SlideShare a Scribd company logo
1 of 49
Chapter 5:
Problem and Solution
Chapter 5:
Problem & Solution
Presented by:
MACABIO, ELLEINE C.
PROJECT MANAGEMENT
Presentation Outline:
What Is a Problem?
From Problem to Project
Conclusion: Making the Solution
Work
5 Parts of a Problem:
A crisis A symptom
A
consequence
A causeA root cause
What
makes a
situation a
problem
.
..
Cause and Root cause of a Problem:
Crisis
requires
urgent
attention
.
.
Cause and Root cause of a Problem:
.
Symptom
tells us
about the
problem.
.
Cause and Root cause of a Problem:
.
.
The
consequence
of a problem is
the unwanted
results if we do
nothing
Cause and Root cause of a Problem:
.
Root cause is
the cause of
the cause
.
Cause and Root cause of a Problem:
.
.
Permanent
preventive
solution puts
an end to a
root cause.
Cause and Root cause of a Problem:
.
.
Cause and Root cause of a Problem:
What
makes a
situation a
problem
Crisis
requires
urgent
attention
Symptom
tells us
about the
problem.
The
consequence
of a problem is
the unwanted
results if we do
nothing
Root cause is
the cause of
the cause
Permanent
preventive
solution puts
an end to a
root cause.
Cause is the
center of
the
problem
What is Problem Definition tool:
Allow you to sort out the pieces of
a problem.
Example of Problem
definition
tool
3 categories to organize a
problem:
problems from your
own company, directly
under your control
problems you can influence
problems you can’t do anything
about
Picture the
solution.
Ask if you
need
information
Ask if you
need
expertise.
Maybe make
a decision.
List your
options
Here is a process for
choosing the best solution to
a problem
Problem to project:
Conclusion: Making the Solution Work
What Are
We Making?
Chapter 6
Scope of What Are We Making?
• The Steps of Defining Scope
• Write a Basic Statement of What We Are Making
• Choose a General Approach to How We Will
Make It
• Draw and Write a Detailed Description of What
We Are Making
• Write a Detailed Work Breakdown Structure
(WBS)
• Write a Detailed Action Plan
• Conclusion: A Leader with a Plan
What Are We Making?
• YOU’VE LEARNED HOW TO DEFINE DREAMS,
OPPORTUNITIES, AND PROBLEMS, IT’S TIME TO PICK
ONE PLAN AND PLAN OUT WHAT WE ARE DOING IN
DETAIL TO MAKE THIS PROJECT HAPPEN.
Defining the scope of the project
DEFINING
RESULTS PROCESS TASK
The Steps of Defining Scope
• Features
• Benefits
• A system
• Value
• A set of steps of work
• Components
The Steps of Defining Scope
1.Write a basic statement of what we are
making.
2.Choose a general approach to how we will
make it.
3. Draw and write a detailed description of
what we are making.
4. Write a detailed Work Breakdown Structure
(WBS).
5. Write a detailed action plan.
Write a Basic Statement of What We Are Making
• Requirements Elicitation
Most common challenges
• Some customers simply don’t know what they want until
they see it.
• Some customers aren’t available.
• Some customers know what they want, but can’t define it
unless we guide them.
How to do requirements elicitation in six steps:
1. Figure out who the customers are.
2. If you can, prepare a prototype, mock-up, or picture of the
product .3. Make a list of questions .4. Meet with the customers5. Write up a clear, detailed description of the product or service6. Show the results to the customers
Choose a General Approach to How We Will Make It
• DRIVER
• CONTRAINTS
Draw and Write a Detailed Description of What We Are
Making
Requirements Specification
• Complete
• Consistent
• Correct
• Feasible
• Modifiable
• Necessary
• Prioritized
• Testable
• Traceable
• Unambiguous
Write a Detailed Work Breakdown Structure (WBS)
Making a Really Good WBS
• Let each person make the WBS for the work he
or she will do. People are more committed
when they plan their own work. It also lets
everyone contribute expertise to the project.
• Walk through the WBS as a team to clarify
ideas and make improvements.
• Never copy a whole WBS because every project
is unique. But copy and modify parts of WBSs
that are similar from past projects.
Write a Detailed Action Plan
• Is each step clear? A clear step is a verb followed by a noun. For example,
“draw blueprint,” “write user instructions,” and “assemble gearbox” are all
good, clear steps.
• Is there a clear starting point? Are all the components listed? Does the worker
know where he or she will get each one?
• Is everything checked or tested as the work is done?
• Is all the work necessary to complete the whole work package included?
• Are all appropriate tests included?
• Does a walk-through show that this will get everything done?
• Is this the best way to do the job?
Chapter 7:
Planning Time
and Money
Presented by:
DELA CRZ, ARVIN DOMINIC B.
Group leader – Group 1
Project Management
Presentation Outline:
Allocating,
Estimating,
Scheduling,
and
Budgeting
Detailed
Scheduling
Detailed
Budgeting
Conclusion:
Ready to
Stay on
Track
EstimatingBudgeting
Scheduling Allocating
Allocating, Estimating,
Scheduling, and Budgeting
` What is Estimation?
A
thoughtful
guess
about the
future.
More
detailed than
estimation
Scheduling
gives us a
plan:
what job will be
done each day,
each week, until
all the work is
done.
What is Scheduling?
Gives us a
statement of
the total
amount of
work
It is
completely
separate from
estimation
which is a
measure of
what it will
take to do
the project.
What is Allocation?
It is based on
what our
business can
give to the
project.
What is Budgeting?
A plan for spending money
from the beginning
of the project to the end.
Key Concepts:
1. Keep
allocation and
estimation
separate
2. In
estimating,
avoid bias.
Bias means
leaning
one way or
the other
3. In
estimating,
be as
accurate as
possible
Key Concepts (cont’n):
4. In time
estimation,
separate
effort and
duration:
Effort is the
amount of
work,
measured in
person-hours.
Duration is the
total schedule,
from beginning
to end, in days
5. We actually
plan work, not
time and
money.
Early Estimation
The first two questions that a business
owner usually asks about a project are:
“How much will it cost?”
“How long will it take?”
Here are some steps for
preparing a good early time
estimate:
1. Complete as much of the plan as you
can.
2. Write down any decisions you haven’t
made.
3. Make a rough list of the steps that you
are going to take.
4. Put two columns next to the list—low
estimate and high estimate.
5. Add up the totals of each column to
get your low and high estimates.
Here are some steps for
preparing a good early cost
estimate:
1. Complete as much of the plan
as you can.
2. Write down any decisions you
haven’t made.
4. Make a rough list of the steps
that you are going to take.
5. Put two columns next to the list—
low estimate and high estimate.
6. Add up the totals of each column
to get your low and high estimates
3. Make a shopping
list.
The Lesson: It is a mistake to think that your time or the time of your
staff doesn’t count as money. Often, we are better off hiring an expert
to do a project and spending our time making money some other way.
Time is Money:
How do we decide how long each item on our list will take
or how much money it will cost? Here are some
approaches:
Do some research
Estimate based on the steps of a past
project
When in doubt, guess.
Detailed Scheduling
1. Make sure your
action plan is
complete and correct.
2. Resolve any open
decisions or
unanswered
questions.
3. Assign each work
package or task to a
specific person.
4. Decide if each person
will work on the project
full time or what hours
each will be available.
5. Have each person come
up with a single, final
estimate of how long
each task will take
6. Put the tasks in order.
Detailed Scheduling
7. Include time for testing each
output.
8. Allow time for things like paint drying or
ovens warming up, where no work is being
done, but time has to pass anyway. This is
called lag time.
9. Check people’s calendars for
holidays, vacation, and other work
Detailed Scheduling
10. Pick a start date and work forward, or pick an end date and
work backwards,
from the last task to the first.
11. Assign each task to a date. Include time for
status meetings, tests, gate
reviews, and rework.
12. Review the schedule with each team member, making any
changes or
corrections.
• Assign a dollar value to each
person’s time
• Add up each person’s total
time and then multiply it by
his or her hourly rate.
• Review your shopping list
against the completed WBS
and action plan
•Do some research and get actual
prices for your shopping list.
•Check for incidental expenses such
as gas, travel expenses, or lunch for
the team, and include those
•Add it all up.
Detailed Budgeting:
Conclusion: Ready to Stay on
Track
/arvindelacruz39982
Follow me on:
1. __________ tells us about the problem
2. __________ requires urgent attention.
3. ___________ is the center of the problem.
4. ___________ cause of the cause
5. ___________ allows you to sort out the pieces
of a problem.
6. ____________ list of the ways that the product/service
is good for the customer.
7. ________ short explanation of why we are doing
the project
8. _______ list of all the pieces of the product/ service.
9. _______ description of what the product or service does.
10 . _______ thoughtful guess about the future.
11. _______ This shows how all the components work together.
12. ________ - plan for spending money from the
beginning to the end.
13. _____ gives us a statement of the total amount of work
14. _____ is Money
15. ______ means leaning one way or the other
a. Root cause
b. Cause
c. Problem
Definition tool
d. Value:
e. Benefits
f. Features:
g. Components:
h. system
i. Estimation
j. Allocation
k. Budgeting
l. Bias
m. Time
n. Crisis
o. Symptom
5 parts of a Problem?
Enumeration
Thanks for
Listening

