SlideShare a Scribd company logo
1 of 6
Download to read offline
CERTIFIED BY:
PROPOSED INFORMATION &
COMMUNICATION TECHNOLOGY CENTER
(ICTC) ACADEMIC BLDG.
VICE CHANCELLOR FOR ADMIN. & FIN.
ENGR. POLAUS M. BARI, D.M.
EXECUTIVE DIRECTOR, ICTC
EMMANUEL M. LAGARE, Ph.D.ENGR. REDEMPTO P. MADRAZO
PROFESSIONAL ELECTRICAL ENGINEER
PRC No.:
PTR No.:
DATE ISSUED:
TIN No.:
PREPARED BY:
ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT
SUKARNO D. TANGGOL, DPA
RECOMMENDING APPROVAL: APPROVED BY:
ARCHT. ANACLETO Y. TAMOSO
OIC - DIRECTOR, PHYSICAL PLANT DIVISION
SHEET No.:
DATE:
FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY
DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
Scale 1:250 m
GRND FLR. POWER LAYOUT PLAN
1
Scale 1:250 m
2ND FLR. POWER LAYOUT PLAN
2
Scale 1:250 m
3RD FLR. POWER LAYOUT PLAN
3
E1
25 of 30
CERTIFIED BY:
PROPOSED INFORMATION &
COMMUNICATION TECHNOLOGY CENTER
(ICTC) ACADEMIC BLDG.
VICE CHANCELLOR FOR ADMIN. & FIN.
ENGR. POLAUS M. BARI, D.M.
EXECUTIVE DIRECTOR, ICTC
EMMANUEL M. LAGARE, Ph.D.ENGR. REDEMPTO P. MADRAZO
PROFESSIONAL ELECTRICAL ENGINEER
PRC No.:
PTR No.:
DATE ISSUED:
TIN No.:
PREPARED BY:
ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT
SUKARNO D. TANGGOL, DPA
RECOMMENDING APPROVAL: APPROVED BY:
ARCHT. ANACLETO Y. TAMOSO
OIC - DIRECTOR, PHYSICAL PLANT DIVISION
SHEET No.:
DATE:
FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY
DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
Scale 1:250 m
ROOFDECK POWER LAYOUT PLAN
1
Scale 1:250 m
GRND FLR. LIGHTING LAYOUT PLAN
2
Scale 1:250 m
2ND FLR. LIGHTING LAYOUT PLAN
3
E2
26 of 30
CERTIFIED BY:
PROPOSED INFORMATION &
COMMUNICATION TECHNOLOGY CENTER
(ICTC) ACADEMIC BLDG.
VICE CHANCELLOR FOR ADMIN. & FIN.
ENGR. POLAUS M. BARI, D.M.
EXECUTIVE DIRECTOR, ICTC
EMMANUEL M. LAGARE, Ph.D.ENGR. REDEMPTO P. MADRAZO
PROFESSIONAL ELECTRICAL ENGINEER
PRC No.:
PTR No.:
DATE ISSUED:
TIN No.:
PREPARED BY:
ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT
SUKARNO D. TANGGOL, DPA
RECOMMENDING APPROVAL: APPROVED BY:
ARCHT. ANACLETO Y. TAMOSO
OIC - DIRECTOR, PHYSICAL PLANT DIVISION
SHEET No.:
DATE:
FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY
DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
Scale 1:250 m
3RD FLR. LIGHTING LAYOUT PLAN
1
Scale 1:250 m
ROOFDECK LIGHTING LAYOUT PLAN
2
Scale 1:250 m
GRND FLR. INTERCOM LAYOUT PLAN
3
E3
27 of 30
CERTIFIED BY:
PROPOSED INFORMATION &
COMMUNICATION TECHNOLOGY CENTER
(ICTC) ACADEMIC BLDG.
VICE CHANCELLOR FOR ADMIN. & FIN.
