SlideShare a Scribd company logo
1 of 7
Download to read offline
CERTIFIED BY:
PROPOSED INFORMATION &
COMMUNICATION TECHNOLOGY CENTER
(ICTC) ACADEMIC BLDG.
VICE CHANCELLOR FOR ADMIN. & FIN.
ENGR. POLAUS M. BARI, D.M.
EXECUTIVE DIRECTOR, ICTC
EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUG
ARCHITECT I, PHYSICAL PLANT DIVISION
PRC No.:
PTR No.:
DATE ISSUED:
TIN No.:
PREPARED BY:
CHRISTIAN C. CAÑETE
ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT
SUKARNO D. TANGGOL, DPA
RECOMMENDING APPROVAL: APPROVED BY:
ARCHT. ANACLETO Y. TAMOSO
OIC - DIRECTOR, PHYSICAL PLANT DIVISION
SHEET No.:
DATE:
FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY
DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
A1
1 of 30
Not Drawn to Scale
LOCATION PLAN
3
this Site
Not Drawn to Scale
VICINITY MAP
3
this Site
BUILDING OFFICIAL
LAND USE AND ZONING
LINE AND GRADE
ARCHITECTURAL
STRUCTURAL
SANITARY
ELECTRICAL
MECHANICAL
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC
WORKS AND HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL CITY OF ILIGAN
FIRE SAFETY
A1
1. PERSPECTIVE VIEW
2. VICINITY MAP
3. LOCATION PLAN
A2
1. GROUND FLOOR PLAN
2. SECOND FLOOR PLAN
3. THIRD FLOOR PLAN
4. LEFT ELEVATION
5. RIGHT ELEVATION'
A3
1. ROOFDECK FLOOR PLAN
2. FRONT ELEVATION
3. REAR ELEVATION
4. SECTION THRU - C
5. SECTION THRU - D
6. SECTION THRU - L
A4
1. SECTION THRU - A
2. SECTION THRU - B
3. GRND FLR REFLECTED CEILING PLAN
4. SECTION THRU - E
5. SECTION THRU - F
A5
1. 2ND FLR REFLECTED CEILING PLAN
2. 3RD FLR REFLECTED CEILING PLAN
3. RFDCK REFLECTED CEILING PLAN
4. CEILING FRAME DETAIL
5. DRY WALL FRAME DETAIL
A6
1. GLASS PARTITION DETAIL
2. SCHEDULE OF WINDOWS
A7
1. SCHEDULE OF DOORS
2. POLYCARBONATE ENCLOSURE DETAIL
3. POLYCARBONATE CANOPY DET.
4. POLYCARBONATE CANOPY FRAMING DET.
S1
1. FOUNDATION PLAN
2. SECOND FLOOR FRAMING PLAN
3. THIRD FLOOR FRAMING PLAN
4. COMBINED FOOTING 1 (CF-1) DETAIL
3. COMBINED FOOTING 4 (CF-4) DETAIL
S2
1. ROOFDECK FRAING PLAN
2. ROOF BEAM PLAN
3. ROOF FRAMING PLAN
4. COMBINED FOOTING 2 (CF-2) DETAIL
5. COMBINED FOOTING 3 (CF-3) DETAIL
S3
1. COMBINED FOOTING 5 (CF-5) DETAIL
2. WALL FOOTING DETAIL
3. COLUMN DETAIL
4. TIE BEAM TRANSVERSE STRUCTURE PROFILE
5. TIE BEAM DETAIL
S4
1. SCHEDULE OF BEAMS - 1
S5
1. SCHEDULE OF BEAMS - 2
S6
1. SECOND FLOOR SLAB DETAIL
2. CONCRETE CANOPY DETAIL
3. CONCRETE GUTTER DETAIL
S7
1. MAIN STAIR SECTION
2. MAIN STAIR DETAIL
3. MAIN STAIR PLAN
4. MAIN STAIR PROFILE
5. SIDE STAIR PROFILE
6. SIDE STAIR LANDING SECTION
7. SIDE STAIR LANDING PLAN
8. SIDE STAIR DETAIL
9. TYPICAL STEEL HAN DRAIL DETAIL
S8
1. ELEVATOR SHAFT FOOTING PLAN
2. ELEVATOR SHAFT FOOTING SECTION
3. ELEVATOR SHAFT WALL DETAIL
4. ELEVATOR SHAFT LAYOUT PLAN
5. ELEVATOR SHAFT ROOF DETAIL
6. PLANTED COLUMN DETAIL
7. FOLDED SLAB DETAIL
S9
1. STEEL STAIR DETAIL
2. WATER TANK PLATFORM DETAIL
3. STEEL TRUSS 1 (T-1) DETAIL
4. STEEL TRUSS 2 (T-2) DETAIL
5. STEEL TRUSS 3 (T-3) DETAIL
6. STEEL TRUSS 4 (T-4) DETAIL
P1
1. GRND FLR DRAINAGE SYSTEM LAYOUT PLAN
2. 2ND FLR DRAINAGE SYSTEM LAYOUT PLAN
3. 3RD FLR DRAINAGE SYSTEM LAYOUT PLAN
4. RIGHT WING PIPING ISOMETRIC DIAGRAM
P2
1. ROOFDECK DRAINAGE SYSTEM LAYOUT PLAN
2. GRND FLR WATER SUPPLY LAYOUT PLAN
3. 2ND FLR WATER SUPPLY LAYOUT PLAN
4. LEFT WING PIPING ISOMETRIC DIAGRAM
P3
1. 3RD FLR WATER SUPPLY LAYOUT PLAN
2. ROOFDECK WATER SUPPLY LAYOUT PLAN
3. GRND FLR STORM DRAINAGE LAYOUT PLAN
