For more classes visit
www.snaptutorial.com
This Tutorial contains 2 Set of Paper/PPT for each Assignment
CIS 517 Week 2 Assignment 1 The Role Of Project Managers (2 Papers)
CIS 517 Week 3 Assignment 2 Waterfall And Agile (2 Papers)
CIS 517 Week 5 Assignment 3 Voip Part 1 (Work Breakdown Structure) (2 Papers)
CIS 517 Week 6 Assignment 4 Voip Part 2 (Gantt And Pert Charts) (2 Papers)
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
Cis 517 Enhance teaching / snaptutorial.com
1. CIS 517 All Assignment (2 Set)
For more classes visit
www.snaptutorial.com
This Tutorial contains 2 Set of Paper/PPT for each Assignment
CIS 517 Week 2 Assignment 1 The Role Of Project Managers
(2 Papers)
CIS 517 Week 3 Assignment 2 Waterfall And Agile (2 Papers)
CIS 517 Week 5 Assignment 3 Voip Part 1 (Work Breakdown
Structure) (2 Papers)
CIS 517 Week 6 Assignment 4 Voip Part 2 (Gantt And Pert
Charts) (2 Papers)
CIS 517 Week 8 Assignment 5 Voip Part 3 (Quality) (2 PPT)
CIS 517 Week 9 Assignment 6 Voip Part 4 (2 Paper)
CIS 517 Week 10 Term Paper Project Managers and Ethics,
Leadership, and Technology (2 Paper)
***************************************************
CIS 517 Week 2 Assignment 1 The Role Of Project Managers (2
Papers)
2. For more classes visit
www.snaptutorial.com
This Tutorial contains 2 Papers
Research job boards for project manager positions. Take note of
the various industries that hire project managers. Then, research
statistics from the project management institute on the rate of
success of projects in different industries including IT.
Write a two to three (2-3) page paper in which you:
1. Explain project management as a discipline.
2. Describe the industries in which project managers are in
high demand. Provide evidence to support your response.
3. Describe the general role of a project manager, and explain
the primary ways in which it differs across different industries.
4. Compare the rate of success of projects in IT and other
industries. Explain the discrepancy or lack thereof.
5. Use at least two (2) quality resources in this assignment.
Note: Wikipedia and similar Websites do not qualify as quality
resources.
Your assignment must follow these formatting requirements:
· Be typed, double spaced, using Times New Roman font
(size 12), with one-inch margins on all sides; citations and
3. references must follow APA or school-specific format. Check
with your professor for any additional instructions.
· Include a cover page containing the title of the assignment,
the student’s name, the professor’s name, the course title, and
the date. The cover page and the reference page are not included
in the required assignment page length.
The specific course learning outcomes associated with this
assignment are:
· Identify how project management improves the success of
information technology projects.
· Use technology and information resources to research
issues in IT project management.
· Write clearly and concisely about issues in IT project
management using proper writing mechanics and technical style
conventions.
***************************************************
CIS 517 Week 3 Assignment 2 Waterfall And Agile (2 Papers)
For more classes visit
www.snaptutorial.com
This Tutorial contains 2 Papers
Research agile methodologies including SCRUM and extreme
programming (XP).
4. Write a three to four (3-4) page paper in which you:
1. Explain waterfall methodologies and identify their
relationship to the PMBOK® process groups.
2. Explain agile methodologies and identify their relationship to
the PMBOK® process groups.
3. Analyze the need for waterfall and agile methodologies.
4. Explain the advantages of extreme programming (XP) and
analyze the advantages of its application in high-budget short-
time projects.
5. Explain the factors to consider when selecting a project
management methodology (Waterfall vs Agile).
6. Use at least three (3) quality resources in this assignment.
Note: Wikipedia and similar Websites do not qualify as quality
resources.
Your assignment must follow these formatting requirements:
· Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and references
must follow APA or school-specific format. Check with your
professor for any additional instructions.
· Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
***************************************************
CIS 517 Week 5 Assignment 3 Voip Part 1 (Work Breakdown
Structure) (2 Papers)
For more classes visit
5. www.snaptutorial.com
This Tutorial contains 2 Papers
This assignment contains two (2) deliverables: a summary
document to be delivered in a word processor document format
and a Work Breakdown Structure (WBS) to be delivered in a
project file.
Overview
As the project manager for an IT department, you have been
assigned to manage the project of deploying a new VoIP phone
system to the company’s campus. The campus consists of three
(3) different buildings, each with twenty to fifty (20 to 50)
workstations. The project must be completed in ninety (90)
calendar days starting on November 1.
Deliverable 1: Summary (MS Word or open source equivalent)
1. Write a one to two (1-2) page summary document in which
you:
a. Summarize the project requirements and other assumptions
(e.g., budget, human resources, workload, environmental
dependencies, etc.).
b. Define a work breakdown structure and describe the
methodology behind constructing one.
Deliverable 2: WBS (MS Project or open source equivalent)
6. 2. Use Microsoft Project to create a WBS which:
a. Contains at least five (5) main tasks, one for each of the
PMBOK® process areas.
b. Contains at least sixty (60) line items distributed in ten (10)
or more work packages.
c. Contains Work Breakdown Structure Code for each task.
d. Presents a duration estimate for each task which results in a
duration estimate for the project not to exceed the requirements
described in the overview.
Deliverable one (1) of your assignment must follow these
formatting requirements:
· Be typed, double spaced, using Times New Roman font
(size 12), with one-inch margins on all sides; citations and
references must follow APA or school-specific format. Check
with your professor for any additional instructions.
· Include a cover page containing the title of the assignment,
the student’s name, the professor’s name, the course title, and
the date. The cover page and the reference page are not included
in the required assignment page length.
The specific course learning outcomes associated with this
assignment are:
· Identify how project management improves the success of
information technology projects.
7. · Explain the relationship of the scope of a project to the
work breakdown structure.
· Use technology and information resources to research
issues in IT project management.
· Write clearly and concisely about issues in IT project
management using proper writing mechanics and technical style
conventions.
Click here to view the grading rubric for this assignment.
***************************************************
CIS 517 Week 6 Assignment 4 Voip Part 2 (Gantt And Pert
Charts) (2 Papers)
For more classes visit
www.snaptutorial.com
This Tutorial contains 2 Papers
Update the Microsoft Project file you created in Assignment 3:
VoIP Part 2 (Work Breakdown Structure) with the following
changes:
· Set property values to denote progress in at least fifteen
(15) of the line items.
· Set properties so that at least one (1) of the main tasks is
behind schedule.
· Create a Gantt chart for your project.
8. · Take a screenshot of the Gantt chart which can later be
inserted into your written paper.
· Create a PERT diagram that identifies the critical path.
· Take a screenshot of the PERT chart which can later be
inserted into your written paper.
Note: If you need a tutorial on taking a screen shot, visit one of
the following locations: (PC users: http://www.take-a-
screenshot.org/) (MAC users: http://binged.it/1xriOcN).
Write a two to three (2-3) page paper in which you:
1. Compare and contrast the information that one receives
from a Gantt chart, versus that of a PERT diagram.
2. Examine the advantages of using a Gantt chart over a
PERT chart and vice versa. Determine when it is appropriate to
use one over the other. Justify your response.
3. Assess the importance of the critical path in project
management.
4. Insert the screenshots of the Gantt and PERT charts you
created based on the provided criteria. Elaborate on the status of
the VoIP deployment project based on the updated information.
Note: The graphical representations do not count toward the
overall page requirement.
5. Use at least two (2) quality resources in this assignment.
Note: Wikipedia and similar Websites do not qualify as quality
resources.
