Company ABC
Ideas for improvement
Idea #1: Built some buffer in front of bottleneck machine:
Here according to theory of constraint we should have collect some time buffer in
before the bottleneck machine. Which will eliminate the waiting time for bottleneck.
Similar we should place some buffer where this component goes for next step. Since
constraint item must not wait for non-constraint item.
Idea #2:Rearranging man power i.e. balancing manpower:
Since welding, rolling and stamping operation requires 12, 8 and 3sec respectively, we
need to shift one man power from rolling and should use in combined welding and
stamping. These machines and product are flexible enough to change in there
processing order.
Idea #3: Roll Marking machine capacity enhancement:
Roll marking machine is one which runs on very low capacity due to various constraint,
In this case I would suggest to order new Roll marking machine which will increase the
capacity of whole plant. It can also be used for manufacturing of other items also
Empirical Support

Idea #1: Built some buffer in front of bottleneck machine:
It will eliminate the unused time of bottleneck machine by 100%. By this mean
assembly line can be run of full capacity of its weakest link. Reduce inventory for
further processing machines by around 25 %

Idea #2:Rearranging man power i.e. balancing manpower:
It reduces the time taken by welding machine by 1 sec and 1.5 sec by stamping and
rolling machine. It increases the man power utilisation by 15 % and less exhaustive work
for operators.

Idea #3: Roll Marking machine capacity enhancement:
This idea will improve the capacity of assembly line by 50%, it will reduce the total
processing time by 35% or 9 sec.
Comparison Table
Cost

Ease of
implementation

Magnitude of impact

Buffer Before
bottleneck

Low
Only inventory of raw
material and
assembly parts need
to put

Easy
Putting the inventory
near to station is not
big deal

Moderate
Maintain the flow of
assembly line, reduce
waiting time for
other machines

Rearranging man
power

Nil
It require only
repositioning of
operators

Easy
Only planning is
required

Good
It saves time, balance
the work and reduce
fatigue

Purchasing Roll
Marking machine

High
Since require
machine,
management
decisions, placing
order, transportation
cost etc.

Hard
Sufficient planning
and careful attention
is needed

High
It increases the
capacity of line.

More Related Content

Viewers also liked

scanned-course certificate
scanned-course certificatescanned-course certificate
scanned-course certificateFofuleng Babila
 
From Doha to Bali: Assessing the Bali Deliverables after 12 long years of mul...
From Doha to Bali: Assessing the Bali Deliverables after 12 long years of mul...From Doha to Bali: Assessing the Bali Deliverables after 12 long years of mul...
From Doha to Bali: Assessing the Bali Deliverables after 12 long years of mul...Simon Lacey
 
DCC short presentation
DCC short presentationDCC short presentation
DCC short presentationMarlene Bank
 
‘The Naked CEO’ by Lord Alex Malley: Book Summary by D Shivakumar; Chairman &...
‘The Naked CEO’ by Lord Alex Malley: Book Summary by D Shivakumar; Chairman &...‘The Naked CEO’ by Lord Alex Malley: Book Summary by D Shivakumar; Chairman &...
‘The Naked CEO’ by Lord Alex Malley: Book Summary by D Shivakumar; Chairman &...Marketing Buzzar
 
Modul 6 kb 2 asuhan neonatus dan bayi dengan oral trush dan diaper trush
Modul 6 kb 2   asuhan neonatus dan bayi dengan oral trush dan diaper trushModul 6 kb 2   asuhan neonatus dan bayi dengan oral trush dan diaper trush
Modul 6 kb 2 asuhan neonatus dan bayi dengan oral trush dan diaper trushpjj_kemenkes
 
Organic Search in Magento - PushON
Organic Search in Magento - PushONOrganic Search in Magento - PushON
Organic Search in Magento - PushONPushON Ltd
 
