“ARMS Reliability based their strategy
                                                                on the RCM approach, what does it
                                                             do, when does it fail to do what it was
                                                            designed to do, what practices should
                                                               be developed to ensure it continues
                                                               to do what it was designed to do for
                                                              a designed period. ARMS Reliability
                                                              are recommended for other Barrick
                                                                                          projects.”
CASE STUDY

Using Reliability Centered Maintenance, ARMS Reliability Help
Barrick Gold Develop Robust Justifiable Maintenance Strategies
For The Pueblo Viejo Mine Development In The Dominican
Republic
Business Need
The Barrick Gold Pueblo Viejo Mine Development is located in the Dominican Republic, approximately 100 kilometers
northwest of the capital city of Santo Domingo. The project is advancing in line with its $3.0 billion capital budget, with
construction of the mine nearing completion and commissioning already commenced in various areas of the mine. The
mine is currently forecasting 23.7 million ounces of reserves resulting in an expected mine life of over 25 years.

With the mine development nearing completion the project team had the goal of having a complete asset strategy in
place prior to the start of operations. This meant ensuring the introduction of a robust and justifiable maintenance
strategy that included both predictive and preventive tasks ready for deployment and upload into Oracle EAM.

The project team identified the use of Reliability Centered Maintenance (RCM) as a means to reach their goals, and
decided to engage ARMS Reliability to expedite the process. The project team was initially attracted to ARMS Reliability
because of their proven RCM expertise and previous experience completing similar studies for mining clients such as
BHP Billiton.


Barrick Gold – Pueblo Viejo had 3 main objectives:
•	 Development	of	Preventive	Maintenance	Instructions	(PMI)’s	that	added	value	to	the	business	
•	 Review	OEM	recommendations,	and	provide	a	scientific	approach	for	justifying	the	frequency	of	PMs	
•	 Ensure	participation	from	all	PVDC	maintenance	and	operations	sections

