MGT 115 Exam 4
1. Which of the following aggregate planning strategies is a
"demand option"?
a. changing price
b. subcontracting
c. varying production levels
d. changing inventory levels
e. using part-time workers
Q2. Which of the following attempts to manipulate product or
service demand?
a. inventories
b. part-time workers
c. subcontracting
d. overtime/idle time
e. price cuts
Q3. Aggregate planning for fast food restaurants is very similar
to aggregate planning in manufacturing, but with much smaller
units of time.
a. true
b. false
Q4. Which of the following is not an advantage of level
scheduling?
a. stable employment
b. lower absenteeism
c. matching production exactly with sales
d. lower turnover
e. more employee commitment
Q5. Which of the following aggregate planning models is based
primarily upon a manager's past experience?
a. the linear decision rule
b. simulation
c. the management coefficients model
d. the transportation method
e. graphical or charting methods
Q6. Aggregate planning occurs over the medium or intermediate
future of 3 to 18 months.
a. true
b. false
Q7. In aggregate planning, the amount of overtime and the size
of the work force are both adjustable elements of capacity.
a. true
b. false
Q8. In aggregate planning, which one of the following is not a
basic option for altering demand?
a. promotion
b. subcontracting
c. back ordering
d. pricing
e. All are demand options.
Q9. Which choice below best describes the counterseasonal
demand option?
a. producing such products as lawnmowers and sunglasses
during the winter
b. developing a mix of products that smoothes out their
demands
c. lowering prices when demand is slack
d. using subcontractors only when demand is excessive
e. the breaking of the aggregate plan into finer levels of
detail
Q10. The management coefficients model is a formal planning
model built around a manager's experience and performance.
a. true
b. false
Q11. A firm's demand in the next four quarters (its aggregate
planning horizon) is forecast to be 80, 50, 40, and 90 units. Last
quarter, the firm produced 60 units. If it uses level scheduling,
the firm will.
a. hire workers to permit production of 65 units per quarter
for the next four quarters
b. hire 20 workers
c. have an increase in inventory of 20 units in the next
quarter
d. have a decrease in inventory of 5 units in the next quarter
e. change its workforce each quarter so that inventory does
not change
Q12. The planning tasks associated with staffing, production,
inventory, and sub-contracting levels typically fall under
a. short-range plans
b. intermediate-range plans
c. long-range plans
d. demand options
e. strategic planning
Q13. Which of the following aggregate planning strategies is
known to lower employee morale?
a. yield management
b. varying production rates through overtime or idle time
c. changing inventory levels
d. varying work force size by hiring or layoffs
e. back ordering during high demand periods
Q14. The quantity required of a dependent demand item is
computed from the demand for the final products in which the
item is used.
a. true
b. false
Q15. Firms may discover that, rather than adapting ERP to the
way they do business, they have to adapt the way they do
business to accommodate the ERP software.
a. true
b. false
Q16. Which of the following lot-sizing techniques results in the
lowest holding costs?
a. lot-for-lot
b. EOQ
c. part-period balancing
d. Wagner-Whitin algorithm
e. the quantity discount model
Q17. Which of the following best describes a gross material
requirements plan?
a. a schedule that shows total demand for an item, and when
it must be ordered from a supplier or when production must be
started
b. an intermediate range plan for the scheduling of families
of products
c. a chart illustrating whether capacity has been exceeded
d. a table that corrects scheduled quantities for inventory on
hand
e. a schedule showing which products are to be manufactured
and in what quantities
Q18. The master production schedule is a forecast of demand
for families of products.
a. true
b. false
Q19. Since MRP is quite detailed in nature, it has no influence
on the longer-range, less detailed aggregate planning.
a. true
b. false
Q20. A material requirements plan contains information with
regard to all of the following except
a. quantities and required delivery dates of all subassemblies
b. quantities and required delivery dates of final products
c. the capacity needed to provide the projected output rate
d. inventory on hand for each final product
e. inventory on hand for each subassembly
Q21. One of the tools that is particularly useful in reducing the
system nervousness in the MRP system is (are)
a. modular bills
b. time phasing
c. time fences
d. lot sizing
e. closed loop system
Q22. Planning bills of material are bills of material for "kits" of
inexpensive items such as washers, nuts, and bolts.
a. true
b. false
Q23. Each X requires 2 of component Y; each Y requires 4 of
part Z. The lead time for assembly of X is 1 week. The lead
time for the manufacture of Y is 1 week. The lead time for the
procurement of Z is 6 weeks. The cumulative lead time for X is
________ weeks.
a. 6
b. 7
c. 8
d. 10
e. cannot be determined
Q24. The Wagner-Whitin algorithm is the most widely used
MRP lot-sizing technique.
a. true
b. false
Q25. Material requirements plans specify
a. the quantities of the product families that need to be
produced
b. the quantity and timing of planned order releases
c. the capacity needed to provide the projected output rate
d. the costs associated with alternative plans
e. whether one should use phantom bills of materials or not
Q26. Each R requires 2 of component S and 1 of part T. The
lead time for assembly of R is 3 days. The lead time for the
manufacture of S is 5 days. The lead time for the manufacture
of T is 10 days. The cumulative lead time for R is ________
days.
a. 6
b. 9
c. 13
d. 17
e. cannot be determined
Q27. A Gantt load chart shows the loading and idle time of
several departments, machines, or facilities.
