SlideShare a Scribd company logo
1 of 6
Download to read offline
SIMCITY4 MANUAL AND WALKTHROUGH BOOK
SECTION C: ADVANCED TUTORIALS

tutorial. Bonus points for those who can spot from
where are they inspired from.
---------------------------------C.01: General Points
|Aureliano(2)|D'Uberville(1,3,5) |
This here is the new and improved walkthrough until you ---------------------------------|VillaSanGirolamo(4)|
get your first skyscraper. All in 16 years too! It used to be
--------------------called the IdOIt's walkthrough to 40,000 but that sounds
kind of mean. So now I am calling it the advanced tutorials
1) God Mode:
also, the new name reflects the improvements to it. The
G-1) Create new Region selecting plain
aim of it is to help you understand the basic mechanics of
G-2) Go into the city and immediately hit pause.
city building and how to get a good profitable city started.
G-3) Optional: Use the mesa tool and click slightly
on the right side of the map. Use quick brush and
I am not sure whether is it because of Patch 2, but this
spread across the right side of the map. If this
time round, I reached 40,000 population in about 10 years.
confuses you then forget it. This really is optional
Of course this time round, I was more reckless with my
since I did not even do it for my tutorials
spending. I spend more mostly because I am quite certain
G-5) Fill the place with trees thickly. Especially the
of the effects of each spending. Therefore it should be
top left hand side.
noted that with the exception of this tutorial, you should
not spend so much and you should leave more money in
C.03: Tutorial 1: D'Urberville, Year 0-11
the bank.
Take note of the following:
This here is an explanation of how the city plan is
laid out. To save space, I obviously cannot
Background Information
reproduce the entire plan of the city tile by tile.
1) Read the earlier sections especially Section B, Parts
Hence this mini map plan is used as an explanation.
1 to 6.
2) Except for the first few months, you will always be
Diagram C.03(1): Final City Layout
making profits so no business deals
for tutorial 1
Construction:
1) Statistics taken at the start of the year.
I: Industrial Zone
2) My constructions done at start of the year.
R: Residential Zone
3) Always build when paused.
C: Commercial Zone
4) For those zero cost and maintenance rewards build G: Green Belt
them as soon as possible. I usually will not tell you =: Free space for future highway
where to build it. But base its placement on its or mass transit. It is 4 tiles
long
effects.
w: Waste to power
Notes on Tutorial itself
1) I will not be repeating the word build over and over P: Coal plant
again. Whenever I mention a structure in BLOCK A: Air force base
?: Possible place for cemetery
LETTERS, it means build it.
.: Black space for amenities, or
2) Unless mentioned otherwise, all zoning is MEDIUM pubic transport stations.
density.
3) I will refer to building instructions by use of square
brackets. Thus reference to the first instruction in
year 0 will be like [0-1]. You will see these numbers
beside each instruction.
Adapt to your situation:
There is often a slight difference in the rate of increase
each year even if you do exactly the same thing.
Therefore, focus on the population numbers and income,
which I have given and compare it with your situation. If
my figures are higher, than just wait a while to reach it. If
my figures are lower than your then just proceed.
C.02: Region & God Mode
1) Region:
This here would be the final setup of the three cities that I
will be using in the tutorial. They are all mid-sized maps.
The numbers coincide with their tutorial numbers. I will
introduce you to my puppet mayors later on in each
SECTION C ADVANCED TUTORIALS

81
SIMCITY4 MANUAL AND WALKTHROUGH BOOK
------------------------|W|A|I|G|C|R|.|R| | | | |
------------------------|P|A|.|G|.|.|.|.| | | | |
------------------------|G|G|I|G|C|R|.|R| | | | |
------------------------|=|=|=|=|=|=|=|=|=|=|=|=|
------------------------|I|=|I|G|C|R|.|R|=|R|.|R|
------------------------|.|=|.|G|.|.|.|.|=|.|.|.|
------------------------|I|=|I|G|C|R|.|R|=|R|.|R|
------------------------|=|=|=|=|=|=|=|=|=|=|=|=|
------------------------|I|=|I|G|C|R|.|R|=|C| | | > > > Commercial
Plaza Zone
------------------------|.|=|.|G|.|.|.|.|=|.|.|.|
------------------------|I|=|I|G|C|R|.|R|=| | | |
------------------------|I|=|I|G|?|C|.|C|=| | | | > > > Zoning just
to fit into last bit of map
------------------------Diagram
C.03(2):
Magnification
of
(ORS)
R: Residential
-: Road
.: Gap / empty space
E: Future development location of
Elementary School
H: 3 possible sites for hospitals
depending on position of (ORS) on map.
It does NOT ask you to place 3
hospitals in one (ORS).
------__|R|.|R| __________________
| ------||
| |.|.|.|
||
| ------||
| |R|.|R|
||
| ------||
|___ |____________
||
||
||
||
/
/
/
1
2
3
12345678901234567890123456789012345
1----------------------------------2-RRRR-RRRR-RRRR-HHH-RRRR-RRRR-RRRR3-RRRR-RRRR-RRRR-HHH-RRRR-RRRR-RRRR4-RRRR-RRRR-RRRR-HHH-RRRR-RRRR-RRRR5-RRRR-RRRR-RRRR-HHH-RRRR-RRRR-RRRR6----------------...---------------7-RRRR-RRRR-RRRR-...-RRRR-RRRR-RRRR8-RRRR-RRRR-RRRR-...-RRRR-RRRR-RRRR9-RRRR-RRRR-RRRR-...-RRRR-RRRR-RRRR10-RRRR-RRRR-RRRR-...-RRRR-RRRR-RRRR1----------------------------------2-RRRR-RRRR-.............-RRRR-RRRR3-RRRR-RRRR-.............-RRRR-RRRRSECTION C ADVANCED TUTORIALS

