Project Management is the dynamic process that
utilizes the appropriate resources of the organization
in a controlled and structured manner, to achieve
some clearly defined objectives identified as strategic
needs. It is always conducted within a defined set of
constraints.
8/7/2014 Gagan Gupta
Planning
Implementation
Monitoring &
Control
Evaluation
8/7/2014 Gagan Gupta
• A Project is considered as Failure……
Whenever a project
doesn’t meet to the
expectation of the
Stakeholders.
8/7/2014 Gagan Gupta
• Cost & Time Over-runs
• Quality Degradation
• Frustration & Stress: sometime resulting in people
quitting
• Low Job Satisfaction
• Low Corporate Market Value
• Low Public Opinion
• Negative Media Campaigns
• May even force the company into Closure
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
Also Known as “You’d like it, just a bit bigger.
No Problem.”
Oh Still a bit Bigger……. OK
Even Bigger? It wasn’t in the plan but Okay….
8/7/2014 Gagan Gupta
When Scope creeps, the end
results is always more work
than expected.
• Problems:
– The changes that were not initially planned for, are added to project.
– The Project takes longer and costs more than planned and there is no
record of WHY??
• Causes:
– Not having a method to handle or recognize changes.
• What to do:
– Document the change management process to be used and followed
by Project Team.
– Educate the project Team to recognize a change or deviation from the
Plan.
– Follow the Change Management Process.
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
• Problems:
– Team Members do not have the information they need when they
need it.
– Issues or changes do not get escalated.
– Project reporting is sluggish
• Causes:
– The project’s communication plan was not completed.
– The project’s communication plan doesn’t have enough details.
• What to do:
– Find out the communication requirements of all team members, and
stakeholders, then document them in a common plan, and then follow
the Plan.
8/7/2014 Gagan Gupta
• You do not have enough people, the right skill-sets, or the
team is not committed to the projects.
• Problems:
– Tasks take longer than expected
to complete.
– Deadlines and milestones get
missed.
– Project completion date comes
into jeopardy.
– You end up working double shifts to
complete all the works.
• Causes:
– There was no pre-commitment of resources to the projects.
– The Project was not supported.
– There was no analysis and documentation of all skill-set required.
• What to do:
– Get executives Sponsorship for the project.
– Document which resources and skill-sets are needed to get the job
done.
– Create a plan that gives enough time to get the job done with the
allocated resources.
– Pre-assign the required resources to the team.
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
• “I would like a set of stairs that leads up to a bridge.”
• Problems:
– Customer will be unhappy.
– Customer will complain and you will end up doing the what they want-
at your expense.
• Causes:
– What the customer wants, was not clearly documented.
– What you believe the customer wants is different that what the
customer believes they have asked for?
• What to do:
– Find out and document exactly what the customer wants.
– Inform everybody of the project scope.
– Document Business, Functional and technical requirements.
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
• How do you figure out how long the project will take?
• Problems:
– An unrealistic timeline or budget will be agreed to.
– You will not be able to do all the work in the time allocated.
• Causes:
– No formal estimating method
– Estimate confidence is law.
– Volume of work not understood
• What to do:
– List all the work as well as possible.
– Estimate each work package.
– Add up all work packages.
– Always give answer using a range of dates
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
• Sorry about the project, I left it in my car & there was a bit of
an incidents.
• Problems:
– Unexpected events cause delays.
– Domino effect of thing going wrong.
• Causes:
– No Formal Risk Management.
– Just try to predict the big things that can go wrong.
– It’s the sum of the all little things that make a project late.