The project team viewed this initial study as a curtain raiser to the future of its preventive maintenance program.
Over the coming operational years the strategy will be groomed to better suit the plant needs. For example PMs will be
amended,	work	instructions	updated,	frequencies	refined	against	failure	information,	addition	of	tasks	etc.
Action/solution                                                        Project Deliverables for Maintenance
                                                                       Strategy Development
The ARMS Reliability approach is to develop a FMEA structure
which identifies the likely failure modes for each asset and           •	 Detailed	RCM	models	for	equipment
describes maintenance tasks to address them. The RCMCost               •	 Develop	a	Functional	Asset	Hierarchy
module of Availability Workbench has the features necessary to
                                                                       •	 FMEA	Drilldown	(Can	be	used	to	set	failure	reporting	codes)
develop optimum maintenance plans, predict budgets, resource
requirements,	and	total	lifetime	costs.		Maintenance	tasks	are	        •	 Maintenance	Plans	for	upload	to	CMMS	system
described	and	estimates	for	labor,	materials	and	equipment	are	        •	 Work	instruction	documents	conforming	to	a	Barrick	template
assigned. The optimum type of task (Run to Fail, Preventive,
Inspection,	Monitoring,	Commissioning	or	Redesign)	is	chosen.	         •	 Zero	based	maintenance	budget	predictions
The optimum interval between tasks is also established, and            •	 Labor	resource	predictions
task groups defined to ensure resource efficiency and minimal
                                                                       •	 Spares	usage	predictions
planned downtime. This step is the decision making phase
of the Maintenance Plan Development and where the ARMS                 •	 FMEA	&	FMECA	reports
Reliability facilitator involves operators and maintainers of the      •	 Identification	of	high	risk	failure	modes
equipment.
                                                                       •	 Equipment	Criticality	based	on	defined	thresholds
ARMS Reliability worked closely with the Barrick Gold – Pueblo
Viejo	project	team,	OEM’s	and	subject	matter	experts	to	collect	
the most helpful project data. ARMS Reliability were able to
                                                                       Benefits
call upon an extensive project library to help populate various        Barrick Gold Pueblo Viejo has identified some key advantages of using
equipment	items	with	pre-populated	failure	information,	where	         Reliability Modeling tools for improving asset management plans:
site personnel did not have experience or OEM information did          •		 It	provides	Barrick	Gold	with	a	valuable	means	of	educating	the	
not exist.                                                             	 operators	and	maintainers	in	what	the	critical	areas	require	to		
                                                                           ensure high levels of plant availability.
In 8 months ARMS Reliability has developed approximately 500           •		 It	provides	a	systematic	process	of	knowledge	capture	that	can		
maintenance plans for 2770 assets which cover nearly 50% of                be challenged and updated over the life of the plant.
the Pueblo Viejo facility.                                             •		 Barrick	Gold	Pueblo	Viejo	knows	that	individual	equipment,		
                                                                           failures and maintenance actions are seen in context of overall
Following the creation of the maintenance plans,work                       plant performance.
instructions to support the maintenance tasks identified in the        •		 Barrick	was	able	to	gain	enhanced	knowledge	of	the	new	plant.	
maintenance strategy are written. The ARMS Reliability solution            As new people were introduced to the site, the RCM process was
has the ability to produce large amounts of documentation                  used to gather their knowledge and information, as well as being
through	its	Work	Instruction	Generator	tool.		This	provides	for	           a communication tool for the project team to explain the chosen
job instructions that are directly written in the strategy selection       strategy
tool are downloaded to templates thus ensuring standardization         •	 The	 approach	 taken	 ensures	 the	 maintenance	 plans	 are
of the maintenance plan and job instructions which can be easily           consistent with the expected system performance and design
updated.                                                                   objective.
                                                                       •	 Partnering	with	ARMS	Reliability	has	enabled	Barrick	to	increase
                                                                           the capabilities of its team and meet necessary training
   “We saved a large amount of time by using the Availability          		 regulations	by	training	the	team	in	the	technology	and	techniques
     Workbench (AWB) to manage the process plus having a               •		 Additional	 benefits	 will	 be	 realized	 as	 Barrick	 continues	 to
                                                                           implement the optimized maintenance strategy.
   facilitator ensures that there is someone dedicated to the
                                                                       •	 The	generation	of	a	standard	set	of	asset	strategies	which	can	be
                              process that is unencumbered”                shared with similar Barrick facilities worldwide.
                                                                       •		 Data	 that	 is	 collected	 in	 the	 future	 can	 be	 plugged	 into	 the
                                                                           simulation tools to create updated models and revised strategies.
                                                                       •	 Barrick	is	now	equipped	with	tools	it	can	use	to	generate	long-term
ARMS Reliability                                                           results.
Australia
6-8	Sinclair	St	
Ocean	Grove	VIC	3226
Ph: +61 3 5255 5357
Fax:	+61	3	5255	5778

USA
3921 Steck Ave
Suite A120 Austin TX
P: 512 795 5291
www.globalreliability.com

More Related Content

Similar to Using RCM, ARMS Reliability Helps Barrick Gold Develop Maintenance Strategies

ARMS Reliability Capability Statement
ARMS Reliability Capability StatementARMS Reliability Capability Statement
ARMS Reliability Capability StatementARMS Reliability
 
Covance Accelerator Methodology Delivers Validated Oracle Argus Cloud in Reco...
Covance Accelerator Methodology Delivers Validated Oracle Argus Cloud in Reco...Covance Accelerator Methodology Delivers Validated Oracle Argus Cloud in Reco...
Covance Accelerator Methodology Delivers Validated Oracle Argus Cloud in Reco...Covance
 
Jet aviation
Jet aviationJet aviation
Jet aviationvvenunit
 
Maetrics Lean Compliance System E Version
Maetrics Lean Compliance System E VersionMaetrics Lean Compliance System E Version
Maetrics Lean Compliance System E VersionTRynkiewicz
 
Best Practices for Managing Asset Information
Best Practices for Managing Asset InformationBest Practices for Managing Asset Information
Best Practices for Managing Asset InformationARC Advisory Group
 
Asset Integrity Solutions rev6
Asset Integrity Solutions  rev6Asset Integrity Solutions  rev6
Asset Integrity Solutions rev6Peter Carr
 
Introduction To Strait & Associates 2011
Introduction To Strait & Associates 2011Introduction To Strait & Associates 2011
Introduction To Strait & Associates 2011kmichaelo
 
Gestión Ciclo de Vida del Producto (PLM)
Gestión Ciclo de Vida del Producto (PLM) Gestión Ciclo de Vida del Producto (PLM)
Gestión Ciclo de Vida del Producto (PLM) Rafael Antona
 
