Running head: RIORDAN PROJECT MANAGEMENT PLAN
PROJECT MANAGEMENT PLAN
8Scope Statement
Project Title: China Relocation
Date:Prepared by:
Project Justification:
This project plan involves the location of Riordan
Manufacturing’s China operations in Hangzhou. The major
driving force for this decision is the fact that the company’s
Chinese partners already have the necessary facilities in place.
In addition, another reason for this is that the Hangzhou city is
proximal to the Qiantang River. Consequently, Qiantang River
is significant since the access to the river is responsible for
Hangzhou Bay, which is big enough to handle the company’s
shipping needs. The project is also justified by the fact that
there has been an increase in the volume of production from the
China plant and therefore, if container shipping companies for
instance the China Shipping Container Lines are utilized. The
ports in Shanghai and Hong Kong are utilized by container
shipping companies. However, Shanghai port, which is 180
kilometers away from the current location, results in extra
logistical steps. The products of the company are transported to
a port located on Qiantang River before being loaded into
containers for shipping. The shipping containers are then loaded
onto barges and taken to Shanghai port. At Shanghai, the
shipping containers are offloaded and transported to another
place of port where final loading takes place before delivery to
final destinations. The other option is to use the truck to
transport the products to the Shanghai port. There, they will be
loaded into shipping containers and onto the ships directly for
delivery into their final destinations. However, trucking
companies charge the same price as local shipping companies.
Therefore, if the China operations are relocated to the city of
Shanghai, there will be great cost savings. Besides, there will
be more sufficient urban infrastructure, putting the company in
a better market position and the company’s Chinese products
can be shipped throughout Europe and Asia.
Project Characteristics and Requirements:
1. Increased shipping destinations
2. Cost Saving
3. Time reduction
4. Simplicity of operation
5. Flexibility – ability to expand and adapt
Summary of Project Deliverables
Project management-related deliverables: business case, charter,
team contract, scope statement, WBS, schedule, cost baseline,
status reports, final project presentation, final project report,
lessons-learned report, and any other documents required to
manage the project.
Product-related deliverables: research reports, design
documents, software code, hardware, etc.
1. Structural documents
These include the documents highlighting the main features of
the way the port will be structured to manage many operations.
2. Structural Layout/ drawings/ schematics
This refers to the mapping of the whole project, the different
locations, offshore and on land locations and the layout of the
same.
Project Success Criteria:
The success of the project can be based on some criteria. One of
the criteria is whether the project was accomplished within the
planned time and cost. The other criterion concerns the output.
In this case, if the output matches the expected in terms of the
amount of cost saving. If the project generates the required
amount, then it was successful.Project Charter
Project Title:
Chinese Relocation
Projected Start Date: 11/25/2013
Projected Finish Date: 12/23/2018
Project Objectives:
· One of the objectives of the project is to ensure that there is
significant cost saving upon the implementation of the project.
This is through the reduction of the logistical costs.
· The other objective is to ensure that more Chinese products
are shipped to Asia and Europe.
· The third objective is to ensure that there is reduction of time
used in trucking and shipping activities.
Approach:
The work will be broken down into a number of main activities,
under which the expected deliverables are to be obtained.
Among these categories are the structural part, the project
initiation part, project planning part and project execution part.
The activities are as follows:
1.0 Port Design
1.1 Electrical
1.2 Structural
1.2.1 Documents
1.2.2 Drawing/Layouts/Schematics
1.3 Mechanical
2.0 Project Initiation
2.1 Evaluation and recommendations
2.2 Project Charter development
2.2.1 Submission of project charter
2.2.2 Review of project charter
2.3 Approval of project charter
2.4 Implementation of the project charter
3.0 Project Planning
3.1 Creation of preliminary scope statement
3.2 Project team determination
3.2.1 Kickoff meeting for project team
3.2.2 Development of project plan
3.3 Submission of project plan
3.4 Approval of project plan
4.0 Project Execution
4.1 Project kickoff meeting
4.2 System Design
4.2.1 Hardware/software procurement