ENGR. POLAUS M. BARI, D.M.
EXECUTIVE DIRECTOR, ICTC
EMMANUEL M. LAGARE, Ph.D.ENGR. REDEMPTO P. MADRAZO
PROFESSIONAL ELECTRICAL ENGINEER
PRC No.:
PTR No.:
DATE ISSUED:
TIN No.:
PREPARED BY:
CHRISTIAN C. CAÑETE
ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT
SUKARNO D. TANGGOL, DPA
RECOMMENDING APPROVAL: APPROVED BY:
ARCHT. ANACLETO Y. TAMOSO
OIC - DIRECTOR, PHYSICAL PLANT DIVISION
SHEET No.:
DATE:
FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY
DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
Not Drawn To Scale
RISER DIAGRAM
6
Not Drawn To Scale
GROUNDING PLAN
4
Not Drawn To Scale
LIGHTING ARRESTER PLAN
5
Scale 1:250 m
2ND FLR. INTERCOM LAYOUT PLAN
1
Scale 1:250 m
3RD FLR. INTERCOM LAYOUT PLAN
2
Scale 1:250 m
ROOFDECK INTERCOM LAYOUT PLAN
3
E4
28 of 30
Not Drawn To Scale
SINGLE LINE DIAGRAM
2
Not Drawn To Scale
TELEPHONE SYS. RISER DIAGRAM
2 Not Drawn To Scale
INTERCOM SYSTEM RISER DIAGRAM
3
CERTIFIED BY:
PROPOSED INFORMATION &
COMMUNICATION TECHNOLOGY CENTER
(ICTC) ACADEMIC BLDG.
VICE CHANCELLOR FOR ADMIN. & FIN.
ENGR. POLAUS M. BARI, D.M.
EXECUTIVE DIRECTOR, ICTC
EMMANUEL M. LAGARE, Ph.D.ENGR. REDEMPTO P. MADRAZO
PROFESSIONAL ELECTRICAL ENGINEER
PRC No.:
PTR No.:
DATE ISSUED:
TIN No.:
PREPARED BY:
CHRISTIAN C. CAÑETE
ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT
SUKARNO D. TANGGOL, DPA
RECOMMENDING APPROVAL: APPROVED BY:
ARCHT. ANACLETO Y. TAMOSO
OIC - DIRECTOR, PHYSICAL PLANT DIVISION
SHEET No.:
DATE:
FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY
DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
Scale 1:250 m
GRND FLR. ACU OUTLET LAYOUT PLAN
3
Scale 1:250 m
2ND FLR. ACU OUTLET LAYOUT PLAN
3
Scale 1:250 m
3RD FLR. ACU OUTLET LAYOUT PLAN
3
E5
29 of 30
CERTIFIED BY:
PROPOSED INFORMATION &
COMMUNICATION TECHNOLOGY CENTER
(ICTC) ACADEMIC BLDG.
VICE CHANCELLOR FOR ADMIN. & FIN.
ENGR. POLAUS M. BARI, D.M.
EXECUTIVE DIRECTOR, ICTC
EMMANUEL M. LAGARE, Ph.D.ENGR. REDEMPTO P. MADRAZO
PROFESSIONAL ELECTRICAL ENGINEER
PRC No.:
PTR No.:
DATE ISSUED:
TIN No.:
PREPARED BY:
CHRISTIAN C. CAÑETE
ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT
SUKARNO D. TANGGOL, DPA
RECOMMENDING APPROVAL: APPROVED BY:
ARCHT. ANACLETO Y. TAMOSO
OIC - DIRECTOR, PHYSICAL PLANT DIVISION
SHEET No.:
DATE:
FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY
DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
Not Drawn To Scale
CABLE TRAY LADDER DETAIL
2
Not Drawn to Scale
LOCATION PLAN
3
this Site
Scale 1:250 m
TYPICAL CABLE TRAY LADDER LAYOUT
1
E6
30 of 30