KNOW-FOR Case study: 
Knowledge sharing for impact: The Global Landscapes Forum
KNOW-FOR Case study: 
Knowledge sharing for impact: The Global Landscapes ForumKNOW-FOR Case study: 
Knowledge sharing for impact: The Global Landscapes Forum
KNOW-FOR Case study: 
Knowledge sharing for impact: The Global Landscapes ForumCIFOR-ICRAF
 
Magento Omnichannel - PushON
Magento Omnichannel - PushONMagento Omnichannel - PushON
Magento Omnichannel - PushONPushON Ltd
 
세바시 15분 최고가 되겠다고 결심하라 - 강윤선 준오헤어 대표
세바시 15분 최고가 되겠다고 결심하라 - 강윤선 준오헤어 대표세바시 15분 최고가 되겠다고 결심하라 - 강윤선 준오헤어 대표
세바시 15분 최고가 되겠다고 결심하라 - 강윤선 준오헤어 대표cbs15min
 
TWT Trendradar: Ein smartes Schloss soll Fahrräder vernetzen
TWT Trendradar: Ein smartes Schloss soll Fahrräder vernetzenTWT Trendradar: Ein smartes Schloss soll Fahrräder vernetzen
TWT Trendradar: Ein smartes Schloss soll Fahrräder vernetzenTWT
 

Viewers also liked (17)

Plano samanal 03 02-2015
Plano samanal 03 02-2015Plano samanal 03 02-2015
Plano samanal 03 02-2015
 
scanned-course certificate
scanned-course certificatescanned-course certificate
scanned-course certificate
 
From Doha to Bali: Assessing the Bali Deliverables after 12 long years of mul...
From Doha to Bali: Assessing the Bali Deliverables after 12 long years of mul...From Doha to Bali: Assessing the Bali Deliverables after 12 long years of mul...
From Doha to Bali: Assessing the Bali Deliverables after 12 long years of mul...
 
DCC short presentation
DCC short presentationDCC short presentation
DCC short presentation
 
Anket
AnketAnket
Anket
 
sertifikat LEI
sertifikat LEIsertifikat LEI
sertifikat LEI
 
The power of love 2015
The power of love 2015The power of love 2015
The power of love 2015
 
Tahun 1 (2014)
Tahun 1 (2014)Tahun 1 (2014)
Tahun 1 (2014)
 
‘The Naked CEO’ by Lord Alex Malley: Book Summary by D Shivakumar; Chairman &...
‘The Naked CEO’ by Lord Alex Malley: Book Summary by D Shivakumar; Chairman &...‘The Naked CEO’ by Lord Alex Malley: Book Summary by D Shivakumar; Chairman &...
‘The Naked CEO’ by Lord Alex Malley: Book Summary by D Shivakumar; Chairman &...
 
Modul 6 kb 2 asuhan neonatus dan bayi dengan oral trush dan diaper trush
Modul 6 kb 2   asuhan neonatus dan bayi dengan oral trush dan diaper trushModul 6 kb 2   asuhan neonatus dan bayi dengan oral trush dan diaper trush
Modul 6 kb 2 asuhan neonatus dan bayi dengan oral trush dan diaper trush
 
Organic Search in Magento - PushON
Organic Search in Magento - PushONOrganic Search in Magento - PushON
Organic Search in Magento - PushON
 
KNOW-FOR Case study: 
Knowledge sharing for impact: The Global Landscapes Forum
KNOW-FOR Case study: 
Knowledge sharing for impact: The Global Landscapes ForumKNOW-FOR Case study: 
Knowledge sharing for impact: The Global Landscapes Forum
KNOW-FOR Case study: 
Knowledge sharing for impact: The Global Landscapes Forum
 
Magento Omnichannel - PushON
Magento Omnichannel - PushONMagento Omnichannel - PushON
Magento Omnichannel - PushON
 
Boeing analysis
Boeing analysisBoeing analysis
Boeing analysis
 
세바시 15분 최고가 되겠다고 결심하라 - 강윤선 준오헤어 대표
세바시 15분 최고가 되겠다고 결심하라 - 강윤선 준오헤어 대표세바시 15분 최고가 되겠다고 결심하라 - 강윤선 준오헤어 대표
세바시 15분 최고가 되겠다고 결심하라 - 강윤선 준오헤어 대표
 