More Related Content

What's hot

File 1 removed 4 slides 2
File 1 removed 4 slides 2File 1 removed 4 slides 2
File 1 removed 4 slides 2test prod1
 
File 1 original
File 1 originalFile 1 original
File 1 originaltest prod1
 
Risk Management: Evaluate Risks in your Project
Risk Management: Evaluate Risks in your ProjectRisk Management: Evaluate Risks in your Project
Risk Management: Evaluate Risks in your ProjectGagan Gupta
 
File 1 word removed 2
File 1 word removed 2File 1 word removed 2
File 1 word removed 2test prod1
 
File 1 word removed 1
File 1 word removed 1File 1 word removed 1
File 1 word removed 1test prod1
 
File 1 removed 5 words 2
File 1 removed 5 words 2File 1 removed 5 words 2
File 1 removed 5 words 2test prod1
 
File 1 removed 1 word from 5 slides 1
File 1 removed 1 word from 5 slides 1File 1 removed 1 word from 5 slides 1
File 1 removed 1 word from 5 slides 1test prod1
 
File 1 removed 5 words 1
File 1 removed 5 words 1File 1 removed 5 words 1
File 1 removed 5 words 1test prod1
 
File 1 removed 1 word from 5 slides 2
File 1 removed 1 word from 5 slides 2File 1 removed 1 word from 5 slides 2
File 1 removed 1 word from 5 slides 2test prod1
 