More Related Content

Viewers also liked

SMO - оптимизация под социальные сети
SMO - оптимизация под социальные сетиSMO - оптимизация под социальные сети
SMO - оптимизация под социальные сетиVladyslava Rykova
 
Inequality in the United States - Understanding Inequality with Data
Inequality in the United States - Understanding Inequality with DataInequality in the United States - Understanding Inequality with Data
Inequality in the United States - Understanding Inequality with DataOscar Blanco-Sanchez
 
Копирайтинг в интерактивных медиа и диджитал среде
Копирайтинг в интерактивных медиа и диджитал средеКопирайтинг в интерактивных медиа и диджитал среде
Копирайтинг в интерактивных медиа и диджитал средеVladyslava Rykova
 
Как стать копирайтером?
Как стать копирайтером?Как стать копирайтером?
Как стать копирайтером?Vladyslava Rykova
 
Нейрокопирайтинг, то что Вы точно не знали про тексты!
Нейрокопирайтинг, то что Вы точно не знали про тексты!Нейрокопирайтинг, то что Вы точно не знали про тексты!
Нейрокопирайтинг, то что Вы точно не знали про тексты!Vladyslava Rykova
 
7 советов начинающему интернет-маркетологу
7 советов начинающему интернет-маркетологу7 советов начинающему интернет-маркетологу
7 советов начинающему интернет-маркетологуVladyslava Rykova
 
Маркетинг образовательных услуг
Маркетинг образовательных услугМаркетинг образовательных услуг
Маркетинг образовательных услугVladyslava Rykova
 

Viewers also liked (9)

A-ICTC
A-ICTCA-ICTC
A-ICTC
 
M-ICTC
M-ICTCM-ICTC
M-ICTC
 
SMO - оптимизация под социальные сети
SMO - оптимизация под социальные сетиSMO - оптимизация под социальные сети
SMO - оптимизация под социальные сети
 
Inequality in the United States - Understanding Inequality with Data
Inequality in the United States - Understanding Inequality with DataInequality in the United States - Understanding Inequality with Data
Inequality in the United States - Understanding Inequality with Data
 
Копирайтинг в интерактивных медиа и диджитал среде
Копирайтинг в интерактивных медиа и диджитал средеКопирайтинг в интерактивных медиа и диджитал среде
Копирайтинг в интерактивных медиа и диджитал среде
 
Как стать копирайтером?
Как стать копирайтером?Как стать копирайтером?
Как стать копирайтером?
 
Нейрокопирайтинг, то что Вы точно не знали про тексты!
Нейрокопирайтинг, то что Вы точно не знали про тексты!Нейрокопирайтинг, то что Вы точно не знали про тексты!
Нейрокопирайтинг, то что Вы точно не знали про тексты!
 
7 советов начинающему интернет-маркетологу
7 советов начинающему интернет-маркетологу7 советов начинающему интернет-маркетологу
7 советов начинающему интернет-маркетологу
 
Маркетинг образовательных услуг
Маркетинг образовательных услугМаркетинг образовательных услуг
Маркетинг образовательных услуг
 

Similar to E-ICTC

Greg_Bergdoll_6_10_15
Greg_Bergdoll_6_10_15Greg_Bergdoll_6_10_15
Greg_Bergdoll_6_10_15Greg Bergdoll
 
Door knock alarm with timer
Door knock alarm with timerDoor knock alarm with timer
Door knock alarm with timerSANDEEP GHOSH
 
Building and Construction Authority GeoSS Seminar 2010
Building and Construction Authority GeoSS Seminar 2010Building and Construction Authority GeoSS Seminar 2010
Building and Construction Authority GeoSS Seminar 2010RekaNext Capital
 
Professional Portfolio v3
Professional Portfolio v3Professional Portfolio v3
Professional Portfolio v3Robert Huber
 
Design and testing of a vertical axis turbine drivenby automotive drag as an ...
Design and testing of a vertical axis turbine drivenby automotive drag as an ...Design and testing of a vertical axis turbine drivenby automotive drag as an ...
Design and testing of a vertical axis turbine drivenby automotive drag as an ...Jomar Basto
 
Decision sciences laboratory biennial progress report, july 1962 june 1964
Decision sciences laboratory biennial progress report, july 1962 june 1964Decision sciences laboratory biennial progress report, july 1962 june 1964
Decision sciences laboratory biennial progress report, july 1962 june 1964Clifford Stone
 
Seminar report on Flexible Electronics by Sourabh Kumar
Seminar report on Flexible Electronics by Sourabh KumarSeminar report on Flexible Electronics by Sourabh Kumar
Seminar report on Flexible Electronics by Sourabh KumarSourabh Kumar
 
IRJET- Investigation of Damage Level and Study on Load Deflection Charact...
IRJET-  	  Investigation of Damage Level and Study on Load Deflection Charact...IRJET-  	  Investigation of Damage Level and Study on Load Deflection Charact...
IRJET- Investigation of Damage Level and Study on Load Deflection Charact...IRJET Journal
 