4.2.2 Installation of development system
4.3 Testing Phase
4.4 Going Live
Communication Plan
Project Name: Riordan Chinese Operations Relocation
Project Team Members Names and Sign-off:
Name
Sign-off on Team Contract
Project manager
Consultant
Electrical Engineer
Mechanical Engineer
Structural Engineer
Contractor
Code of Conduct: As a project team, we will:
· Be considerate since other people will use our work and we
will also depend on others as well.
· Be respectful while treating each other since we are all able to
make valuable contribution to the project. Disagreement should
not result in poor manners and poor behaviors.
· Be collaborative, meaning that individuals should work with
others in teams.
Participation: We will:
· All take part in decision making and implementation of the
same decisions.
· Contribute in the project planning and project execution
processes.
· Offer our time to take part in any of the project’s activity
when called upon to do so.
Communication: We will:
· Provide valid email addresses or contact information so that
direct responses can be made
· Avoid the use of repetitive arguments and personal attacks
while communicating.
· Attend any of the project meetings we are called upon to so as
to get information regarding the project.
Problem Solving: We will:
· Seek to find the root cause of the particular problem affecting
the project.
· Come up with solutions that are sensible.
· Come up with workable plans for the implementation of the
solutions.
Meeting Guidelines: We will:
· Stick to the guidelines agreed upon by the project team.
· Ensure that we accomplish a planned task in time.
· Ensure that we meet the expectations of the tasks assigned to
us.
Stakeholder Analysis
Stakeholder
What Information
When
How
Responsible Person
Project Manager
Project Status
Weekly
Face to Face/Email
Project Team Leads, Consultant, Contractor
Project Team Leads
Project Status
Weekly/As Needed
Face to Face/Email
Project Manager; Project Team
Contractor
When to execute desired service; Community concerns; port
requirements/restrictions ;permit needs
As Needed before executing desired work/Weekly once work
has begun
Face to Face/Email
Project Manager
Consultant
Assessments/Survey (Preliminary and Final) Findings
As Completed
Face to Face/Email
Project Manager
Project Team
Project Status
Weekly
Email
Project Team Leads, Project Manager
M E M O R A N D U M
To:
Charles Williamson, Dale Edgel, Lowell Bradford, Clyde Cousi
ns, Maria Trinh, Robert
Lord
From: Hugh McCauley
Re: China Relocation
Confidential
Our initial decision to locate our China operations in Hangzhou
was driven largely by the fact
that our Chinese partners already had facilities there and the cit
y’s proximity to the Qiantang
River. We thought that the river access which led on to Hangzh
ou Bay would be sufficient to
handle our shipping needs.
As the production volume from the China plant has increased, w
e are seeing that significant
savings can be had by utilizing container shipping companies su
ch as the China Shipping
Container Lines, a branch of the China Shipping (Group) Compa
ny. Most of the container
shipping companies utilize ports in Hong Kong and Shanghai.
While the Shanghai port is only 180 kilometers away from our c
urrent location, we are incurring
additional logistical steps in shipping out of Shanghai.
•
Currently, our products are trucked to a port on the Qiantang Ri
ver and loaded into
shipping containers. The containers are then loaded onto barges
that make their way to
the Shanghai port. The barges dock in Shanghai where the cont
ainers are offloaded
and trucked to another area of the port where they are loaded on
to to the ships that will
take them to their final destinations.
•
Alternatively, we could transport the products by truck to the po
rt at Shanghai where
they would be loaded into containers and then directly onto the
ships that will be taking
them to their final destinations. However, the trucking compani
es, knowing that they are
being used as an alternative to the local shipping companies to
move the same products
to the Shanghai ports, generally charge just as much as the ship
ping companies for the
same volume of goods.
We believe that the relocation of the China operations to the cit
y of Shanghai will result in
significant cost savings, will provide our operations with a more
substantial urban infrastructure
and will put us into a better position to market and ship our Chi
nese products throughout Asia
and Europe.
China Relocation Memo
Page 2
We have incorporated a move of the China operations to Shangh
ai within the next five years
into the strategic planning of Riordan Manufacturing and Riorda
n Industries. Please begin
drafting strategic plans for how such a move will impact your ar
eas of responsibility and how
your areas will facilitate the relocation.