Agile at enterprice level
Agile at enterprice levelAgile at enterprice level
Agile at enterprice levelJan De Baere
 
Introduction to Agile Scrum
Introduction to Agile ScrumIntroduction to Agile Scrum
Introduction to Agile ScrumHiep Luong
 
Why projects are causing your organisation staff salary costs to go up
Why projects are causing your organisation staff salary costs to go up Why projects are causing your organisation staff salary costs to go up
Why projects are causing your organisation staff salary costs to go up Barry Hodge
 
File 1 removed 4 slides 1
File 1 removed 4 slides 1File 1 removed 4 slides 1
File 1 removed 4 slides 1test prod1
 
File 1 removed slide 1
File 1 removed slide 1File 1 removed slide 1
File 1 removed slide 1test prod1
 
Time management ih Head Start
Time management ih Head StartTime management ih Head Start
Time management ih Head StartDeborah Fears
 
Project evaluation examples
Project evaluation   examplesProject evaluation   examples
Project evaluation examplesErasmus+
 
GTD for Project- and LOB managers
GTD for Project- and LOB managersGTD for Project- and LOB managers
GTD for Project- and LOB managersUPrince
 

What's hot (19)

File 1 removed 4 slides 2
File 1 removed 4 slides 2File 1 removed 4 slides 2
File 1 removed 4 slides 2
 
File 1 original
File 1 originalFile 1 original
File 1 original
 
Risk Management: Evaluate Risks in your Project
Risk Management: Evaluate Risks in your ProjectRisk Management: Evaluate Risks in your Project
Risk Management: Evaluate Risks in your Project
 
File 1 word removed 2
File 1 word removed 2File 1 word removed 2
File 1 word removed 2
 
File 1 word removed 1
File 1 word removed 1File 1 word removed 1
File 1 word removed 1
 
File 1 removed 5 words 2
File 1 removed 5 words 2File 1 removed 5 words 2
File 1 removed 5 words 2
 
File 1 removed 1 word from 5 slides 1
File 1 removed 1 word from 5 slides 1File 1 removed 1 word from 5 slides 1
File 1 removed 1 word from 5 slides 1
 
File 1 removed 5 words 1
File 1 removed 5 words 1File 1 removed 5 words 1
File 1 removed 5 words 1
 
File 1 removed 1 word from 5 slides 2
File 1 removed 1 word from 5 slides 2File 1 removed 1 word from 5 slides 2
File 1 removed 1 word from 5 slides 2
 
Agile at enterprice level
Agile at enterprice levelAgile at enterprice level
Agile at enterprice level
 
Introduction to Agile Scrum
Introduction to Agile ScrumIntroduction to Agile Scrum
Introduction to Agile Scrum
 
Scrum and DevOps training
Scrum and DevOps trainingScrum and DevOps training
Scrum and DevOps training
 
Why projects are causing your organisation staff salary costs to go up
Why projects are causing your organisation staff salary costs to go up Why projects are causing your organisation staff salary costs to go up
Why projects are causing your organisation staff salary costs to go up
 
File 1 removed 4 slides 1
File 1 removed 4 slides 1File 1 removed 4 slides 1
File 1 removed 4 slides 1
 
File 1 removed slide 1
File 1 removed slide 1File 1 removed slide 1
File 1 removed slide 1
 
Time management ih Head Start
Time management ih Head StartTime management ih Head Start
Time management ih Head Start
 
Project evaluation examples
Project evaluation   examplesProject evaluation   examples
Project evaluation examples
 
Agile planning
Agile planningAgile planning
Agile planning
 
GTD for Project- and LOB managers
GTD for Project- and LOB managersGTD for Project- and LOB managers
GTD for Project- and LOB managers
 

Similar to Chapter 5,6,7 (group 1 project man)

Chapter 5 successful problem solving & task mgt
Chapter 5   successful problem solving & task mgtChapter 5   successful problem solving & task mgt
Chapter 5 successful problem solving & task mgtNasz Zainuddin
 
Іванна Заєць: Основи ПМа (PM’s Essentials)
 Іванна Заєць: Основи ПМа (PM’s Essentials) Іванна Заєць: Основи ПМа (PM’s Essentials)
Іванна Заєць: Основи ПМа (PM’s Essentials)Lviv Startup Club
 
Projects Better Faster Cheaper
Projects Better Faster CheaperProjects Better Faster Cheaper
Projects Better Faster CheaperMELINDA KORENCHUK
 
Newdesigncycleintro 140901083345-phpapp02
Newdesigncycleintro 140901083345-phpapp02Newdesigncycleintro 140901083345-phpapp02
Newdesigncycleintro 140901083345-phpapp02ISM
 
getsmarters_project_management_playbook.pdf
getsmarters_project_management_playbook.pdfgetsmarters_project_management_playbook.pdf
getsmarters_project_management_playbook.pdfSreekrishnaPasumarth
 
New design cycle intro
New design cycle introNew design cycle intro
New design cycle introISM
 
Project Development and Management.pptx
Project Development and Management.pptxProject Development and Management.pptx
Project Development and Management.pptxJessaMaeSortonesOmoy
 
Project Management
Project ManagementProject Management
Project ManagementLean Teams
 
WRITING-PROJECT-PROPOSALS.pptx
WRITING-PROJECT-PROPOSALS.pptxWRITING-PROJECT-PROPOSALS.pptx
WRITING-PROJECT-PROPOSALS.pptxANDREANIKKAOCHIA
 