4. DIRECTOR'S OFFICE PUMBING LAYOUT PLAN
5. FACULTY LOUNGE PLUMBING LAYOUT PLAN
P4
1. BLOWN UP PLUMBING LAYOUT PLAN
P5
1. CISTERN DETAIL
2. SEPTIC VAULT DETAIL
3. LOCATION PLAN
M1
1. GRND FLR FIRE ALARM SYSTEM LAYOUT PLAN
2. 2ND FLR FIRE ALARM SYSTEM LAYOUT PLAN
3. 3RD FLR FIRE ALARM SYSTEM LAYOUT PLAN
4. FIRE ALARM SYSTEM RISER DIAGRAM
5. FIRE ALARM SYSTEM ELEMENTARY DIAGRAM
M2
1. RFDCK FIRE ALARM SYSTEM LAYOUT PLAN
2. ELEVATOR HOISTWAY PIT PLAN
3. ELEVATOR HOISTWAY LANDING PLAN
4. ELEVATOR HOISTWAY OVERHEAD PLAN
5. ELEVATOR HOISTWAY SECTION
E1
1. GRND FLR POWER CIRCUIT LAYOUT PLAN
2. 2ND FLR POWER CIRCUIT LAYOUT PLAN
3. 3RD FLR POWER CIRCUIT LAYOUT PLAN
E2
1. RFDCK POWER CIRCUIT LAYOUT PLAN
2. GRND FLR LIGHTING CIRCUIT LAYOUT PLAN
3. 2ND FLR LIGHTING CIRCUIT LAYOUT PLAN
4. SCHEDULE OF POWER & LIGHTING LOADS
E3
1. 3RD FLR LIGHTING CIRCUIT LAYOUT PLAN
2. RFDCK LIGHTING CIRCUIT LAYOUT PLAN
3. GRND FLR INTERCOM LINE LAYOUT PLAN
4. SCHEDULE OF ACU & SUBFEEDER LOADS
E4
1. 2ND FLR INTERCOM LINE LAYOUT PLAN
2. 3RD FLR INTERCOM LINE LAYOUT PLAN
3. RFDCK INTERCOM LINE LAYOUT PLAN
4. GROUNDING PLAN
5. LIGHTNING ARRESTER PLAN
6. ELECTRICAL RISER DIAGRAM
E5
1. GRND FLR ACU OUTLET LAYOUT PLAN
2. 2ND FLR ACU OUTLET LAYOUT PLAN
3. 3RD FLR ACU OUTLET LAYOUT PLAN
4. ELECTRICAL SINGLE LINE DIAGRAM
5. TELEPHONE LINE RISER DIAGRAM
6. INTERCOM LINE RISER DIAGRAM
E6
1. TYPICAL CABLE TRAY LADDER LAYOUT PLAN
2. CABLE TRAY LADDER DETAIL
3. LOCATION PLAN
Scale: 1:250 m
GROUND FLOOR PLAN
1
Scale: 1:250 m
SECOND FLOOR PLAN
2
Scale: 1:250 m
THIRD FLOOR PLAN
3
Scale: 1:100 m
LEFT ELEVATION
4
Scale: 1:100 m
RIGHT ELEVATION
5
CERTIFIED BY:
PROPOSED INFORMATION &
COMMUNICATION TECHNOLOGY CENTER
(ICTC) ACADEMIC BLDG.
VICE CHANCELLOR FOR ADMIN. & FIN.
ENGR. POLAUS M. BARI, D.M.
EXECUTIVE DIRECTOR, ICTC
EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUG
ARCHITECT I, PHYSICAL PLANT DIVISION
PRC No.:
PTR No.:
DATE ISSUED:
TIN No.:
PREPARED BY:
CHRISTIAN C. CAÑETE
ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT
SUKARNO D. TANGGOL, DPA
RECOMMENDING APPROVAL: APPROVED BY:
ARCHT. ANACLETO Y. TAMOSO
OIC - DIRECTOR, PHYSICAL PLANT DIVISION
SHEET No.:
DATE:
FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY
DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
A2
2 of 30
Scale: 1:250 m
FRONT ELEVATION
2
Scale: 1:250 m
REAR ELEVATION
3
Scale: 1:100 m
SECTION THRU - L
6
Scale: 1:100 m
SECTION THRU - C
4 Scale: 1:100 m
SECTION THRU - D
5
CERTIFIED BY:
PROPOSED INFORMATION &
COMMUNICATION TECHNOLOGY CENTER
(ICTC) ACADEMIC BLDG.
VICE CHANCELLOR FOR ADMIN. & FIN.
ENGR. POLAUS M. BARI, D.M.
EXECUTIVE DIRECTOR, ICTC
EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUG
ARCHITECT I, PHYSICAL PLANT DIVISION
PRC No.:
PTR No.:
DATE ISSUED:
TIN No.:
PREPARED BY:
CHRISTIAN C. CAÑETE
ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT
SUKARNO D. TANGGOL, DPA
RECOMMENDING APPROVAL: APPROVED BY:
ARCHT. ANACLETO Y. TAMOSO
OIC - DIRECTOR, PHYSICAL PLANT DIVISION
SHEET No.:
DATE:
FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY
DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
Scale: 1:250 m
ROOFDECK FLOOR PLAN
1
A3
3 of 30
Scale: 1:250 m
SECTION THRU - A
1
Scale: 1:250 m
SECTION THRU - B
2
Scale: 1:100 m
SECTION THRU - E
4
Scale: 1:100 m
SECTION THRU - F
5
Scale: 1:250 m
GRND FLR REF CEILING PLAN
3
CERTIFIED BY:
PROPOSED INFORMATION &