Your assignment must follow these formatting requirements:
· Be typed, double spaced, using Times New Roman font
(size 12), with one-inch margins on all sides; citations and
references must follow APA or school-specific format. Check
with your professor for any additional instructions.
9. · Include a cover page containing the title of the assignment,
the student’s name, the professor’s name, the course title, and
the date. The cover page and the reference page are not included
in the required assignment page length.
· Import completed diagrams, charts, or screenshots into the
Word document before the paper is submitted.
The specific course learning outcomes associated with this
assignment are:
· Distinguish among various time management techniques
such as CPM, Gantt charts, and the PERT method.
· Use project management and graphic software to plan and
manage a project throughout the project life cycle.
· Use technology and information resources to research
issues in IT project management.
· Write clearly and concisely about issues in IT project
management using proper writing mechanics and technical style
conventions.
Click here to view the grading rubric for this assignment.
***************************************************
CIS 517 Week 8 Assignment 5 Voip Part 3 (Quality) (2 PPT)
For more classes visit
www.snaptutorial.com
This Tutorial contains 2 Papers
10. Suppose the VoIP project sponsor wants you to present the
project to the board of directors. Particularly, the sponsor would
like you to discuss the quality of the project. It is worth noting
that during the deployment of the VoIP system the quality
control team tracked forty (40) of the deployments. The
following problems were documented:
· Five (5) of the deployments experienced delays due to the
unique configuration of the office space which required
modification to install the proper wiring.
· Twelve (12) of the users called the help desk to get
additional training on the new system.
· Two (2) of the new devices were defective.
Prepare a fifteen to twenty (15-20) slide digital presentation with
the software of your choice (e.g., PowerPoint, Google slides,
Prezi, etc.) in which you:
1. Explain quality and its importance to project success.
2. Explain quality management planning.
3. Contrast quality assurance and quality control.
4. Describe the different quality activities involved in this
project and each of their outcomes.
5. Describe Pareto diagrams and their use in project
management.
6. Present the data in the provided scenario using a Pareto
diagram (Use the software of your choosing to prepare the
diagram).
7. Use appropriate key points and / or graphics to
professionally convey the information.
8. Include presenter notes to explain each slide.
11. 9. Use at least two (2) quality resources in this assignment.
Note: Wikipedia and similar Websites do not qualify as quality
resources.
Your assignment must follow these formatting requirements:
· Include the title of the assignment, the student’s name, the
professor’s name, the course title, and the date in the
presentation.
· Include the references used in the assignment in the
presentation.
· Import charts, graphs, and / or the Pareto diagram into the
presentation. The completed works must be imported into the
presentation.
The specific course learning outcomes associated with this
assignment are:
· Explain and defend the various quality factors in project
quality.
· Use technology and information resources to research
issues in IT project management.
· Write clearly and concisely about issues in IT project
management using proper writing mechanics and technical style
conventions.
Click here to view the grading rubric for this assignment.
***************************************************
CIS 517 Week 9 Assignment 6 Voip Part 4 (2 Paper)
For more classes visit
12. www.snaptutorial.com
This Tutorial contains 2 Papers
Utilizing the Delphi technique, your team constructed the
following risks register the VoIP project containing the risk, the
likelihood of its occurrence on a scale of 1 (least likely) to 5
(most likely), and the potential negative impact on the project on
the same scale. In addition, they recommended the appropriate
response and identified its type for one of the risks identified.
Write a three to five (3-5) page paper in which you:
1. Explain risk management and its associated activities and
defend the need for a risk management plan.
2. Describe the Delphi technique used to identify risks and
infer on types of projects where this technique is most accurate.
3. Examine the four (4) types of risk response (i.e., avoidance,
acceptance, transference, and mitigation) and determine the
appropriate situation where each should be used.
4. Complete the table with the risk response type (i.e.,
avoidance, acceptance, transference, and mitigation) and a
description of the response.