Project Planning.ppt
Project Planning.pptProject Planning.ppt
Project Planning.pptselam49
 
Designing and planning to test a new idea/product/feature
Designing and planning to test a new idea/product/featureDesigning and planning to test a new idea/product/feature
Designing and planning to test a new idea/product/featureJeremy Horn
 
component 3 moving from theory to practice.pdf
component  3 moving from theory to practice.pdfcomponent  3 moving from theory to practice.pdf
component 3 moving from theory to practice.pdfAnatole9
 
Resume Return to Basicspublic
Resume Return to BasicspublicResume Return to Basicspublic
Resume Return to BasicspublicCatherine Neary
 
Practical Steps to a Balanced Work Life
Practical Steps to a Balanced Work LifePractical Steps to a Balanced Work Life
Practical Steps to a Balanced Work LifeElijah Ezendu
 
General Project Management 2003
General Project Management 2003General Project Management 2003
General Project Management 2003Sidewinder2011
 
Brief introduction to project management and project management tools
Brief introduction to project management and project management toolsBrief introduction to project management and project management tools
Brief introduction to project management and project management toolsNathan Petralia
 

Similar to Chapter 5,6,7 (group 1 project man) (20)

Chapter 5 successful problem solving & task mgt
Chapter 5   successful problem solving & task mgtChapter 5   successful problem solving & task mgt
Chapter 5 successful problem solving & task mgt
 
Іванна Заєць: Основи ПМа (PM’s Essentials)
 Іванна Заєць: Основи ПМа (PM’s Essentials) Іванна Заєць: Основи ПМа (PM’s Essentials)
Іванна Заєць: Основи ПМа (PM’s Essentials)
 
Projects Better Faster Cheaper
Projects Better Faster CheaperProjects Better Faster Cheaper
Projects Better Faster Cheaper
 
Newdesigncycleintro 140901083345-phpapp02
Newdesigncycleintro 140901083345-phpapp02Newdesigncycleintro 140901083345-phpapp02
Newdesigncycleintro 140901083345-phpapp02
 
getsmarters_project_management_playbook.pdf
getsmarters_project_management_playbook.pdfgetsmarters_project_management_playbook.pdf
getsmarters_project_management_playbook.pdf
 
New design cycle intro
New design cycle introNew design cycle intro
New design cycle intro
 
Project Development and Management.pptx
Project Development and Management.pptxProject Development and Management.pptx
Project Development and Management.pptx
 
From Zero To Agile
From Zero To AgileFrom Zero To Agile
From Zero To Agile
 
Project Management
Project ManagementProject Management
Project Management
 
Kanban for ODDS
Kanban for ODDSKanban for ODDS
Kanban for ODDS
 
WRITING-PROJECT-PROPOSALS.pptx
WRITING-PROJECT-PROPOSALS.pptxWRITING-PROJECT-PROPOSALS.pptx
WRITING-PROJECT-PROPOSALS.pptx
 
Project Planning.ppt
Project Planning.pptProject Planning.ppt
Project Planning.ppt
 
Time management
Time managementTime management
Time management
 
Designing and planning to test a new idea/product/feature
Designing and planning to test a new idea/product/featureDesigning and planning to test a new idea/product/feature
Designing and planning to test a new idea/product/feature
 
component 3 moving from theory to practice.pdf
component  3 moving from theory to practice.pdfcomponent  3 moving from theory to practice.pdf
component 3 moving from theory to practice.pdf
 
Resume Return to Basicspublic
Resume Return to BasicspublicResume Return to Basicspublic
Resume Return to Basicspublic
 
Practical Steps to a Balanced Work Life
Practical Steps to a Balanced Work LifePractical Steps to a Balanced Work Life
Practical Steps to a Balanced Work Life
 
General Project Management 2003
General Project Management 2003General Project Management 2003
General Project Management 2003
 
Brief introduction to project management and project management tools
Brief introduction to project management and project management toolsBrief introduction to project management and project management tools
Brief introduction to project management and project management tools
 
Advertising 101
Advertising 101Advertising 101
Advertising 101
 

More from Arvin Dela Cruz

Duterte cabinet secretary
Duterte cabinet secretaryDuterte cabinet secretary
Duterte cabinet secretaryArvin Dela Cruz
 
Chapter 14: Rizal in London
Chapter 14: Rizal in LondonChapter 14: Rizal in London
Chapter 14: Rizal in LondonArvin Dela Cruz
 
Macabio chapter5 projectmanagement
Macabio chapter5 projectmanagementMacabio chapter5 projectmanagement
Macabio chapter5 projectmanagementArvin Dela Cruz
 
Report in ECOLRT gdp and gnp
Report in ECOLRT gdp and gnpReport in ECOLRT gdp and gnp
Report in ECOLRT gdp and gnpArvin Dela Cruz
 
Ecolrt handouts (group 6)
Ecolrt handouts (group 6)Ecolrt handouts (group 6)
Ecolrt handouts (group 6)Arvin Dela Cruz
 
Recommendation letter uphsd
Recommendation letter uphsdRecommendation letter uphsd
Recommendation letter uphsdArvin Dela Cruz
 

More from Arvin Dela Cruz (10)

Duterte cabinet secretary
Duterte cabinet secretaryDuterte cabinet secretary
Duterte cabinet secretary
 
Chapter 14: Rizal in London
Chapter 14: Rizal in LondonChapter 14: Rizal in London
Chapter 14: Rizal in London
 