COMMUNICATION TECHNOLOGY CENTER
(ICTC) ACADEMIC BLDG.
VICE CHANCELLOR FOR ADMIN. & FIN.
ENGR. POLAUS M. BARI, D.M.
EXECUTIVE DIRECTOR, ICTC
EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUG
ARCHITECT I, PHYSICAL PLANT DIVISION
PRC No.:
PTR No.:
DATE ISSUED:
TIN No.:
PREPARED BY:
CHRISTIAN C. CAÑETE
ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT
SUKARNO D. TANGGOL, DPA
RECOMMENDING APPROVAL: APPROVED BY:
ARCHT. ANACLETO Y. TAMOSO
OIC - DIRECTOR, PHYSICAL PLANT DIVISION
SHEET No.:
DATE:
FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY
DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
A4
4 of 30
CEILING FRAME ISOMETRIC VIEW
DRY WALL FRAME ISOMETRIC VIEW
Scale: 1:30 m
CEILING FRAME DETAIL
4
Scale: 1:30 m
DRY WALL FRAME DETAIL
5
CERTIFIED BY:
PROPOSED INFORMATION &
COMMUNICATION TECHNOLOGY CENTER
(ICTC) ACADEMIC BLDG.
VICE CHANCELLOR FOR ADMIN. & FIN.
ENGR. POLAUS M. BARI, D.M.
EXECUTIVE DIRECTOR, ICTC
EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUG
ARCHITECT I, PHYSICAL PLANT DIVISION
PRC No.:
PTR No.:
DATE ISSUED:
TIN No.:
PREPARED BY:
CHRISTIAN C. CAÑETE
ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT
SUKARNO D. TANGGOL, DPA
RECOMMENDING APPROVAL: APPROVED BY:
ARCHT. ANACLETO Y. TAMOSO
OIC - DIRECTOR, PHYSICAL PLANT DIVISION
SHEET No.:
DATE:
FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY
DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
Scale: 1:250 m
2ND FLR. REF. CEILING PLAN
1
Scale: 1:250 m
3RD FLR. REF. CEILING PLAN
2
Scale: 1:250 m
RF.DCK. FLR. REF. CEILING PLAN
3
A5
5 of 30
CERTIFIED BY:
PROPOSED INFORMATION &
COMMUNICATION TECHNOLOGY CENTER
(ICTC) ACADEMIC BLDG.
VICE CHANCELLOR FOR ADMIN. & FIN.
ENGR. POLAUS M. BARI, D.M.
EXECUTIVE DIRECTOR, ICTC
EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUG
ARCHITECT I, PHYSICAL PLANT DIVISION
PRC No.:
PTR No.:
DATE ISSUED:
TIN No.:
PREPARED BY:
CHRISTIAN C. CAÑETE
ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT
SUKARNO D. TANGGOL, DPA
RECOMMENDING APPROVAL: APPROVED BY:
ARCHT. ANACLETO Y. TAMOSO
OIC - DIRECTOR, PHYSICAL PLANT DIVISION
SHEET No.:
DATE:
FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY
DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
Scale: 1:30 m
GLASS PARTITION DETAIL
1
Scale: 1:25 m
SCHEDULE OF WINDOWS
2
A6
6 of 30
Scale: 1:50 m
POLYCARBONATE ENCLOSURE DETAIL
2
AT 2ND FLR. SIDE STAIR PLAN AT 3RD FLR. SIDE STAIR PLAN AT RF DECK SIDE STAIR PLAN
LOBBY ENCLOSURE PLAN
FASCIA FRAME
SECTION
CT-2
SECTION
CT-1 SECTION
CT-1
TOP VIEWCT-1 SECTION
Scale: 1:25 m
POLYCARBONATE CANOPY FRAME DET.
3
FASCIA FRAME
DET.
PLYCARBONATE CANOPY FRAMING PLAN
PLYCARBONATE CANOPY FRAMING SECTION
CERTIFIED BY:
PROPOSED INFORMATION &
COMMUNICATION TECHNOLOGY CENTER
(ICTC) ACADEMIC BLDG.
VICE CHANCELLOR FOR ADMIN. & FIN.
ENGR. POLAUS M. BARI, D.M.
EXECUTIVE DIRECTOR, ICTC
EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUG
ARCHITECT I, PHYSICAL PLANT DIVISION
PRC No.:
PTR No.:
DATE ISSUED:
TIN No.:
PREPARED BY:
CHRISTIAN C. CAÑETE
ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT
SUKARNO D. TANGGOL, DPA
RECOMMENDING APPROVAL: APPROVED BY:
ARCHT. ANACLETO Y. TAMOSO
OIC - DIRECTOR, PHYSICAL PLANT DIVISION
SHEET No.:
DATE:
FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY
DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
Scale: 1:25 m
POLYCARBONATE CANOPY FRAMING DET.
4
Scale: 1:25 m
SCHEDULE OF DOORS
1
A7
7 of 30