a. true
b. false
Q28. The assignment method provides an optimum, one-to-one
assignment of jobs to resources.
a. true
b. false
Q29. Sequencing (or dispatching)
a. assigns dates to specific jobs or operations steps
b. assigns jobs to work centers
c. specifies the order in which jobs should be done at each
center
d. assigns workers to jobs
e. assigns workers to machines
Q30. Orders are processed in the sequence in which they arrive
if (the) ________ rule sequences the jobs.
a. earliest due date
b. slack time remaining
c. first come, first served
d. critical ratio
e. Johnson's
Q31. One criterion for developing effective schedules is
minimizing completion time.
a. true
b. false
Q32. Which scheduling technique should be employed when due
dates are important for a job order?
a. forward scheduling
b. loading
c. dispatching
d. backward scheduling
e. master scheduling
Q33. The constant work-in-process (ConWIP) card aids input-
output control by limiting the amount of work in a work center.
a. true
b. false
Q34. Process-focused facilities and repetitive facilities generate
forward-looking schedules, but process-focused facilities do
this with JIT and kanban while repetitive facilities generally use
MRP.
a. true
b. false
Q35. If an assignment problem consists of 5 workers and 4
projects,
a. one worker will not get a project assignment
b. one project will be assigned two workers
c. the fifth worker will split time among the four projects
d. one project will not get a worker assigned
e. The problem cannot be solved by assignment method.
Q36. Three jobs are to be assigned to three machines. Cost for
each job-machine combination appears in the table below.
Perform the first two steps of the assignment method (subtract
the smallest number in each row and subtract the smallest
number in each column; then cover with straight lines). At this
point in the problem-solving process
a. the row for Job 1 contains the values 5, 6, and 0
b. calculations are complete, and the problem is ready for an
optimal set of assignments
c. the column for Machine B indicates that it should be
retired
d. Job 1 should be performed on Machine B
e. Job 1 should be performed on Machine A
Q37. The theory of constraints has its origins in
a. linear programming theory
b. the theory of economies of scale
c. material requirements planning
d. the theory of finite capacity planning
e. Goldratt and Cox's book, The Goal: A Process of Ongoing
Improvement
Q38. Which of the following statements regarding scheduling at
Delta Airlines is false?
a. About one flight in twenty is disrupted by weather events.
b. Schedule changes at one airport have a ripple effect that
may have impacts in many others.
c. Delta's high-tech computer and communications system is
located in Atlanta.
d. Delta's rapid rescheduling uses mathematical scheduling
models.
e. Delta's rapid rescheduling promotes air safety and limits
traveler inconvenience, but has not resulted in money savings
for Delta.
Q39. Reducing distance is a common JIT goal, both inside and
outside facilities. Outside, it manifests itself in attempts to get
suppliers closer to facilities; inside, it is a common layout
tactic.
a. true
b. false
Q40. Which one of the following scenarios represents the use of
a kanban to reduce inventories?
a. A supervisor tells the operators to stay busy and start
producing parts for next month.
b. A "supplier" work center signals the downstream
workstation that a batch has been completed.
c. A supervisor signals to several work centers that the
production rate should be changed.
d. A "customer" work center signals to the "supplier"
workstation that more parts are needed.
e. An operator asks the next station's operator to help him fix
his machine.
Q41. If setup times and costs can be reduced enough, the JIT
ideal of "Lot Size = 1" can be achieved.
a. true
b. false
Q42. The list of 5S's, although it looks like a housekeeping
directive, supports lean production by
a. identifying non-value items and removing them, in the
"sort/segregate" item
b. reducing wasted motion, in the "standardize" item
c. increasing variability through standardized procedures, in
the "standardize" item
d. eliminating wasted motion through ergonomic studies, in
the "support" item
e. building good safety practices, in the "shine/sweep" item
Q43. A manufacturer took the following actions to reduce
inventory. Which of these is generally not accepted as a JIT
action?
a. It used a pull system to move inventory.
b. It produced in ever smaller lots.
c. It required deliveries directly to the point of use.
d. It picked the supplier that offered the lowest price based
on quantity discounts.
e. It worked to reduce the company's in-transit inventory.
Q44. Transportation is an element of the Seven Wastes because
a. all movement of material between plants is waste
b. movement of equipment or people that adds no value is
waste
c. the transportation method of linear programming reduces
travel requirements
d. moving material between plants, between work centers,
and handling more than once is waste
e. transportation of any kind is a waste
Q45. Hidden problems are generally uncovered during the
process of reducing inventory.
a. true
b. false
Q46. With level schedules, a few large batches, rather than
frequent small batches, are processed.
a. true
b. false
Q47. A firm wants to develop a level material use schedule
based on the following data. What should be the setup cost?
a. $0.45
b. $4.50
c. $45
d. $450
e. $500
Q48. The first step in reducing setup times is the separation of
setup into preparation activities and actual setup, so that as
much work as possible can be done while the machine or
process is operating.
a. true
b. false
Q49. JIT systems carry inventory just in case something goes
wrong.
a. true
b. false
Q50. Inventory has only one positive aspect, which is
availability; inventory has several negatives, including
increased material handling, obsolescence, and damage.
a. true
b. false
MGT 115 Exam 41. Which of the following aggregate planning strat.docx

