Background and results of A3
 Trays was trending in highest GMPS issues across the plant.
Catherine was requested to understand and implement
countermeasures to improve performance of GMP across the
plant
 48 Instances of GMP Findings this week (Plant Wk 31)
 Priortised Problem: Trolley Signage not permantly fixed or
incorrect
 Countermeasure Plan :Training and communication on Filling
out signs
 Results: only 18 GMP issues of this category found in past 10
months.
A3 currently working on for certification
Background and current status of A3 for certification
 QA technicians found 2 gauges on the production floor that had not been
calibrated by the calibration department.
 Ultimate Goal: To ensure patient protection by making sure that all gauges are calibrated
before being issued to the manufacturing floor
 Prioritised Problem: Calibration sticker missing on visual standard part VS445A Global
unite stem and when reviewed by calibration it was found that it had not gone through the
calibration process.
GAP
Root cause of visual standard A3
 In process of writing up a procedure/work instruction of
issuing visual standards to the manufacturing floor.
My Training Matrix
HOLD REVIEW
 Currently providing support to the trays and sigma value streams by
reviewing the hold report in both value streams and determining disposition
as required.
 Fully trained on inspections in both areas.
 Supporting associates on night shift on quality issues
IN HOUSE TRAINING
Continuous improvement
 Recently completed a certificate in Quality Assurance in CIT,
CR_SQUAS_6.
 Starting the diploma course in QA management in September.
 I have just joined the health and safety team to represent
quality along with Lisa McCarty. Main Role and Responsibilities
are for this new role are:
Main Role and Responsibilities
1 Attend daily pulse walk (VS safety reps only)
2 Attend daily safety walks (all areas)
3 Attend training as required
4 Attend safety committee meetings
5 Make representation for safety issues from fellow workers in team/Dept.
6 Liaise with EHS Manager on safety issues after highlighting them to your TL
7 Attend A3 or other investigations following accidents, incidents etc.
8 Get involved in site safety initiatives
9 Make recommendations for improvement
10 Support safety initiatives and programs including H&S week
11 Be open to auditing other areas of site outside your Dept.
12 Support with risk assessments in your area once trained to do so

More Related Content

What's hot

Experiences with TMMi facts and figures - Romanian Testing Conference 2014
Experiences with TMMi facts and figures - Romanian Testing Conference 2014Experiences with TMMi facts and figures - Romanian Testing Conference 2014
Experiences with TMMi facts and figures - Romanian Testing Conference 2014SYSQA BV
 
Jan jaap TMMi facts and figures v2
Jan jaap TMMi facts and figures v2Jan jaap TMMi facts and figures v2
Jan jaap TMMi facts and figures v2Romania Testing
 
Improve your test process, improve your life
Improve your test process, improve your lifeImprove your test process, improve your life
Improve your test process, improve your lifeQualitest
 
Success Story - Testing Banking Application
Success Story - Testing Banking Application  Success Story - Testing Banking Application
Success Story - Testing Banking Application Indium Software
 
2 anton muzhailo - formal test process improvement. how to invest to the te...
2   anton muzhailo - formal test process improvement. how to invest to the te...2   anton muzhailo - formal test process improvement. how to invest to the te...
2 anton muzhailo - formal test process improvement. how to invest to the te...Ievgenii Katsan
 
Improving Regression Testing Effectiveness With Defect Detection Percentage (...
Improving Regression Testing Effectiveness With Defect Detection Percentage (...Improving Regression Testing Effectiveness With Defect Detection Percentage (...
Improving Regression Testing Effectiveness With Defect Detection Percentage (...DevOps.com
 
Bespoke Lean Training Partnership/Key Performance Indicators
Bespoke Lean Training Partnership/Key Performance Indicators Bespoke Lean Training Partnership/Key Performance Indicators
Bespoke Lean Training Partnership/Key Performance Indicators The Pathway Group
 
How Testing Engineers Execute a QA process in Software Testing
How Testing Engineers Execute a QA process in Software TestingHow Testing Engineers Execute a QA process in Software Testing
How Testing Engineers Execute a QA process in Software Testingdiptidilpak
 
Engr.adnan iqbal resume
Engr.adnan iqbal resumeEngr.adnan iqbal resume
Engr.adnan iqbal resumeAdnan Iqbal
 
Risk and Testing
Risk and TestingRisk and Testing
Risk and TestingNolaCita
 
RMart Group QM Role
RMart Group QM RoleRMart Group QM Role
RMart Group QM RoleLee Clack
 
RAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silvermanRAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silvermanAccendo Reliability
 
