1. Name: BALA CHANDAR KUMAR CHINTA
Date of Birth: 30/03/1989 Email: balachandar.chinta17@bimtech.ac.in
WORK EXPERIENCE IN MONTHS (add if any)
Company Name Designation Duration
Roles& Responsibilities
Possess2+ yearsof professional experience in developing, designing and installing
equipmentformonitoringandcontrollingengineeringsystemsinAshhandling Plant.
Knowledgeof datasheets,instrumentdrawings,I/Owiringdiagrams,PandIDs,
calculationandspecifications.
FamiliarwithISA standardsandAutoCAD
KeyAssignment/Initiatives
Erectionand Commissioningof AshhandlingPlantof Thermal Power Plantof
500MW.
Designing
ACADEMIC PROFILE
Course / Degree Year Specialization College / University / Board
Percentage
(%) / CGPA
PGDM 2017 Retail Management
BirlaInstitute of ManagementTechnology,
GreaterNoida
Graduation 2010
Instrument
Technology
AndhraUniversity,Vishakhapatnam 64.5
12th
2006 Science Gayathri Juniorcollege 90.6
10th
2004 - Mohan ConventHighSchool 83.83
INTERNSHIP/PROJECT(S) (DuringGraduation) (add if any)
Company Name Domain Area Duration
ProjectTitle Automation of expansionturbinesfor1 month in Vishakhapatnam Steel Plant
Objectives
To improve the performance of break Generators of air separation plant using
Micro ProcessorsbasedPLCLogic system
Learning
Monitoringthe processparametersfromPCPDesktopmonitorandhistorical trends.Further,it
isusedto improve accuracy,reliabilityandensuringsafe andcontinuousrunningof break
generator.
Company Name Domain Area Duration
ProjectTitle Universal Electro-Optical HybridLogic Gatesfor 6 months
Objectives
A circuitthat acceptseitherElectrical orOptical Signalstoproduce inElectrical orOptical
Signals.
Learning
These Gates are used in both Electrical and Digital competitions.
Cost of regenerationforefficientandeconomicalcomputingsystems.
2. PROJECTS UNDERTAKEN
1. Project Hariduaganj Thermal Power Plant (2X250MW) Unit 9, Uttar Pradesh
Company Name Tecpro SystemsLimited Duration 2 months
Project Title Erection of Instruments in Ash handling Systems in Thermal Power Plant using
Honeywell Master Logic 200R Series PLC
2. Project Bellary Thermal Power Station (1X500MW) Unit 2, Karnataka
Company Name Tecpro SystemsLimited Duration 2 years3 months
Project Title Erectionand Commissioning/Automation of Ash handling Systems in Thermal Power Plant
using Allen Bradley 1756-PA72/C Series PLC
3. Project Pipeline connectivity to PESPL, APGPCL & KOVVUR Terminals
Company Name Kasukurthi Sujatha Constructions Pvt Ltd. Duration 3 months
Project Title Corrections and modifications in GAD and P&ID drawings. Preparation of
Instrument index and cable schedule and Procurement of Instruments.
ACHIEVEMENTS & ACTIVITIES
Extra-Curricular&
Academics
Part of organizingcommittee of SPIKES2009 fest.
Part of organizingthe seminarin“Role of instrumentationInEnvironmental Studies”.
Memberof WorldVisionIndiaandAkshayaPatra Foundation.
CyclingClubMember.
OTHER INFORMATION
PermanentAddress: D.no:4-64, nearBalaji Apartments, SundaraNagar,Kakinada-533005
Languages Known: English,Hindi, andTelugu.