More Related Content

Similar to MGT 115 Exam 41. Which of the following aggregate planning strat.docx

1.2 project management by bee 2
1.2 project management by bee 21.2 project management by bee 2
1.2 project management by bee 2Narayan Mane
 
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011naveenupmanyu01
 
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011naveenupmanyu01
 
Page 9Introduction to Project Management Principles and Practices.docx
Page 9Introduction to Project Management Principles and Practices.docxPage 9Introduction to Project Management Principles and Practices.docx
Page 9Introduction to Project Management Principles and Practices.docxalfred4lewis58146
 
Questões de Certificação CO
Questões de Certificação COQuestões de Certificação CO
Questões de Certificação COManuel Robalinho
 
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...Suma Kamadod
 
Six Sigma Green Belt - Which of the following tools is most likely to be orga...
Six Sigma Green Belt - Which of the following tools is most likely to be orga...Six Sigma Green Belt - Which of the following tools is most likely to be orga...
Six Sigma Green Belt - Which of the following tools is most likely to be orga...Suma Kamadod
 
Six Sigma Green Belt - Correction, over production, inventory, and motion are...
Six Sigma Green Belt - Correction, over production, inventory, and motion are...Six Sigma Green Belt - Correction, over production, inventory, and motion are...
Six Sigma Green Belt - Correction, over production, inventory, and motion are...Suma Kamadod
 
Six Sigma Green Belt - A calibrated micrometer was used to take 10 replicated...
Six Sigma Green Belt - A calibrated micrometer was used to take 10 replicated...Six Sigma Green Belt - A calibrated micrometer was used to take 10 replicated...
Six Sigma Green Belt - A calibrated micrometer was used to take 10 replicated...Suma Kamadod
 
Six Sigma Green Belt - Positional, cyclical, and temporal variations are most...
Six Sigma Green Belt - Positional, cyclical, and temporal variations are most...Six Sigma Green Belt - Positional, cyclical, and temporal variations are most...
Six Sigma Green Belt - Positional, cyclical, and temporal variations are most...Suma Kamadod
 
Six Sigma Green Belt - The type of chart that presents the value of items in ...
Six Sigma Green Belt - The type of chart that presents the value of items in ...Six Sigma Green Belt - The type of chart that presents the value of items in ...
Six Sigma Green Belt - The type of chart that presents the value of items in ...Suma Kamadod
 
Six Sigma Green Belt - A sample consists of one or more units of product draw...
Six Sigma Green Belt - A sample consists of one or more units of product draw...Six Sigma Green Belt - A sample consists of one or more units of product draw...
Six Sigma Green Belt - A sample consists of one or more units of product draw...Suma Kamadod
 
Six Sigma Green Belt - In preparation for construction of a cause and effect ...
Six Sigma Green Belt - In preparation for construction of a cause and effect ...Six Sigma Green Belt - In preparation for construction of a cause and effect ...
Six Sigma Green Belt - In preparation for construction of a cause and effect ...Suma Kamadod
 
Six Sigma Green Belt - In analysis of variance, which of the following distri...
Six Sigma Green Belt - In analysis of variance, which of the following distri...Six Sigma Green Belt - In analysis of variance, which of the following distri...
Six Sigma Green Belt - In analysis of variance, which of the following distri...Suma Kamadod
 
Six Sigma Green Belt - A control plan is designed to do which of the followin...
Six Sigma Green Belt - A control plan is designed to do which of the followin...Six Sigma Green Belt - A control plan is designed to do which of the followin...
Six Sigma Green Belt - A control plan is designed to do which of the followin...Suma Kamadod
 
Six Sigma Green Belt - Which of the following tools would be most appropriate...
Six Sigma Green Belt - Which of the following tools would be most appropriate...Six Sigma Green Belt - Which of the following tools would be most appropriate...
Six Sigma Green Belt - Which of the following tools would be most appropriate...Suma Kamadod
 
Six Sigma Green Belt - The following is a sample data set. 10 8 8 6 5 what is...
Six Sigma Green Belt - The following is a sample data set. 10 8 8 6 5 what is...Six Sigma Green Belt - The following is a sample data set. 10 8 8 6 5 what is...
Six Sigma Green Belt - The following is a sample data set. 10 8 8 6 5 what is...Suma Kamadod
 
Six Sigma Green Belt - Which of the following is a good tool for planning cyc...
Six Sigma Green Belt - Which of the following is a good tool for planning cyc...Six Sigma Green Belt - Which of the following is a good tool for planning cyc...
Six Sigma Green Belt - Which of the following is a good tool for planning cyc...Suma Kamadod
 
Six Sigma Green Belt - At what stage of the problem solving process would a t...
Six Sigma Green Belt - At what stage of the problem solving process would a t...Six Sigma Green Belt - At what stage of the problem solving process would a t...
Six Sigma Green Belt - At what stage of the problem solving process would a t...Suma Kamadod
 
Six Sigma Green Belt - In measurement system analysis, which of the following...
Six Sigma Green Belt - In measurement system analysis, which of the following...Six Sigma Green Belt - In measurement system analysis, which of the following...
Six Sigma Green Belt - In measurement system analysis, which of the following...Suma Kamadod
 

Similar to MGT 115 Exam 41. Which of the following aggregate planning strat.docx (20)

1.2 project management by bee 2
1.2 project management by bee 21.2 project management by bee 2
1.2 project management by bee 2
 
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
 
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
 
Page 9Introduction to Project Management Principles and Practices.docx
Page 9Introduction to Project Management Principles and Practices.docxPage 9Introduction to Project Management Principles and Practices.docx
Page 9Introduction to Project Management Principles and Practices.docx
 
Questões de Certificação CO
Questões de Certificação COQuestões de Certificação CO
Questões de Certificação CO
 
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
 
Six Sigma Green Belt - Which of the following tools is most likely to be orga...
Six Sigma Green Belt - Which of the following tools is most likely to be orga...Six Sigma Green Belt - Which of the following tools is most likely to be orga...
Six Sigma Green Belt - Which of the following tools is most likely to be orga...
 
Six Sigma Green Belt - Correction, over production, inventory, and motion are...
Six Sigma Green Belt - Correction, over production, inventory, and motion are...Six Sigma Green Belt - Correction, over production, inventory, and motion are...
Six Sigma Green Belt - Correction, over production, inventory, and motion are...
 
