SlideShare a Scribd company logo
1 of 17
Download to read offline
THE EAST CERMAK DATA CENTER
THE CONNECTED DATA CENTER OF CHOICE
THE EAST CERMAK DATA CENTER
6 Considerations for a Cloud Ready Data Center
connectivity
power/water
scalable
control
tax incentives
location
100’ from Cermak Road
1500’ from 350 E. Cermak
Prime Chicago South Loop
THE EAST CERMAK DATA CENTER
THE EAST CERMAK DATA CENTER
Utilize Air-Side Economizers an Estimated 7000 Hours
Downtown Chicago Equals Low PUE
100’ from Dense Fiber Concentration
Two Diverse Fiber Entrances
Dense Fiber Connectivity
THE EAST CERMAK DATA CENTER
40 Mega Watts + 2 ER Feeders
2 Diverse Water Supplies off Grid
40 MW from Multiple Feeders from Multiple Substations
Bus A – Three Feeders (State) + ER Feeder from Quary
Bus B – Three Feeders (Quary) + ER Feeder from State
Store 60,000 Gallons of Fuel On-Site
Store 150,000 Gallons of backup water supply On-Site
Space for 24 Generators
THE EAST CERMAK DATA CENTER
Can you add additional power?
Yes! 40 MW is committed. More can be requested!
Can you modify the on-site storage amounts?
Yes! You can change the types and quantities.
Can you add more generators?
Yes based on your design and following floor loading.
Single Line
THE EAST CERMAK DATA CENTER
First Floor with On-Site Parking
THE EAST CERMAK DATA CENTER
32’ Column Spacing
150-250 lbs./SF Floor Loading
50,000 lbs. Material Lift
Scalable: 356,000 SF
Typical Upper Floor with Generator Locations
THE EAST CERMAK DATA CENTER
7 Flexible Floors of 52,000 SF
THE EAST CERMAK DATA CENTER
Hi-Density Upper Level Floor Layout
Scalable: Expand as Business Grows
THE EAST CERMAK DATA CENTER
Complete Turnkey Lease or Ownership
Complete Control
THE EAST CERMAK DATA CENTER
Interior Layout and Configuration
Customer Design Elements
Security
Mechanical
Electrical
Tax Relief = Class 6b Tax Incentive
THE EAST CERMAK DATA CENTER
Building Class 6b
• 60% Reduction of Real Estate
Taxes for the first 10 years!
• 40% Reduction of Real Estate
Taxes for the 11th Year!
• 20% Reduction of Real Estate
Taxes for the 12th Year!
• Renewable based on City approval
• Estimated Savings of $18.7 MM
• Illinois House Bill 3336 – Tax
Exemption for data centers soon
to be voted on!
Property Features
THE EAST CERMAK DATA CENTER
• Floors convertible to office space
• Internal Loading Dock 2 Full Bays
• Diverse Fiber Conduits & Vaults
• Diverse Water Supply Entrances
• Diverse Power w/ER Feeder
• Indoor Parking Available
• 17’ Slab to Slab
• Roof Rights
Why is The East Cermak Data Center the right Choice?
356,000 SF
24 Gen
Pads
Scalable
Flexibility
Dense
Fiber
LOW PUE
Prime
Location
60,000
Gallons
of Fuel
40 MW
THE EAST CERMAK DATA CENTER
THE EAST CERMAK DATA CENTER
THE CONNECTED DATA CENTER OF CHOICE
THE EAST CERMAK DATA CENTER
For more information, please contact
Larry Graiber
Data Center Development
James McHugh Construction
773-569-1744
lgraiber@mchughconstruction.com

More Related Content

Similar to Cloud Ready East Cermak Data Center

Larry Hebert Resume
Larry Hebert ResumeLarry Hebert Resume
Larry Hebert ResumeLarry Hebert
 
Engage with...TPS | Driving the Electric Revolution Webinar
Engage with...TPS | Driving the Electric Revolution WebinarEngage with...TPS | Driving the Electric Revolution Webinar
Engage with...TPS | Driving the Electric Revolution WebinarKTN
 
PVAmerica-2013-Presentation-FINAL
PVAmerica-2013-Presentation-FINALPVAmerica-2013-Presentation-FINAL
PVAmerica-2013-Presentation-FINALRobert Potter
 
Cost Saving and Excellent Payback for US Exchange Carrier - an Eltek Case S...
Cost Saving and Excellent Payback for US Exchange Carrier   - an Eltek Case S...Cost Saving and Excellent Payback for US Exchange Carrier   - an Eltek Case S...
Cost Saving and Excellent Payback for US Exchange Carrier - an Eltek Case S...Eltek
 