More Related Content

Similar to Running head RIORDAN PROJECT MANAGEMENT PLANPROJECT MANAGEMEN.docx

EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group
 
EPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s Methodology
EPC Group
 
Project management plan
Project management planProject management plan
Project management planDonny Olson
 
Project initiation topic 2.2_project charters
Project initiation topic 2.2_project chartersProject initiation topic 2.2_project charters
Project initiation topic 2.2_project charters
RudreshSamant
 
The role of the project manager
The role of the project managerThe role of the project manager
The role of the project manager
Project Management Solutions
 
AYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfAYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdf
rinkumandaljis
 
Construction company business plan
Construction company business planConstruction company business plan
Construction company business planfarouq umar
 
ConfidentialOur initial decision to locate our China operations .docx
ConfidentialOur initial decision to locate our China operations .docxConfidentialOur initial decision to locate our China operations .docx
ConfidentialOur initial decision to locate our China operations .docx
maxinesmith73660
 
Include the following sections of the Project Execution, Monitorin.docx
Include the following sections of the Project Execution, Monitorin.docxInclude the following sections of the Project Execution, Monitorin.docx
Include the following sections of the Project Execution, Monitorin.docx
widdowsonerica
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
Nishant Pandey
 
How Translation Project Will be Done
How Translation Project Will be Done How Translation Project Will be Done
How Translation Project Will be Done
Lyric Labs
 
Project management-plan template
Project management-plan templateProject management-plan template
Project management-plan template
Vivek Srivastava
 
MODULE 1 Introduction to Construction Management
MODULE 1 Introduction to Construction ManagementMODULE 1 Introduction to Construction Management
MODULE 1 Introduction to Construction Management
Shree Swami atmanand saraswati inst. of technology, surat
 
Cv jason dixon dated 20160124
Cv jason dixon dated 20160124Cv jason dixon dated 20160124
Cv jason dixon dated 20160124
Jason Dixon
 
Project management
Project managementProject management
Project management
Hamad Al-oqayli
 
Work breakdown structure WBS Columbia Southe.docx
Work breakdown structure WBS Columbia Southe.docxWork breakdown structure WBS Columbia Southe.docx
Work breakdown structure WBS Columbia Southe.docx
ericbrooks84875
 
Project 27663255255255781771777166162666
Project 27663255255255781771777166162666Project 27663255255255781771777166162666
Project 27663255255255781771777166162666
MilkiasMuse
 
project management plan.pptx
project management plan.pptxproject management plan.pptx
project management plan.pptx
Nimra zaman
 

Similar to Running head RIORDAN PROJECT MANAGEMENT PLANPROJECT MANAGEMEN.docx (20)

EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
 
EPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s Methodology
 
Project management plan
Project management planProject management plan
Project management plan
 
Project initiation topic 2.2_project charters
Project initiation topic 2.2_project chartersProject initiation topic 2.2_project charters
Project initiation topic 2.2_project charters
 
The role of the project manager
The role of the project managerThe role of the project manager
The role of the project manager
 
AYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfAYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdf
 
Construction company business plan
Construction company business planConstruction company business plan
Construction company business plan
 
ConfidentialOur initial decision to locate our China operations .docx
ConfidentialOur initial decision to locate our China operations .docxConfidentialOur initial decision to locate our China operations .docx
ConfidentialOur initial decision to locate our China operations .docx
 
Include the following sections of the Project Execution, Monitorin.docx
Include the following sections of the Project Execution, Monitorin.docxInclude the following sections of the Project Execution, Monitorin.docx
Include the following sections of the Project Execution, Monitorin.docx
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
 
How Translation Project Will be Done
How Translation Project Will be Done How Translation Project Will be Done
How Translation Project Will be Done
 
Project management-plan template
Project management-plan templateProject management-plan template
Project management-plan template
 
MODULE 1 Introduction to Construction Management
MODULE 1 Introduction to Construction ManagementMODULE 1 Introduction to Construction Management
MODULE 1 Introduction to Construction Management
 