Six Sigma Green Belt - A calibrated micrometer was used to take 10 replicated...
Six Sigma Green Belt - A calibrated micrometer was used to take 10 replicated...Six Sigma Green Belt - A calibrated micrometer was used to take 10 replicated...
Six Sigma Green Belt - A calibrated micrometer was used to take 10 replicated...
 
Six Sigma Green Belt - Positional, cyclical, and temporal variations are most...
Six Sigma Green Belt - Positional, cyclical, and temporal variations are most...Six Sigma Green Belt - Positional, cyclical, and temporal variations are most...
Six Sigma Green Belt - Positional, cyclical, and temporal variations are most...
 
Six Sigma Green Belt - The type of chart that presents the value of items in ...
Six Sigma Green Belt - The type of chart that presents the value of items in ...Six Sigma Green Belt - The type of chart that presents the value of items in ...
Six Sigma Green Belt - The type of chart that presents the value of items in ...
 
Six Sigma Green Belt - A sample consists of one or more units of product draw...
Six Sigma Green Belt - A sample consists of one or more units of product draw...Six Sigma Green Belt - A sample consists of one or more units of product draw...
Six Sigma Green Belt - A sample consists of one or more units of product draw...
 
Six Sigma Green Belt - In preparation for construction of a cause and effect ...
Six Sigma Green Belt - In preparation for construction of a cause and effect ...Six Sigma Green Belt - In preparation for construction of a cause and effect ...
Six Sigma Green Belt - In preparation for construction of a cause and effect ...
 
Six Sigma Green Belt - In analysis of variance, which of the following distri...
Six Sigma Green Belt - In analysis of variance, which of the following distri...Six Sigma Green Belt - In analysis of variance, which of the following distri...
Six Sigma Green Belt - In analysis of variance, which of the following distri...
 
Six Sigma Green Belt - A control plan is designed to do which of the followin...
Six Sigma Green Belt - A control plan is designed to do which of the followin...Six Sigma Green Belt - A control plan is designed to do which of the followin...
Six Sigma Green Belt - A control plan is designed to do which of the followin...
 
Six Sigma Green Belt - Which of the following tools would be most appropriate...
Six Sigma Green Belt - Which of the following tools would be most appropriate...Six Sigma Green Belt - Which of the following tools would be most appropriate...
Six Sigma Green Belt - Which of the following tools would be most appropriate...
 
Six Sigma Green Belt - The following is a sample data set. 10 8 8 6 5 what is...
Six Sigma Green Belt - The following is a sample data set. 10 8 8 6 5 what is...Six Sigma Green Belt - The following is a sample data set. 10 8 8 6 5 what is...
Six Sigma Green Belt - The following is a sample data set. 10 8 8 6 5 what is...
 
Six Sigma Green Belt - Which of the following is a good tool for planning cyc...
Six Sigma Green Belt - Which of the following is a good tool for planning cyc...Six Sigma Green Belt - Which of the following is a good tool for planning cyc...
Six Sigma Green Belt - Which of the following is a good tool for planning cyc...
 
Six Sigma Green Belt - At what stage of the problem solving process would a t...
Six Sigma Green Belt - At what stage of the problem solving process would a t...Six Sigma Green Belt - At what stage of the problem solving process would a t...
Six Sigma Green Belt - At what stage of the problem solving process would a t...
 
Six Sigma Green Belt - In measurement system analysis, which of the following...
Six Sigma Green Belt - In measurement system analysis, which of the following...Six Sigma Green Belt - In measurement system analysis, which of the following...
Six Sigma Green Belt - In measurement system analysis, which of the following...
 

More from annandleola

CASE 6B – CHESTER & WAYNE Chester & Wayne is a regional .docx
CASE 6B – CHESTER & WAYNE Chester & Wayne is a regional .docxCASE 6B – CHESTER & WAYNE Chester & Wayne is a regional .docx
CASE 6B – CHESTER & WAYNE Chester & Wayne is a regional .docxannandleola
 
CASE 9 Bulimia Nervosa Table 9-1   Dx Checklist   Bulimia Nervos.docx
CASE 9 Bulimia Nervosa Table 9-1   Dx Checklist   Bulimia Nervos.docxCASE 9 Bulimia Nervosa Table 9-1   Dx Checklist   Bulimia Nervos.docx
CASE 9 Bulimia Nervosa Table 9-1   Dx Checklist   Bulimia Nervos.docxannandleola
 
Case 9 Bulimia Nervosa in Gorenstein and Comer (2014)Rita was a.docx
Case 9 Bulimia Nervosa in Gorenstein and Comer (2014)Rita was a.docxCase 9 Bulimia Nervosa in Gorenstein and Comer (2014)Rita was a.docx
Case 9 Bulimia Nervosa in Gorenstein and Comer (2014)Rita was a.docxannandleola
 
Case 8.1 Pros and Cons of Balkan Intervention59Must the a.docx
Case 8.1 Pros and Cons of Balkan Intervention59Must the a.docxCase 8.1 Pros and Cons of Balkan Intervention59Must the a.docx
Case 8.1 Pros and Cons of Balkan Intervention59Must the a.docxannandleola
 
CASE 5Business Performance Evaluation Approaches for Thoughtf.docx
CASE 5Business Performance Evaluation Approaches for Thoughtf.docxCASE 5Business Performance Evaluation Approaches for Thoughtf.docx
CASE 5Business Performance Evaluation Approaches for Thoughtf.docxannandleola
 