High gain resonant switched-capacitor cell-based dcdc converter for offshore ...
High gain resonant switched-capacitor cell-based dcdc converter for offshore ...High gain resonant switched-capacitor cell-based dcdc converter for offshore ...
High gain resonant switched-capacitor cell-based dcdc converter for offshore ...LeMeniz Infotech
 
AC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj Info
AC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj InfoAC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj Info
AC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj InfoDario Gnoato
 
Force Energy Saver
Force Energy SaverForce Energy Saver
Force Energy SaverRay Barnes
 
Intergate.Manhattan Brochure_022114
Intergate.Manhattan Brochure_022114Intergate.Manhattan Brochure_022114
Intergate.Manhattan Brochure_022114ArleneECarvalho
 
Intergate seattlebrochure web
Intergate seattlebrochure web Intergate seattlebrochure web
Intergate seattlebrochure web ArleneECarvalho
 
Black & Veatch Data Center Innovation and Services
Black & Veatch Data Center Innovation and Services Black & Veatch Data Center Innovation and Services
Black & Veatch Data Center Innovation and Services Black & Veatch
 
A bidirectional llc resonant converter with automatic forward and backward mo...
A bidirectional llc resonant converter with automatic forward and backward mo...A bidirectional llc resonant converter with automatic forward and backward mo...
A bidirectional llc resonant converter with automatic forward and backward mo...IISTech2015
 
Intergate.ashburn brocure0315
Intergate.ashburn brocure0315 Intergate.ashburn brocure0315
Intergate.ashburn brocure0315 ArleneECarvalho
 
Freestate Capability Statement
Freestate Capability StatementFreestate Capability Statement
Freestate Capability StatementTodd Jewell
 
Charlie Littlefair on digital disruption and the environment
Charlie Littlefair on digital disruption and the environment Charlie Littlefair on digital disruption and the environment
Charlie Littlefair on digital disruption and the environment OCESAdmin
 
01 2015_Aug_13 DoE_Agarwal -- arl mos workshop 2015.pptx
01 2015_Aug_13 DoE_Agarwal -- arl mos workshop 2015.pptx01 2015_Aug_13 DoE_Agarwal -- arl mos workshop 2015.pptx
01 2015_Aug_13 DoE_Agarwal -- arl mos workshop 2015.pptxUthiraramyabalaKK1
 
Data Centers and Mission Critical Opportunities
Data Centers and Mission Critical OpportunitiesData Centers and Mission Critical Opportunities
Data Centers and Mission Critical OpportunitiesBlack & Veatch
 

Similar to Cloud Ready East Cermak Data Center (20)

Larry Hebert Resume
Larry Hebert ResumeLarry Hebert Resume
Larry Hebert Resume
 
365 Services Overview
365 Services Overview365 Services Overview
365 Services Overview
 
Engage with...TPS | Driving the Electric Revolution Webinar
Engage with...TPS | Driving the Electric Revolution WebinarEngage with...TPS | Driving the Electric Revolution Webinar
Engage with...TPS | Driving the Electric Revolution Webinar
 
PVAmerica-2013-Presentation-FINAL
PVAmerica-2013-Presentation-FINALPVAmerica-2013-Presentation-FINAL
PVAmerica-2013-Presentation-FINAL
 
Cost Saving and Excellent Payback for US Exchange Carrier - an Eltek Case S...
Cost Saving and Excellent Payback for US Exchange Carrier   - an Eltek Case S...Cost Saving and Excellent Payback for US Exchange Carrier   - an Eltek Case S...
Cost Saving and Excellent Payback for US Exchange Carrier - an Eltek Case S...
 
High gain resonant switched-capacitor cell-based dcdc converter for offshore ...
High gain resonant switched-capacitor cell-based dcdc converter for offshore ...High gain resonant switched-capacitor cell-based dcdc converter for offshore ...
High gain resonant switched-capacitor cell-based dcdc converter for offshore ...
 
1.1 integrating renewables srm
1.1 integrating renewables   srm1.1 integrating renewables   srm
1.1 integrating renewables srm
 
AC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj Info
AC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj InfoAC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj Info
AC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj Info
 
DC Metering - Moving toward center stage
DC Metering - Moving toward center stageDC Metering - Moving toward center stage
DC Metering - Moving toward center stage
 
Force Energy Saver
Force Energy SaverForce Energy Saver
Force Energy Saver
 
Intergate.Manhattan Brochure_022114
Intergate.Manhattan Brochure_022114Intergate.Manhattan Brochure_022114
Intergate.Manhattan Brochure_022114
 
Intergate seattlebrochure web
Intergate seattlebrochure web Intergate seattlebrochure web
Intergate seattlebrochure web
 
Black & Veatch Data Center Innovation and Services
Black & Veatch Data Center Innovation and Services Black & Veatch Data Center Innovation and Services
Black & Veatch Data Center Innovation and Services
 
A bidirectional llc resonant converter with automatic forward and backward mo...
A bidirectional llc resonant converter with automatic forward and backward mo...A bidirectional llc resonant converter with automatic forward and backward mo...
A bidirectional llc resonant converter with automatic forward and backward mo...
 