Cv jason dixon dated 20160124
Cv jason dixon dated 20160124Cv jason dixon dated 20160124
Cv jason dixon dated 20160124
 
Project management-CH 4
Project management-CH 4Project management-CH 4
Project management-CH 4
 
Project management
Project managementProject management
Project management
 
Work breakdown structure WBS Columbia Southe.docx
Work breakdown structure WBS Columbia Southe.docxWork breakdown structure WBS Columbia Southe.docx
Work breakdown structure WBS Columbia Southe.docx
 
Project 27663255255255781771777166162666
Project 27663255255255781771777166162666Project 27663255255255781771777166162666
Project 27663255255255781771777166162666
 
project management plan.pptx
project management plan.pptxproject management plan.pptx
project management plan.pptx
 
Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter Template
 

More from charisellington63520

in addition to these questions also answer the following;Answer .docx
in addition to these questions also answer the following;Answer .docxin addition to these questions also answer the following;Answer .docx
in addition to these questions also answer the following;Answer .docx
charisellington63520
 
In an environment of compliancy laws, regulations, and standards, in.docx
In an environment of compliancy laws, regulations, and standards, in.docxIn an environment of compliancy laws, regulations, and standards, in.docx
In an environment of compliancy laws, regulations, and standards, in.docx
charisellington63520
 
In American politics, people often compare their enemies to Hitler o.docx
In American politics, people often compare their enemies to Hitler o.docxIn American politics, people often compare their enemies to Hitler o.docx
In American politics, people often compare their enemies to Hitler o.docx
charisellington63520
 
In addition to the thread, the student is required to reply to 2 oth.docx
In addition to the thread, the student is required to reply to 2 oth.docxIn addition to the thread, the student is required to reply to 2 oth.docx
In addition to the thread, the student is required to reply to 2 oth.docx
charisellington63520
 
In addition to reading the Announcements, prepare for this d.docx
In addition to reading the Announcements, prepare for this d.docxIn addition to reading the Announcements, prepare for this d.docx
In addition to reading the Announcements, prepare for this d.docx
charisellington63520
 
In Act 4 during the trial scene, Bassanio says the following lin.docx
In Act 4 during the trial scene, Bassanio says the following lin.docxIn Act 4 during the trial scene, Bassanio says the following lin.docx
In Act 4 during the trial scene, Bassanio says the following lin.docx
charisellington63520
 
In a Word document, please respond to the following questions.docx
In a Word document, please respond to the following questions.docxIn a Word document, please respond to the following questions.docx
In a Word document, please respond to the following questions.docx
charisellington63520
 
In a Word document, create A Set of Instructions. (you will want.docx
In a Word document, create A Set of Instructions. (you will want.docxIn a Word document, create A Set of Instructions. (you will want.docx
In a Word document, create A Set of Instructions. (you will want.docx
charisellington63520
 
In a two page response MLA format paperMaria Werner talks about .docx
In a two page response MLA format paperMaria Werner talks about .docxIn a two page response MLA format paperMaria Werner talks about .docx
In a two page response MLA format paperMaria Werner talks about .docx
charisellington63520
 
In a paragraph (150 words minimum), please respond to the follow.docx
In a paragraph (150 words minimum), please respond to the follow.docxIn a paragraph (150 words minimum), please respond to the follow.docx
In a paragraph (150 words minimum), please respond to the follow.docx
charisellington63520
 
In a paragraph form, discuss the belowThe client comes to t.docx
In a paragraph form, discuss the belowThe client comes to t.docxIn a paragraph form, discuss the belowThe client comes to t.docx
In a paragraph form, discuss the belowThe client comes to t.docx
charisellington63520
 
In a minimum of 300 words in APA format.Through the advent o.docx
In a minimum of 300 words in APA format.Through the advent o.docxIn a minimum of 300 words in APA format.Through the advent o.docx
In a minimum of 300 words in APA format.Through the advent o.docx
charisellington63520
 
In a paragraph form, post your initial response after reading th.docx
In a paragraph form, post your initial response after reading th.docxIn a paragraph form, post your initial response after reading th.docx
In a paragraph form, post your initial response after reading th.docx
charisellington63520
 