More Related Content

Viewers also liked

SMO - оптимизация под социальные сети
SMO - оптимизация под социальные сетиSMO - оптимизация под социальные сети
SMO - оптимизация под социальные сетиVladyslava Rykova
 
Inequality in the United States - Understanding Inequality with Data
Inequality in the United States - Understanding Inequality with DataInequality in the United States - Understanding Inequality with Data
Inequality in the United States - Understanding Inequality with DataOscar Blanco-Sanchez
 
modified carbon fibre composite
modified carbon fibre compositemodified carbon fibre composite
modified carbon fibre compositeCharu Lakshmi
 
Manufacturing of fibre polymer composites
Manufacturing of fibre polymer compositesManufacturing of fibre polymer composites
Manufacturing of fibre polymer compositesMosarruf Shawon
 
Копирайтинг в интерактивных медиа и диджитал среде
Копирайтинг в интерактивных медиа и диджитал средеКопирайтинг в интерактивных медиа и диджитал среде
Копирайтинг в интерактивных медиа и диджитал средеVladyslava Rykova
 
Как стать копирайтером?
Как стать копирайтером?Как стать копирайтером?
Как стать копирайтером?Vladyslava Rykova
 
Нейрокопирайтинг, то что Вы точно не знали про тексты!
Нейрокопирайтинг, то что Вы точно не знали про тексты!Нейрокопирайтинг, то что Вы точно не знали про тексты!
Нейрокопирайтинг, то что Вы точно не знали про тексты!Vladyslava Rykova
 
Carbon fibre presentation
Carbon fibre presentationCarbon fibre presentation
Carbon fibre presentationanicholls1234
 
7 советов начинающему интернет-маркетологу
7 советов начинающему интернет-маркетологу7 советов начинающему интернет-маркетологу
7 советов начинающему интернет-маркетологуVladyslava Rykova
 
Маркетинг образовательных услуг
Маркетинг образовательных услугМаркетинг образовательных услуг
Маркетинг образовательных услугVladyslava Rykova
 
Carbon fibre final ppt
Carbon fibre final pptCarbon fibre final ppt
Carbon fibre final pptSantosh Sharma
 

Viewers also liked (16)

M-ICTC
M-ICTCM-ICTC
M-ICTC
 
SMO - оптимизация под социальные сети
SMO - оптимизация под социальные сетиSMO - оптимизация под социальные сети
SMO - оптимизация под социальные сети
 
Carbon fibres(snigdha)
Carbon fibres(snigdha)Carbon fibres(snigdha)
Carbon fibres(snigdha)
 
Inequality in the United States - Understanding Inequality with Data
Inequality in the United States - Understanding Inequality with DataInequality in the United States - Understanding Inequality with Data
Inequality in the United States - Understanding Inequality with Data
 
modified carbon fibre composite
modified carbon fibre compositemodified carbon fibre composite
modified carbon fibre composite
 
Manufacturing of fibre polymer composites
Manufacturing of fibre polymer compositesManufacturing of fibre polymer composites
Manufacturing of fibre polymer composites
 
CARBON FIBRE, GLASS FIBRE AND OPTICAL FIBRE
CARBON FIBRE, GLASS FIBRE AND OPTICAL FIBRECARBON FIBRE, GLASS FIBRE AND OPTICAL FIBRE
CARBON FIBRE, GLASS FIBRE AND OPTICAL FIBRE
 
Копирайтинг в интерактивных медиа и диджитал среде
Копирайтинг в интерактивных медиа и диджитал средеКопирайтинг в интерактивных медиа и диджитал среде
Копирайтинг в интерактивных медиа и диджитал среде
 
Как стать копирайтером?
Как стать копирайтером?Как стать копирайтером?
Как стать копирайтером?
 
Нейрокопирайтинг, то что Вы точно не знали про тексты!
Нейрокопирайтинг, то что Вы точно не знали про тексты!Нейрокопирайтинг, то что Вы точно не знали про тексты!
Нейрокопирайтинг, то что Вы точно не знали про тексты!
 
