. World Trade Centers
  • 13. 11 Deemed the largest public assembly hall in the Western Hemisphere during its construction,The Jacob K. Javits Convention Center in NewYork is a remarkable example of space frame technology. During the original construction between 1981 and 1985, the steel space frame was primed and protected with shop-applied Series 66 Epoxoline.The Righter Group sold more than 16,000 gallons of Series 66, applied to the exposed steel space frame consisting of 76,000 individual pipe tubes and 19,000 connecting nodes. Series 90-93Tneme-Zinc was also used to prime coat the support columns throughout the structure. The initial structure was a sophisticated, three-dimensional engineering design that was made popular by I.M. Pei in the 1980s. Thirty years after the original construction,The Jacob K. Javits Convention Center underwent a $463 million renovation and again chose the Righter Group to coat the steel.The renovated center has been used to host the biggest events in NewYork, and is known for its spectacular views. For the renovation, the structural frame and underside deck were modernized and recoated with nearly 12,000 gallons of light gray Series 115 Uni-Bond DF.This product was chosen because it provides high-performance corrosion resistance and reduces the potential for overspray issues.The structural steel outside the building was primed with Series 90-97, followed by a coat of Series 27 F.C.Typoxy and finished with Series 73 Endura-Shield.The Javits Center is now considered one of the busiest convention centers in the United States and its construction has paved the way for limitless geometric design possibilities in convention centers. Jacob K. Javits Convention Center
  • 14. 12 PROJECTSBetter known as the horizontal skyscraper, Center Plaza is a distinctive mixed-use complex located in downtown Boston.Totaling 717,128 square feet, Center Plaza is unlike traditional high- rise office towers because it’s much longer horizontally than it is vertically. Built between 1965 and 1969, the horizontal skyscraper is nine-stories high and can provide up to 75,000 square feet of continuous office space on any one floor.The multipurpose skyscraper is situated between City Hall Plaza and Pemberton Square in Boston’s Financial District. Center Plaza occupies 900 square feet of retail along Cambridge Street, and its location makes it an attractive option for occupants that require office space near government buildings, hospitals and financial buildings. The Righter Group providedTnemec 99 Red Metal Primer to coat the enormous amount of steel used in the skyscraper for the original construction. Center Plaza is so long that it stretches the length of a 90-story building, and is made up of three interconnected structures that are arranged in an arced shape. The complex has floor plates, high ceilings and hundreds of windows that offer natural light and views from all floors. Center Plaza was extremely modern for its time, and the Righter Group had a part in constructing a building that’s been termed a unique architectural expression of beauty, grace and purpose. Horizontal Skyscraper
  • 15. 13 Built in 1967, the north terminal in the Boston-Logan International Airport was an innovative example of wedding glass, concrete and steel. Located in Boston, Massachusetts, the design of the building was meant to give the feeling of soaring flight simply from its appearance. With a wing concept on the roof, the architectural design of the terminal was unquestionably modern for its time. During the time of this construction, the Righter Group was known as H. Righter Company, Inc. For this project, the company recommendedTnemec 99 Red Metal Primer for the steel. Eighteen hundred tons of steel were used to construct the north terminal and the amount of steel used allowed for 125,000 square feet of floor space in two stories, alongside electric stairways and elevators. Due to the innovative design of the building, the steel had to be curved to different radii.This was an engineering feet, and allowed for the crescent shaped roof trusses. The $9,500,000 structure was expensive for its time and it afforded a substantial amount of glass windows which gave passengers unobstructed views of field operations and flying planes. While the Righter Group has changed its name, the northern terminal at the Boston-Logan International Airport has stayed relatively the same for the last 48 years. Boston-Logan International Airport
  • 16. 14 CONTACTUS Righter Group’s territory serves Connecticut, Maine, Massachusetts, New Hampshire, northern New Jersey, eastern NewYork and Rhode Island in the U.S., and the Canadian provinces of Quebec, Nova Scotia, Newfoundland and New Brunswick. With an ever-growing knowledge of high-performance coatings, specialty paints, and seamless flooring and wall protection systems, representatives at Righter Group make it their mission to find customers the best products available to meet the needs of any given project. Each representative in the company offers years of coatings and construction experience, averaging 22 years of work at the Righter Group alone. All representatives make it a priority to stay up-to-date on coatings- and construction-related affairs, staying involved in local and national organizations that help improve the industries they care so much about. All consultants at the agency are either NACE-certified, members of the Construction Specifiers Institute (CSI), participants in the Society for Protective Coatings (SSPC), or all of the above. Each member of the Righter Group staff knows the products and coating systems that perform the best in their given territory and take pride in offering the most all- around service available to their local coatings customers.
  • 17. 15 “Problem Solving in Construction” In 2012,Tnemec introduced a thermal insulating coating formulated with aerogel particles – the first of its kind in the nation. With the help of Righter Group, Aerolon was integrated into several new markets when it was discovered that the spray-applied coating could perform better than other widely used construction products. By controlling condensation and surface temperature, Aerolon can be used as a non-structural thermal break on wall or roof penetrations, such as I-beams, fins, roof davits, parapets, or window frames. President: Don Miller – Eastern MA, ME Representatives: Phil Gonnella – NYC & Long Island Areas, Northern NJ, Fairfield County CT 201-401-5300 Larry Mitkus – Eastern MA, ME, RI 978-697-0153 Greg Pope – Eastern MA, ME, NH, New Brunswick, Nova Scotia, Quebec 978-697-2045 Mike Woessner – MA, ME, NH, NY (North Country), VT 978-697-0152 Ed Leach – Flooring Specialist/Contractor Liaison, All Areas 978-697-1951 David Pope – CT, NYC, Long Island Areas, Albany 203-247-8218 Raymond Quirion – Quebec City, Montreal 418-520-3765 187 Ballardvale Street Suite A190 Wilmington, MA 01887 tel: 800.533.3003 fax: 800.988.9824 rightergroup@tnemec.com