Intergate.ashburn brocure0315
Intergate.ashburn brocure0315 Intergate.ashburn brocure0315
Intergate.ashburn brocure0315
 
Freestate Capability Statement
Freestate Capability StatementFreestate Capability Statement
Freestate Capability Statement
 
Charlie Littlefair on digital disruption and the environment
Charlie Littlefair on digital disruption and the environment Charlie Littlefair on digital disruption and the environment
Charlie Littlefair on digital disruption and the environment
 
01 2015_Aug_13 DoE_Agarwal -- arl mos workshop 2015.pptx
01 2015_Aug_13 DoE_Agarwal -- arl mos workshop 2015.pptx01 2015_Aug_13 DoE_Agarwal -- arl mos workshop 2015.pptx
01 2015_Aug_13 DoE_Agarwal -- arl mos workshop 2015.pptx
 
Igq brochure web_0315
Igq brochure web_0315 Igq brochure web_0315
Igq brochure web_0315
 
Data Centers and Mission Critical Opportunities
Data Centers and Mission Critical OpportunitiesData Centers and Mission Critical Opportunities
Data Centers and Mission Critical Opportunities
 

Recently uploaded

Cyber Security Services Unveiled: Strategies to Secure Your Digital Presence
Cyber Security Services Unveiled: Strategies to Secure Your Digital PresenceCyber Security Services Unveiled: Strategies to Secure Your Digital Presence
Cyber Security Services Unveiled: Strategies to Secure Your Digital PresencePC Doctors NET
 
Thank You Luv I’ll Never Walk Alone Again T shirts
Thank You Luv I’ll Never Walk Alone Again T shirtsThank You Luv I’ll Never Walk Alone Again T shirts
Thank You Luv I’ll Never Walk Alone Again T shirtsrahman018755
 
How Do I Begin the Linksys Velop Setup Process?
How Do I Begin the Linksys Velop Setup Process?How Do I Begin the Linksys Velop Setup Process?
How Do I Begin the Linksys Velop Setup Process?Linksys Velop Login
 
Pvtaan Social media marketing proposal.pdf
Pvtaan Social media marketing proposal.pdfPvtaan Social media marketing proposal.pdf
Pvtaan Social media marketing proposal.pdfPvtaan
 
Premier Mobile App Development Agency in USA.pdf
Premier Mobile App Development Agency in USA.pdfPremier Mobile App Development Agency in USA.pdf
Premier Mobile App Development Agency in USA.pdfappinfoedgeca
 
Reggie miller choke t shirtsReggie miller choke t shirts
Reggie miller choke t shirtsReggie miller choke t shirtsReggie miller choke t shirtsReggie miller choke t shirts
Reggie miller choke t shirtsReggie miller choke t shirtsrahman018755
 
Statistical Analysis of DNS Latencies.pdf
Statistical Analysis of DNS Latencies.pdfStatistical Analysis of DNS Latencies.pdf
Statistical Analysis of DNS Latencies.pdfOndejSur
 
I’ll See Y’All Motherfuckers In Game 7 Shirt
I’ll See Y’All Motherfuckers In Game 7 ShirtI’ll See Y’All Motherfuckers In Game 7 Shirt
I’ll See Y’All Motherfuckers In Game 7 Shirtrahman018755
 
The Use of AI in Indonesia Election 2024: A Case Study
The Use of AI in Indonesia Election 2024: A Case StudyThe Use of AI in Indonesia Election 2024: A Case Study
The Use of AI in Indonesia Election 2024: A Case StudyDamar Juniarto
 
Bug Bounty Blueprint : A Beginner's Guide
Bug Bounty Blueprint : A Beginner's GuideBug Bounty Blueprint : A Beginner's Guide
Bug Bounty Blueprint : A Beginner's GuideVarun Mithran
 