82
SIMCITY4 MANUAL AND WALKTHROUGH BOOK
4-RRRR-RRRR-.............-RRRR-RRRR5-RRRR-RRRR-.............-RRRR-RRRR6----------------------------------7-HHH......-.....EE......-.........8-HHH......-.....EE......-.........9-HHH......-.....EE......-.........20----------------------------------1-RRRR-RRRR-.............-RRRR-RRRR2-RRRR-RRRR-.............-RRRR-RRRR3-RRRR-RRRR-.............-RRRR-RRRR4-RRRR-RRRR-.............-RRRR-RRRR5----------------------------------6-RRRR-RRRR-RRRR-...-RRRR-RRRR-RRRR7-RRRR-RRRR-RRRR-...-RRRR-RRRR-RRRR8-RRRR-RRRR-RRRR-...-RRRR-RRRR-RRRR9-RRRR-RRRR-RRRR-...-RRRR-RRRR-RRRR30----------------...---------------1-RRRR-RRRR-RRRR-HHH-RRRR-RRRR-RRRR2-RRRR-RRRR-RRRR-HHH-RRRR-RRRR-RRRR3-RRRR-RRRR-RRRR-HHH-RRRR-RRRR-RRRR4-RRRR-RRRR-RRRR-HHH-RRRR-RRRR-RRRR5----------------------------------Diagram C.03(2): Magnification of Industrial Zones
I:
-:
.:
R:

Industry
Road
Gap/space
Residential
----------|I|.|I|G|C|
----------|.|.|.|G|C|
----------|I|.|I|G|C|
----------|| | | | |________________________________
|| | | |_____________________________
||
|| | |______________________
||
||
|| |____________
||
||
||
||
||
||
||
||
/
/
/
/
/

1
2
3
4
1234567890123456789012345678901234567890123456789
1------------------------------------------------2-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
3-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
4-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
5-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
6-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC---7-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
8-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
9-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
10------------------------------------....-CCCC-.-R
1-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC---2-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
3-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
4-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
SECTION C ADVANCED TUTORIALS

83
SIMCITY4 MANUAL AND WALKTHROUGH BOOK
5-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
6------------------------------------------------7-....-....-....-....-....-....-....-....-CCCC-.-.
8-....-....-....-....-....-....-....-....-CCCC-.-.
9-....-....-....-....-....-....-....-....-CCCC-.-.
20------------------------------------------------1-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
2-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
3-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
4-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
5-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC---6------------------------------------....-CCCC-.-R
7-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
8-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
9-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
30-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC---1-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
2-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
3-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
4-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R
5------------------------------------------------Diagram
C.03(3):
Magnification
of Note that in the first tutorial only one quod the
Commercial Plaza zoning
top left is filled up. And the other commercial
zones in the area are not based on the above
C: Commercial
design but based on the design as seen in
P: Plaza, reward or any commercial Diagram C.03(2): Magnification of Industrial
boosters
Zones.
.: Free space for commercial boosters,
mass transit stations or amenities
-: Roads
------__|C|.|C| __________________
| ------||
| |.|.|.|
||
| ------||
| |C|.|C|
||
| ------||
|___ |____________
||
||
||
||
/
/
/
1
2
3
12345678901234567890123456789012345
1----------------------------------2-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC3-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC4-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC5-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC6-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC7-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC8----------------------------------9-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC10-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC1-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC2-CCCCCC-CCC-------------CCC-CCCCCC3-CCCCCC-CCC-PPP-...-PPP-CCC-CCCCCC4-CCCCCC-CCC-PPP-...-PPP-CCC-CCCCCC5-CCCCCC-CCC-PPP-...-PPP-CCC-CCCCCC6----------------------------------7-......-...-...-...-...-...-......8-......-...-...-...-...-...-......9-......-...-...-...-...-...-......SECTION C ADVANCED TUTORIALS