Istqb fl chap_6_edited
Istqb fl chap_6_editedIstqb fl chap_6_edited
Istqb fl chap_6_editedAkash gupta
 
'Tester: Get Out Of Your Cave!' by Jan Jaap Cannegieter
'Tester: Get Out Of Your Cave!' by Jan Jaap Cannegieter'Tester: Get Out Of Your Cave!' by Jan Jaap Cannegieter
'Tester: Get Out Of Your Cave!' by Jan Jaap CannegieterTEST Huddle
 
Challenges with measuring quality for agile distributed research type project
Challenges with measuring quality for agile distributed research type projectChallenges with measuring quality for agile distributed research type project
Challenges with measuring quality for agile distributed research type projectChandan Patary
 

What's hot (20)

Experiences with TMMi facts and figures - Romanian Testing Conference 2014
Experiences with TMMi facts and figures - Romanian Testing Conference 2014Experiences with TMMi facts and figures - Romanian Testing Conference 2014
Experiences with TMMi facts and figures - Romanian Testing Conference 2014
 
Jan jaap TMMi facts and figures v2
Jan jaap TMMi facts and figures v2Jan jaap TMMi facts and figures v2
Jan jaap TMMi facts and figures v2
 
Improve your test process, improve your life
Improve your test process, improve your lifeImprove your test process, improve your life
Improve your test process, improve your life
 
New sqa leadroles
New sqa leadrolesNew sqa leadroles
New sqa leadroles
 
Success Story - Testing Banking Application
Success Story - Testing Banking Application  Success Story - Testing Banking Application
Success Story - Testing Banking Application
 
2 anton muzhailo - formal test process improvement. how to invest to the te...
2   anton muzhailo - formal test process improvement. how to invest to the te...2   anton muzhailo - formal test process improvement. how to invest to the te...
2 anton muzhailo - formal test process improvement. how to invest to the te...
 
Improving Regression Testing Effectiveness With Defect Detection Percentage (...
Improving Regression Testing Effectiveness With Defect Detection Percentage (...Improving Regression Testing Effectiveness With Defect Detection Percentage (...
Improving Regression Testing Effectiveness With Defect Detection Percentage (...
 
Reliability maturity matrix
Reliability maturity matrixReliability maturity matrix
Reliability maturity matrix
 
Bespoke Lean Training Partnership/Key Performance Indicators
Bespoke Lean Training Partnership/Key Performance Indicators Bespoke Lean Training Partnership/Key Performance Indicators
Bespoke Lean Training Partnership/Key Performance Indicators
 
How Testing Engineers Execute a QA process in Software Testing
How Testing Engineers Execute a QA process in Software TestingHow Testing Engineers Execute a QA process in Software Testing
How Testing Engineers Execute a QA process in Software Testing
 
Engr.adnan iqbal resume
Engr.adnan iqbal resumeEngr.adnan iqbal resume
Engr.adnan iqbal resume
 
Risk and Testing
Risk and TestingRisk and Testing
Risk and Testing
 
RMart Group QM Role
RMart Group QM RoleRMart Group QM Role
RMart Group QM Role
 
RAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silvermanRAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silverman
 
Istqb fl chap_6_edited
Istqb fl chap_6_editedIstqb fl chap_6_edited
Istqb fl chap_6_edited
 
Zero defects
Zero defectsZero defects
Zero defects
 
'Tester: Get Out Of Your Cave!' by Jan Jaap Cannegieter
'Tester: Get Out Of Your Cave!' by Jan Jaap Cannegieter'Tester: Get Out Of Your Cave!' by Jan Jaap Cannegieter
'Tester: Get Out Of Your Cave!' by Jan Jaap Cannegieter
 
IPM Solutions
IPM SolutionsIPM Solutions
IPM Solutions
 
Challenges with measuring quality for agile distributed research type project
Challenges with measuring quality for agile distributed research type projectChallenges with measuring quality for agile distributed research type project
Challenges with measuring quality for agile distributed research type project
 
DFR Methods Survey 2014
DFR Methods Survey 2014DFR Methods Survey 2014
DFR Methods Survey 2014
 

Similar to QA Technician presentation 1

Pre course assessment- validation v2
Pre  course assessment- validation v2Pre  course assessment- validation v2
Pre course assessment- validation v2Irena Morgan
 
Pre course assessment- validation v2
Pre  course assessment- validation v2Pre  course assessment- validation v2
Pre course assessment- validation v2Irena Morgan
 
Introductory Advantage Presentation Case Study
Introductory Advantage Presentation Case StudyIntroductory Advantage Presentation Case Study
Introductory Advantage Presentation Case StudyEarlynn373
 