Session 2434 improving your time to value 052914
Session 2434 improving your time to value 052914Session 2434 improving your time to value 052914
Session 2434 improving your time to value 052914Kristin Cowhey
 
IBM Solution Brief strEAM+
IBM Solution Brief strEAM+IBM Solution Brief strEAM+
IBM Solution Brief strEAM+ruudwillekens
 
SAXOTECH Managed Hosting
SAXOTECH Managed HostingSAXOTECH Managed Hosting
SAXOTECH Managed Hostingwebhostingguy
 
Shipcom obsolesence jan16
Shipcom obsolesence jan16Shipcom obsolesence jan16
Shipcom obsolesence jan16Vik Chauhan
 

Similar to Using RCM, ARMS Reliability Helps Barrick Gold Develop Maintenance Strategies (20)

Amitabha Cv 15022010
Amitabha Cv 15022010Amitabha Cv 15022010
Amitabha Cv 15022010
 
ARMS Reliability Capability Statement
ARMS Reliability Capability StatementARMS Reliability Capability Statement
ARMS Reliability Capability Statement
 
Cloud Strategy First
 Cloud Strategy First Cloud Strategy First
Cloud Strategy First
 
Covance Accelerator Methodology Delivers Validated Oracle Argus Cloud in Reco...
Covance Accelerator Methodology Delivers Validated Oracle Argus Cloud in Reco...Covance Accelerator Methodology Delivers Validated Oracle Argus Cloud in Reco...
Covance Accelerator Methodology Delivers Validated Oracle Argus Cloud in Reco...
 
Jet aviation
Jet aviationJet aviation
Jet aviation
 
Maetrics Lean Compliance System E Version
Maetrics Lean Compliance System E VersionMaetrics Lean Compliance System E Version
Maetrics Lean Compliance System E Version
 
C24 Sandbox Insert
C24 Sandbox InsertC24 Sandbox Insert
C24 Sandbox Insert
 
Best Practices for Managing Asset Information
Best Practices for Managing Asset InformationBest Practices for Managing Asset Information
Best Practices for Managing Asset Information
 
Mohideen Khader-122316
Mohideen Khader-122316Mohideen Khader-122316
Mohideen Khader-122316
 
Asset Integrity Solutions rev6
Asset Integrity Solutions  rev6Asset Integrity Solutions  rev6
Asset Integrity Solutions rev6
 
Introduction To Strait & Associates 2011
Introduction To Strait & Associates 2011Introduction To Strait & Associates 2011
Introduction To Strait & Associates 2011
 
Gestión Ciclo de Vida del Producto (PLM)
Gestión Ciclo de Vida del Producto (PLM) Gestión Ciclo de Vida del Producto (PLM)
Gestión Ciclo de Vida del Producto (PLM)
 
Session 2434 improving your time to value 052914
Session 2434 improving your time to value 052914Session 2434 improving your time to value 052914
Session 2434 improving your time to value 052914
 
Erp product evaluation, selection, implementation and support
Erp product evaluation, selection, implementation and supportErp product evaluation, selection, implementation and support
Erp product evaluation, selection, implementation and support
 
Sa hr-cs-3
Sa hr-cs-3Sa hr-cs-3
Sa hr-cs-3
 
IBM Solution Brief strEAM+
IBM Solution Brief strEAM+IBM Solution Brief strEAM+
IBM Solution Brief strEAM+
 
Resume
ResumeResume
Resume
 
RAMS for new projects
RAMS for new projectsRAMS for new projects
RAMS for new projects
 
SAXOTECH Managed Hosting
SAXOTECH Managed HostingSAXOTECH Managed Hosting
SAXOTECH Managed Hosting
 
Shipcom obsolesence jan16
Shipcom obsolesence jan16Shipcom obsolesence jan16
Shipcom obsolesence jan16
 

More from ARMS Reliability

How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"ARMS Reliability
 
Jack Jager AMPEAK 2014 Presentation - 6 steps for a successful root cause ana...
Jack Jager AMPEAK 2014 Presentation - 6 steps for a successful root cause ana...Jack Jager AMPEAK 2014 Presentation - 6 steps for a successful root cause ana...
Jack Jager AMPEAK 2014 Presentation - 6 steps for a successful root cause ana...ARMS Reliability
 