Macabio chapter5 projectmanagement
Macabio chapter5 projectmanagementMacabio chapter5 projectmanagement
Macabio chapter5 projectmanagement
 
Techno delacruz report
Techno delacruz reportTechno delacruz report
Techno delacruz report
 
Rizal's Exile dapitan
Rizal's Exile dapitanRizal's Exile dapitan
Rizal's Exile dapitan
 
Report in ECOLRT gdp and gnp
Report in ECOLRT gdp and gnpReport in ECOLRT gdp and gnp
Report in ECOLRT gdp and gnp
 
Ecolrt handouts (group 6)
Ecolrt handouts (group 6)Ecolrt handouts (group 6)
Ecolrt handouts (group 6)
 
Recommendation letter uphsd
Recommendation letter uphsdRecommendation letter uphsd
Recommendation letter uphsd
 
Technical presentation
Technical presentationTechnical presentation
Technical presentation
 
Ojt Narrative Report
Ojt Narrative ReportOjt Narrative Report
Ojt Narrative Report
 

Recently uploaded

Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 

Recently uploaded (20)

Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 

Chapter 5,6,7 (group 1 project man)

  • 1. Chapter 5: Problem and Solution Chapter 5: Problem & Solution Presented by: MACABIO, ELLEINE C. PROJECT MANAGEMENT
  • 2. Presentation Outline: What Is a Problem? From Problem to Project Conclusion: Making the Solution Work
  • 3. 5 Parts of a Problem: A crisis A symptom A consequence A causeA root cause
  • 4. What makes a situation a problem . .. Cause and Root cause of a Problem:
  • 6. . Symptom tells us about the problem. . Cause and Root cause of a Problem:
  • 7. . . The consequence of a problem is the unwanted results if we do nothing Cause and Root cause of a Problem:
  • 8. . Root cause is the cause of the cause . Cause and Root cause of a Problem:
  • 9. . . Permanent preventive solution puts an end to a root cause. Cause and Root cause of a Problem:
  • 10. . . Cause and Root cause of a Problem: What makes a situation a problem Crisis requires urgent attention Symptom tells us about the problem. The consequence of a problem is the unwanted results if we do nothing Root cause is the cause of the cause Permanent preventive solution puts an end to a root cause. Cause is the center of the problem
  • 11. What is Problem Definition tool: Allow you to sort out the pieces of a problem. Example of Problem definition tool
  • 12. 3 categories to organize a problem: problems from your own company, directly under your control problems you can influence problems you can’t do anything about
  • 13. Picture the solution. Ask if you need information Ask if you need expertise. Maybe make a decision. List your options Here is a process for choosing the best solution to a problem Problem to project:
  • 14. Conclusion: Making the Solution Work
  • 16. Scope of What Are We Making? • The Steps of Defining Scope • Write a Basic Statement of What We Are Making • Choose a General Approach to How We Will Make It • Draw and Write a Detailed Description of What We Are Making • Write a Detailed Work Breakdown Structure (WBS) • Write a Detailed Action Plan • Conclusion: A Leader with a Plan
  • 17. What Are We Making? • YOU’VE LEARNED HOW TO DEFINE DREAMS, OPPORTUNITIES, AND PROBLEMS, IT’S TIME TO PICK ONE PLAN AND PLAN OUT WHAT WE ARE DOING IN DETAIL TO MAKE THIS PROJECT HAPPEN. Defining the scope of the project DEFINING RESULTS PROCESS TASK
  • 18. The Steps of Defining Scope • Features • Benefits • A system • Value • A set of steps of work • Components
  • 19. The Steps of Defining Scope 1.Write a basic statement of what we are making. 2.Choose a general approach to how we will make it. 3. Draw and write a detailed description of what we are making. 4. Write a detailed Work Breakdown Structure (WBS). 5. Write a detailed action plan.
  • 20. Write a Basic Statement of What We Are Making • Requirements Elicitation
  • 21. Most common challenges • Some customers simply don’t know what they want until they see it. • Some customers aren’t available. • Some customers know what they want, but can’t define it unless we guide them.
  • 22. How to do requirements elicitation in six steps: 1. Figure out who the customers are. 2. If you can, prepare a prototype, mock-up, or picture of the product .3. Make a list of questions .4. Meet with the customers5. Write up a clear, detailed description of the product or service6. Show the results to the customers
  • 23. Choose a General Approach to How We Will Make It • DRIVER • CONTRAINTS
  • 24. Draw and Write a Detailed Description of What We Are Making Requirements Specification • Complete • Consistent • Correct • Feasible • Modifiable • Necessary • Prioritized • Testable • Traceable • Unambiguous
  • 25. Write a Detailed Work Breakdown Structure (WBS) Making a Really Good WBS • Let each person make the WBS for the work he or she will do. People are more committed when they plan their own work. It also lets everyone contribute expertise to the project. • Walk through the WBS as a team to clarify ideas and make improvements. • Never copy a whole WBS because every project is unique. But copy and modify parts of WBSs that are similar from past projects.