84
SIMCITY4 MANUAL AND WALKTHROUGH BOOK
20----------------------------------1-CCCCCC-CCC-PPP-...-PPP-CCC-CCCCCC2-CCCCCC-CCC-PPP-...-PPP-CCC-CCCCCC3-CCCCCC-CCC-PPP-...-PPP-CCC-CCCCCC4-CCCCCC-CCC-------------CCC-CCCCCC5-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC6-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC7-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC8----------------------------------9-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC30-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC1-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC2-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC3-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC4-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC5----------------------------------D'Urberville – PLAN
This is the main plan of the city until the end of tutorial 1. The numbers below refer to the instructions as to
when to build it. I will not put numbers below those areas left for expansion or the greenbelt. Also some areas
have two dates of construction because the initial construction does not exhaust the entire area. Therefore I
will list only the first date and in the instructions for the subsequent build dates, I will refer to the first
instruction. I will place a (m) in that box to indicate areas of multiple construction dates.
-----------------------------------------------------------------|W
|A
|I
|G
|C
|R
|.
|R
|
|
|
|
|
|
|0-4 |9-4 |3-1 |
|4-1 |1-2 |
|1-2 |
|
|
|
|
|
-----------------------------------------------------------------|P(m)|A
|.
|G
|.
|.
|.
|.
|
|
|
|
|
|
|0-5 |9-4 |
|
|
|
|
|
|
|
|
|
|
|
-----------------------------------------------------------------|G
|G
|I
|G
|C
|R
|.
|R
|
|
|
|
|
|
|
|
|3-1 |
|4-1 |1-2 |9-2 |1-2 |
|
|
|
|
|
-----------------------------------------------------------------|=
|=
|=
|=
|=
|=
|=
|=
|=
|=
|=
|=
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
-----------------------------------------------------------------|I
|=
|I
|G
|C(m)|R
|.
|R
|=
|R
|.
|R
|
|
|0-6 |
|0-6 |
|0-7 |0-8 |
|0-8 |
|6-1 |
|6-1 |
|
-----------------------------------------------------------------|.
|=
|.
|G
|.
|.
|.
|.
|=
|.
|.
|.
|
|
|
|2-1 |
|
|
|
|
|
|
|7-1 |
|
|
|
-----------------------------------------------------------------|I
|=
|I
|G
|C(m)|R
|.
|R
|=
|R
|.
|R
|
|
|0-6 |
|0-6 |
|0-7 |0-8 |
|0-8 |
|6-1 |
|6-1 |
|
-----------------------------------------------------------------|=
|=
|=
|=
|=
|=
|=
|=
|=
|=
|=
|=
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
-----------------------------------------------------------------|I
|=
|I
|G
|C
|R
|.
|R
|=
|C
|
|
|
|
|5-3 |
|5-3 |
|5-2 |5-1 |9-2 |5-1 |
|7-2 |
|
|
|
-----------------------------------------------------------------|.
|=
|.
|G
|.
|.
|.
|.
|=
|.
|.
|.
|
|
|
|
|
|
|
|
|
|
|
|8-2 |
|
|
|
-----------------------------------------------------------------|I
|=
|I
|G
|C
|R
|.
|R
|=
|
|
|
|
|
|5-3 |
|5-3 |
|5-2 |5-1 |
|5-1 |
|
|
|
|
|
-----------------------------------------------------------------SECTION C ADVANCED TUTORIALS

85
SIMCITY4 MANUAL AND WALKTHROUGH BOOK
|I
|=
|I
|G
|?
|C
|.
|C
|=
|
|
|
|
|
|8-1 |
|8-1 |
|
|6-1 |
|6-1 |
|
|
|
|
|
-----------------------------------------------------------------And before we begin, let me introduce you to D'Urberville's mayor, Tess.