In a minimum 250-word paragraph, discuss at least one point the auth.docx
In a minimum 250-word paragraph, discuss at least one point the auth.docxIn a minimum 250-word paragraph, discuss at least one point the auth.docx
In a minimum 250-word paragraph, discuss at least one point the auth.docx
charisellington63520
 
In a hostage crisis, is it ethical for a government to agree to gran.docx
In a hostage crisis, is it ethical for a government to agree to gran.docxIn a hostage crisis, is it ethical for a government to agree to gran.docx
In a hostage crisis, is it ethical for a government to agree to gran.docx
charisellington63520
 
In a double-spaced 12 Font paper  How did you immediately feel a.docx
In a double-spaced 12 Font paper  How did you immediately feel a.docxIn a double-spaced 12 Font paper  How did you immediately feel a.docx
In a double-spaced 12 Font paper  How did you immediately feel a.docx
charisellington63520
 
In a follow-up to your IoT discussion with management, you have .docx
In a follow-up to your IoT discussion with management, you have .docxIn a follow-up to your IoT discussion with management, you have .docx
In a follow-up to your IoT discussion with management, you have .docx
charisellington63520
 
In a COVID-19 situation identify the guidelines for ethical use of t.docx
In a COVID-19 situation identify the guidelines for ethical use of t.docxIn a COVID-19 situation identify the guidelines for ethical use of t.docx
In a COVID-19 situation identify the guidelines for ethical use of t.docx
charisellington63520
 
In a 750- to 1,250-word paper, evaluate the implications of Internet.docx
In a 750- to 1,250-word paper, evaluate the implications of Internet.docxIn a 750- to 1,250-word paper, evaluate the implications of Internet.docx
In a 750- to 1,250-word paper, evaluate the implications of Internet.docx
charisellington63520
 
In a 600 word count (EACH bullet point having 300 words each) di.docx
In a 600 word count (EACH bullet point having 300 words each) di.docxIn a 600 word count (EACH bullet point having 300 words each) di.docx
In a 600 word count (EACH bullet point having 300 words each) di.docx
charisellington63520
 

More from charisellington63520 (20)

in addition to these questions also answer the following;Answer .docx
in addition to these questions also answer the following;Answer .docxin addition to these questions also answer the following;Answer .docx
in addition to these questions also answer the following;Answer .docx
 
In an environment of compliancy laws, regulations, and standards, in.docx
In an environment of compliancy laws, regulations, and standards, in.docxIn an environment of compliancy laws, regulations, and standards, in.docx
In an environment of compliancy laws, regulations, and standards, in.docx
 
In American politics, people often compare their enemies to Hitler o.docx
In American politics, people often compare their enemies to Hitler o.docxIn American politics, people often compare their enemies to Hitler o.docx
In American politics, people often compare their enemies to Hitler o.docx
 
In addition to the thread, the student is required to reply to 2 oth.docx
In addition to the thread, the student is required to reply to 2 oth.docxIn addition to the thread, the student is required to reply to 2 oth.docx
In addition to the thread, the student is required to reply to 2 oth.docx
 
In addition to reading the Announcements, prepare for this d.docx
In addition to reading the Announcements, prepare for this d.docxIn addition to reading the Announcements, prepare for this d.docx
In addition to reading the Announcements, prepare for this d.docx
 
In Act 4 during the trial scene, Bassanio says the following lin.docx
In Act 4 during the trial scene, Bassanio says the following lin.docxIn Act 4 during the trial scene, Bassanio says the following lin.docx
In Act 4 during the trial scene, Bassanio says the following lin.docx
 
In a Word document, please respond to the following questions.docx
In a Word document, please respond to the following questions.docxIn a Word document, please respond to the following questions.docx
In a Word document, please respond to the following questions.docx
 
In a Word document, create A Set of Instructions. (you will want.docx
In a Word document, create A Set of Instructions. (you will want.docxIn a Word document, create A Set of Instructions. (you will want.docx
In a Word document, create A Set of Instructions. (you will want.docx
 
