1. STRAYER CIS 348 Week 6 Assignment 4 Mobile
App Part 1 (Work Breakdown Structure) (2
Papers) NEW
Check this A+ tutorial guideline at
http://www.assignmentcloud.com/cis-348-
strayer/cis-348-week-6-assignment-4-mobile-
app-part-1-work-breakdown-structure-new
For more classes visit
http://www.assignmentcloud.com/
This Tutorial contains 2 Papers
CIS 348 Week 6 Assignment 4: Mobile App Part 1
(Work Breakdown Structure)
Due Week 6 and worth 85 points
This assignment contains two (2) deliverables: a
summary document to be delivered in a word
processor document format and a Work
Breakdown Structure (WBS) to be delivered in a
project file.
Overview:
2. Imagine that you work as the project manager for
an IT department. Your organization has recently
approved the development of a mobile application.
As the project manager, you will manage the
development of the project. The project will
include user experience (UX) design by a
consultant, graphic design by a team of two
contracted designers, and in-house application
development by a team of three (3) programmers
and a database developer.
Deliverable 1: Summary (MS Word or open source
equivalent)
Write a one to two (1-2) page summary document
in which you:
Summarize the project requirements and other
assumptions (i.e., budget, human resources,
workload, environmental dependencies, etc.).
Define a work breakdown structure and describe
the methodology behind constructing one.
Deliverable 2: WBS (MS Project or open source
equivalent)
Use Microsoft Project or an open source equivalent
to create a WBS which addresses the following:
Contain at least five (5) main tasks, one (1) for
each of the PMBOK® process areas.
Contain at least thirty (30) line items distributed
in five (5) or more work packages.
3. Contain Work Breakdown Structure Code for each
task.
Present duration estimates for each task that
results in a duration estimate for the project not to
exceed the requirements described in the
overview.
Deliverable one (1) of your assignment must
follow these formatting requirements:
Be typed, double spaced, using Times New Roman
font (size 12), with one-inch margins on all sides;
citations and references must follow APA or
school-specific format. Check with your professor
for any additional instructions.
Include a cover page containing the title of the
assignment, the student’s name, the professor’s
name, the course title, and the date. The cover
page and the reference page are not included in
the required assignment page length.
The specific course learning outcomes associated
with this assignment are:
Explain and apply the phases of the project
management life cycle.
Develop processes that initiate technology
projects, including project selection and defining
project scope.
Analyze and develop project schedules with
appropriate techniques and software tools.
4. Use technology and information resources to
research issues in information systems and
technology.
Write clearly and concisely about Information
Technology Project Management topics using
proper writing mechanics and technical style
conventions