5. Create a decision tree with the software of your choice to
address risk number 6. Assume that when you check the
schedule on day 60 of the project, it becomes evident that two
(2) additional engineers are needed to ensure on-time
completion of the project. The engineers cost $25,000 each and
13. a fee of $120,000 is issued by the legacy provider. The
probability of completing the project on time is as follows: With
the current personnel – 60%; With one (1) engineer – 80%; With
both engineers – 98%.
6. Explain the methodology utilized to create a decision tree
and recommend the appropriate action to take based on your
decision tree from criterion 5.
7. Use at least two (2) quality resources in this assignment.
Note: Wikipedia and similar Websites do not qualify as quality
resources.
Your assignment must follow these formatting requirements:
· Be typed, double spaced, using Times New Roman font
(size 12), with one-inch margins on all sides; citations and
references must follow APA or school-specific format. Check
with your professor for any additional instructions.
· Include a cover page containing the title of the assignment,
the student’s name, the professor’s name, the course title, and
the date. The cover page and the reference page are not included
in the required assignment page length.
· Include the decision tree created in your chosen software.
The completed decision tree must be imported into the Word
document before the paper is submitted.
The specific course learning outcomes associated with this
assignment are:
· Examine the human resource factors that can impact
project management.
· Summarize how the PMBOK® process groups and
knowledge areas are involved throughout the project life cycle.
14. · Compare and contrast the sources and mitigating factors of
project risk.
· Use project management and graphic software to plan and
manage a project throughout the project life cycle.
· Use technology and information resources to research
issues in IT project management.
· Write clearly and concisely about issues in IT project
management using proper writing mechanics and technical style
conventions
Click here to view the grading rubric for this assignment.
***************************************************
CIS 517 Week 10 Term Paper Project Managers and Ethics,
Leadership, and Technology (2 Paper)
For more classes visit
www.snaptutorial.com
This Tutorial contains 2 Papers
Term Paper: Project Managers and Ethics, Leadership, and
Technology
Due Week 10 and worth 190 points
Project managers do a lot more than calculations and reporting;
they must keep the team on track, ensure ethical decisions are
made, deal with conflict, and, depending on the type of
15. organization, they may perform employee evaluations, issue
bonuses, hire and lay off personnel, and other tasks. In this
paper, you will discuss some of the project management
activities that don’t produce deliverables.
Write a twelve to fifteen (12-15) page paper in which you:
1. Describe the different organizational structures as it relates
to project management (i.e., functional, project-based, matrix).
2. Discuss at least two (two) different roles that project
managers can play in organizational leadership.
3. Describe at least three (3) human resource factors that
affect project management.
4. Recommend five (5) conflict resolution techniques that
project managers can utilize to keep team members productive.
5. Explain at least three (3) leadership approaches and when
they are best utilized.
6. Describe five (5) ethical situations or dilemmas that project
managers might face in their role within an organization.
7. Summarize tools and techniques commonly used in project
procurement.
8. Assess the role of technology in project management.
9. Provide your expectations for the development of the
project management field aided by modern technologies.
10. Use at least four (4) quality resources in this assignment.
Note: Wikipedia and similar Websites do not qualify as quality
resources.
Your assignment must follow these formatting requirements:
· Be typed, double spaced, using Times New Roman font
(size 12), with one-inch margins on all sides; citations and
16. references must follow APA or school-specific format. Check
with your professor for any additional instructions.
· Include a cover page containing the title of the assignment,
the student’s name, the professor’s name, the course title, and
the date. The cover page and the reference page are not included
in the required assignment page length.
The specific course learning outcomes associated with this
assignment are:
· Describe and demonstrate ethical practices in project
management.
· Examine the human resource factors that can impact
project management.
· Use technology and information resources to research
issues in IT project management.
· Write clearly and concisely about issues in IT project
management using proper writing mechanics and technical style
conventions.
Click here to view the grading rubric for this assignment.
***************************************************