Weylon Malek AMPEAK 2014 Presentation - Process Reliability
Weylon Malek AMPEAK 2014 Presentation - Process ReliabilityWeylon Malek AMPEAK 2014 Presentation - Process Reliability
Weylon Malek AMPEAK 2014 Presentation - Process ReliabilityARMS Reliability
 
Vulnerability Assessment and Analysis (VAA) Overview
Vulnerability Assessment and Analysis (VAA) OverviewVulnerability Assessment and Analysis (VAA) Overview
Vulnerability Assessment and Analysis (VAA) OverviewARMS Reliability
 
Root Cause Analysis - When is a problem not a problem?
Root Cause Analysis - When is a problem not a problem?Root Cause Analysis - When is a problem not a problem?
Root Cause Analysis - When is a problem not a problem?ARMS Reliability
 
ARMS Reliability Corporate Brochure
ARMS Reliability Corporate BrochureARMS Reliability Corporate Brochure
ARMS Reliability Corporate BrochureARMS Reliability
 
Estimating Failure Parameters in Reliability Analysis
Estimating Failure Parameters in Reliability AnalysisEstimating Failure Parameters in Reliability Analysis
Estimating Failure Parameters in Reliability AnalysisARMS Reliability
 

More from ARMS Reliability (7)

How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"
 
Jack Jager AMPEAK 2014 Presentation - 6 steps for a successful root cause ana...
Jack Jager AMPEAK 2014 Presentation - 6 steps for a successful root cause ana...Jack Jager AMPEAK 2014 Presentation - 6 steps for a successful root cause ana...
Jack Jager AMPEAK 2014 Presentation - 6 steps for a successful root cause ana...
 
Weylon Malek AMPEAK 2014 Presentation - Process Reliability
Weylon Malek AMPEAK 2014 Presentation - Process ReliabilityWeylon Malek AMPEAK 2014 Presentation - Process Reliability
Weylon Malek AMPEAK 2014 Presentation - Process Reliability
 
Vulnerability Assessment and Analysis (VAA) Overview
Vulnerability Assessment and Analysis (VAA) OverviewVulnerability Assessment and Analysis (VAA) Overview
Vulnerability Assessment and Analysis (VAA) Overview
 
Root Cause Analysis - When is a problem not a problem?
Root Cause Analysis - When is a problem not a problem?Root Cause Analysis - When is a problem not a problem?
Root Cause Analysis - When is a problem not a problem?
 
ARMS Reliability Corporate Brochure
ARMS Reliability Corporate BrochureARMS Reliability Corporate Brochure
ARMS Reliability Corporate Brochure
 
Estimating Failure Parameters in Reliability Analysis
Estimating Failure Parameters in Reliability AnalysisEstimating Failure Parameters in Reliability Analysis
Estimating Failure Parameters in Reliability Analysis
 

Recently uploaded

Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfjimielynbastida
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 

Recently uploaded (20)

Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdf
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 

