SlideShare a Scribd company logo
Full Name:
Date of Birth:
Nationality:
Alessandro Rocchi
04/07/1973
italian
Current Position: ASSISTANT TESTER (MOD5) 3c (under mentorship)
Qualifications &
Affiliations:
Address :
IRSE Licence No. 0066171: Test Assistant
426 hornsey road inslington N194EB London…TEL:
00447886556736.
Key Skills and Competencies:
. 3C course
 Licensed by the Institution of Railway Signal Engineers as a Test Assistant 1.3.150
 Site Person in Charge Track competent track accustomed c.r.i.d QAF 54
 CSCS
 PTS
 Good knowledge and practice in Health and Safety
Axle counters set up course
Career Summary:
2013: Test assistant/Site person in charge - THALES
2009: Test Assistant – SIMS Limited
2007: Test Assistant /assistant installer Site Person in Charge – Westinghouse-invensys
2004: Site Person in Charge – Design Rationale
2003: Site Person in Charge – Balfour Beatty
1998: Site Person in Charge – MJ Quinn
2014 test assistant/s.p.i.c – atkins 3c under mentorship 2015: kellys rail test assistant/s.p.i.c 3c
under mentorship
Detailed Experience:
January 2013 – December 2013 january 2014 june 2014
 Test assistant – THALES test assistant different agencies
 Northern line possessions with m.p.i on district line
 Axle counters set up various weekends in Paddington main
 Continuity and meggering testing line/kent/ipswich
 Helping with functional testing
 Working on points- r.g.i.-c.o.l
 Monthly maintenance on loops tbtc using scope meter
 Commissioning
September 2011 – December 2012 july 2014-dec 2014
Test assistant – ATKINS/SIMS test assistant atkins 3C (under
mentors)
Metropolitan line SSR upgrade programme ebi tracks project(tpi)on district line
Immunization track circuitry conversion wire counts/cables testing/setup tracks
Checking recording track voltages commissioning 3C under mentorship
Wire counts meggerring.marking prints.verification
Locations and track equipment
Correlation
Jan 2015-present
Cables meggering test assistant 3C under mentorship
Cables testing kellys project Piccadilly line
Commissioning cables testing AC mains
November 2009 – September 2011 tracks to standard
Testing C.O.L
 Test Assistant – SIMS Limited changing led`s signals head
 EBI 200 Track Conversions – East End of the District Line train stop and motors replacement
 Shepherds Bush Marker / Latimer Road meggering ,marking prints verification
o Signal Relocation as part of Platform Extension working towards 3C licence
o Replaced 600v AC Main cabling and switch boxes
o Installed Cable Management System
o Correlation
o Wire Counting
o Cable Tracing
o Cable Testing
o Continuity and Meggering testing
o Commissioning
1 of 2 September 2012
 Triangle Sidings
o Installed points and track circuits
o Assisted in wire counts, correlation, cable tracing, dropping tracks and corresponding
o Commissioning
 Ladbroke Grove
o Replacement of relay room
o Correlation, cable tracing, wire counts, location case profile check, cable testing
o Commissioning
 Barbican
o Replacement of IMR
o Wire count to Q Relays, Fish Tank Relays, Fuse Bays & TDBS
o Testing of circuitry in new IMR, corresponding, cable testing
o Commissioning
 West Ham, Plaistow, Bromley By Bow
o Cable Tracing
o Wire Counting
o Commissioning
January 2007 – November 2009
 Test Assistant /assistant installer Site Person in Charge – Westinghouse
 SSL Upgrade Metropolitan Line
 Wire counting
 Cable testing
 Correlation
 Commissioning
 Installation wiring under mentorship
September 2004 – January 2007
 Site Person in Charge – Design Rationale
 St Paul’s Station Upgrade
 Works supervisor for CMS installation
July 2003 - September 2004
 Site Person in Charge – Balfour Beatty
 Oxford Circus
 Tottenham Hale
July 1998 - July 2003
 Site Person in Charge – MJ Quinn
 CMS Installations
 Cable Running
 Electrical Installation
2 of 2 September 2012

More Related Content

Similar to rocchi alessandro cv

Track Performance
Track PerformanceTrack Performance
Track Performance
Railways and Harbours
 