Case 6-2 Not Getting Face Time at Facebook—and Getting the Last La.docx
Case 6-2 Not Getting Face Time at Facebook—and Getting the Last La.docxCase 6-2 Not Getting Face Time at Facebook—and Getting the Last La.docx
Case 6-2 Not Getting Face Time at Facebook—and Getting the Last La.docxannandleola
 
Case 6.4 The Case of the Poorly Performing SalespersonEd Markham.docx
Case 6.4 The Case of the Poorly Performing SalespersonEd Markham.docxCase 6.4 The Case of the Poorly Performing SalespersonEd Markham.docx
Case 6.4 The Case of the Poorly Performing SalespersonEd Markham.docxannandleola
 
Case 5.6Kelo v City of New London545 U.S. 469 (2005)Ye.docx
Case 5.6Kelo v City of New London545 U.S. 469 (2005)Ye.docxCase 5.6Kelo v City of New London545 U.S. 469 (2005)Ye.docx
Case 5.6Kelo v City of New London545 U.S. 469 (2005)Ye.docxannandleola
 
CASE 5.10 FIBREBOARD PAPER PRODUCTS CORP. V. NLRB SUPREME COURT OF.docx
CASE 5.10 FIBREBOARD PAPER PRODUCTS CORP. V. NLRB SUPREME COURT OF.docxCASE 5.10 FIBREBOARD PAPER PRODUCTS CORP. V. NLRB SUPREME COURT OF.docx
CASE 5.10 FIBREBOARD PAPER PRODUCTS CORP. V. NLRB SUPREME COURT OF.docxannandleola
 
Case 4 The McDonald’s China Food Supplier Scandal1. What we.docx
Case 4 The McDonald’s China Food Supplier Scandal1. What we.docxCase 4 The McDonald’s China Food Supplier Scandal1. What we.docx
Case 4 The McDonald’s China Food Supplier Scandal1. What we.docxannandleola
 
Case 3 Neesha Wilson Phoenix Rising Risks, Protective Factors, and.docx
Case 3 Neesha Wilson Phoenix Rising Risks, Protective Factors, and.docxCase 3 Neesha Wilson Phoenix Rising Risks, Protective Factors, and.docx
Case 3 Neesha Wilson Phoenix Rising Risks, Protective Factors, and.docxannandleola
 
Case 48 Sun Microsystems Done by Nour Abdulaziz Maryam .docx
Case 48 Sun Microsystems Done by Nour Abdulaziz  Maryam .docxCase 48 Sun Microsystems Done by Nour Abdulaziz  Maryam .docx
Case 48 Sun Microsystems Done by Nour Abdulaziz Maryam .docxannandleola
 
CASE 42 Myasthenia Gravis The immune response turns agai.docx
CASE 42 Myasthenia Gravis The immune response turns agai.docxCASE 42 Myasthenia Gravis The immune response turns agai.docx
CASE 42 Myasthenia Gravis The immune response turns agai.docxannandleola
 
Case 4 JetBlue Delighting Customers Through Happy JettingIn the.docx
Case 4 JetBlue Delighting Customers Through Happy JettingIn the.docxCase 4 JetBlue Delighting Customers Through Happy JettingIn the.docx
Case 4 JetBlue Delighting Customers Through Happy JettingIn the.docxannandleola
 
Case 4-2 Hardee TransportationThe Assignment Answer the four .docx
Case 4-2 Hardee TransportationThe Assignment Answer the four .docxCase 4-2 Hardee TransportationThe Assignment Answer the four .docx
Case 4-2 Hardee TransportationThe Assignment Answer the four .docxannandleola
 
Case 3-8 Accountant takes on Halliburton and Wins!1.      Descri.docx
Case 3-8 Accountant takes on Halliburton and Wins!1.      Descri.docxCase 3-8 Accountant takes on Halliburton and Wins!1.      Descri.docx
Case 3-8 Accountant takes on Halliburton and Wins!1.      Descri.docxannandleola
 
CASE 3.2 A Shift for Lieutenant Colonel AdamsEAM 751 Chapter.docx
CASE 3.2 A Shift for Lieutenant Colonel AdamsEAM 751 Chapter.docxCASE 3.2 A Shift for Lieutenant Colonel AdamsEAM 751 Chapter.docx
CASE 3.2 A Shift for Lieutenant Colonel AdamsEAM 751 Chapter.docxannandleola
 
Case 3 Ford’s Pinto Fires The Retrospective View of Ford’s Fiel.docx
Case 3 Ford’s Pinto Fires The Retrospective View of Ford’s Fiel.docxCase 3 Ford’s Pinto Fires The Retrospective View of Ford’s Fiel.docx
Case 3 Ford’s Pinto Fires The Retrospective View of Ford’s Fiel.docxannandleola
 
Case 3Competition in the Craft Brewing Industry in 2017John D. Var.docx
Case 3Competition in the Craft Brewing Industry in 2017John D. Var.docxCase 3Competition in the Craft Brewing Industry in 2017John D. Var.docx
Case 3Competition in the Craft Brewing Industry in 2017John D. Var.docxannandleola
 
CASE 3.2 Ethics, Schmethics-Enrons Code of EthicsIn Jul.docx
CASE 3.2 Ethics, Schmethics-Enrons Code of EthicsIn Jul.docxCASE 3.2 Ethics, Schmethics-Enrons Code of EthicsIn Jul.docx
CASE 3.2 Ethics, Schmethics-Enrons Code of EthicsIn Jul.docxannandleola
 

More from annandleola (20)

CASE 6B – CHESTER & WAYNE Chester & Wayne is a regional .docx
CASE 6B – CHESTER & WAYNE Chester & Wayne is a regional .docxCASE 6B – CHESTER & WAYNE Chester & Wayne is a regional .docx
CASE 6B – CHESTER & WAYNE Chester & Wayne is a regional .docx
 