– Nothing is more stressful than trying to keep on schedule when
unexpected things keep happening.
• What to do:
– List all the work as well as possible.
– Figure out what can go wrong with each piece of work.
– Prioritize each risk as High/ Medium/ Low Probability or impact.
– Sort the list.
– Create a plan to deal with the risks at the top of list.
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
• “Emergency Phone installed, Deliverable completed”
• Problems:
– Difficult to get the agreement that the product is finished.
– Customer Keep wanting more, saying you didn’t do it to their
Specification.
• Causes:
– The Milestones or deliverables were not measurable.
– The customer never told us How many they wanted So we just
assumed 1,
• What to do:
– Ensure Milestones or Deliverables are:
Clearly Defined
Measurable (Quantifiable)
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
• Of course we Can do that for you.
• Problems:
– There was little or no planning before deciding you can get the job
done.
– The task you agree to turns out to be more work than expected.
– It takes you longer and jeopardizes other deliverables.
• g to use a passage of Lorem Ipsum, you need to
be sure there isn't anything embarrassing hidden
in the ard McClintock, a Latin professor at
Hampden-Sydney College in Virginia, looked up
one of the more obscure Latin words,
consectetur, from a Lorem Ipsum passage, and
going through the cites of the word in classical
literature, discovered the undoubtable source.
Lorem Ipsum comes from sections 1.10.32 and
1.10.33 of "de Finibus Bonorum et Malorum"
(The Extremes of
8/7/2014 Gagan Gupta
• g to use a passage of Lorem Ipsum, you need
to be sure there isn't anything embarrassing
hidden in the middle of text. All the Lorem
Ipsum generators on the Internet tend to
repeat predefined chunks as necessary,
making this the first true
8/7/2014 Gagan Gupta
• Ipsum passage, and going through the cites of
the word in classical literature, discovered the
undoubtable source. Lorem Ipsum comes
from sections 1.10.32 and 1.10.33 of "de
Finibus Bonorum et Malorum" (The Extremes
of Good and Evil) by Cicero, written in 45 BC.
This book is
8/7/2014 Gagan Gupta
• Richard McClintock, a Latin professor at
Hampden-Sydney College in Virginia, looked
up one of the more obscure Latin words,
consectetur, from
8/7/2014 Gagan Gupta
• Causes:
– Not enough time spent planning.
– You may have been pressured into giving an answer right then and
there.
– Didn’t have a full understanding of the work involved before
committing.
• What to do:
– Take the time to fully understand the work before agreeing to it.
– Its okay to say the work is not possible or will take too long
– Only agree to work when you’re sure it can be done, this will benefit
you and your managers.
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
• Hurry .... We have a tight deadline. No time to plan. Just start digging.
• Problems:
– The plan is flawed from the start.
– The project gets out of control and can’t be recovered.
• Causes:
– You have to do the work and weren’t also given time for project
management.
– Perhaps you only have 10% or 20% allotment for the project
management duties.
• What to do:
– Planning a project is like setting out a roadmap. Without it you will
likely get lost.
– Controlling a project is like driving a car. You have to continuously
watch the road (the Plan) and make little adjustments.
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
• I think I know how this helmet goes on. I have been riding scooters for two
years now.
• Problems:
– Your project don’t finish on time.
– Your project are always squeezed at the end.
– Your project are stressful.
– You have to deal with unrealistic expectation or customers.
– You feel your projects are out of control.
• Causes:
– People often don’t know what they don’t know.
– Their project are out of control but they don’t know WHY??
– They feel they are doing okay but could benefit from formal project
management education.
• What to do:
– Learn the methods, tools, and techniques successful Project manager
use to initiate, plan, execute and control their projects.
8/7/2014 Gagan Gupta
8/7/2014 Gagan Gupta
Presented by Gagan Gupta