Carbon fibre presentation
Carbon fibre presentationCarbon fibre presentation
Carbon fibre presentation
 
7 советов начинающему интернет-маркетологу
7 советов начинающему интернет-маркетологу7 советов начинающему интернет-маркетологу
7 советов начинающему интернет-маркетологу
 
Carbon fiber.1
Carbon fiber.1Carbon fiber.1
Carbon fiber.1
 
carbon fibre
carbon fibrecarbon fibre
carbon fibre
 
Маркетинг образовательных услуг
Маркетинг образовательных услугМаркетинг образовательных услуг
Маркетинг образовательных услуг
 
Carbon fibre final ppt
Carbon fibre final pptCarbon fibre final ppt
Carbon fibre final ppt
 

Similar to A-ICTC

DOD PRESENTATION TOM BEARDEN
DOD PRESENTATION TOM BEARDENDOD PRESENTATION TOM BEARDEN
DOD PRESENTATION TOM BEARDENJohn Hutchison
 
Farmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeFarmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeRichard Clark
 
21dj0036 plan.pdf
21dj0036 plan.pdf21dj0036 plan.pdf
21dj0036 plan.pdfQuote5
 
DCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfDCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfRoshelleStahl1
 
Binder 161004 - 6500 san pablo ave, oakland (1)
Binder  161004 - 6500 san pablo ave, oakland (1)Binder  161004 - 6500 san pablo ave, oakland (1)
Binder 161004 - 6500 san pablo ave, oakland (1)E'ville Eye
 
Design of Kalinga Film Studio at Bhubaneswar
Design of Kalinga Film Studio at BhubaneswarDesign of Kalinga Film Studio at Bhubaneswar
Design of Kalinga Film Studio at Bhubaneswaralwayslogo
 
Design and-construction-of-driven-pile-foundation
Design and-construction-of-driven-pile-foundationDesign and-construction-of-driven-pile-foundation
Design and-construction-of-driven-pile-foundationMD.Yeasin Mostafiz
 
MEASURED DRAWINGS
MEASURED DRAWINGSMEASURED DRAWINGS
MEASURED DRAWINGSAndrew Law
 
BARANGAY HALL-ESTIMATE-POW-SCURVE.pdf
BARANGAY HALL-ESTIMATE-POW-SCURVE.pdfBARANGAY HALL-ESTIMATE-POW-SCURVE.pdf
BARANGAY HALL-ESTIMATE-POW-SCURVE.pdfMichaelJorgeBernales
 
112936846-Guidelines-for-Ultrasonic-Inspection.pdf
112936846-Guidelines-for-Ultrasonic-Inspection.pdf112936846-Guidelines-for-Ultrasonic-Inspection.pdf
112936846-Guidelines-for-Ultrasonic-Inspection.pdfkamaltouileb2
 
Professional Portfolio v3
Professional Portfolio v3Professional Portfolio v3
Professional Portfolio v3Robert Huber
 

Similar to A-ICTC (20)

3Sty_9CL.pdf
3Sty_9CL.pdf3Sty_9CL.pdf
3Sty_9CL.pdf
 
LA FLORESTA
LA FLORESTALA FLORESTA
LA FLORESTA
 
Structural_Plan.pdf
Structural_Plan.pdfStructural_Plan.pdf
Structural_Plan.pdf
 
Teleport (1) ufaf
Teleport (1)   ufafTeleport (1)   ufaf
Teleport (1) ufaf
 
DOD PRESENTATION TOM BEARDEN
DOD PRESENTATION TOM BEARDENDOD PRESENTATION TOM BEARDEN
DOD PRESENTATION TOM BEARDEN
 
SELENDRA CONDOMINIUM CONSTRUCTION ORIENTATION
SELENDRA CONDOMINIUM CONSTRUCTION ORIENTATIONSELENDRA CONDOMINIUM CONSTRUCTION ORIENTATION
SELENDRA CONDOMINIUM CONSTRUCTION ORIENTATION
 
Farmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeFarmers Agoura Hills CEO Office
Farmers Agoura Hills CEO Office
 
21dj0036 plan.pdf
21dj0036 plan.pdf21dj0036 plan.pdf
21dj0036 plan.pdf
 
DCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfDCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdf
 
CATIA
CATIACATIA
CATIA
 
Binder 161004 - 6500 san pablo ave, oakland (1)
Binder  161004 - 6500 san pablo ave, oakland (1)Binder  161004 - 6500 san pablo ave, oakland (1)
Binder 161004 - 6500 san pablo ave, oakland (1)
 
Design of Kalinga Film Studio at Bhubaneswar
Design of Kalinga Film Studio at BhubaneswarDesign of Kalinga Film Studio at Bhubaneswar
Design of Kalinga Film Studio at Bhubaneswar
 
Design and-construction-of-driven-pile-foundation
Design and-construction-of-driven-pile-foundationDesign and-construction-of-driven-pile-foundation
Design and-construction-of-driven-pile-foundation
 
MEASURED DRAWINGS
MEASURED DRAWINGSMEASURED DRAWINGS
MEASURED DRAWINGS
 
BARANGAY HALL-ESTIMATE-POW-SCURVE.pdf
BARANGAY HALL-ESTIMATE-POW-SCURVE.pdfBARANGAY HALL-ESTIMATE-POW-SCURVE.pdf
BARANGAY HALL-ESTIMATE-POW-SCURVE.pdf
 
112936846-Guidelines-for-Ultrasonic-Inspection.pdf
112936846-Guidelines-for-Ultrasonic-Inspection.pdf112936846-Guidelines-for-Ultrasonic-Inspection.pdf
112936846-Guidelines-for-Ultrasonic-Inspection.pdf
 
Professional Portfolio v3
Professional Portfolio v3Professional Portfolio v3
Professional Portfolio v3
 
IJAZAH S1
IJAZAH S1IJAZAH S1
IJAZAH S1
 
Neighbourhood planning
Neighbourhood planningNeighbourhood planning
Neighbourhood planning
 