CASE 9 Bulimia Nervosa Table 9-1   Dx Checklist   Bulimia Nervos.docx
CASE 9 Bulimia Nervosa Table 9-1   Dx Checklist   Bulimia Nervos.docxCASE 9 Bulimia Nervosa Table 9-1   Dx Checklist   Bulimia Nervos.docx
CASE 9 Bulimia Nervosa Table 9-1   Dx Checklist   Bulimia Nervos.docx
 
Case 9 Bulimia Nervosa in Gorenstein and Comer (2014)Rita was a.docx
Case 9 Bulimia Nervosa in Gorenstein and Comer (2014)Rita was a.docxCase 9 Bulimia Nervosa in Gorenstein and Comer (2014)Rita was a.docx
Case 9 Bulimia Nervosa in Gorenstein and Comer (2014)Rita was a.docx
 
Case 8.1 Pros and Cons of Balkan Intervention59Must the a.docx
Case 8.1 Pros and Cons of Balkan Intervention59Must the a.docxCase 8.1 Pros and Cons of Balkan Intervention59Must the a.docx
Case 8.1 Pros and Cons of Balkan Intervention59Must the a.docx
 
CASE 5Business Performance Evaluation Approaches for Thoughtf.docx
CASE 5Business Performance Evaluation Approaches for Thoughtf.docxCASE 5Business Performance Evaluation Approaches for Thoughtf.docx
CASE 5Business Performance Evaluation Approaches for Thoughtf.docx
 
Case 6-2 Not Getting Face Time at Facebook—and Getting the Last La.docx
Case 6-2 Not Getting Face Time at Facebook—and Getting the Last La.docxCase 6-2 Not Getting Face Time at Facebook—and Getting the Last La.docx
Case 6-2 Not Getting Face Time at Facebook—and Getting the Last La.docx
 
Case 6.4 The Case of the Poorly Performing SalespersonEd Markham.docx
Case 6.4 The Case of the Poorly Performing SalespersonEd Markham.docxCase 6.4 The Case of the Poorly Performing SalespersonEd Markham.docx
Case 6.4 The Case of the Poorly Performing SalespersonEd Markham.docx
 
Case 5.6Kelo v City of New London545 U.S. 469 (2005)Ye.docx
Case 5.6Kelo v City of New London545 U.S. 469 (2005)Ye.docxCase 5.6Kelo v City of New London545 U.S. 469 (2005)Ye.docx
Case 5.6Kelo v City of New London545 U.S. 469 (2005)Ye.docx
 
CASE 5.10 FIBREBOARD PAPER PRODUCTS CORP. V. NLRB SUPREME COURT OF.docx
CASE 5.10 FIBREBOARD PAPER PRODUCTS CORP. V. NLRB SUPREME COURT OF.docxCASE 5.10 FIBREBOARD PAPER PRODUCTS CORP. V. NLRB SUPREME COURT OF.docx
CASE 5.10 FIBREBOARD PAPER PRODUCTS CORP. V. NLRB SUPREME COURT OF.docx
 
Case 4 The McDonald’s China Food Supplier Scandal1. What we.docx
Case 4 The McDonald’s China Food Supplier Scandal1. What we.docxCase 4 The McDonald’s China Food Supplier Scandal1. What we.docx
Case 4 The McDonald’s China Food Supplier Scandal1. What we.docx
 
Case 3 Neesha Wilson Phoenix Rising Risks, Protective Factors, and.docx
Case 3 Neesha Wilson Phoenix Rising Risks, Protective Factors, and.docxCase 3 Neesha Wilson Phoenix Rising Risks, Protective Factors, and.docx
Case 3 Neesha Wilson Phoenix Rising Risks, Protective Factors, and.docx
 
Case 48 Sun Microsystems Done by Nour Abdulaziz Maryam .docx
Case 48 Sun Microsystems Done by Nour Abdulaziz  Maryam .docxCase 48 Sun Microsystems Done by Nour Abdulaziz  Maryam .docx
Case 48 Sun Microsystems Done by Nour Abdulaziz Maryam .docx
 
CASE 42 Myasthenia Gravis The immune response turns agai.docx
CASE 42 Myasthenia Gravis The immune response turns agai.docxCASE 42 Myasthenia Gravis The immune response turns agai.docx
CASE 42 Myasthenia Gravis The immune response turns agai.docx
 
Case 4 JetBlue Delighting Customers Through Happy JettingIn the.docx
Case 4 JetBlue Delighting Customers Through Happy JettingIn the.docxCase 4 JetBlue Delighting Customers Through Happy JettingIn the.docx
Case 4 JetBlue Delighting Customers Through Happy JettingIn the.docx
 
Case 4-2 Hardee TransportationThe Assignment Answer the four .docx
Case 4-2 Hardee TransportationThe Assignment Answer the four .docxCase 4-2 Hardee TransportationThe Assignment Answer the four .docx
Case 4-2 Hardee TransportationThe Assignment Answer the four .docx
 
Case 3-8 Accountant takes on Halliburton and Wins!1.      Descri.docx
Case 3-8 Accountant takes on Halliburton and Wins!1.      Descri.docxCase 3-8 Accountant takes on Halliburton and Wins!1.      Descri.docx
Case 3-8 Accountant takes on Halliburton and Wins!1.      Descri.docx
 
CASE 3.2 A Shift for Lieutenant Colonel AdamsEAM 751 Chapter.docx
CASE 3.2 A Shift for Lieutenant Colonel AdamsEAM 751 Chapter.docxCASE 3.2 A Shift for Lieutenant Colonel AdamsEAM 751 Chapter.docx
CASE 3.2 A Shift for Lieutenant Colonel AdamsEAM 751 Chapter.docx
 