SECTION C ADVANCED TUTORIALS

86

More Related Content

Viewers also liked

Sim compile section a v01
Sim compile section a v01Sim compile section a v01
Sim compile section a v01cloudyouzardn
 
Ieee 2013 2014 final sem java project titles
Ieee 2013 2014 final sem java project titlesIeee 2013 2014 final sem java project titles
Ieee 2013 2014 final sem java project titlesRICHBRAINTECH
 
Ieee 2013 2014 final year students me,mtech dotnet project titles
Ieee 2013 2014 final year students  me,mtech  dotnet project titlesIeee 2013 2014 final year students  me,mtech  dotnet project titles
Ieee 2013 2014 final year students me,mtech dotnet project titlesRICHBRAINTECH
 
Sfx paris sales memory stick 2
Sfx paris sales memory stick 2Sfx paris sales memory stick 2
Sfx paris sales memory stick 2Kent Faith
 
Ieee 2013 2014 final sem me,mtech students for cse,it java project titles
Ieee 2013 2014 final sem me,mtech students for cse,it java project titlesIeee 2013 2014 final sem me,mtech students for cse,it java project titles
Ieee 2013 2014 final sem me,mtech students for cse,it java project titlesRICHBRAINTECH
 
User Experience-updated
User Experience-updatedUser Experience-updated
User Experience-updatedMichelle Lu
 
Presentation1
Presentation1Presentation1
Presentation1tugasCALL
 
Ieee 2013 2014 final sem me,mtech students for cse,it dotnet project titles
Ieee 2013 2014 final sem me,mtech students for cse,it  dotnet project titlesIeee 2013 2014 final sem me,mtech students for cse,it  dotnet project titles
Ieee 2013 2014 final sem me,mtech students for cse,it dotnet project titlesRICHBRAINTECH
 
Prezentare reteaua spiritelor
Prezentare reteaua spiritelorPrezentare reteaua spiritelor
Prezentare reteaua spiritelorConstantin Borcia
 
New Historicism A Historical Aanalysis of Literature
New Historicism A Historical Aanalysis of LiteratureNew Historicism A Historical Aanalysis of Literature
New Historicism A Historical Aanalysis of LiteratureKaushal Desai
 

Viewers also liked (17)

Sim compile section a v01
Sim compile section a v01Sim compile section a v01
Sim compile section a v01
 
Ieee 2013 2014 final sem java project titles
Ieee 2013 2014 final sem java project titlesIeee 2013 2014 final sem java project titles
Ieee 2013 2014 final sem java project titles
 
Ieee 2013 2014 final year students me,mtech dotnet project titles
Ieee 2013 2014 final year students  me,mtech  dotnet project titlesIeee 2013 2014 final year students  me,mtech  dotnet project titles
Ieee 2013 2014 final year students me,mtech dotnet project titles
 
P&G Coupons
P&G CouponsP&G Coupons
P&G Coupons
 
Apple IFit
Apple IFitApple IFit
Apple IFit
 
Sfx paris sales memory stick 2
Sfx paris sales memory stick 2Sfx paris sales memory stick 2
Sfx paris sales memory stick 2
 
Ieee 2013 2014 final sem me,mtech students for cse,it java project titles
Ieee 2013 2014 final sem me,mtech students for cse,it java project titlesIeee 2013 2014 final sem me,mtech students for cse,it java project titles
Ieee 2013 2014 final sem me,mtech students for cse,it java project titles
 
User Experience-updated
User Experience-updatedUser Experience-updated
User Experience-updated
 
Presentation1
Presentation1Presentation1
Presentation1
 
ClimbingRoutes
ClimbingRoutesClimbingRoutes
ClimbingRoutes
 
Ieee 2013 2014 final sem me,mtech students for cse,it dotnet project titles
Ieee 2013 2014 final sem me,mtech students for cse,it  dotnet project titlesIeee 2013 2014 final sem me,mtech students for cse,it  dotnet project titles
Ieee 2013 2014 final sem me,mtech students for cse,it dotnet project titles
 
Physics in movies
Physics in moviesPhysics in movies
Physics in movies
 
fresh
freshfresh
fresh
 
Prezentare reteaua spiritelor
Prezentare reteaua spiritelorPrezentare reteaua spiritelor
Prezentare reteaua spiritelor
 
Horsing around
Horsing aroundHorsing around
Horsing around
 
E learning
E learning E learning
E learning
 
New Historicism A Historical Aanalysis of Literature
New Historicism A Historical Aanalysis of LiteratureNew Historicism A Historical Aanalysis of Literature
New Historicism A Historical Aanalysis of Literature
 

Similar to Sim compile section c v01

1. A logistics specialist for Charm City Inc. must distribute case.docx
1. A logistics specialist for Charm City Inc. must distribute case.docx1. A logistics specialist for Charm City Inc. must distribute case.docx
1. A logistics specialist for Charm City Inc. must distribute case.docxNarcisaBrandenburg70
 