Adaptaflex technical
Adaptaflex technical Adaptaflex technical
Adaptaflex technical
Pum Alek
 
Fashionable Design and technology
Fashionable Design and technologyFashionable Design and technology
Fashionable Design and technology
Ibrahim Al-Hudhaif
 
Installation of Advanced Composite Core Conductors in Indonesia
Installation of Advanced Composite Core Conductors in IndonesiaInstallation of Advanced Composite Core Conductors in Indonesia
Installation of Advanced Composite Core Conductors in Indonesia
Dave Bryant
 
nathan_resume(2)
nathan_resume(2)nathan_resume(2)
nathan_resume(2)Sri Nathan
 
JAMES READ - CV 2014
JAMES READ - CV 2014JAMES READ - CV 2014
JAMES READ - CV 2014James Read
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
T.N. Sathish
 
Mitigation of Light Trespass from Headlamps of Locomotives on Curved Tracks
Mitigation of Light Trespass from Headlamps of Locomotives on Curved TracksMitigation of Light Trespass from Headlamps of Locomotives on Curved Tracks
Mitigation of Light Trespass from Headlamps of Locomotives on Curved Tracks
Michael Weber
 
Resume (apr16)
Resume (apr16)Resume (apr16)
Resume (apr16)
Werner Du Plooy
 
mahaprabu resume 18.10.2016
mahaprabu resume 18.10.2016mahaprabu resume 18.10.2016
mahaprabu resume 18.10.2016Mahaprabu A.S.
 
Borusan Mannesmann: Line Pipe Product Catalogue
Borusan Mannesmann: Line Pipe Product CatalogueBorusan Mannesmann: Line Pipe Product Catalogue
Borusan Mannesmann: Line Pipe Product Catalogue
Borusan Mannesmann Boru
 
Safe Resume expanded
Safe Resume expandedSafe Resume expanded
Safe Resume expandedPaul Burns
 
RPS CV of Simon Hua
RPS CV of Simon HuaRPS CV of Simon Hua
RPS CV of Simon HuaSimon Hua
 

Similar to rocchi alessandro cv (20)

Track Performance
Track PerformanceTrack Performance
Track Performance
 
SH CV Aug 16
SH CV Aug 16SH CV Aug 16
SH CV Aug 16
 
David Coates CV
David Coates CVDavid Coates CV
David Coates CV
 
Adaptaflex technical
Adaptaflex technical Adaptaflex technical
Adaptaflex technical
 
Fashionable Design and technology
Fashionable Design and technologyFashionable Design and technology
Fashionable Design and technology
 
Installation of Advanced Composite Core Conductors in Indonesia
Installation of Advanced Composite Core Conductors in IndonesiaInstallation of Advanced Composite Core Conductors in Indonesia
Installation of Advanced Composite Core Conductors in Indonesia
 
jims cv 2015
jims cv 2015jims cv 2015
jims cv 2015
 
nathan_resume(2)
nathan_resume(2)nathan_resume(2)
nathan_resume(2)
 
JAMES READ - CV 2014
JAMES READ - CV 2014JAMES READ - CV 2014
JAMES READ - CV 2014
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
 
Mitigation of Light Trespass from Headlamps of Locomotives on Curved Tracks
Mitigation of Light Trespass from Headlamps of Locomotives on Curved TracksMitigation of Light Trespass from Headlamps of Locomotives on Curved Tracks
Mitigation of Light Trespass from Headlamps of Locomotives on Curved Tracks
 
Resume (apr16)
Resume (apr16)Resume (apr16)
Resume (apr16)
 
CB CV 2015
CB CV 2015CB CV 2015
CB CV 2015
 
mahaprabu resume 18.10.2016
mahaprabu resume 18.10.2016mahaprabu resume 18.10.2016
mahaprabu resume 18.10.2016
 
Borusan Mannesmann: Line Pipe Product Catalogue
Borusan Mannesmann: Line Pipe Product CatalogueBorusan Mannesmann: Line Pipe Product Catalogue
Borusan Mannesmann: Line Pipe Product Catalogue
 
ARUN-RESUME
ARUN-RESUMEARUN-RESUME
ARUN-RESUME
 
Safe Resume expanded
Safe Resume expandedSafe Resume expanded
Safe Resume expanded
 