Weibull Analysis.pdf
Weibull Analysis.pdfWeibull Analysis.pdf
Weibull Analysis.pdf
 

A-ICTC

  • 1. CERTIFIED BY: PROPOSED INFORMATION & COMMUNICATION TECHNOLOGY CENTER (ICTC) ACADEMIC BLDG. VICE CHANCELLOR FOR ADMIN. & FIN. ENGR. POLAUS M. BARI, D.M. EXECUTIVE DIRECTOR, ICTC EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUG ARCHITECT I, PHYSICAL PLANT DIVISION PRC No.: PTR No.: DATE ISSUED: TIN No.: PREPARED BY: CHRISTIAN C. CAÑETE ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT SUKARNO D. TANGGOL, DPA RECOMMENDING APPROVAL: APPROVED BY: ARCHT. ANACLETO Y. TAMOSO OIC - DIRECTOR, PHYSICAL PLANT DIVISION SHEET No.: DATE: FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS. A1 1 of 30 Not Drawn to Scale LOCATION PLAN 3 this Site Not Drawn to Scale VICINITY MAP 3 this Site BUILDING OFFICIAL LAND USE AND ZONING LINE AND GRADE ARCHITECTURAL STRUCTURAL SANITARY ELECTRICAL MECHANICAL REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE BUILDING OFFICIAL CITY OF ILIGAN FIRE SAFETY A1 1. PERSPECTIVE VIEW 2. VICINITY MAP 3. LOCATION PLAN A2 1. GROUND FLOOR PLAN 2. SECOND FLOOR PLAN 3. THIRD FLOOR PLAN 4. LEFT ELEVATION 5. RIGHT ELEVATION' A3 1. ROOFDECK FLOOR PLAN 2. FRONT ELEVATION 3. REAR ELEVATION 4. SECTION THRU - C 5. SECTION THRU - D 6. SECTION THRU - L A4 1. SECTION THRU - A 2. SECTION THRU - B 3. GRND FLR REFLECTED CEILING PLAN 4. SECTION THRU - E 5. SECTION THRU - F A5 1. 2ND FLR REFLECTED CEILING PLAN 2. 3RD FLR REFLECTED CEILING PLAN 3. RFDCK REFLECTED CEILING PLAN 4. CEILING FRAME DETAIL 5. DRY WALL FRAME DETAIL A6 1. GLASS PARTITION DETAIL 2. SCHEDULE OF WINDOWS A7 1. SCHEDULE OF DOORS 2. POLYCARBONATE ENCLOSURE DETAIL 3. POLYCARBONATE CANOPY DET. 4. POLYCARBONATE CANOPY FRAMING DET. S1 1. FOUNDATION PLAN 2. SECOND FLOOR FRAMING PLAN 3. THIRD FLOOR FRAMING PLAN 4. COMBINED FOOTING 1 (CF-1) DETAIL 3. COMBINED FOOTING 4 (CF-4) DETAIL S2 1. ROOFDECK FRAING PLAN 2. ROOF BEAM PLAN 3. ROOF FRAMING PLAN 4. COMBINED FOOTING 2 (CF-2) DETAIL 5. COMBINED FOOTING 3 (CF-3) DETAIL S3 1. COMBINED FOOTING 5 (CF-5) DETAIL 2. WALL FOOTING DETAIL 3. COLUMN DETAIL 4. TIE BEAM TRANSVERSE STRUCTURE PROFILE 5. TIE BEAM DETAIL S4 1. SCHEDULE OF BEAMS - 1 S5 1. SCHEDULE OF BEAMS - 2 S6 1. SECOND FLOOR SLAB DETAIL 2. CONCRETE CANOPY DETAIL 3. CONCRETE GUTTER DETAIL S7 1. MAIN STAIR SECTION 2. MAIN STAIR DETAIL 3. MAIN STAIR PLAN 4. MAIN STAIR PROFILE 5. SIDE STAIR PROFILE 6. SIDE STAIR LANDING SECTION 7. SIDE STAIR LANDING PLAN 8. SIDE STAIR DETAIL 9. TYPICAL STEEL HAN DRAIL DETAIL S8 1. ELEVATOR SHAFT FOOTING PLAN 2. ELEVATOR SHAFT FOOTING SECTION 3. ELEVATOR SHAFT WALL DETAIL 4. ELEVATOR SHAFT LAYOUT PLAN 5. ELEVATOR SHAFT ROOF DETAIL 6. PLANTED COLUMN DETAIL 7. FOLDED SLAB DETAIL S9 1. STEEL STAIR DETAIL 2. WATER TANK PLATFORM DETAIL 3. STEEL TRUSS 1 (T-1) DETAIL 4. STEEL TRUSS 2 (T-2) DETAIL 5. STEEL TRUSS 3 (T-3) DETAIL 6. STEEL TRUSS 4 (T-4) DETAIL P1 1. GRND FLR DRAINAGE SYSTEM LAYOUT PLAN 2. 2ND FLR DRAINAGE SYSTEM LAYOUT PLAN 3. 3RD FLR DRAINAGE SYSTEM LAYOUT PLAN 4. RIGHT WING PIPING ISOMETRIC DIAGRAM P2 1. ROOFDECK DRAINAGE SYSTEM LAYOUT PLAN 2. GRND FLR WATER SUPPLY LAYOUT PLAN 3. 2ND FLR WATER SUPPLY LAYOUT PLAN 4. LEFT WING PIPING ISOMETRIC DIAGRAM P3 1. 