More Related Content

What's hot

File 1 word removed 2
File 1 word removed 2File 1 word removed 2
File 1 word removed 2test prod1
 
File 1 removed 5 words 1
File 1 removed 5 words 1File 1 removed 5 words 1
File 1 removed 5 words 1test prod1
 
Risk Management: Evaluate Risks in your Project
Risk Management: Evaluate Risks in your ProjectRisk Management: Evaluate Risks in your Project
Risk Management: Evaluate Risks in your ProjectGagan Gupta
 
File 1 word removed 1
File 1 word removed 1File 1 word removed 1
File 1 word removed 1test prod1
 
File 1 removed 1 word from 5 slides 2
File 1 removed 1 word from 5 slides 2File 1 removed 1 word from 5 slides 2
File 1 removed 1 word from 5 slides 2test prod1
 
File 1 removed slide 1
File 1 removed slide 1File 1 removed slide 1
File 1 removed slide 1test prod1
 
File 1 removed 4 slides 2
File 1 removed 4 slides 2File 1 removed 4 slides 2
File 1 removed 4 slides 2test prod1
 
Relationship Business-Projects-Operations
Relationship Business-Projects-OperationsRelationship Business-Projects-Operations
Relationship Business-Projects-OperationsHari Thapliyal
 
Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)Arvin Dela Cruz
 
Software Project Estimation Survival Guide
Software Project Estimation Survival GuideSoftware Project Estimation Survival Guide
Software Project Estimation Survival Guidemichaelcummings
 
Agile estimation and planning peter saddington
Agile estimation and planning  peter saddingtonAgile estimation and planning  peter saddington
Agile estimation and planning peter saddingtonPeter Saddington
 
Estimating software development
Estimating software developmentEstimating software development
Estimating software developmentJane Prusakova
 
Why projects are causing your organisation staff salary costs to go up
Why projects are causing your organisation staff salary costs to go up Why projects are causing your organisation staff salary costs to go up
Why projects are causing your organisation staff salary costs to go up Barry Hodge
 
Project Management Paper
Project Management PaperProject Management Paper
Project Management PaperNick Vangeli
 

What's hot (18)

File 1 word removed 2
File 1 word removed 2File 1 word removed 2
File 1 word removed 2
 
File 1 removed 5 words 1
File 1 removed 5 words 1File 1 removed 5 words 1
File 1 removed 5 words 1
 
Risk Management: Evaluate Risks in your Project
Risk Management: Evaluate Risks in your ProjectRisk Management: Evaluate Risks in your Project
Risk Management: Evaluate Risks in your Project
 
File 1 word removed 1
File 1 word removed 1File 1 word removed 1
File 1 word removed 1
 
File 1 removed 1 word from 5 slides 2
File 1 removed 1 word from 5 slides 2File 1 removed 1 word from 5 slides 2
File 1 removed 1 word from 5 slides 2
 
File 1 removed slide 1
File 1 removed slide 1File 1 removed slide 1
File 1 removed slide 1
 
File 1 removed 4 slides 2
File 1 removed 4 slides 2File 1 removed 4 slides 2
File 1 removed 4 slides 2
 
Relationship Business-Projects-Operations
Relationship Business-Projects-OperationsRelationship Business-Projects-Operations
Relationship Business-Projects-Operations
 
7. fmp evaluation
7. fmp evaluation7. fmp evaluation
7. fmp evaluation
 
Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)
 
Software Project Estimation Survival Guide
Software Project Estimation Survival GuideSoftware Project Estimation Survival Guide
Software Project Estimation Survival Guide
 
B leach
B leachB leach
B leach
 
Agile UX
Agile UXAgile UX
Agile UX
 
Agile estimation and planning peter saddington
Agile estimation and planning  peter saddingtonAgile estimation and planning  peter saddington
Agile estimation and planning peter saddington
 
Estimating software development
Estimating software developmentEstimating software development
Estimating software development
 
Why projects are causing your organisation staff salary costs to go up
Why projects are causing your organisation staff salary costs to go up Why projects are causing your organisation staff salary costs to go up
Why projects are causing your organisation staff salary costs to go up
 
agile_flow
agile_flowagile_flow
agile_flow
 
Project Management Paper
Project Management PaperProject Management Paper
Project Management Paper
 

Viewers also liked

File 2 removed 1 word from 5 slides 1
File 2 removed 1 word from 5 slides 1File 2 removed 1 word from 5 slides 1
File 2 removed 1 word from 5 slides 1test prod1
 