Module_2_dspgggffffggggggggggggggga.pptx
Module_2_dspgggffffggggggggggggggga.pptxModule_2_dspgggffffggggggggggggggga.pptx
Module_2_dspgggffffggggggggggggggga.pptxrealme6igamerr
 
Practical work 3
Practical work 3Practical work 3
Practical work 3wkhairil80
 
Gsp 215 Believe Possibilities / snaptutorial.com
Gsp 215  Believe Possibilities / snaptutorial.comGsp 215  Believe Possibilities / snaptutorial.com
Gsp 215 Believe Possibilities / snaptutorial.comStokesCope20
 
Gsp 215 Effective Communication / snaptutorial.com
Gsp 215  Effective Communication / snaptutorial.comGsp 215  Effective Communication / snaptutorial.com
Gsp 215 Effective Communication / snaptutorial.comHarrisGeorg21
 
Paper id 27201434
Paper id 27201434Paper id 27201434
Paper id 27201434IJRAT
 
Cad notes - ENGINEERING DRAWING - RGPV,BHOPAL
Cad notes - ENGINEERING DRAWING - RGPV,BHOPALCad notes - ENGINEERING DRAWING - RGPV,BHOPAL
Cad notes - ENGINEERING DRAWING - RGPV,BHOPALAbhishek Kandare
 
Graphics Within Industry
Graphics Within IndustryGraphics Within Industry
Graphics Within Industrys2francetrip
 
AutoCAD Lab Manual
AutoCAD Lab ManualAutoCAD Lab Manual
AutoCAD Lab ManualCynthia King
 
Modeling seismic analysis_and_design_of_rc_building_10_story
Modeling seismic analysis_and_design_of_rc_building_10_storyModeling seismic analysis_and_design_of_rc_building_10_story
Modeling seismic analysis_and_design_of_rc_building_10_storyAliAlmayalee
 
AJAY SHARMA autocad-summer-training-report.pdf
AJAY SHARMA autocad-summer-training-report.pdfAJAY SHARMA autocad-summer-training-report.pdf
AJAY SHARMA autocad-summer-training-report.pdfYaarJani
 
Two marks with answers ME6501 CAD
Two marks with answers ME6501 CADTwo marks with answers ME6501 CAD
Two marks with answers ME6501 CADPriscilla CPG
 
GSP 215 Effective Communication - tutorialrank.com
GSP 215  Effective Communication - tutorialrank.comGSP 215  Effective Communication - tutorialrank.com
GSP 215 Effective Communication - tutorialrank.comBartholomew35
 

Similar to Sim compile section c v01 (20)

Samplepaper
SamplepaperSamplepaper
Samplepaper
 
Cad notes
Cad notesCad notes
Cad notes
 
1. A logistics specialist for Charm City Inc. must distribute case.docx
1. A logistics specialist for Charm City Inc. must distribute case.docx1. A logistics specialist for Charm City Inc. must distribute case.docx
1. A logistics specialist for Charm City Inc. must distribute case.docx
 
Module_2_dspgggffffggggggggggggggga.pptx
Module_2_dspgggffffggggggggggggggga.pptxModule_2_dspgggffffggggggggggggggga.pptx
Module_2_dspgggffffggggggggggggggga.pptx
 
Practical work 3
Practical work 3Practical work 3
Practical work 3
 
Gsp 215 Believe Possibilities / snaptutorial.com
Gsp 215  Believe Possibilities / snaptutorial.comGsp 215  Believe Possibilities / snaptutorial.com
Gsp 215 Believe Possibilities / snaptutorial.com
 
AUTOCAD RAHUL
AUTOCAD  RAHULAUTOCAD  RAHUL
AUTOCAD RAHUL
 
Gsp 215 Effective Communication / snaptutorial.com
Gsp 215  Effective Communication / snaptutorial.comGsp 215  Effective Communication / snaptutorial.com
Gsp 215 Effective Communication / snaptutorial.com
 
Fx570 ms 991ms_e
Fx570 ms 991ms_eFx570 ms 991ms_e
Fx570 ms 991ms_e
 
Paper id 27201434
Paper id 27201434Paper id 27201434
Paper id 27201434
 
Cad notes
Cad notesCad notes
Cad notes
 
CAD
CADCAD
CAD
 
Cad notes - ENGINEERING DRAWING - RGPV,BHOPAL
Cad notes - ENGINEERING DRAWING - RGPV,BHOPALCad notes - ENGINEERING DRAWING - RGPV,BHOPAL
Cad notes - ENGINEERING DRAWING - RGPV,BHOPAL
 
Graphics Within Industry
Graphics Within IndustryGraphics Within Industry
Graphics Within Industry
 