Production 2024 sunderland culture final - Copy.pptx
Production 2024 sunderland culture final - Copy.pptxProduction 2024 sunderland culture final - Copy.pptx
Production 2024 sunderland culture final - Copy.pptxChloeMeadows1
 
audience research (emma) 1.pptxkkkkkkkkkkkkkkkkk
audience research (emma) 1.pptxkkkkkkkkkkkkkkkkkaudience research (emma) 1.pptxkkkkkkkkkkkkkkkkk
audience research (emma) 1.pptxkkkkkkkkkkkkkkkkklolsDocherty
 
iThome_CYBERSEC2024_Drive_Into_the_DarkWeb
iThome_CYBERSEC2024_Drive_Into_the_DarkWebiThome_CYBERSEC2024_Drive_Into_the_DarkWeb
iThome_CYBERSEC2024_Drive_Into_the_DarkWebJie Liau
 
TORTOGEL TELAH MENJADI SALAH SATU PLATFORM PERMAINAN PALING FAVORIT.
TORTOGEL TELAH MENJADI SALAH SATU PLATFORM PERMAINAN PALING FAVORIT.TORTOGEL TELAH MENJADI SALAH SATU PLATFORM PERMAINAN PALING FAVORIT.
TORTOGEL TELAH MENJADI SALAH SATU PLATFORM PERMAINAN PALING FAVORIT.Tortogel
 
Development Lifecycle.pptx for the secure development of apps
Development Lifecycle.pptx for the secure development of appsDevelopment Lifecycle.pptx for the secure development of apps
Development Lifecycle.pptx for the secure development of appscristianmanaila2
 

Recently uploaded (16)

Cyber Security Services Unveiled: Strategies to Secure Your Digital Presence
Cyber Security Services Unveiled: Strategies to Secure Your Digital PresenceCyber Security Services Unveiled: Strategies to Secure Your Digital Presence
Cyber Security Services Unveiled: Strategies to Secure Your Digital Presence
 
Thank You Luv I’ll Never Walk Alone Again T shirts
Thank You Luv I’ll Never Walk Alone Again T shirtsThank You Luv I’ll Never Walk Alone Again T shirts
Thank You Luv I’ll Never Walk Alone Again T shirts
 
How Do I Begin the Linksys Velop Setup Process?
How Do I Begin the Linksys Velop Setup Process?How Do I Begin the Linksys Velop Setup Process?
How Do I Begin the Linksys Velop Setup Process?
 
Pvtaan Social media marketing proposal.pdf
Pvtaan Social media marketing proposal.pdfPvtaan Social media marketing proposal.pdf
Pvtaan Social media marketing proposal.pdf
 
Premier Mobile App Development Agency in USA.pdf
Premier Mobile App Development Agency in USA.pdfPremier Mobile App Development Agency in USA.pdf
Premier Mobile App Development Agency in USA.pdf
 
Reggie miller choke t shirtsReggie miller choke t shirts
Reggie miller choke t shirtsReggie miller choke t shirtsReggie miller choke t shirtsReggie miller choke t shirts
Reggie miller choke t shirtsReggie miller choke t shirts
 
Statistical Analysis of DNS Latencies.pdf
Statistical Analysis of DNS Latencies.pdfStatistical Analysis of DNS Latencies.pdf
Statistical Analysis of DNS Latencies.pdf
 
I’ll See Y’All Motherfuckers In Game 7 Shirt
I’ll See Y’All Motherfuckers In Game 7 ShirtI’ll See Y’All Motherfuckers In Game 7 Shirt
I’ll See Y’All Motherfuckers In Game 7 Shirt
 
The Use of AI in Indonesia Election 2024: A Case Study
The Use of AI in Indonesia Election 2024: A Case StudyThe Use of AI in Indonesia Election 2024: A Case Study
The Use of AI in Indonesia Election 2024: A Case Study
 
Bug Bounty Blueprint : A Beginner's Guide
Bug Bounty Blueprint : A Beginner's GuideBug Bounty Blueprint : A Beginner's Guide
Bug Bounty Blueprint : A Beginner's Guide
 
Production 2024 sunderland culture final - Copy.pptx
Production 2024 sunderland culture final - Copy.pptxProduction 2024 sunderland culture final - Copy.pptx
Production 2024 sunderland culture final - Copy.pptx
 
audience research (emma) 1.pptxkkkkkkkkkkkkkkkkk
audience research (emma) 1.pptxkkkkkkkkkkkkkkkkkaudience research (emma) 1.pptxkkkkkkkkkkkkkkkkk
audience research (emma) 1.pptxkkkkkkkkkkkkkkkkk
 
iThome_CYBERSEC2024_Drive_Into_the_DarkWeb
iThome_CYBERSEC2024_Drive_Into_the_DarkWebiThome_CYBERSEC2024_Drive_Into_the_DarkWeb
iThome_CYBERSEC2024_Drive_Into_the_DarkWeb
 