File 3 extra slide 1
File 3 extra slide 1File 3 extra slide 1
File 3 extra slide 1test prod1
 
File 4 original
File 4 originalFile 4 original
File 4 originaltest prod1
 
File 3 removed 5 words 1
File 3 removed 5 words 1File 3 removed 5 words 1
File 3 removed 5 words 1test prod1
 
File 4 removed 1 slide 2
File 4 removed 1 slide 2File 4 removed 1 slide 2
File 4 removed 1 slide 2test prod1
 
File 3 removed 4 slides 1
File 3 removed 4 slides 1File 3 removed 4 slides 1
File 3 removed 4 slides 1test prod1
 
File 2 extra slide 2
File 2 extra slide 2File 2 extra slide 2
File 2 extra slide 2test prod1
 
File 3 removed 1 word 1
File 3 removed 1 word 1File 3 removed 1 word 1
File 3 removed 1 word 1test prod1
 
File 4 removed 4 slides 1
File 4 removed 4 slides 1File 4 removed 4 slides 1
File 4 removed 4 slides 1test prod1
 
File 2 removed 4 slides 1
File 2 removed 4 slides 1File 2 removed 4 slides 1
File 2 removed 4 slides 1test prod1
 
File 5 original copy 2
File 5 original  copy 2File 5 original  copy 2
File 5 original copy 2test prod1
 
File 5 removed 4 slides 2
File 5 removed 4 slides 2File 5 removed 4 slides 2
File 5 removed 4 slides 2test prod1
 
File 4 removed 1 word from 5 slides 1
File 4 removed 1 word from 5 slides 1File 4 removed 1 word from 5 slides 1
File 4 removed 1 word from 5 slides 1test prod1
 
File 3 removed 1 word from 5 slides 1
File 3 removed 1 word from 5 slides 1File 3 removed 1 word from 5 slides 1
File 3 removed 1 word from 5 slides 1test prod1
 
File 5 extra four slides 2
File 5 extra four slides 2File 5 extra four slides 2
File 5 extra four slides 2test prod1
 
File 4 removed 5 words 1
File 4 removed 5 words 1File 4 removed 5 words 1
File 4 removed 5 words 1test prod1
 
File 5 removed 1 slide 2
File 5 removed 1 slide 2File 5 removed 1 slide 2
File 5 removed 1 slide 2test prod1
 

Viewers also liked (18)

File 2 removed 1 word from 5 slides 1
File 2 removed 1 word from 5 slides 1File 2 removed 1 word from 5 slides 1
File 2 removed 1 word from 5 slides 1
 
File 3 extra slide 1
File 3 extra slide 1File 3 extra slide 1
File 3 extra slide 1
 
File 4 original
File 4 originalFile 4 original
File 4 original
 
File 3 removed 5 words 1
File 3 removed 5 words 1File 3 removed 5 words 1
File 3 removed 5 words 1
 
File 4 removed 1 slide 2
File 4 removed 1 slide 2File 4 removed 1 slide 2
File 4 removed 1 slide 2
 
File 3 removed 4 slides 1
File 3 removed 4 slides 1File 3 removed 4 slides 1
File 3 removed 4 slides 1
 
File 2 extra slide 2
File 2 extra slide 2File 2 extra slide 2
File 2 extra slide 2
 
7
77
7
 
File 3 removed 1 word 1
File 3 removed 1 word 1File 3 removed 1 word 1
File 3 removed 1 word 1
 
File 4 removed 4 slides 1
File 4 removed 4 slides 1File 4 removed 4 slides 1
File 4 removed 4 slides 1
 
File 2 removed 4 slides 1
File 2 removed 4 slides 1File 2 removed 4 slides 1
File 2 removed 4 slides 1
 
File 5 original copy 2
File 5 original  copy 2File 5 original  copy 2
File 5 original copy 2
 
File 5 removed 4 slides 2
File 5 removed 4 slides 2File 5 removed 4 slides 2
File 5 removed 4 slides 2
 