In a two page response MLA format paperMaria Werner talks about .docx
In a two page response MLA format paperMaria Werner talks about .docxIn a two page response MLA format paperMaria Werner talks about .docx
In a two page response MLA format paperMaria Werner talks about .docx
 
In a paragraph (150 words minimum), please respond to the follow.docx
In a paragraph (150 words minimum), please respond to the follow.docxIn a paragraph (150 words minimum), please respond to the follow.docx
In a paragraph (150 words minimum), please respond to the follow.docx
 
In a paragraph form, discuss the belowThe client comes to t.docx
In a paragraph form, discuss the belowThe client comes to t.docxIn a paragraph form, discuss the belowThe client comes to t.docx
In a paragraph form, discuss the belowThe client comes to t.docx
 
In a minimum of 300 words in APA format.Through the advent o.docx
In a minimum of 300 words in APA format.Through the advent o.docxIn a minimum of 300 words in APA format.Through the advent o.docx
In a minimum of 300 words in APA format.Through the advent o.docx
 
In a paragraph form, post your initial response after reading th.docx
In a paragraph form, post your initial response after reading th.docxIn a paragraph form, post your initial response after reading th.docx
In a paragraph form, post your initial response after reading th.docx
 
In a minimum 250-word paragraph, discuss at least one point the auth.docx
In a minimum 250-word paragraph, discuss at least one point the auth.docxIn a minimum 250-word paragraph, discuss at least one point the auth.docx
In a minimum 250-word paragraph, discuss at least one point the auth.docx
 
In a hostage crisis, is it ethical for a government to agree to gran.docx
In a hostage crisis, is it ethical for a government to agree to gran.docxIn a hostage crisis, is it ethical for a government to agree to gran.docx
In a hostage crisis, is it ethical for a government to agree to gran.docx
 
In a double-spaced 12 Font paper  How did you immediately feel a.docx
In a double-spaced 12 Font paper  How did you immediately feel a.docxIn a double-spaced 12 Font paper  How did you immediately feel a.docx
In a double-spaced 12 Font paper  How did you immediately feel a.docx
 
In a follow-up to your IoT discussion with management, you have .docx
In a follow-up to your IoT discussion with management, you have .docxIn a follow-up to your IoT discussion with management, you have .docx
In a follow-up to your IoT discussion with management, you have .docx
 
In a COVID-19 situation identify the guidelines for ethical use of t.docx
In a COVID-19 situation identify the guidelines for ethical use of t.docxIn a COVID-19 situation identify the guidelines for ethical use of t.docx
In a COVID-19 situation identify the guidelines for ethical use of t.docx
 
In a 750- to 1,250-word paper, evaluate the implications of Internet.docx
In a 750- to 1,250-word paper, evaluate the implications of Internet.docxIn a 750- to 1,250-word paper, evaluate the implications of Internet.docx
In a 750- to 1,250-word paper, evaluate the implications of Internet.docx
 
In a 600 word count (EACH bullet point having 300 words each) di.docx
In a 600 word count (EACH bullet point having 300 words each) di.docxIn a 600 word count (EACH bullet point having 300 words each) di.docx
In a 600 word count (EACH bullet point having 300 words each) di.docx
 

Recently uploaded

Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
thanhdowork
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Marketing internship report file for MBA
Marketing internship report file for MBAMarketing internship report file for MBA
Marketing internship report file for MBA
gb193092
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
Chapter -12, Antibiotics (One Page Notes).pdf
Chapter -12, Antibiotics (One Page Notes).pdfChapter -12, Antibiotics (One Page Notes).pdf
Chapter -12, Antibiotics (One Page Notes).pdf
Kartik Tiwari
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
Normal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of LabourNormal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of Labour
Wasim Ak
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 

Recently uploaded (20)

Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Marketing internship report file for MBA
Marketing internship report file for MBAMarketing internship report file for MBA
Marketing internship report file for MBA
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
Chapter -12, Antibiotics (One Page Notes).pdf
Chapter -12, Antibiotics (One Page Notes).pdfChapter -12, Antibiotics (One Page Notes).pdf
Chapter -12, Antibiotics (One Page Notes).pdf
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
Normal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of LabourNormal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of Labour
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 