GOOGLE Io 2024 At takes center stage.pdf
GOOGLE Io 2024 At takes center stage.pdfGOOGLE Io 2024 At takes center stage.pdf
GOOGLE Io 2024 At takes center stage.pdf
 
TORTOGEL TELAH MENJADI SALAH SATU PLATFORM PERMAINAN PALING FAVORIT.
TORTOGEL TELAH MENJADI SALAH SATU PLATFORM PERMAINAN PALING FAVORIT.TORTOGEL TELAH MENJADI SALAH SATU PLATFORM PERMAINAN PALING FAVORIT.
TORTOGEL TELAH MENJADI SALAH SATU PLATFORM PERMAINAN PALING FAVORIT.
 
Development Lifecycle.pptx for the secure development of apps
Development Lifecycle.pptx for the secure development of appsDevelopment Lifecycle.pptx for the secure development of apps
Development Lifecycle.pptx for the secure development of apps
 

Cloud Ready East Cermak Data Center

  • 1. THE EAST CERMAK DATA CENTER THE CONNECTED DATA CENTER OF CHOICE
  • 2. THE EAST CERMAK DATA CENTER 6 Considerations for a Cloud Ready Data Center connectivity power/water scalable control tax incentives location
  • 3. 100’ from Cermak Road 1500’ from 350 E. Cermak Prime Chicago South Loop THE EAST CERMAK DATA CENTER
  • 4. THE EAST CERMAK DATA CENTER Utilize Air-Side Economizers an Estimated 7000 Hours Downtown Chicago Equals Low PUE
  • 5. 100’ from Dense Fiber Concentration Two Diverse Fiber Entrances Dense Fiber Connectivity THE EAST CERMAK DATA CENTER
  • 6. 40 Mega Watts + 2 ER Feeders 2 Diverse Water Supplies off Grid 40 MW from Multiple Feeders from Multiple Substations Bus A – Three Feeders (State) + ER Feeder from Quary Bus B – Three Feeders (Quary) + ER Feeder from State Store 60,000 Gallons of Fuel On-Site Store 150,000 Gallons of backup water supply On-Site Space for 24 Generators THE EAST CERMAK DATA CENTER Can you add additional power? Yes! 40 MW is committed. More can be requested! Can you modify the on-site storage amounts? Yes! You can change the types and quantities. Can you add more generators? Yes based on your design and following floor loading.
  • 7. Single Line THE EAST CERMAK DATA CENTER
  • 8. First Floor with On-Site Parking THE EAST CERMAK DATA CENTER 32’ Column Spacing 150-250 lbs./SF Floor Loading 50,000 lbs. Material Lift Scalable: 356,000 SF
  • 9. Typical Upper Floor with Generator Locations THE EAST CERMAK DATA CENTER 7 Flexible Floors of 52,000 SF
  • 10. THE EAST CERMAK DATA CENTER Hi-Density Upper Level Floor Layout Scalable: Expand as Business Grows
  • 11. THE EAST CERMAK DATA CENTER Complete Turnkey Lease or Ownership Complete Control
  • 12. THE EAST CERMAK DATA CENTER Interior Layout and Configuration Customer Design Elements Security Mechanical Electrical
  • 13. Tax Relief = Class 6b Tax Incentive THE EAST CERMAK DATA CENTER Building Class 6b • 60% Reduction of Real Estate Taxes for the first 10 years! • 40% Reduction of Real Estate Taxes for the 11th Year! • 20% Reduction of Real Estate Taxes for the 12th Year! • Renewable based on City approval • Estimated Savings of $18.7 MM • Illinois House Bill 3336 – Tax Exemption for data centers soon to be voted on!
  • 14. Property Features THE EAST CERMAK DATA CENTER • Floors convertible to office space • Internal Loading Dock 2 Full Bays • Diverse Fiber Conduits & Vaults • Diverse Water Supply Entrances • Diverse Power w/ER Feeder • Indoor Parking Available • 17’ Slab to Slab • Roof Rights
  • 15. Why is The East Cermak Data Center the right Choice? 356,000 SF 24 Gen Pads Scalable Flexibility Dense Fiber LOW PUE Prime Location 60,000 Gallons of Fuel 40 MW THE EAST CERMAK DATA CENTER
  • 16. THE EAST CERMAK DATA CENTER THE CONNECTED DATA CENTER OF CHOICE
  • 17. THE EAST CERMAK DATA CENTER For more information, please contact Larry Graiber Data Center Development James McHugh Construction 773-569-1744 lgraiber@mchughconstruction.com