File 4 removed 1 word from 5 slides 1
File 4 removed 1 word from 5 slides 1File 4 removed 1 word from 5 slides 1
File 4 removed 1 word from 5 slides 1
 
File 3 removed 1 word from 5 slides 1
File 3 removed 1 word from 5 slides 1File 3 removed 1 word from 5 slides 1
File 3 removed 1 word from 5 slides 1
 
File 5 extra four slides 2
File 5 extra four slides 2File 5 extra four slides 2
File 5 extra four slides 2
 
File 4 removed 5 words 1
File 4 removed 5 words 1File 4 removed 5 words 1
File 4 removed 5 words 1
 
File 5 removed 1 slide 2
File 5 removed 1 slide 2File 5 removed 1 slide 2
File 5 removed 1 slide 2
 

Similar to File 1 four extra slides 2

Recipe cards task 1 pro forma
Recipe cards task 1 pro formaRecipe cards task 1 pro forma
Recipe cards task 1 pro formaPJG123
 
Project Managment Good Practices
Project Managment Good PracticesProject Managment Good Practices
Project Managment Good PracticesHari Thapliyal
 
Behavioural.docx
Behavioural.docxBehavioural.docx
Behavioural.docxAccount36
 
Scrum training day 1
Scrum training day 1Scrum training day 1
Scrum training day 1Elad Sofer
 
Practical tips every engineer needs to know about managing a project
Practical tips every engineer needs to know about managing a projectPractical tips every engineer needs to know about managing a project
Practical tips every engineer needs to know about managing a projectJan Van Bruaene
 
C03.10-ProjectClosing.key.pdf
C03.10-ProjectClosing.key.pdfC03.10-ProjectClosing.key.pdf
C03.10-ProjectClosing.key.pdfssuser8babb7
 
Agile.pptx
Agile.pptxAgile.pptx
Agile.pptxRafeeq T
 
PM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya gPM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya gSatyanarayana Gande
 
Іванна Заєць: Основи ПМа (PM’s Essentials)
 Іванна Заєць: Основи ПМа (PM’s Essentials) Іванна Заєць: Основи ПМа (PM’s Essentials)
Іванна Заєць: Основи ПМа (PM’s Essentials)Lviv Startup Club
 
Are you failing at being agile? #digitallabin
Are you failing at being agile? #digitallabinAre you failing at being agile? #digitallabin
Are you failing at being agile? #digitallabinAntonio Peric-Mazar
 
Project report titles for mba in production management
Project report titles for mba in production managementProject report titles for mba in production management
Project report titles for mba in production managementmbaprojectconsultacy2014
 

Similar to File 1 four extra slides 2 (20)

File 1 copy 2
File 1 copy 2File 1 copy 2
File 1 copy 2
 
File 1 copy 1
File 1 copy 1File 1 copy 1
File 1 copy 1
 
The art of execution
The art of executionThe art of execution
The art of execution
 
Recipe cards task 1 pro forma
Recipe cards task 1 pro formaRecipe cards task 1 pro forma
Recipe cards task 1 pro forma
 
Project Managment Good Practices
Project Managment Good PracticesProject Managment Good Practices
Project Managment Good Practices
 
Behavioural.docx
Behavioural.docxBehavioural.docx
Behavioural.docx
 
Scrum training day 1
Scrum training day 1Scrum training day 1
Scrum training day 1
 
Scrum Anti Patterns
Scrum Anti PatternsScrum Anti Patterns
Scrum Anti Patterns
 
Beyond projects
Beyond projectsBeyond projects
Beyond projects
 
Practical tips every engineer needs to know about managing a project
Practical tips every engineer needs to know about managing a projectPractical tips every engineer needs to know about managing a project
Practical tips every engineer needs to know about managing a project
 
C03.10-ProjectClosing.key.pdf
C03.10-ProjectClosing.key.pdfC03.10-ProjectClosing.key.pdf
C03.10-ProjectClosing.key.pdf
 