Using RCM, ARMS Reliability Helps Barrick Gold Develop Maintenance Strategies

  • 1. “ARMS Reliability based their strategy on the RCM approach, what does it do, when does it fail to do what it was designed to do, what practices should be developed to ensure it continues to do what it was designed to do for a designed period. ARMS Reliability are recommended for other Barrick projects.” CASE STUDY Using Reliability Centered Maintenance, ARMS Reliability Help Barrick Gold Develop Robust Justifiable Maintenance Strategies For The Pueblo Viejo Mine Development In The Dominican Republic Business Need The Barrick Gold Pueblo Viejo Mine Development is located in the Dominican Republic, approximately 100 kilometers northwest of the capital city of Santo Domingo. The project is advancing in line with its $3.0 billion capital budget, with construction of the mine nearing completion and commissioning already commenced in various areas of the mine. The mine is currently forecasting 23.7 million ounces of reserves resulting in an expected mine life of over 25 years. With the mine development nearing completion the project team had the goal of having a complete asset strategy in place prior to the start of operations. This meant ensuring the introduction of a robust and justifiable maintenance strategy that included both predictive and preventive tasks ready for deployment and upload into Oracle EAM. The project team identified the use of Reliability Centered Maintenance (RCM) as a means to reach their goals, and decided to engage ARMS Reliability to expedite the process. The project team was initially attracted to ARMS Reliability because of their proven RCM expertise and previous experience completing similar studies for mining clients such as BHP Billiton. Barrick Gold – Pueblo Viejo had 3 main objectives: • Development of Preventive Maintenance Instructions (PMI)’s that added value to the business • Review OEM recommendations, and provide a scientific approach for justifying the frequency of PMs • Ensure participation from all PVDC maintenance and operations sections The project team viewed this initial study as a curtain raiser to the future of its preventive maintenance program. Over the coming operational years the strategy will be groomed to better suit the plant needs. For example PMs will be amended, work instructions updated, frequencies refined against failure information, addition of tasks etc.
  • 2. Action/solution Project Deliverables for Maintenance Strategy Development The ARMS Reliability approach is to develop a FMEA structure which identifies the likely failure modes for each asset and • Detailed RCM models for equipment describes maintenance tasks to address them. The RCMCost • Develop a Functional Asset Hierarchy module of Availability Workbench has the features necessary to • FMEA Drilldown (Can be used to set failure reporting codes) develop optimum maintenance plans, predict budgets, resource requirements, and total lifetime costs. Maintenance tasks are • Maintenance Plans for upload to CMMS system described and estimates for labor, materials and equipment are • Work instruction documents conforming to a Barrick template assigned. The optimum type of task (Run to Fail, Preventive, Inspection, Monitoring, Commissioning or Redesign) is chosen. • Zero based maintenance budget predictions The optimum interval between tasks is also established, and • Labor resource predictions task groups defined to ensure resource efficiency and minimal • Spares usage predictions planned downtime. This step is the decision making phase of the Maintenance Plan Development and where the ARMS • FMEA & FMECA reports Reliability facilitator involves operators and maintainers of the • Identification of high risk failure modes equipment. • Equipment Criticality based on defined thresholds ARMS Reliability worked closely with the Barrick Gold – Pueblo Viejo project team, OEM’s and subject matter experts to collect the most helpful project data. ARMS Reliability were able to Benefits call upon an extensive project library to help populate various Barrick Gold Pueblo Viejo has identified some key advantages of using equipment items with pre-populated failure information, where Reliability Modeling tools for improving asset management plans: site personnel did not have experience or OEM information did • It provides Barrick Gold with a valuable means of educating the not exist. operators and maintainers in what the critical areas require to ensure high levels of plant availability. In 8 months ARMS Reliability has developed approximately 500 • It provides a systematic process of knowledge capture that can maintenance plans for 2770 assets which cover nearly 50% of be challenged and updated over the life of the plant. the Pueblo Viejo facility. • Barrick Gold Pueblo Viejo knows that individual equipment, failures and maintenance actions are seen in context of overall Following the creation of the maintenance plans,work plant performance. instructions to support the maintenance tasks identified in the • Barrick was able to gain enhanced knowledge of the new plant. maintenance strategy are written. The ARMS Reliability solution As new people were introduced to the site, the RCM process was has the ability to produce large amounts of documentation used to gather their knowledge and information, as well as being through its Work Instruction Generator tool. This provides for a communication tool for the project team to explain the chosen job instructions that are directly written in the strategy selection strategy tool are downloaded to templates thus ensuring standardization • The approach taken ensures the maintenance plans are of the maintenance plan and job instructions which can be easily consistent with the expected system performance and design updated. objective. • Partnering with ARMS Reliability has enabled Barrick to increase the capabilities of its team and meet necessary training “We saved a large amount of time by using the Availability regulations by training the team in the technology and techniques Workbench (AWB) to manage the process plus having a • Additional benefits will be realized as Barrick continues to implement the optimized maintenance strategy. facilitator ensures that there is someone dedicated to the • The generation of a standard set of asset strategies which can be process that is unencumbered” shared with similar Barrick facilities worldwide. • Data that is collected in the future can be plugged into the simulation tools to create updated models and revised strategies. • Barrick is now equipped with tools it can use to generate long-term ARMS Reliability results. Australia 6-8 Sinclair St Ocean Grove VIC 3226 Ph: +61 3 5255 5357 Fax: +61 3 5255 5778 USA 3921 Steck Ave Suite A120 Austin TX P: 512 795 5291 www.globalreliability.com