3RD FLR WATER SUPPLY LAYOUT PLAN 2. ROOFDECK WATER SUPPLY LAYOUT PLAN 3. GRND FLR STORM DRAINAGE LAYOUT PLAN 4. DIRECTOR'S OFFICE PUMBING LAYOUT PLAN 5. FACULTY LOUNGE PLUMBING LAYOUT PLAN P4 1. BLOWN UP PLUMBING LAYOUT PLAN P5 1. CISTERN DETAIL 2. SEPTIC VAULT DETAIL 3. LOCATION PLAN M1 1. GRND FLR FIRE ALARM SYSTEM LAYOUT PLAN 2. 2ND FLR FIRE ALARM SYSTEM LAYOUT PLAN 3. 3RD FLR FIRE ALARM SYSTEM LAYOUT PLAN 4. FIRE ALARM SYSTEM RISER DIAGRAM 5. FIRE ALARM SYSTEM ELEMENTARY DIAGRAM M2 1. RFDCK FIRE ALARM SYSTEM LAYOUT PLAN 2. ELEVATOR HOISTWAY PIT PLAN 3. ELEVATOR HOISTWAY LANDING PLAN 4. ELEVATOR HOISTWAY OVERHEAD PLAN 5. ELEVATOR HOISTWAY SECTION E1 1. GRND FLR POWER CIRCUIT LAYOUT PLAN 2. 2ND FLR POWER CIRCUIT LAYOUT PLAN 3. 3RD FLR POWER CIRCUIT LAYOUT PLAN E2 1. RFDCK POWER CIRCUIT LAYOUT PLAN 2. GRND FLR LIGHTING CIRCUIT LAYOUT PLAN 3. 2ND FLR LIGHTING CIRCUIT LAYOUT PLAN 4. SCHEDULE OF POWER & LIGHTING LOADS E3 1. 3RD FLR LIGHTING CIRCUIT LAYOUT PLAN 2. RFDCK LIGHTING CIRCUIT LAYOUT PLAN 3. GRND FLR INTERCOM LINE LAYOUT PLAN 4. SCHEDULE OF ACU & SUBFEEDER LOADS E4 1. 2ND FLR INTERCOM LINE LAYOUT PLAN 2. 3RD FLR INTERCOM LINE LAYOUT PLAN 3. RFDCK INTERCOM LINE LAYOUT PLAN 4. GROUNDING PLAN 5. LIGHTNING ARRESTER PLAN 6. ELECTRICAL RISER DIAGRAM E5 1. GRND FLR ACU OUTLET LAYOUT PLAN 2. 2ND FLR ACU OUTLET LAYOUT PLAN 3. 3RD FLR ACU OUTLET LAYOUT PLAN 4. ELECTRICAL SINGLE LINE DIAGRAM 5. TELEPHONE LINE RISER DIAGRAM 6. INTERCOM LINE RISER DIAGRAM E6 1. TYPICAL CABLE TRAY LADDER LAYOUT PLAN 2. CABLE TRAY LADDER DETAIL 3. LOCATION PLAN
  • 2. Scale: 1:250 m GROUND FLOOR PLAN 1 Scale: 1:250 m SECOND FLOOR PLAN 2 Scale: 1:250 m THIRD FLOOR PLAN 3 Scale: 1:100 m LEFT ELEVATION 4 Scale: 1:100 m RIGHT ELEVATION 5 CERTIFIED BY: PROPOSED INFORMATION & COMMUNICATION TECHNOLOGY CENTER (ICTC) ACADEMIC BLDG. VICE CHANCELLOR FOR ADMIN. & FIN. ENGR. POLAUS M. BARI, D.M. EXECUTIVE DIRECTOR, ICTC EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUG ARCHITECT I, PHYSICAL PLANT DIVISION PRC No.: PTR No.: DATE ISSUED: TIN No.: PREPARED BY: CHRISTIAN C. CAÑETE ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT SUKARNO D. TANGGOL, DPA RECOMMENDING APPROVAL: APPROVED BY: ARCHT. ANACLETO Y. TAMOSO OIC - DIRECTOR, PHYSICAL PLANT DIVISION SHEET No.: DATE: FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS. A2 2 of 30
  • 3. Scale: 1:250 m FRONT ELEVATION 2 Scale: 1:250 m REAR ELEVATION 3 Scale: 1:100 m SECTION THRU - L 6 Scale: 1:100 m SECTION THRU - C 4 Scale: 1:100 m SECTION THRU - D 5 CERTIFIED BY: PROPOSED INFORMATION & COMMUNICATION TECHNOLOGY CENTER (ICTC) ACADEMIC BLDG. VICE CHANCELLOR FOR ADMIN. & FIN. ENGR. POLAUS M. BARI, D.M. EXECUTIVE DIRECTOR, ICTC EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUG ARCHITECT I, PHYSICAL PLANT DIVISION PRC No.: PTR No.: DATE ISSUED: TIN No.: PREPARED BY: CHRISTIAN C. CAÑETE ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT SUKARNO D. TANGGOL, DPA RECOMMENDING APPROVAL: APPROVED BY: ARCHT. ANACLETO Y. TAMOSO OIC - DIRECTOR, PHYSICAL PLANT DIVISION SHEET No.: DATE: FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS. Scale: 1:250 m ROOFDECK FLOOR PLAN 1 A3 3 of 30