  • 26. Write a Detailed Action Plan • Is each step clear? A clear step is a verb followed by a noun. For example, “draw blueprint,” “write user instructions,” and “assemble gearbox” are all good, clear steps. • Is there a clear starting point? Are all the components listed? Does the worker know where he or she will get each one? • Is everything checked or tested as the work is done? • Is all the work necessary to complete the whole work package included? • Are all appropriate tests included? • Does a walk-through show that this will get everything done? • Is this the best way to do the job?
  • 27. Chapter 7: Planning Time and Money Presented by: DELA CRZ, ARVIN DOMINIC B. Group leader – Group 1 Project Management
  • 30. ` What is Estimation? A thoughtful guess about the future.
  • 31. More detailed than estimation Scheduling gives us a plan: what job will be done each day, each week, until all the work is done. What is Scheduling?
  • 32. Gives us a statement of the total amount of work It is completely separate from estimation which is a measure of what it will take to do the project. What is Allocation? It is based on what our business can give to the project.
  • 33. What is Budgeting? A plan for spending money from the beginning of the project to the end.
  • 34. Key Concepts: 1. Keep allocation and estimation separate 2. In estimating, avoid bias. Bias means leaning one way or the other 3. In estimating, be as accurate as possible
  • 35. Key Concepts (cont’n): 4. In time estimation, separate effort and duration: Effort is the amount of work, measured in person-hours. Duration is the total schedule, from beginning to end, in days 5. We actually plan work, not time and money.
  • 36. Early Estimation The first two questions that a business owner usually asks about a project are: “How much will it cost?” “How long will it take?”
  • 37. Here are some steps for preparing a good early time estimate: 1. Complete as much of the plan as you can. 2. Write down any decisions you haven’t made. 3. Make a rough list of the steps that you are going to take. 4. Put two columns next to the list—low estimate and high estimate. 5. Add up the totals of each column to get your low and high estimates.
  • 38. Here are some steps for preparing a good early cost estimate: 1. Complete as much of the plan as you can. 2. Write down any decisions you haven’t made. 4. Make a rough list of the steps that you are going to take. 5. Put two columns next to the list— low estimate and high estimate. 6. Add up the totals of each column to get your low and high estimates 3. Make a shopping list.
  • 39. The Lesson: It is a mistake to think that your time or the time of your staff doesn’t count as money. Often, we are better off hiring an expert to do a project and spending our time making money some other way. Time is Money:
  • 40. How do we decide how long each item on our list will take or how much money it will cost? Here are some approaches: Do some research Estimate based on the steps of a past project When in doubt, guess.
  • 41. Detailed Scheduling 1. Make sure your action plan is complete and correct. 2. Resolve any open decisions or unanswered questions. 3. Assign each work package or task to a specific person. 4. Decide if each person will work on the project full time or what hours each will be available. 5. Have each person come up with a single, final estimate of how long each task will take 6. Put the tasks in order.
  • 42. Detailed Scheduling 7. Include time for testing each output. 8. Allow time for things like paint drying or ovens warming up, where no work is being done, but time has to pass anyway. This is called lag time. 9. Check people’s calendars for holidays, vacation, and other work
  • 43. Detailed Scheduling 10. Pick a start date and work forward, or pick an end date and work backwards, from the last task to the first. 11. Assign each task to a date. Include time for status meetings, tests, gate reviews, and rework. 12. Review the schedule with each team member, making any changes or corrections.
  • 44. • Assign a dollar value to each person’s time • Add up each person’s total time and then multiply it by his or her hourly rate. • Review your shopping list against the completed WBS and action plan •Do some research and get actual prices for your shopping list. •Check for incidental expenses such as gas, travel expenses, or lunch for the team, and include those •Add it all up. Detailed Budgeting:
  • 45. Conclusion: Ready to Stay on Track
  • 47. 1. __________ tells us about the problem 2. __________ requires urgent attention. 3. ___________ is the center of the problem. 4. ___________ cause of the cause 5. ___________ allows you to sort out the pieces of a problem. 6. ____________ list of the ways that the product/service is good for the customer. 7. ________ short explanation of why we are doing the project 8. _______ list of all the pieces of the product/ service. 9. _______ description of what the product or service does. 10 . _______ thoughtful guess about the future. 11. _______ This shows how all the components work together. 12. ________ - plan for spending money from the beginning to the end. 13. _____ gives us a statement of the total amount of work 14. _____ is Money 15. ______ means leaning one way or the other a. Root cause b. Cause c. Problem Definition tool d. Value: e. Benefits f. Features: g. Components: h. system i. Estimation j. Allocation k. Budgeting l. Bias m. Time n. Crisis o. Symptom
  • 48. 5 parts of a Problem? Enumeration