AutoCAD Lab Manual
AutoCAD Lab ManualAutoCAD Lab Manual
AutoCAD Lab Manual
 
Modeling seismic analysis_and_design_of_rc_building_10_story
Modeling seismic analysis_and_design_of_rc_building_10_storyModeling seismic analysis_and_design_of_rc_building_10_story
Modeling seismic analysis_and_design_of_rc_building_10_story
 
AJAY SHARMA autocad-summer-training-report.pdf
AJAY SHARMA autocad-summer-training-report.pdfAJAY SHARMA autocad-summer-training-report.pdf
AJAY SHARMA autocad-summer-training-report.pdf
 
Two marks with answers ME6501 CAD
Two marks with answers ME6501 CADTwo marks with answers ME6501 CAD
Two marks with answers ME6501 CAD
 
Critical path analysis
Critical path analysisCritical path analysis
Critical path analysis
 
GSP 215 Effective Communication - tutorialrank.com
GSP 215  Effective Communication - tutorialrank.comGSP 215  Effective Communication - tutorialrank.com
GSP 215 Effective Communication - tutorialrank.com
 

Recently uploaded

Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 

Recently uploaded (20)

Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 

Sim compile section c v01

  • 1. SIMCITY4 MANUAL AND WALKTHROUGH BOOK SECTION C: ADVANCED TUTORIALS tutorial. Bonus points for those who can spot from where are they inspired from. ---------------------------------C.01: General Points |Aureliano(2)|D'Uberville(1,3,5) | This here is the new and improved walkthrough until you ---------------------------------|VillaSanGirolamo(4)| get your first skyscraper. All in 16 years too! It used to be --------------------called the IdOIt's walkthrough to 40,000 but that sounds kind of mean. So now I am calling it the advanced tutorials 1) God Mode: also, the new name reflects the improvements to it. The G-1) Create new Region selecting plain aim of it is to help you understand the basic mechanics of G-2) Go into the city and immediately hit pause. city building and how to get a good profitable city started. G-3) Optional: Use the mesa tool and click slightly on the right side of the map. Use quick brush and I am not sure whether is it because of Patch 2, but this spread across the right side of the map. If this time round, I reached 40,000 population in about 10 years. confuses you then forget it. This really is optional Of course this time round, I was more reckless with my since I did not even do it for my tutorials spending. I spend more mostly because I am quite certain G-5) Fill the place with trees thickly. Especially the of the effects of each spending. Therefore it should be top left hand side. noted that with the exception of this tutorial, you should not spend so much and you should leave more money in C.03: Tutorial 1: D'Urberville, Year 0-11 the bank. Take note of the following: This here is an explanation of how the city plan is laid out. To save space, I obviously cannot Background Information reproduce the entire plan of the city tile by tile. 1) Read the earlier sections especially Section B, Parts Hence this mini map plan is used as an explanation. 1 to 6. 2) Except for the first few months, you will always be Diagram C.03(1): Final City Layout making profits so no business deals for tutorial 1 Construction: 1) Statistics taken at the start of the year. I: Industrial Zone 2) My constructions done at start of the year. R: Residential Zone 3) Always build when paused. C: Commercial Zone 4) For those zero cost and maintenance rewards build G: Green Belt them as soon as possible. I usually will not tell you =: Free space for future highway where to build it. But base its placement on its or mass transit. It is 4 tiles long effects. w: Waste to power Notes on Tutorial itself 1) I will not be repeating the word build over and over P: Coal plant again. Whenever I mention a structure in BLOCK A: Air force base ?: Possible place for cemetery LETTERS, it means build it. .: Black space for amenities, or 2) Unless mentioned otherwise, all zoning is MEDIUM pubic transport stations. density. 3) I will refer to building instructions by use of square brackets. Thus reference to the first instruction in year 0 will be like [0-1]. You will see these numbers beside each instruction. Adapt to your situation: There is often a slight difference in the rate of increase each year even if you do exactly the same thing. Therefore, focus on the population numbers and income, which I have given and compare it with your situation. If my figures are higher, than just wait a while to reach it. If my figures are lower than your then just proceed. C.02: Region & God Mode 1) Region: This here would be the final setup of the three cities that I will be using in the tutorial. They are all mid-sized maps. The numbers coincide with their tutorial numbers. I will introduce you to my puppet mayors later on in each SECTION C ADVANCED TUTORIALS 81