Agile.pptx
Agile.pptxAgile.pptx
Agile.pptx
 
Article 2
Article 2Article 2
Article 2
 
Article 2
Article 2Article 2
Article 2
 
Planning tips
Planning tipsPlanning tips
Planning tips
 
Adamson "Project Management, Predictive Planning"
Adamson "Project Management, Predictive Planning"Adamson "Project Management, Predictive Planning"
Adamson "Project Management, Predictive Planning"
 
PM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya gPM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya g
 
Іванна Заєць: Основи ПМа (PM’s Essentials)
 Іванна Заєць: Основи ПМа (PM’s Essentials) Іванна Заєць: Основи ПМа (PM’s Essentials)
Іванна Заєць: Основи ПМа (PM’s Essentials)
 
Are you failing at being agile? #digitallabin
Are you failing at being agile? #digitallabinAre you failing at being agile? #digitallabin
Are you failing at being agile? #digitallabin
 
Project report titles for mba in production management
Project report titles for mba in production managementProject report titles for mba in production management
Project report titles for mba in production management
 

More from test prod1

Lead form geo testing us -DO NOT DELETE
Lead form geo testing us -DO NOT DELETELead form geo testing us -DO NOT DELETE
Lead form geo testing us -DO NOT DELETEtest prod1
 
Lead form geo testing eu -DO NOT DELETE
Lead form geo testing eu -DO NOT DELETELead form geo testing eu -DO NOT DELETE
Lead form geo testing eu -DO NOT DELETEtest prod1
 
Lead form geo testing in -DO NOT DELETE
Lead form geo testing in -DO NOT DELETELead form geo testing in -DO NOT DELETE
Lead form geo testing in -DO NOT DELETEtest prod1
 
Unique file 15
Unique file 15Unique file 15
Unique file 15test prod1
 
Unique file 14
Unique file 14Unique file 14
Unique file 14test prod1
 
Unique file 12
Unique file 12Unique file 12
Unique file 12test prod1
 
Unique file 11
Unique file 11Unique file 11
Unique file 11test prod1
 
Unique file 10
Unique file 10Unique file 10
Unique file 10test prod1
 
File 5 removed 5 words 2
File 5 removed 5 words 2File 5 removed 5 words 2
File 5 removed 5 words 2test prod1
 

More from test prod1 (20)

Ppt11
Ppt11Ppt11
Ppt11
 
Do notdelete
Do notdeleteDo notdelete
Do notdelete
 
Do notdelete
Do notdeleteDo notdelete
Do notdelete
 
Lead form geo testing us -DO NOT DELETE
Lead form geo testing us -DO NOT DELETELead form geo testing us -DO NOT DELETE
Lead form geo testing us -DO NOT DELETE
 
Lead form geo testing eu -DO NOT DELETE
Lead form geo testing eu -DO NOT DELETELead form geo testing eu -DO NOT DELETE
Lead form geo testing eu -DO NOT DELETE
 
Lead form geo testing in -DO NOT DELETE
Lead form geo testing in -DO NOT DELETELead form geo testing in -DO NOT DELETE
Lead form geo testing in -DO NOT DELETE
 
Unique file 15
Unique file 15Unique file 15
Unique file 15
 
Unique file 14
Unique file 14Unique file 14
Unique file 14
 
Unique file 12
Unique file 12Unique file 12
Unique file 12
 
Unique file 11
Unique file 11Unique file 11
Unique file 11
 
Unique file 10
Unique file 10Unique file 10
Unique file 10
 
Unique file 9
Unique file 9Unique file 9
Unique file 9
 
Unique file 8
Unique file 8Unique file 8
Unique file 8
 
Unique file 7
Unique file 7Unique file 7
Unique file 7
 
Unique file 5
Unique file 5Unique file 5
Unique file 5
 
Unique file 4
Unique file 4Unique file 4
Unique file 4
 
Unique file 3
Unique file 3Unique file 3
Unique file 3
 
Unique file 2
Unique file 2Unique file 2
Unique file 2
 
Unique file 1
Unique file 1Unique file 1
Unique file 1
 
File 5 removed 5 words 2
File 5 removed 5 words 2File 5 removed 5 words 2
File 5 removed 5 words 2
 