Bilgi Ozan Akyuz
Bilgi Ozan AkyuzBilgi Ozan Akyuz
Bilgi Ozan AkyuzOzan Akyüz
 
ASSESSMENT ON AUTOCLAVED AERATED CONCRETE BLOCKS USING FREQUENCY ANALYSIS THR...
ASSESSMENT ON AUTOCLAVED AERATED CONCRETE BLOCKS USING FREQUENCY ANALYSIS THR...ASSESSMENT ON AUTOCLAVED AERATED CONCRETE BLOCKS USING FREQUENCY ANALYSIS THR...
ASSESSMENT ON AUTOCLAVED AERATED CONCRETE BLOCKS USING FREQUENCY ANALYSIS THR...A Makwana
 
CMOS digitally programmable analog front-ends for third generation wireless a...
CMOS digitally programmable analog front-ends for third generation wireless a...CMOS digitally programmable analog front-ends for third generation wireless a...
CMOS digitally programmable analog front-ends for third generation wireless a...Hoopeer Hoopeer
 
FIRE FIGHTING ROBOT USING RF TECHNOLOGY
FIRE FIGHTING ROBOT USING RF TECHNOLOGYFIRE FIGHTING ROBOT USING RF TECHNOLOGY
FIRE FIGHTING ROBOT USING RF TECHNOLOGYYADU K.A
 
HVW3-PageResume10Jan2013++
HVW3-PageResume10Jan2013++HVW3-PageResume10Jan2013++
HVW3-PageResume10Jan2013++Harry Winsor
 

Similar to E-ICTC (20)

3Sty_9CL.pdf
3Sty_9CL.pdf3Sty_9CL.pdf
3Sty_9CL.pdf
 
Greg_Bergdoll_6_10_15
Greg_Bergdoll_6_10_15Greg_Bergdoll_6_10_15
Greg_Bergdoll_6_10_15
 
Tony
TonyTony
Tony
 
Final Report Content
Final Report ContentFinal Report Content
Final Report Content
 
Door knock alarm with timer
Door knock alarm with timerDoor knock alarm with timer
Door knock alarm with timer
 
LA FLORESTA
LA FLORESTALA FLORESTA
LA FLORESTA
 
Building and Construction Authority GeoSS Seminar 2010
Building and Construction Authority GeoSS Seminar 2010Building and Construction Authority GeoSS Seminar 2010
Building and Construction Authority GeoSS Seminar 2010
 
Professional Portfolio v3
Professional Portfolio v3Professional Portfolio v3
Professional Portfolio v3
 
Design and testing of a vertical axis turbine drivenby automotive drag as an ...
Design and testing of a vertical axis turbine drivenby automotive drag as an ...Design and testing of a vertical axis turbine drivenby automotive drag as an ...
Design and testing of a vertical axis turbine drivenby automotive drag as an ...
 
Decision sciences laboratory biennial progress report, july 1962 june 1964
Decision sciences laboratory biennial progress report, july 1962 june 1964Decision sciences laboratory biennial progress report, july 1962 june 1964
Decision sciences laboratory biennial progress report, july 1962 june 1964
 
Curriculum vitae(CV)
Curriculum vitae(CV)Curriculum vitae(CV)
Curriculum vitae(CV)
 
Seminar report on Flexible Electronics by Sourabh Kumar
Seminar report on Flexible Electronics by Sourabh KumarSeminar report on Flexible Electronics by Sourabh Kumar
Seminar report on Flexible Electronics by Sourabh Kumar
 
IRJET- Investigation of Damage Level and Study on Load Deflection Charact...
IRJET-  	  Investigation of Damage Level and Study on Load Deflection Charact...IRJET-  	  Investigation of Damage Level and Study on Load Deflection Charact...
IRJET- Investigation of Damage Level and Study on Load Deflection Charact...
 
C&I engineer
C&I engineerC&I engineer
C&I engineer
 
Christan Agsaullo
Christan AgsaulloChristan Agsaullo
Christan Agsaullo
 
Bilgi Ozan Akyuz
Bilgi Ozan AkyuzBilgi Ozan Akyuz
Bilgi Ozan Akyuz
 
ASSESSMENT ON AUTOCLAVED AERATED CONCRETE BLOCKS USING FREQUENCY ANALYSIS THR...
ASSESSMENT ON AUTOCLAVED AERATED CONCRETE BLOCKS USING FREQUENCY ANALYSIS THR...ASSESSMENT ON AUTOCLAVED AERATED CONCRETE BLOCKS USING FREQUENCY ANALYSIS THR...
ASSESSMENT ON AUTOCLAVED AERATED CONCRETE BLOCKS USING FREQUENCY ANALYSIS THR...
 