  • 2. SIMCITY4 MANUAL AND WALKTHROUGH BOOK ------------------------|W|A|I|G|C|R|.|R| | | | | ------------------------|P|A|.|G|.|.|.|.| | | | | ------------------------|G|G|I|G|C|R|.|R| | | | | ------------------------|=|=|=|=|=|=|=|=|=|=|=|=| ------------------------|I|=|I|G|C|R|.|R|=|R|.|R| ------------------------|.|=|.|G|.|.|.|.|=|.|.|.| ------------------------|I|=|I|G|C|R|.|R|=|R|.|R| ------------------------|=|=|=|=|=|=|=|=|=|=|=|=| ------------------------|I|=|I|G|C|R|.|R|=|C| | | > > > Commercial Plaza Zone ------------------------|.|=|.|G|.|.|.|.|=|.|.|.| ------------------------|I|=|I|G|C|R|.|R|=| | | | ------------------------|I|=|I|G|?|C|.|C|=| | | | > > > Zoning just to fit into last bit of map ------------------------Diagram C.03(2): Magnification of (ORS) R: Residential -: Road .: Gap / empty space E: Future development location of Elementary School H: 3 possible sites for hospitals depending on position of (ORS) on map. It does NOT ask you to place 3 hospitals in one (ORS). ------__|R|.|R| __________________ | ------|| | |.|.|.| || | ------|| | |R|.|R| || | ------|| |___ |____________ || || || || / / / 1 2 3 12345678901234567890123456789012345 1----------------------------------2-RRRR-RRRR-RRRR-HHH-RRRR-RRRR-RRRR3-RRRR-RRRR-RRRR-HHH-RRRR-RRRR-RRRR4-RRRR-RRRR-RRRR-HHH-RRRR-RRRR-RRRR5-RRRR-RRRR-RRRR-HHH-RRRR-RRRR-RRRR6----------------...---------------7-RRRR-RRRR-RRRR-...-RRRR-RRRR-RRRR8-RRRR-RRRR-RRRR-...-RRRR-RRRR-RRRR9-RRRR-RRRR-RRRR-...-RRRR-RRRR-RRRR10-RRRR-RRRR-RRRR-...-RRRR-RRRR-RRRR1----------------------------------2-RRRR-RRRR-.............-RRRR-RRRR3-RRRR-RRRR-.............-RRRR-RRRRSECTION C ADVANCED TUTORIALS 82
  • 3. SIMCITY4 MANUAL AND WALKTHROUGH BOOK 4-RRRR-RRRR-.............-RRRR-RRRR5-RRRR-RRRR-.............-RRRR-RRRR6----------------------------------7-HHH......-.....EE......-.........8-HHH......-.....EE......-.........9-HHH......-.....EE......-.........20----------------------------------1-RRRR-RRRR-.............-RRRR-RRRR2-RRRR-RRRR-.............-RRRR-RRRR3-RRRR-RRRR-.............-RRRR-RRRR4-RRRR-RRRR-.............-RRRR-RRRR5----------------------------------6-RRRR-RRRR-RRRR-...-RRRR-RRRR-RRRR7-RRRR-RRRR-RRRR-...-RRRR-RRRR-RRRR8-RRRR-RRRR-RRRR-...-RRRR-RRRR-RRRR9-RRRR-RRRR-RRRR-...-RRRR-RRRR-RRRR30----------------...---------------1-RRRR-RRRR-RRRR-HHH-RRRR-RRRR-RRRR2-RRRR-RRRR-RRRR-HHH-RRRR-RRRR-RRRR3-RRRR-RRRR-RRRR-HHH-RRRR-RRRR-RRRR4-RRRR-RRRR-RRRR-HHH-RRRR-RRRR-RRRR5----------------------------------Diagram C.03(2): Magnification of Industrial Zones I: -: .: R: Industry Road Gap/space Residential ----------|I|.|I|G|C| ----------|.|.|.|G|C| ----------|I|.|I|G|C| ----------|| | | | |________________________________ || | | |_____________________________ || || | |______________________ || || || |____________ || || || || || || || || / / / / / 1 2 3 4 1234567890123456789012345678901234567890123456789 1------------------------------------------------2-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 3-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 4-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 5-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 6-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC---7-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 8-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 9-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 10------------------------------------....-CCCC-.-R 1-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC---2-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 3-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 4-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R SECTION C ADVANCED TUTORIALS 83
  • 4. SIMCITY4 MANUAL AND WALKTHROUGH BOOK 5-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 6------------------------------------------------7-....-....-....-....-....-....-....-....-CCCC-.-. 8-....-....-....-....-....-....-....-....-CCCC-.-. 9-....-....-....-....-....-....-....-....-CCCC-.-. 20------------------------------------------------1-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 2-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 3-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 4-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 5-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC---6------------------------------------....-CCCC-.-R 7-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 8-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 9-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 30-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC---1-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 2-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 3-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 4-IIII-IIII-IIII-....-IIII-IIII-IIII-....-CCCC-.