File 1 four extra slides 2

  • 2. Project Management is the dynamic process that utilizes the appropriate resources of the organization in a controlled and structured manner, to achieve some clearly defined objectives identified as strategic needs. It is always conducted within a defined set of constraints. 8/7/2014 Gagan Gupta
  • 4. • A Project is considered as Failure…… Whenever a project doesn’t meet to the expectation of the Stakeholders. 8/7/2014 Gagan Gupta
  • 5. • Cost & Time Over-runs • Quality Degradation • Frustration & Stress: sometime resulting in people quitting • Low Job Satisfaction • Low Corporate Market Value • Low Public Opinion • Negative Media Campaigns • May even force the company into Closure 8/7/2014 Gagan Gupta
  • 7. Also Known as “You’d like it, just a bit bigger. No Problem.” Oh Still a bit Bigger……. OK Even Bigger? It wasn’t in the plan but Okay…. 8/7/2014 Gagan Gupta When Scope creeps, the end results is always more work than expected.
  • 8. • Problems: – The changes that were not initially planned for, are added to project. – The Project takes longer and costs more than planned and there is no record of WHY?? • Causes: – Not having a method to handle or recognize changes. • What to do: – Document the change management process to be used and followed by Project Team. – Educate the project Team to recognize a change or deviation from the Plan. – Follow the Change Management Process. 8/7/2014 Gagan Gupta
  • 9. 8/7/2014 Gagan Gupta • Problems: – Team Members do not have the information they need when they need it. – Issues or changes do not get escalated. – Project reporting is sluggish • Causes: – The project’s communication plan was not completed. – The project’s communication plan doesn’t have enough details. • What to do: – Find out the communication requirements of all team members, and stakeholders, then document them in a common plan, and then follow the Plan.
  • 10. 8/7/2014 Gagan Gupta • You do not have enough people, the right skill-sets, or the team is not committed to the projects. • Problems: – Tasks take longer than expected to complete. – Deadlines and milestones get missed. – Project completion date comes into jeopardy. – You end up working double shifts to complete all the works.
  • 11. • Causes: – There was no pre-commitment of resources to the projects. – The Project was not supported. – There was no analysis and documentation of all skill-set required. • What to do: – Get executives Sponsorship for the project. – Document which resources and skill-sets are needed to get the job done. – Create a plan that gives enough time to get the job done with the allocated resources. – Pre-assign the required resources to the team. 8/7/2014 Gagan Gupta
  • 12. 8/7/2014 Gagan Gupta • “I would like a set of stairs that leads up to a bridge.” • Problems: – Customer will be unhappy. – Customer will complain and you will end up doing the what they want- at your expense.
  • 13. • Causes: – What the customer wants, was not clearly documented. – What you believe the customer wants is different that what the customer believes they have asked for? • What to do: – Find out and document exactly what the customer wants. – Inform everybody of the project scope. – Document Business, Functional and technical requirements. 8/7/2014 Gagan Gupta
  • 14. 8/7/2014 Gagan Gupta • How do you figure out how long the project will take? • Problems: – An unrealistic timeline or budget will be agreed to. – You will not be able to do all the work in the time allocated.
  • 15. • Causes: – No formal estimating method – Estimate confidence is law. – Volume of work not understood • What to do: – List all the work as well as possible. – Estimate each work package. – Add up all work packages. – Always give answer using a range of dates 8/7/2014 Gagan Gupta
  • 16. 8/7/2014 Gagan Gupta • Sorry about the project, I left it in my car & there was a bit of an incidents. • Problems: – Unexpected events cause delays. – Domino effect of thing going wrong.