CMOS digitally programmable analog front-ends for third generation wireless a...
CMOS digitally programmable analog front-ends for third generation wireless a...CMOS digitally programmable analog front-ends for third generation wireless a...
CMOS digitally programmable analog front-ends for third generation wireless a...
 
FIRE FIGHTING ROBOT USING RF TECHNOLOGY
FIRE FIGHTING ROBOT USING RF TECHNOLOGYFIRE FIGHTING ROBOT USING RF TECHNOLOGY
FIRE FIGHTING ROBOT USING RF TECHNOLOGY
 
HVW3-PageResume10Jan2013++
HVW3-PageResume10Jan2013++HVW3-PageResume10Jan2013++
HVW3-PageResume10Jan2013++
 

E-ICTC

  • 1. CERTIFIED BY: PROPOSED INFORMATION & COMMUNICATION TECHNOLOGY CENTER (ICTC) ACADEMIC BLDG. VICE CHANCELLOR FOR ADMIN. & FIN. ENGR. POLAUS M. BARI, D.M. EXECUTIVE DIRECTOR, ICTC EMMANUEL M. LAGARE, Ph.D.ENGR. REDEMPTO P. MADRAZO PROFESSIONAL ELECTRICAL ENGINEER PRC No.: PTR No.: DATE ISSUED: TIN No.: PREPARED BY: ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT SUKARNO D. TANGGOL, DPA RECOMMENDING APPROVAL: APPROVED BY: ARCHT. ANACLETO Y. TAMOSO OIC - DIRECTOR, PHYSICAL PLANT DIVISION SHEET No.: DATE: FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS. Scale 1:250 m GRND FLR. POWER LAYOUT PLAN 1 Scale 1:250 m 2ND FLR. POWER LAYOUT PLAN 2 Scale 1:250 m 3RD FLR. POWER LAYOUT PLAN 3 E1 25 of 30
  • 2. CERTIFIED BY: PROPOSED INFORMATION & COMMUNICATION TECHNOLOGY CENTER (ICTC) ACADEMIC BLDG. VICE CHANCELLOR FOR ADMIN. & FIN. ENGR. POLAUS M. BARI, D.M. EXECUTIVE DIRECTOR, ICTC EMMANUEL M. LAGARE, Ph.D.ENGR. REDEMPTO P. MADRAZO PROFESSIONAL ELECTRICAL ENGINEER PRC No.: PTR No.: DATE ISSUED: TIN No.: PREPARED BY: ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT SUKARNO D. TANGGOL, DPA RECOMMENDING APPROVAL: APPROVED BY: ARCHT. ANACLETO Y. TAMOSO OIC - DIRECTOR, PHYSICAL PLANT DIVISION SHEET No.: DATE: FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS. Scale 1:250 m ROOFDECK POWER LAYOUT PLAN 1 Scale 1:250 m GRND FLR. LIGHTING LAYOUT PLAN 2 Scale 1:250 m 2ND FLR. LIGHTING LAYOUT PLAN 3 E2 26 of 30
  • 3. CERTIFIED BY: PROPOSED INFORMATION & COMMUNICATION TECHNOLOGY CENTER (ICTC) ACADEMIC BLDG. VICE CHANCELLOR FOR ADMIN. & FIN. ENGR. POLAUS M. BARI, D.M. EXECUTIVE DIRECTOR, ICTC EMMANUEL M. LAGARE, Ph.D.ENGR. REDEMPTO P. MADRAZO PROFESSIONAL ELECTRICAL ENGINEER PRC No.: PTR No.: DATE ISSUED: TIN No.: PREPARED BY: ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT SUKARNO D. TANGGOL, DPA RECOMMENDING APPROVAL: APPROVED BY: ARCHT. ANACLETO Y. TAMOSO OIC - DIRECTOR, PHYSICAL PLANT DIVISION SHEET No.: DATE: FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS. Scale 1:250 m 3RD FLR. LIGHTING LAYOUT PLAN 1 Scale 1:250 m ROOFDECK LIGHTING LAYOUT PLAN 2 Scale 1:250 m GRND FLR. INTERCOM LAYOUT PLAN 3 E3 27 of 30