TWT Trendradar: Ein smartes Schloss soll Fahrräder vernetzen
TWT Trendradar: Ein smartes Schloss soll Fahrräder vernetzenTWT Trendradar: Ein smartes Schloss soll Fahrräder vernetzen
TWT Trendradar: Ein smartes Schloss soll Fahrräder vernetzen
 
Universidad autónoma de tlaxcala 1
Universidad autónoma de tlaxcala 1Universidad autónoma de tlaxcala 1
Universidad autónoma de tlaxcala 1
 

Similar to Cop 4

Capacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity PlanningCapacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity PlanningRaju Pegada
 
Schneider Case Study Challenge
Schneider Case Study ChallengeSchneider Case Study Challenge
Schneider Case Study ChallengeNikhil Kejriwal
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS Julian Kalac P.Eng
 
An Analysis Of Layout Planning
An Analysis Of Layout PlanningAn Analysis Of Layout Planning
An Analysis Of Layout PlanningDereck Downing
 
Plant Sustainability and Relaibility.pptx
Plant Sustainability and Relaibility.pptxPlant Sustainability and Relaibility.pptx
Plant Sustainability and Relaibility.pptxssuser61b22e
 
In apparel manufacturing (2 files merged)
In apparel manufacturing (2 files merged)In apparel manufacturing (2 files merged)
In apparel manufacturing (2 files merged)Ankur Shukla
 
SMED for non-manufacturing sectors - Revised
SMED for non-manufacturing sectors - RevisedSMED for non-manufacturing sectors - Revised
SMED for non-manufacturing sectors - RevisedVIVEK NERURKAR
 
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDERDESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDERAkshay Deshpande
 
Addis Ababa City Administration Technical, Vocational, Education And Training...
Addis Ababa City Administration Technical, Vocational, Education And Training...Addis Ababa City Administration Technical, Vocational, Education And Training...
Addis Ababa City Administration Technical, Vocational, Education And Training...Haileyesus Wondwossen
 
Senior Design II Final Report Group 3 Paper Stock Bubbles
Senior Design II Final Report Group 3 Paper Stock BubblesSenior Design II Final Report Group 3 Paper Stock Bubbles
Senior Design II Final Report Group 3 Paper Stock BubblesAustin Sims
 
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineDevelopment of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineLaukik Raut
 
Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Ishan Parekh
 
Report on Solution for reduction of cycle time in the manufacturing of Al Wheels
Report on Solution for reduction of cycle time in the manufacturing of Al WheelsReport on Solution for reduction of cycle time in the manufacturing of Al Wheels
Report on Solution for reduction of cycle time in the manufacturing of Al WheelsLAVA KUMAR ADDEPALLI
 
Advantages Of Robotic Machine In Industries - Grind Master
Advantages Of Robotic Machine In Industries - Grind MasterAdvantages Of Robotic Machine In Industries - Grind Master
Advantages Of Robotic Machine In Industries - Grind MasterOmkar Sane
 
Mechanical projects topics in Gagner Technologies
Mechanical projects topics in Gagner TechnologiesMechanical projects topics in Gagner Technologies
Mechanical projects topics in Gagner Technologiesgagnertechnologies
 

Similar to Cop 4 (20)

Capacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity PlanningCapacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity Planning
 
Pmm
PmmPmm
Pmm
 
Schneider Case Study Challenge
Schneider Case Study ChallengeSchneider Case Study Challenge
Schneider Case Study Challenge
 
DonnerCompany
DonnerCompanyDonnerCompany
DonnerCompany
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
 
Plant Layout
Plant LayoutPlant Layout
Plant Layout
 
An Analysis Of Layout Planning
An Analysis Of Layout PlanningAn Analysis Of Layout Planning
An Analysis Of Layout Planning
 