Editor's Notes

  1. It is a major unpredictable event that ……threatens to harm an operation, staff and customers of an organization…Can strike any time and during this situation it tends to be – Confusion, uncertainty and fear
  2. The Project Management Institute calls this defining the scope of the project (Scope planning includes defining all that we are making and clarifying what we are not making) When we are done planning scope, we should have a clear picture of what we are making. Once we know what we are making, we can define how we will make it—that is, we move from describing results to describing the steps of the process, the tasks that will get the work done.
  3. In defining scope, it is good to explain what we are doing in many different ways. Here are several ways of describing a product or service—the results of our project—and how we might make use of those descriptions: Value: A short explanation of why we are doing the project, of the benefit it will bring to customer and company. This one sentence justification of the project makes sure we get commitment to the project. Benefits: A list of the ways that the product or service is good for the customer. This helps with marketing and sales. Features: A description of what the product or service does. This helps the customer decide if it is right for him or her. Components: A list of all the pieces of the product or service. This helps define all the steps of work we will do. A system: This shows how all the components work together. This is useful for testing and also for future repairs or modifications. A set of steps of work: This is the to-do list for our project. This is the core of the project plan that will allow us to estimate time, cost, and other factors. The Lesson: A complete description of our project and product will make sense to everyone and give us everything we need to plan a path to success.
  4. The Steps of Defining Scope Here are the steps of defining scope, from the big picture down to the details. 1. Write a basic statement of what we are making. 2. Choose a general approach to how we will make it. 3. Draw and write a detailed description of what we are making. 4. Write a detailed Work Breakdown Structure (WBS). 5. Write a detailed .
  5. If you are doing a project for a customer, then you need to take a different approach, called requirements elicitation. To put it simply, requirements elicitation means finding out what your customers want - in detail. We have to figure out who our customers are meet with them, ask questions, and write up the answer. Once we write up the answer, we show it to the customers—and anyone else who cares—and makes sure that everyone understands and agrees with what we are doing.
  6. Requirements elicitation isn’t easy. Here are some of the most common challenges: Some customers simply don’t know what they want until they see it and don’t know what will work for them until they try it out and use it. _ Some customers aren’t available. If we are developing a product or service for sale, we don’t even know who our customers will be. We need to either let a marketing department be a substitute for our customers or develop some kind of a customer focus group. _ Some customers know what they want, but can’t define it unless we guide them through the process of describing the product or service, its functionality, and its value step by step.
  7. To define project requirements, we’re going to have to find the customers and guide them through the process of telling us what will be good for them. Here is how to do requirements elicitation in six steps:   1. Figure out who the customers are. If there is more than one group of customers and they have different needs, answer each of the rest of the questions for each customer group. 2. If you can, prepare a prototype, mock-up, or picture of the product so that the customers can look at it, play with it, and tell you what they think. 3. Make a list of questions that you want your customers to answer. 4. Meet with the customers, show them what you’ve got, ask your questions, and write down everything. You may want to meet with them more than once. 5. Write up a clear, detailed description of the product or service, based on your notes from the customer meetings.   6. Show the results to the customers and get their approval before you launch the project.
  8. Choosing the wrong approach can turn a project into a disaster. For example, many homeowners and small business owners think that they can do something as well as a professional can and save some money by doing it themselves. Most of the time, that doesn’t work. If it could be done better and cheaper, a professional would already know how! So it is best to either use the best—hire an expert—or learn from the best before you do it yourself. In planning the basic approach, you’ll decide whether you’re fixing something old or making something new and whether you’re using your own team, bringing in an expert to work with you, or contracting the job out entirely. In addition, there are two other important decisions to make—you need to define your driver and list the constraints on the project. A driver is the single, most important direction on a project. Since my company is called Quality Technology & Instruction, quality—making each book and course as good as it can be—is the main driver on most of my projects. Other companies might focus on speed (getting the job done as soon as possible) or cost (doing it as inexpensively as possible). For each project, you choose one driver.   After you choose a driver, write up a list of constraints. A constraint is a limit on the project. For example, if the driver is quality, we might say, “Make it as good as possible, as long as it is done by the end of the year and costs under $2,000.” In that case, the time limit and cost limit are constraints.
  9. Now you are ready to write a detailed description of the product, service, or result of your project. Each detail you don’t write down now will take ten times longer when, in the middle of the project, you have to stop work and figure out what you are doing. As we discussed in Chapter 1, the best project managers plan most thoroughly. A complete, detailed plan is essential when life is on the line, but it also pays off on any project. The Institute of Electrical and Electronics Engineers has written an excellent description of a good requirements specification. It has these qualities: _ Complete. The whole scope is there. _ Consistent. It doesn’t contradict itself. _ Correct. It contains no errors and accurately represents user requirements. _ Feasible. It can be accomplished within the time, cost, and other constraints of the project. _ Modifiable. It can be revised without getting scrambled. _ Necessary. All the information is needed for the project. _ Prioritized. Items are identified as required or, if not required, given an order of priority, so that if scope has to be reduced, we know which items to cut first. _ Testable. The items are defined well enough that the project team and/or the user can look at each of them and say if the product meets the requirement. _ Traceable. Each detail of each requirement can be traced to the customer who requested it, to each module and feature necessary for its implementation, and to its place(s) in the Work Breakdown Structure, the activity list, project plans, tests, and other records of project activity. _ Unambiguous. Each element of the specification has only one reasonable interpretation. Although the IEEE recommended these specifically for software design specifications (in document 803.1993), I find that it helps to review any specification and every project-planning document with these qualities in mind.