-R 5------------------------------------------------Diagram C.03(3): Magnification of Note that in the first tutorial only one quod the Commercial Plaza zoning top left is filled up. And the other commercial zones in the area are not based on the above C: Commercial design but based on the design as seen in P: Plaza, reward or any commercial Diagram C.03(2): Magnification of Industrial boosters Zones. .: Free space for commercial boosters, mass transit stations or amenities -: Roads ------__|C|.|C| __________________ | ------|| | |.|.|.| || | ------|| | |C|.|C| || | ------|| |___ |____________ || || || || / / / 1 2 3 12345678901234567890123456789012345 1----------------------------------2-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC3-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC4-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC5-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC6-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC7-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC8----------------------------------9-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC10-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC1-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC2-CCCCCC-CCC-------------CCC-CCCCCC3-CCCCCC-CCC-PPP-...-PPP-CCC-CCCCCC4-CCCCCC-CCC-PPP-...-PPP-CCC-CCCCCC5-CCCCCC-CCC-PPP-...-PPP-CCC-CCCCCC6----------------------------------7-......-...-...-...-...-...-......8-......-...-...-...-...-...-......9-......-...-...-...-...-...-......SECTION C ADVANCED TUTORIALS 84
  • 5. SIMCITY4 MANUAL AND WALKTHROUGH BOOK 20----------------------------------1-CCCCCC-CCC-PPP-...-PPP-CCC-CCCCCC2-CCCCCC-CCC-PPP-...-PPP-CCC-CCCCCC3-CCCCCC-CCC-PPP-...-PPP-CCC-CCCCCC4-CCCCCC-CCC-------------CCC-CCCCCC5-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC6-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC7-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC8----------------------------------9-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC30-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC1-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC2-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC3-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC4-CCCCCC-CCCCCCC-...-CCCCCCC-CCCCCC5----------------------------------D'Urberville – PLAN This is the main plan of the city until the end of tutorial 1. The numbers below refer to the instructions as to when to build it. I will not put numbers below those areas left for expansion or the greenbelt. Also some areas have two dates of construction because the initial construction does not exhaust the entire area. Therefore I will list only the first date and in the instructions for the subsequent build dates, I will refer to the first instruction. I will place a (m) in that box to indicate areas of multiple construction dates. -----------------------------------------------------------------|W |A |I |G |C |R |. |R | | | | | | |0-4 |9-4 |3-1 | |4-1 |1-2 | |1-2 | | | | | | -----------------------------------------------------------------|P(m)|A |. |G |. |. |. |. | | | | | | |0-5 |9-4 | | | | | | | | | | | | -----------------------------------------------------------------|G |G |I |G |C |R |. |R | | | | | | | | |3-1 | |4-1 |1-2 |9-2 |1-2 | | | | | | -----------------------------------------------------------------|= |= |= |= |= |= |= |= |= |= |= |= | | | | | | | | | | | | | | | | -----------------------------------------------------------------|I |= |I |G |C(m)|R |. |R |= |R |. |R | | |0-6 | |0-6 | |0-7 |0-8 | |0-8 | |6-1 | |6-1 | | -----------------------------------------------------------------|. |= |. |G |. |. |. |. |= |. |. |. | | | |2-1 | | | | | | | |7-1 | | | | -----------------------------------------------------------------|I |= |I |G |C(m)|R |. |R |= |R |. |R | | |0-6 | |0-6 | |0-7 |0-8 | |0-8 | |6-1 | |6-1 | | -----------------------------------------------------------------|= |= |= |= |= |= |= |= |= |= |= |= | | | | | | | | | | | | | | | | -----------------------------------------------------------------|I |= |I |G |C |R |. |R |= |C | | | | |5-3 | |5-3 | |5-2 |5-1 |9-2 |5-1 | |7-2 | | | | -----------------------------------------------------------------|. |= |. |G |. |. |. |. |= |. |. |. | | | | | | | | | | | |8-2 | | | | -----------------------------------------------------------------|I |= |I |G |C |R |. |R |= | | | | | |5-3 | |5-3 | |5-2 |5-1 | |5-1 | | | | | | -----------------------------------------------------------------SECTION C ADVANCED TUTORIALS 85
  • 6. SIMCITY4 MANUAL AND WALKTHROUGH BOOK |I |= |I |G |? |C |. |C |= | | | | | |8-1 | |8-1 | | |6-1 | |6-1 | | | | | | -----------------------------------------------------------------And before we begin, let me introduce you to D'Urberville's mayor, Tess. SECTION C ADVANCED TUTORIALS 86