  • 4. CERTIFIED BY: PROPOSED INFORMATION & COMMUNICATION TECHNOLOGY CENTER (ICTC) ACADEMIC BLDG. VICE CHANCELLOR FOR ADMIN. & FIN. ENGR. POLAUS M. BARI, D.M. EXECUTIVE DIRECTOR, ICTC EMMANUEL M. LAGARE, Ph.D.ENGR. REDEMPTO P. MADRAZO PROFESSIONAL ELECTRICAL ENGINEER PRC No.: PTR No.: DATE ISSUED: TIN No.: PREPARED BY: CHRISTIAN C. CAÑETE ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT SUKARNO D. TANGGOL, DPA RECOMMENDING APPROVAL: APPROVED BY: ARCHT. ANACLETO Y. TAMOSO OIC - DIRECTOR, PHYSICAL PLANT DIVISION SHEET No.: DATE: FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS. Not Drawn To Scale RISER DIAGRAM 6 Not Drawn To Scale GROUNDING PLAN 4 Not Drawn To Scale LIGHTING ARRESTER PLAN 5 Scale 1:250 m 2ND FLR. INTERCOM LAYOUT PLAN 1 Scale 1:250 m 3RD FLR. INTERCOM LAYOUT PLAN 2 Scale 1:250 m ROOFDECK INTERCOM LAYOUT PLAN 3 E4 28 of 30
  • 5. Not Drawn To Scale SINGLE LINE DIAGRAM 2 Not Drawn To Scale TELEPHONE SYS. RISER DIAGRAM 2 Not Drawn To Scale INTERCOM SYSTEM RISER DIAGRAM 3 CERTIFIED BY: PROPOSED INFORMATION & COMMUNICATION TECHNOLOGY CENTER (ICTC) ACADEMIC BLDG. VICE CHANCELLOR FOR ADMIN. & FIN. ENGR. POLAUS M. BARI, D.M. EXECUTIVE DIRECTOR, ICTC EMMANUEL M. LAGARE, Ph.D.ENGR. REDEMPTO P. MADRAZO PROFESSIONAL ELECTRICAL ENGINEER PRC No.: PTR No.: DATE ISSUED: TIN No.: PREPARED BY: CHRISTIAN C. CAÑETE ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT SUKARNO D. TANGGOL, DPA RECOMMENDING APPROVAL: APPROVED BY: ARCHT. ANACLETO Y. TAMOSO OIC - DIRECTOR, PHYSICAL PLANT DIVISION SHEET No.: DATE: FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS. Scale 1:250 m GRND FLR. ACU OUTLET LAYOUT PLAN 3 Scale 1:250 m 2ND FLR. ACU OUTLET LAYOUT PLAN 3 Scale 1:250 m 3RD FLR. ACU OUTLET LAYOUT PLAN 3 E5 29 of 30
  • 6. CERTIFIED BY: PROPOSED INFORMATION & COMMUNICATION TECHNOLOGY CENTER (ICTC) ACADEMIC BLDG. VICE CHANCELLOR FOR ADMIN. & FIN. ENGR. POLAUS M. BARI, D.M. EXECUTIVE DIRECTOR, ICTC EMMANUEL M. LAGARE, Ph.D.ENGR. REDEMPTO P. MADRAZO PROFESSIONAL ELECTRICAL ENGINEER PRC No.: PTR No.: DATE ISSUED: TIN No.: PREPARED BY: CHRISTIAN C. CAÑETE ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT SUKARNO D. TANGGOL, DPA RECOMMENDING APPROVAL: APPROVED BY: ARCHT. ANACLETO Y. TAMOSO OIC - DIRECTOR, PHYSICAL PLANT DIVISION SHEET No.: DATE: FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS. Not Drawn To Scale CABLE TRAY LADDER DETAIL 2 Not Drawn to Scale LOCATION PLAN 3 this Site Scale 1:250 m TYPICAL CABLE TRAY LADDER LAYOUT 1 E6 30 of 30