Case 3 Ford’s Pinto Fires The Retrospective View of Ford’s Fiel.docx
Case 3 Ford’s Pinto Fires The Retrospective View of Ford’s Fiel.docxCase 3 Ford’s Pinto Fires The Retrospective View of Ford’s Fiel.docx
Case 3 Ford’s Pinto Fires The Retrospective View of Ford’s Fiel.docx
 
Case 3Competition in the Craft Brewing Industry in 2017John D. Var.docx
Case 3Competition in the Craft Brewing Industry in 2017John D. Var.docxCase 3Competition in the Craft Brewing Industry in 2017John D. Var.docx
Case 3Competition in the Craft Brewing Industry in 2017John D. Var.docx
 
CASE 3.2 Ethics, Schmethics-Enrons Code of EthicsIn Jul.docx
CASE 3.2 Ethics, Schmethics-Enrons Code of EthicsIn Jul.docxCASE 3.2 Ethics, Schmethics-Enrons Code of EthicsIn Jul.docx
CASE 3.2 Ethics, Schmethics-Enrons Code of EthicsIn Jul.docx
 

Recently uploaded

Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.MateoGardella
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfSanaAli374401
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 

Recently uploaded (20)

Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 

MGT 115 Exam 41. Which of the following aggregate planning strat.docx

  • 1. MGT 115 Exam 4 1. Which of the following aggregate planning strategies is a "demand option"? a. changing price b. subcontracting c. varying production levels d. changing inventory levels e. using part-time workers Q2. Which of the following attempts to manipulate product or service demand? a. inventories b. part-time workers c. subcontracting d. overtime/idle time e. price cuts Q3. Aggregate planning for fast food restaurants is very similar to aggregate planning in manufacturing, but with much smaller units of time. a. true b. false Q4. Which of the following is not an advantage of level scheduling? a. stable employment b. lower absenteeism c. matching production exactly with sales d. lower turnover e. more employee commitment Q5. Which of the following aggregate planning models is based primarily upon a manager's past experience? a. the linear decision rule
  • 2. b. simulation c. the management coefficients model d. the transportation method e. graphical or charting methods Q6. Aggregate planning occurs over the medium or intermediate future of 3 to 18 months. a. true b. false Q7. In aggregate planning, the amount of overtime and the size of the work force are both adjustable elements of capacity. a. true b. false Q8. In aggregate planning, which one of the following is not a basic option for altering demand? a. promotion b. subcontracting c. back ordering d. pricing e. All are demand options. Q9. Which choice below best describes the counterseasonal demand option? a. producing such products as lawnmowers and sunglasses during the winter b. developing a mix of products that smoothes out their demands c. lowering prices when demand is slack d. using subcontractors only when demand is excessive e. the breaking of the aggregate plan into finer levels of detail Q10. The management coefficients model is a formal planning model built around a manager's experience and performance.
  • 3. a. true b. false Q11. A firm's demand in the next four quarters (its aggregate planning horizon) is forecast to be 80, 50, 40, and 90 units. Last quarter, the firm produced 60 units. If it uses level scheduling, the firm will. a. hire workers to permit production of 65 units per quarter for the next four quarters b. hire 20 workers c. have an increase in inventory of 20 units in the next quarter d. have a decrease in inventory of 5 units in the next quarter e. change its workforce each quarter so that inventory does not change Q12. The planning tasks associated with staffing, production, inventory, and sub-contracting levels typically fall under a. short-range plans b. intermediate-range plans c. long-range plans d. demand options e. strategic planning Q13. Which of the following aggregate planning strategies is known to lower employee morale? a. yield management b. varying production rates through overtime or idle time c. changing inventory levels d. varying work force size by hiring or layoffs e. back ordering during high demand periods Q14. The quantity required of a dependent demand item is computed from the demand for the final products in which the item is used. a. true
  • 4. b. false Q15. Firms may discover that, rather than adapting ERP to the way they do business, they have to adapt the way they do business to accommodate the ERP software. a. true b. false Q16. Which of the following lot-sizing techniques results in the lowest holding costs? a. lot-for-lot b. EOQ c. part-period balancing d. Wagner-Whitin algorithm e. the quantity discount model Q17. Which of the following best describes a gross material requirements plan? a. a schedule that shows total demand for an item, and when it must be ordered from a supplier or when production must be started b. an intermediate range plan for the scheduling of families of products c. a chart illustrating whether capacity has been exceeded d. a table that corrects scheduled quantities for inventory on hand e. a schedule showing which products are to be manufactured and in what quantities Q18. The master production schedule is a forecast of demand for families of products. a. true b. false Q19. Since MRP is quite detailed in nature, it has no influence on the longer-range, less detailed aggregate planning.
  • 5. a. true b. false Q20. A material requirements plan contains information with regard to all of the following except a. quantities and required delivery dates of all subassemblies b. quantities and required delivery dates of final products c. the capacity needed to provide the projected output rate d. inventory on hand for each final product e. inventory on hand for each subassembly Q21. One of the tools that is particularly useful in reducing the system nervousness in the MRP system is (are) a. modular bills b. time phasing c. time fences d. lot sizing e. closed loop system Q22. Planning bills of material are bills of material for "kits" of inexpensive items such as washers, nuts, and bolts. a. true b. false Q23. Each X requires 2 of component Y; each Y requires 4 of part Z. The lead time for assembly of X is 1 week. The lead time for the manufacture of Y is 1 week. The lead time for the procurement of Z is 6 weeks. The cumulative lead time for X is ________ weeks. a. 6 b. 7 c. 8 d. 10 e. cannot be determined Q24. The Wagner-Whitin algorithm is the most widely used