  • 17. • Causes: – No Formal Risk Management. – Just try to predict the big things that can go wrong. – It’s the sum of the all little things that make a project late. – Nothing is more stressful than trying to keep on schedule when unexpected things keep happening. • What to do: – List all the work as well as possible. – Figure out what can go wrong with each piece of work. – Prioritize each risk as High/ Medium/ Low Probability or impact. – Sort the list. – Create a plan to deal with the risks at the top of list. 8/7/2014 Gagan Gupta
  • 18. 8/7/2014 Gagan Gupta • “Emergency Phone installed, Deliverable completed” • Problems: – Difficult to get the agreement that the product is finished. – Customer Keep wanting more, saying you didn’t do it to their Specification.
  • 19. • Causes: – The Milestones or deliverables were not measurable. – The customer never told us How many they wanted So we just assumed 1, • What to do: – Ensure Milestones or Deliverables are: Clearly Defined Measurable (Quantifiable) 8/7/2014 Gagan Gupta
  • 20. 8/7/2014 Gagan Gupta • Of course we Can do that for you. • Problems: – There was little or no planning before deciding you can get the job done. – The task you agree to turns out to be more work than expected. – It takes you longer and jeopardizes other deliverables.
  • 21. • g to use a passage of Lorem Ipsum, you need to be sure there isn't anything embarrassing hidden in the ard McClintock, a Latin professor at Hampden-Sydney College in Virginia, looked up one of the more obscure Latin words, consectetur, from a Lorem Ipsum passage, and going through the cites of the word in classical literature, discovered the undoubtable source. Lorem Ipsum comes from sections 1.10.32 and 1.10.33 of "de Finibus Bonorum et Malorum" (The Extremes of 8/7/2014 Gagan Gupta
  • 22. • g to use a passage of Lorem Ipsum, you need to be sure there isn't anything embarrassing hidden in the middle of text. All the Lorem Ipsum generators on the Internet tend to repeat predefined chunks as necessary, making this the first true 8/7/2014 Gagan Gupta
  • 23. • Ipsum passage, and going through the cites of the word in classical literature, discovered the undoubtable source. Lorem Ipsum comes from sections 1.10.32 and 1.10.33 of "de Finibus Bonorum et Malorum" (The Extremes of Good and Evil) by Cicero, written in 45 BC. This book is 8/7/2014 Gagan Gupta
  • 24. • Richard McClintock, a Latin professor at Hampden-Sydney College in Virginia, looked up one of the more obscure Latin words, consectetur, from 8/7/2014 Gagan Gupta
  • 25. • Causes: – Not enough time spent planning. – You may have been pressured into giving an answer right then and there. – Didn’t have a full understanding of the work involved before committing. • What to do: – Take the time to fully understand the work before agreeing to it. – Its okay to say the work is not possible or will take too long – Only agree to work when you’re sure it can be done, this will benefit you and your managers. 8/7/2014 Gagan Gupta
  • 26. 8/7/2014 Gagan Gupta • Hurry .... We have a tight deadline. No time to plan. Just start digging. • Problems: – The plan is flawed from the start. – The project gets out of control and can’t be recovered.
  • 27. • Causes: – You have to do the work and weren’t also given time for project management. – Perhaps you only have 10% or 20% allotment for the project management duties. • What to do: – Planning a project is like setting out a roadmap. Without it you will likely get lost. – Controlling a project is like driving a car. You have to continuously watch the road (the Plan) and make little adjustments. 8/7/2014 Gagan Gupta
  • 28. 8/7/2014 Gagan Gupta • I think I know how this helmet goes on. I have been riding scooters for two years now. • Problems: – Your project don’t finish on time. – Your project are always squeezed at the end. – Your project are stressful. – You have to deal with unrealistic expectation or customers. – You feel your projects are out of control.
  • 29. • Causes: – People often don’t know what they don’t know. – Their project are out of control but they don’t know WHY?? – They feel they are doing okay but could benefit from formal project management education. • What to do: – Learn the methods, tools, and techniques successful Project manager use to initiate, plan, execute and control their projects. 8/7/2014 Gagan Gupta