MSA NSW Engineering RTO Conference 2014
MSA NSW Engineering RTO Conference 2014MSA NSW Engineering RTO Conference 2014
MSA NSW Engineering RTO Conference 2014Leon Drury
 
Week 4Quality ManagementOPERATIONS MANAGEMENT.docx
Week 4Quality ManagementOPERATIONS MANAGEMENT.docxWeek 4Quality ManagementOPERATIONS MANAGEMENT.docx
Week 4Quality ManagementOPERATIONS MANAGEMENT.docxmelbruce90096
 
Productions & Operations Management Chapter 06
Productions & Operations Management Chapter 06Productions & Operations Management Chapter 06
Productions & Operations Management Chapter 06jncgw5t6xq
 
CAPA-Overview-PPTSample.pdf
CAPA-Overview-PPTSample.pdfCAPA-Overview-PPTSample.pdf
CAPA-Overview-PPTSample.pdfVishalNair46
 
Mohamed salah cv
Mohamed  salah cvMohamed  salah cv
Mohamed salah cvchemsalah82
 
How Design Controls & Risk Management Best Practices Reduce Customer Complain...
How Design Controls & Risk Management Best Practices Reduce Customer Complain...How Design Controls & Risk Management Best Practices Reduce Customer Complain...
How Design Controls & Risk Management Best Practices Reduce Customer Complain...Greenlight Guru
 
How Design Controls & Risk Management Best Practices Reduce Customer Complain...
How Design Controls & Risk Management Best Practices Reduce Customer Complain...How Design Controls & Risk Management Best Practices Reduce Customer Complain...
How Design Controls & Risk Management Best Practices Reduce Customer Complain...Greenlight Guru
 
Professor Yakub Aliyu Product Quality Non Conformance presentation -v1.4_11...
Professor Yakub  Aliyu  Product Quality Non Conformance presentation -v1.4_11...Professor Yakub  Aliyu  Product Quality Non Conformance presentation -v1.4_11...
Professor Yakub Aliyu Product Quality Non Conformance presentation -v1.4_11...Professor Yakub Aliyu
 
Northeast Lean Conference 2019 - Employee Engagement - McMahon Roman.ppt
Northeast Lean Conference 2019 - Employee Engagement - McMahon Roman.pptNortheast Lean Conference 2019 - Employee Engagement - McMahon Roman.ppt
Northeast Lean Conference 2019 - Employee Engagement - McMahon Roman.pptTim McMahon
 
Quality Control Report
Quality Control ReportQuality Control Report
Quality Control ReportEzevillo Zim
 
Application of Six Sigma Methodologyto Reduce Defects of a Gri.docx
Application of Six Sigma Methodologyto Reduce Defects of a Gri.docxApplication of Six Sigma Methodologyto Reduce Defects of a Gri.docx
Application of Six Sigma Methodologyto Reduce Defects of a Gri.docxjustine1simpson78276
 
QA MeetUp Yerevan - Aug 25
QA MeetUp Yerevan - Aug 25QA MeetUp Yerevan - Aug 25
QA MeetUp Yerevan - Aug 25Sargis Sargsyan
 

Similar to QA Technician presentation 1 (20)

Pre course assessment- validation v2
Pre  course assessment- validation v2Pre  course assessment- validation v2
Pre course assessment- validation v2
 
Pre course assessment- validation v2
Pre  course assessment- validation v2Pre  course assessment- validation v2
Pre course assessment- validation v2
 
Ch8 total+qlty+mgt
Ch8 total+qlty+mgtCh8 total+qlty+mgt
Ch8 total+qlty+mgt
 
Introductory Advantage Presentation Case Study
Introductory Advantage Presentation Case StudyIntroductory Advantage Presentation Case Study
Introductory Advantage Presentation Case Study
 
Tqm
TqmTqm
Tqm
 
MSA NSW Engineering RTO Conference 2014
MSA NSW Engineering RTO Conference 2014MSA NSW Engineering RTO Conference 2014
MSA NSW Engineering RTO Conference 2014
 
Week 4Quality ManagementOPERATIONS MANAGEMENT.docx
Week 4Quality ManagementOPERATIONS MANAGEMENT.docxWeek 4Quality ManagementOPERATIONS MANAGEMENT.docx
Week 4Quality ManagementOPERATIONS MANAGEMENT.docx
 
Productions & Operations Management Chapter 06
Productions & Operations Management Chapter 06Productions & Operations Management Chapter 06
Productions & Operations Management Chapter 06
 
CAPA-Overview-PPTSample.pdf
CAPA-Overview-PPTSample.pdfCAPA-Overview-PPTSample.pdf
CAPA-Overview-PPTSample.pdf
 
Mohamed salah cv
Mohamed  salah cvMohamed  salah cv
Mohamed salah cv
 
Six sigma project
Six sigma projectSix sigma project
Six sigma project
 
PQMS.pptx
PQMS.pptxPQMS.pptx
PQMS.pptx
 
How Design Controls & Risk Management Best Practices Reduce Customer Complain...
How Design Controls & Risk Management Best Practices Reduce Customer Complain...How Design Controls & Risk Management Best Practices Reduce Customer Complain...
How Design Controls & Risk Management Best Practices Reduce Customer Complain...
 