  • 4. Scale: 1:250 m SECTION THRU - A 1 Scale: 1:250 m SECTION THRU - B 2 Scale: 1:100 m SECTION THRU - E 4 Scale: 1:100 m SECTION THRU - F 5 Scale: 1:250 m GRND FLR REF CEILING PLAN 3 CERTIFIED BY: PROPOSED INFORMATION & COMMUNICATION TECHNOLOGY CENTER (ICTC) ACADEMIC BLDG. VICE CHANCELLOR FOR ADMIN. & FIN. ENGR. POLAUS M. BARI, D.M. EXECUTIVE DIRECTOR, ICTC EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUG ARCHITECT I, PHYSICAL PLANT DIVISION PRC No.: PTR No.: DATE ISSUED: TIN No.: PREPARED BY: CHRISTIAN C. CAÑETE ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT SUKARNO D. TANGGOL, DPA RECOMMENDING APPROVAL: APPROVED BY: ARCHT. ANACLETO Y. TAMOSO OIC - DIRECTOR, PHYSICAL PLANT DIVISION SHEET No.: DATE: FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS. A4 4 of 30
  • 5. CEILING FRAME ISOMETRIC VIEW DRY WALL FRAME ISOMETRIC VIEW Scale: 1:30 m CEILING FRAME DETAIL 4 Scale: 1:30 m DRY WALL FRAME DETAIL 5 CERTIFIED BY: PROPOSED INFORMATION & COMMUNICATION TECHNOLOGY CENTER (ICTC) ACADEMIC BLDG. VICE CHANCELLOR FOR ADMIN. & FIN. ENGR. POLAUS M. BARI, D.M. EXECUTIVE DIRECTOR, ICTC EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUG ARCHITECT I, PHYSICAL PLANT DIVISION PRC No.: PTR No.: DATE ISSUED: TIN No.: PREPARED BY: CHRISTIAN C. CAÑETE ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT SUKARNO D. TANGGOL, DPA RECOMMENDING APPROVAL: APPROVED BY: ARCHT. ANACLETO Y. TAMOSO OIC - DIRECTOR, PHYSICAL PLANT DIVISION SHEET No.: DATE: FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS. Scale: 1:250 m 2ND FLR. REF. CEILING PLAN 1 Scale: 1:250 m 3RD FLR. REF. CEILING PLAN 2 Scale: 1:250 m RF.DCK. FLR. REF. CEILING PLAN 3 A5 5 of 30
  • 6. CERTIFIED BY: PROPOSED INFORMATION & COMMUNICATION TECHNOLOGY CENTER (ICTC) ACADEMIC BLDG. VICE CHANCELLOR FOR ADMIN. & FIN. ENGR. POLAUS M. BARI, D.M. EXECUTIVE DIRECTOR, ICTC EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUG ARCHITECT I, PHYSICAL PLANT DIVISION PRC No.: PTR No.: DATE ISSUED: TIN No.: PREPARED BY: CHRISTIAN C. CAÑETE ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT SUKARNO D. TANGGOL, DPA RECOMMENDING APPROVAL: APPROVED BY: ARCHT. ANACLETO Y. TAMOSO OIC - DIRECTOR, PHYSICAL PLANT DIVISION SHEET No.: DATE: FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS. Scale: 1:30 m GLASS PARTITION DETAIL 1 Scale: 1:25 m SCHEDULE OF WINDOWS 2 A6 6 of 30
  • 7. Scale: 1:50 m POLYCARBONATE ENCLOSURE DETAIL 2 AT 2ND FLR. SIDE STAIR PLAN AT 3RD FLR. SIDE STAIR PLAN AT RF DECK SIDE STAIR PLAN LOBBY ENCLOSURE PLAN FASCIA FRAME SECTION CT-2 SECTION CT-1 SECTION CT-1 TOP VIEWCT-1 SECTION Scale: 1:25 m POLYCARBONATE CANOPY FRAME DET. 3 FASCIA FRAME DET. PLYCARBONATE CANOPY FRAMING PLAN PLYCARBONATE CANOPY FRAMING SECTION CERTIFIED BY: PROPOSED INFORMATION & COMMUNICATION TECHNOLOGY CENTER (ICTC) ACADEMIC BLDG. VICE CHANCELLOR FOR ADMIN. & FIN. ENGR. POLAUS M. BARI, D.M. EXECUTIVE DIRECTOR, ICTC EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUG ARCHITECT I, PHYSICAL PLANT DIVISION PRC No.: PTR No.: DATE ISSUED: TIN No.: PREPARED BY: CHRISTIAN C. CAÑETE ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT SUKARNO D. TANGGOL, DPA RECOMMENDING APPROVAL: APPROVED BY: ARCHT. ANACLETO Y. TAMOSO OIC - DIRECTOR, PHYSICAL PLANT DIVISION SHEET No.: DATE: FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS. Scale: 1:25 m POLYCARBONATE CANOPY FRAMING DET. 4 Scale: 1:25 m SCHEDULE OF DOORS 1 A7 7 of 30