Running head RIORDAN PROJECT MANAGEMENT PLANPROJECT MANAGEMEN.docx

  • 1. Running head: RIORDAN PROJECT MANAGEMENT PLAN PROJECT MANAGEMENT PLAN 8Scope Statement Project Title: China Relocation Date:Prepared by: Project Justification: This project plan involves the location of Riordan Manufacturing’s China operations in Hangzhou. The major driving force for this decision is the fact that the company’s Chinese partners already have the necessary facilities in place. In addition, another reason for this is that the Hangzhou city is proximal to the Qiantang River. Consequently, Qiantang River is significant since the access to the river is responsible for Hangzhou Bay, which is big enough to handle the company’s shipping needs. The project is also justified by the fact that there has been an increase in the volume of production from the China plant and therefore, if container shipping companies for instance the China Shipping Container Lines are utilized. The ports in Shanghai and Hong Kong are utilized by container shipping companies. However, Shanghai port, which is 180 kilometers away from the current location, results in extra logistical steps. The products of the company are transported to a port located on Qiantang River before being loaded into containers for shipping. The shipping containers are then loaded onto barges and taken to Shanghai port. At Shanghai, the shipping containers are offloaded and transported to another place of port where final loading takes place before delivery to final destinations. The other option is to use the truck to transport the products to the Shanghai port. There, they will be loaded into shipping containers and onto the ships directly for delivery into their final destinations. However, trucking
  • 2. companies charge the same price as local shipping companies. Therefore, if the China operations are relocated to the city of Shanghai, there will be great cost savings. Besides, there will be more sufficient urban infrastructure, putting the company in a better market position and the company’s Chinese products can be shipped throughout Europe and Asia. Project Characteristics and Requirements: 1. Increased shipping destinations 2. Cost Saving 3. Time reduction 4. Simplicity of operation 5. Flexibility – ability to expand and adapt Summary of Project Deliverables Project management-related deliverables: business case, charter, team contract, scope statement, WBS, schedule, cost baseline, status reports, final project presentation, final project report, lessons-learned report, and any other documents required to manage the project. Product-related deliverables: research reports, design documents, software code, hardware, etc. 1. Structural documents These include the documents highlighting the main features of the way the port will be structured to manage many operations. 2. Structural Layout/ drawings/ schematics This refers to the mapping of the whole project, the different locations, offshore and on land locations and the layout of the same.
  • 3. Project Success Criteria: The success of the project can be based on some criteria. One of the criteria is whether the project was accomplished within the planned time and cost. The other criterion concerns the output. In this case, if the output matches the expected in terms of the amount of cost saving. If the project generates the required amount, then it was successful.Project Charter Project Title: Chinese Relocation Projected Start Date: 11/25/2013 Projected Finish Date: 12/23/2018 Project Objectives: · One of the objectives of the project is to ensure that there is significant cost saving upon the implementation of the project. This is through the reduction of the logistical costs. · The other objective is to ensure that more Chinese products are shipped to Asia and Europe. · The third objective is to ensure that there is reduction of time used in trucking and shipping activities. Approach: The work will be broken down into a number of main activities, under which the expected deliverables are to be obtained. Among these categories are the structural part, the project initiation part, project planning part and project execution part. The activities are as follows: 1.0 Port Design
  • 4. 1.1 Electrical 1.2 Structural 1.2.1 Documents 1.2.2 Drawing/Layouts/Schematics 1.3 Mechanical 2.0 Project Initiation 2.1 Evaluation and recommendations 2.2 Project Charter development 2.2.1 Submission of project charter 2.2.2 Review of project charter 2.3 Approval of project charter 2.4 Implementation of the project charter 3.0 Project Planning 3.1 Creation of preliminary scope statement 3.2 Project team determination 3.2.1 Kickoff meeting for project team 3.2.2 Development of project plan 3.3 Submission of project plan