How Design Controls & Risk Management Best Practices Reduce Customer Complain...
How Design Controls & Risk Management Best Practices Reduce Customer Complain...How Design Controls & Risk Management Best Practices Reduce Customer Complain...
How Design Controls & Risk Management Best Practices Reduce Customer Complain...
 
Professor Yakub Aliyu Product Quality Non Conformance presentation -v1.4_11...
Professor Yakub  Aliyu  Product Quality Non Conformance presentation -v1.4_11...Professor Yakub  Aliyu  Product Quality Non Conformance presentation -v1.4_11...
Professor Yakub Aliyu Product Quality Non Conformance presentation -v1.4_11...
 
Northeast Lean Conference 2019 - Employee Engagement - McMahon Roman.ppt
Northeast Lean Conference 2019 - Employee Engagement - McMahon Roman.pptNortheast Lean Conference 2019 - Employee Engagement - McMahon Roman.ppt
Northeast Lean Conference 2019 - Employee Engagement - McMahon Roman.ppt
 
Quality Control Report
Quality Control ReportQuality Control Report
Quality Control Report
 
Application of Six Sigma Methodologyto Reduce Defects of a Gri.docx
Application of Six Sigma Methodologyto Reduce Defects of a Gri.docxApplication of Six Sigma Methodologyto Reduce Defects of a Gri.docx
Application of Six Sigma Methodologyto Reduce Defects of a Gri.docx
 
Doug Cruz_Resume_2016
Doug Cruz_Resume_2016Doug Cruz_Resume_2016
Doug Cruz_Resume_2016
 
QA MeetUp Yerevan - Aug 25
QA MeetUp Yerevan - Aug 25QA MeetUp Yerevan - Aug 25
QA MeetUp Yerevan - Aug 25
 

QA Technician presentation 1

  • 1. QA Technician Role Update Colin Sorensen
  • 2. A3 Completed :with Catherine O’Donoghue and Elaine Whitnell
  • 3. Background and results of A3  Trays was trending in highest GMPS issues across the plant. Catherine was requested to understand and implement countermeasures to improve performance of GMP across the plant  48 Instances of GMP Findings this week (Plant Wk 31)  Priortised Problem: Trolley Signage not permantly fixed or incorrect  Countermeasure Plan :Training and communication on Filling out signs  Results: only 18 GMP issues of this category found in past 10 months.
  • 4. A3 currently working on for certification
  • 5. Background and current status of A3 for certification  QA technicians found 2 gauges on the production floor that had not been calibrated by the calibration department.  Ultimate Goal: To ensure patient protection by making sure that all gauges are calibrated before being issued to the manufacturing floor  Prioritised Problem: Calibration sticker missing on visual standard part VS445A Global unite stem and when reviewed by calibration it was found that it had not gone through the calibration process. GAP
  • 6. Root cause of visual standard A3  In process of writing up a procedure/work instruction of issuing visual standards to the manufacturing floor.
  • 8. HOLD REVIEW  Currently providing support to the trays and sigma value streams by reviewing the hold report in both value streams and determining disposition as required.  Fully trained on inspections in both areas.  Supporting associates on night shift on quality issues IN HOUSE TRAINING
  • 9. Continuous improvement  Recently completed a certificate in Quality Assurance in CIT, CR_SQUAS_6.  Starting the diploma course in QA management in September.  I have just joined the health and safety team to represent quality along with Lisa McCarty. Main Role and Responsibilities are for this new role are: Main Role and Responsibilities 1 Attend daily pulse walk (VS safety reps only) 2 Attend daily safety walks (all areas) 3 Attend training as required 4 Attend safety committee meetings 5 Make representation for safety issues from fellow workers in team/Dept. 6 Liaise with EHS Manager on safety issues after highlighting them to your TL 7 Attend A3 or other investigations following accidents, incidents etc. 8 Get involved in site safety initiatives 9 Make recommendations for improvement 10 Support safety initiatives and programs including H&S week 11 Be open to auditing other areas of site outside your Dept. 12 Support with risk assessments in your area once trained to do so