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
 
Ir. Unggang CV latest
Ir. Unggang CV latestIr. Unggang CV latest
Ir. Unggang CV latest
 
RPS CV of Simon Hua
RPS CV of Simon HuaRPS CV of Simon Hua
RPS CV of Simon Hua
 

rocchi alessandro cv

  • 1. Full Name: Date of Birth: Nationality: Alessandro Rocchi 04/07/1973 italian Current Position: ASSISTANT TESTER (MOD5) 3c (under mentorship) Qualifications & Affiliations: Address : IRSE Licence No. 0066171: Test Assistant 426 hornsey road inslington N194EB London…TEL: 00447886556736. Key Skills and Competencies: . 3C course  Licensed by the Institution of Railway Signal Engineers as a Test Assistant 1.3.150  Site Person in Charge Track competent track accustomed c.r.i.d QAF 54  CSCS  PTS  Good knowledge and practice in Health and Safety Axle counters set up course Career Summary: 2013: Test assistant/Site person in charge - THALES 2009: Test Assistant – SIMS Limited 2007: Test Assistant /assistant installer Site Person in Charge – Westinghouse-invensys 2004: Site Person in Charge – Design Rationale 2003: Site Person in Charge – Balfour Beatty 1998: Site Person in Charge – MJ Quinn 2014 test assistant/s.p.i.c – atkins 3c under mentorship 2015: kellys rail test assistant/s.p.i.c 3c under mentorship Detailed Experience: January 2013 – December 2013 january 2014 june 2014  Test assistant – THALES test assistant different agencies  Northern line possessions with m.p.i on district line  Axle counters set up various weekends in Paddington main  Continuity and meggering testing line/kent/ipswich  Helping with functional testing  Working on points- r.g.i.-c.o.l  Monthly maintenance on loops tbtc using scope meter  Commissioning September 2011 – December 2012 july 2014-dec 2014 Test assistant – ATKINS/SIMS test assistant atkins 3C (under mentors) Metropolitan line SSR upgrade programme ebi tracks project(tpi)on district line Immunization track circuitry conversion wire counts/cables testing/setup tracks Checking recording track voltages commissioning 3C under mentorship Wire counts meggerring.marking prints.verification Locations and track equipment Correlation Jan 2015-present Cables meggering test assistant 3C under mentorship Cables testing kellys project Piccadilly line Commissioning cables testing AC mains November 2009 – September 2011 tracks to standard Testing C.O.L  Test Assistant – SIMS Limited changing led`s signals head  EBI 200 Track Conversions – East End of the District Line train stop and motors replacement  Shepherds Bush Marker / Latimer Road meggering ,marking prints verification o Signal Relocation as part of Platform Extension working towards 3C licence o Replaced 600v AC Main cabling and switch boxes o Installed Cable Management System o Correlation o Wire Counting o Cable Tracing o Cable Testing o Continuity and Meggering testing o Commissioning 1 of 2 September 2012
  • 2.  Triangle Sidings o Installed points and track circuits o Assisted in wire counts, correlation, cable tracing, dropping tracks and corresponding o Commissioning  Ladbroke Grove o Replacement of relay room o Correlation, cable tracing, wire counts, location case profile check, cable testing o Commissioning  Barbican o Replacement of IMR o Wire count to Q Relays, Fish Tank Relays, Fuse Bays & TDBS o Testing of circuitry in new IMR, corresponding, cable testing o Commissioning  West Ham, Plaistow, Bromley By Bow o Cable Tracing o Wire Counting o Commissioning January 2007 – November 2009  Test Assistant /assistant installer Site Person in Charge – Westinghouse  SSL Upgrade Metropolitan Line  Wire counting  Cable testing  Correlation  Commissioning  Installation wiring under mentorship September 2004 – January 2007  Site Person in Charge – Design Rationale  St Paul’s Station Upgrade  Works supervisor for CMS installation July 2003 - September 2004  Site Person in Charge – Balfour Beatty  Oxford Circus  Tottenham Hale July 1998 - July 2003  Site Person in Charge – MJ Quinn  CMS Installations  Cable Running  Electrical Installation 2 of 2 September 2012