  • 5. 3.4 Approval of project plan 4.0 Project Execution 4.1 Project kickoff meeting 4.2 System Design 4.2.1 Hardware/software procurement 4.2.2 Installation of development system 4.3 Testing Phase 4.4 Going Live Communication Plan Project Name: Riordan Chinese Operations Relocation Project Team Members Names and Sign-off: Name Sign-off on Team Contract Project manager Consultant Electrical Engineer Mechanical Engineer Structural Engineer Contractor Code of Conduct: As a project team, we will: · Be considerate since other people will use our work and we
  • 6. will also depend on others as well. · Be respectful while treating each other since we are all able to make valuable contribution to the project. Disagreement should not result in poor manners and poor behaviors. · Be collaborative, meaning that individuals should work with others in teams. Participation: We will: · All take part in decision making and implementation of the same decisions. · Contribute in the project planning and project execution processes. · Offer our time to take part in any of the project’s activity when called upon to do so. Communication: We will: · Provide valid email addresses or contact information so that direct responses can be made · Avoid the use of repetitive arguments and personal attacks while communicating. · Attend any of the project meetings we are called upon to so as to get information regarding the project. Problem Solving: We will: · Seek to find the root cause of the particular problem affecting the project. · Come up with solutions that are sensible.
  • 7. · Come up with workable plans for the implementation of the solutions. Meeting Guidelines: We will: · Stick to the guidelines agreed upon by the project team. · Ensure that we accomplish a planned task in time. · Ensure that we meet the expectations of the tasks assigned to us. Stakeholder Analysis Stakeholder What Information When How Responsible Person Project Manager Project Status Weekly Face to Face/Email Project Team Leads, Consultant, Contractor Project Team Leads Project Status Weekly/As Needed Face to Face/Email Project Manager; Project Team Contractor When to execute desired service; Community concerns; port requirements/restrictions ;permit needs As Needed before executing desired work/Weekly once work has begun Face to Face/Email Project Manager
  • 8. Consultant Assessments/Survey (Preliminary and Final) Findings As Completed Face to Face/Email Project Manager Project Team Project Status Weekly Email Project Team Leads, Project Manager M E M O R A N D U M To: Charles Williamson, Dale Edgel, Lowell Bradford, Clyde Cousi ns, Maria Trinh, Robert Lord From: Hugh McCauley Re: China Relocation Confidential Our initial decision to locate our China operations in Hangzhou was driven largely by the fact that our Chinese partners already had facilities there and the cit y’s proximity to the Qiantang River. We thought that the river access which led on to Hangzh ou Bay would be sufficient to handle our shipping needs. As the production volume from the China plant has increased, w e are seeing that significant savings can be had by utilizing container shipping companies su
  • 9. ch as the China Shipping Container Lines, a branch of the China Shipping (Group) Compa ny. Most of the container shipping companies utilize ports in Hong Kong and Shanghai. While the Shanghai port is only 180 kilometers away from our c urrent location, we are incurring additional logistical steps in shipping out of Shanghai. • Currently, our products are trucked to a port on the Qiantang Ri ver and loaded into shipping containers. The containers are then loaded onto barges that make their way to the Shanghai port. The barges dock in Shanghai where the cont ainers are offloaded and trucked to another area of the port where they are loaded on to to the ships that will take them to their final destinations. • Alternatively, we could transport the products by truck to the po rt at Shanghai where they would be loaded into containers and then directly onto the ships that will be taking them to their final destinations. However, the trucking compani es, knowing that they are being used as an alternative to the local shipping companies to move the same products to the Shanghai ports, generally charge just as much as the ship ping companies for the same volume of goods. We believe that the relocation of the China operations to the cit y of Shanghai will result in significant cost savings, will provide our operations with a more
  • 10. substantial urban infrastructure and will put us into a better position to market and ship our Chi nese products throughout Asia and Europe. China Relocation Memo Page 2 We have incorporated a move of the China operations to Shangh ai within the next five years into the strategic planning of Riordan Manufacturing and Riorda n Industries. Please begin drafting strategic plans for how such a move will impact your ar eas of responsibility and how your areas will facilitate the relocation.