  • 6. MRP lot-sizing technique. a. true b. false Q25. Material requirements plans specify a. the quantities of the product families that need to be produced b. the quantity and timing of planned order releases c. the capacity needed to provide the projected output rate d. the costs associated with alternative plans e. whether one should use phantom bills of materials or not Q26. Each R requires 2 of component S and 1 of part T. The lead time for assembly of R is 3 days. The lead time for the manufacture of S is 5 days. The lead time for the manufacture of T is 10 days. The cumulative lead time for R is ________ days. a. 6 b. 9 c. 13 d. 17 e. cannot be determined Q27. A Gantt load chart shows the loading and idle time of several departments, machines, or facilities. a. true b. false Q28. The assignment method provides an optimum, one-to-one assignment of jobs to resources. a. true b. false Q29. Sequencing (or dispatching) a. assigns dates to specific jobs or operations steps b. assigns jobs to work centers
  • 7. c. specifies the order in which jobs should be done at each center d. assigns workers to jobs e. assigns workers to machines Q30. Orders are processed in the sequence in which they arrive if (the) ________ rule sequences the jobs. a. earliest due date b. slack time remaining c. first come, first served d. critical ratio e. Johnson's Q31. One criterion for developing effective schedules is minimizing completion time. a. true b. false Q32. Which scheduling technique should be employed when due dates are important for a job order? a. forward scheduling b. loading c. dispatching d. backward scheduling e. master scheduling Q33. The constant work-in-process (ConWIP) card aids input- output control by limiting the amount of work in a work center. a. true b. false Q34. Process-focused facilities and repetitive facilities generate forward-looking schedules, but process-focused facilities do this with JIT and kanban while repetitive facilities generally use MRP. a. true
  • 8. b. false Q35. If an assignment problem consists of 5 workers and 4 projects, a. one worker will not get a project assignment b. one project will be assigned two workers c. the fifth worker will split time among the four projects d. one project will not get a worker assigned e. The problem cannot be solved by assignment method. Q36. Three jobs are to be assigned to three machines. Cost for each job-machine combination appears in the table below. Perform the first two steps of the assignment method (subtract the smallest number in each row and subtract the smallest number in each column; then cover with straight lines). At this point in the problem-solving process a. the row for Job 1 contains the values 5, 6, and 0 b. calculations are complete, and the problem is ready for an optimal set of assignments c. the column for Machine B indicates that it should be retired d. Job 1 should be performed on Machine B e. Job 1 should be performed on Machine A Q37. The theory of constraints has its origins in a. linear programming theory b. the theory of economies of scale c. material requirements planning d. the theory of finite capacity planning e. Goldratt and Cox's book, The Goal: A Process of Ongoing Improvement Q38. Which of the following statements regarding scheduling at Delta Airlines is false? a. About one flight in twenty is disrupted by weather events. b. Schedule changes at one airport have a ripple effect that
  • 9. may have impacts in many others. c. Delta's high-tech computer and communications system is located in Atlanta. d. Delta's rapid rescheduling uses mathematical scheduling models. e. Delta's rapid rescheduling promotes air safety and limits traveler inconvenience, but has not resulted in money savings for Delta. Q39. Reducing distance is a common JIT goal, both inside and outside facilities. Outside, it manifests itself in attempts to get suppliers closer to facilities; inside, it is a common layout tactic. a. true b. false Q40. Which one of the following scenarios represents the use of a kanban to reduce inventories? a. A supervisor tells the operators to stay busy and start producing parts for next month. b. A "supplier" work center signals the downstream workstation that a batch has been completed. c. A supervisor signals to several work centers that the production rate should be changed. d. A "customer" work center signals to the "supplier" workstation that more parts are needed. e. An operator asks the next station's operator to help him fix his machine. Q41. If setup times and costs can be reduced enough, the JIT ideal of "Lot Size = 1" can be achieved. a. true b. false Q42. The list of 5S's, although it looks like a housekeeping directive, supports lean production by
  • 10. a. identifying non-value items and removing them, in the "sort/segregate" item b. reducing wasted motion, in the "standardize" item c. increasing variability through standardized procedures, in the "standardize" item d. eliminating wasted motion through ergonomic studies, in the "support" item e. building good safety practices, in the "shine/sweep" item Q43. A manufacturer took the following actions to reduce inventory. Which of these is generally not accepted as a JIT action? a. It used a pull system to move inventory. b. It produced in ever smaller lots. c. It required deliveries directly to the point of use. d. It picked the supplier that offered the lowest price based on quantity discounts. e. It worked to reduce the company's in-transit inventory. Q44. Transportation is an element of the Seven Wastes because a. all movement of material between plants is waste b. movement of equipment or people that adds no value is waste c. the transportation method of linear programming reduces travel requirements d. moving material between plants, between work centers, and handling more than once is waste e. transportation of any kind is a waste Q45. Hidden problems are generally uncovered during the process of reducing inventory. a. true b. false Q46. With level schedules, a few large batches, rather than frequent small batches, are processed.
  • 11. a. true b. false Q47. A firm wants to develop a level material use schedule based on the following data. What should be the setup cost? a. $0.45 b. $4.50 c. $45 d. $450 e. $500 Q48. The first step in reducing setup times is the separation of setup into preparation activities and actual setup, so that as much work as possible can be done while the machine or process is operating. a. true b. false Q49. JIT systems carry inventory just in case something goes wrong. a. true b. false Q50. Inventory has only one positive aspect, which is availability; inventory has several negatives, including increased material handling, obsolescence, and damage. a. true b. false