  10. A Work Breakdown Structure is a detailed list of all the parts of our product or service. For example, the WBS for an airplane would list one fuselage, two wings, some engines, a tail, some controls, seats, so forth and so on. The WBS includes all of the items that go into the product and only those items. It is a hierarchical list, so the detail of an engine would have a housing, a block, cylinders, pistons, and so forth. The lowest-level items in a WBS are called work packages. When we make each work package right and put it all together and test it, our project will be complete. Creating the WBS has helped us make the crucial transition from what we are making to how we will make it.
  11. In writing the WBS, we went from the top—the big picture of the whole thing we are making—down to the bottom—to each work package that describes a small, manageable part of the whole project. That is called top-down design, and it is the best way to bring a project under management. Now, we’re going to complete our work plan by going from the bottom up. We start with each detail—each work package—and ask, “How will I make this?” If you’re working with other people on the project, assign each work package to a team member. Then say, “Write down how you’re going to make this and to test it to make sure it works.” Each person should create an action plan for each work package and you should read and review them all. When you review each work package, here’s what you should check: _ Is each step clear? A clear step is a verb followed by a noun. For example, “draw blueprint,” “write user instructions,” and “assemble gearbox” are all good, clear steps. _ Is there a clear starting point? Are all the components listed? Does the worker know where he or she will get each one? _ Is everything checked or tested as the work is done? _ Is all the work necessary to complete the whole work package included? _ Are all appropriate tests included? _ Does a walk-through show that this will get everything done? _ Is this the best way to do the job? Working as a team, keep improving the action plan until you see that every step is written down, so that each work package will be complete and correct. Then add work packages for assembling components and testing everything as the parts come together and then more tests when it is all assembled. Be sure to include action plans for project management, such as weekly status meetings, and quality management, such as end-user testing to ensure customer delight. When the WBS and action plan are complete, you are ready to create a detailed estimate of the time and cost, finish planning, and launch the project.
  12. this chapter, we’ll look at the basic concepts of estimating and planning time and money. Then we’ll look at detailed scheduling and preparing a budget so that you can be ready to keep track of your work, time, and money as the project moves ahead.
  13. These are the major topic will cover my presentation
  14. The first topic is about Allocating, Scheduling, Budgeting and Estimating
  15. Estimate is a guess, assumption, assuming, assessment, measure, opinion or prediction Dahil sa estimation naging mas makatotohanan habang ang project ay umuusad , dahil ang mahahalagang isyu ay natuklasan nang mas maaga .
  16. Dahil sa pag-iiskedyul , maaari mong kumpletuhin ang proyekto sa oras o sa deadline nito…. Pinipigilan nito ang isang overload skedyul na trabaho o project.
  17. Upang maisalarawan ang halaga ng trabaho, maaari kaming gumamit ng isang pie chart / pie grapgh Allocation ay tungkol sa distributing, allotment, sharing or assigning of resources such as time, money and activites.
  18. Ang budgeting o pagbabadyet ay pagbabalanse ng iyong mga gastos sa iyong kita . Kung hindi mo babalansehin at gumastos ka ng higit sa kailangan mo , ay magkakaroon ka ng pinansyal na problema. Maraming mga tao ang hindi maunawaan na sila ay gumagasta ng pera o resources sa kanillang project kaya sa bandang huli sila ay nalulugi o na-babankcrupt.
  19. Kung magpaplano ihiwalay ang allocation sa estimation. Dahil ang estimation ay hindi accurate para sa bawat application at mayroon itong isang panganib ng hindi natutugunan ang badyet o iskedyul. Bias means pagkiling, pagkampi o may pinapaboran. “walang kinikilingan walang pinoprotektahan serbisyong totoo lamang” The accuracy of factual information can help you judge the credibility of the project. Accuracy of information can also provide clues to possible bias in the resource under investigation.
  20. Sa pag-estimate ng time, kailangan i-separate o ibukod ang effort sa time. Dahil ang effort ay nasusukat lamang per hour habang ang duration ay nasusukat per days. 5. Dapat na pagtuunan ng pansin ang pagtrabaho sa project at hindi sa oras at pera.
  21. “How much it will cost?” Magkano ba ang gagasutsin sa project? Mura ba o Mahal? “How long it will take?” Gaano ba katagal aabutin bago matapos ang isang project? Aabutin ba ito ng ilang araw, ilang linggo, buwan ba o taon
  22. The more plan you accomplished, the better Isulat ang anumang mga desisyon hindi mo pa nagawa. Gumawa ng isang listahan ng mga hakbang na gagwin. Ilagay ang dalawang mga hanay sa tabi ng pagtantya listahan – ilagay kung low estimate o high estimate 5. Magdagdag ng total o kabuuan sa bawat haligi o column upang makuha ang total ng mababa at mataas na mga pagtatantya.
  23. Ang kaibahan lang ng cost estimate sa time estimate sa naunang slide ay pagkakaroon ng shopping list.
  24. Time is more valuable than money because you cannot revert time and the money available today is worth more than the same amount of money in the future.
  25. 2. Ang step 2 ay napakahalaga lalo nasa kasabihang “History repeats itself” means things which have happenned in the past are bound to happen again sometime in the future. kaya kailangan nating matuto sa mga nakalipas na pinagdaan kung bakit ag project ay hindi nag-success. 3. Kung hindi sigurado, kung may duda, pangamba, alinlangan at pagaatubili, ay manghula na lamang. Itong step 3 ay ginagawa lamang kung wala ng ibang available options at kung ang project ay nasa malubha ng kalagayan.
  26. Siguraduhin na ang iyong plano sa pagkilos ay kumpleto at tama. Lutasin ang anumang hindi siguradong desisyon o hindi nasagot na tanong Mag-assign ng trabaho o activity sa mga taong gagawa ng project. Siguraduhing kung kayang gawin ng taong in-assign ang project at kung available ba siya sa oras a in-assign Magkaroon ng huling estimation o conclusion sa gagawing project, Gawing systematiko at organisadong ang mga activities na gagawin. Mas mabuti kung gagawa ng schedule or gantt chart para ditto.
  27. 7. Bigyang prioridad ang oras para sa pagsasagawa ng testing 8. Magkaroon ng lag time o tagal ng panahon sa pagitan ng gawin na kung saan walang trabahong ginagawa. 9. i- consider ang mga special occasion at holidays