Plant Sustainability and Relaibility.pptx
Plant Sustainability and Relaibility.pptxPlant Sustainability and Relaibility.pptx
Plant Sustainability and Relaibility.pptx
 
jit.pptx
jit.pptxjit.pptx
jit.pptx
 
In apparel manufacturing (2 files merged)
In apparel manufacturing (2 files merged)In apparel manufacturing (2 files merged)
In apparel manufacturing (2 files merged)
 
Resume
ResumeResume
Resume
 
SMED for non-manufacturing sectors - Revised
SMED for non-manufacturing sectors - RevisedSMED for non-manufacturing sectors - Revised
SMED for non-manufacturing sectors - Revised
 
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDERDESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
 
Addis Ababa City Administration Technical, Vocational, Education And Training...
Addis Ababa City Administration Technical, Vocational, Education And Training...Addis Ababa City Administration Technical, Vocational, Education And Training...
Addis Ababa City Administration Technical, Vocational, Education And Training...
 
Senior Design II Final Report Group 3 Paper Stock Bubbles
Senior Design II Final Report Group 3 Paper Stock BubblesSenior Design II Final Report Group 3 Paper Stock Bubbles
Senior Design II Final Report Group 3 Paper Stock Bubbles
 
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineDevelopment of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
 
Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)
 
Report on Solution for reduction of cycle time in the manufacturing of Al Wheels
Report on Solution for reduction of cycle time in the manufacturing of Al WheelsReport on Solution for reduction of cycle time in the manufacturing of Al Wheels
Report on Solution for reduction of cycle time in the manufacturing of Al Wheels
 
Advantages Of Robotic Machine In Industries - Grind Master
Advantages Of Robotic Machine In Industries - Grind MasterAdvantages Of Robotic Machine In Industries - Grind Master
Advantages Of Robotic Machine In Industries - Grind Master
 
Mechanical projects topics in Gagner Technologies
Mechanical projects topics in Gagner TechnologiesMechanical projects topics in Gagner Technologies
Mechanical projects topics in Gagner Technologies
 

Cop 4

  • 1. Company ABC Ideas for improvement Idea #1: Built some buffer in front of bottleneck machine: Here according to theory of constraint we should have collect some time buffer in before the bottleneck machine. Which will eliminate the waiting time for bottleneck. Similar we should place some buffer where this component goes for next step. Since constraint item must not wait for non-constraint item. Idea #2:Rearranging man power i.e. balancing manpower: Since welding, rolling and stamping operation requires 12, 8 and 3sec respectively, we need to shift one man power from rolling and should use in combined welding and stamping. These machines and product are flexible enough to change in there processing order. Idea #3: Roll Marking machine capacity enhancement: Roll marking machine is one which runs on very low capacity due to various constraint, In this case I would suggest to order new Roll marking machine which will increase the capacity of whole plant. It can also be used for manufacturing of other items also
  • 2. Empirical Support Idea #1: Built some buffer in front of bottleneck machine: It will eliminate the unused time of bottleneck machine by 100%. By this mean assembly line can be run of full capacity of its weakest link. Reduce inventory for further processing machines by around 25 % Idea #2:Rearranging man power i.e. balancing manpower: It reduces the time taken by welding machine by 1 sec and 1.5 sec by stamping and rolling machine. It increases the man power utilisation by 15 % and less exhaustive work for operators. Idea #3: Roll Marking machine capacity enhancement: This idea will improve the capacity of assembly line by 50%, it will reduce the total processing time by 35% or 9 sec.
  • 3. Comparison Table Cost Ease of implementation Magnitude of impact Buffer Before bottleneck Low Only inventory of raw material and assembly parts need to put Easy Putting the inventory near to station is not big deal Moderate Maintain the flow of assembly line, reduce waiting time for other machines Rearranging man power Nil It require only repositioning of operators Easy Only planning is required Good It saves time, balance the work and reduce fatigue Purchasing Roll Marking machine High Since require machine, management decisions, placing order, transportation cost etc. Hard Sufficient planning and careful attention is needed High It increases the capacity of line.