1. Dinesh Kumar is an electrical engineer with 8 years of experience in cement plant maintenance and project management. He is looking for opportunities to utilize his skills in electrical maintenance, commissioning, and instrumentation.
2. He has a Bachelor's degree in electrical engineering and experience managing electrical systems at cement plants in Saudi Arabia and India. His responsibilities included maintenance, testing, commissioning, and troubleshooting of equipment like transformers, motors, switchgear, and instrumentation controls.
3. Additionally, he has experience coordinating electrical and instrumentation activities for cement plant projects, inspecting equipment, and preparing operation and maintenance documentation.
Internship report from my internship at VVC transformer manufacturing company in Bangalore.We did this internship in the third year of our electrical and electronics engineering under VTU.
Internship report from my internship at VVC transformer manufacturing company in Bangalore.We did this internship in the third year of our electrical and electronics engineering under VTU.
1.Testing, commissioning and maintenance of SCADA /DCS systems and Electrical Drives.
2. Good knowledge of all IEC 61850 standards especially new one IEC 61850-90-1,IEC 61850-90-5 and IEC 61850-9-2LE and configuration process of IEC 61850 based substation automation system.
3. Testing and commissioning of relays of Siemens , SEL and ABB.And testing and commissioning of PCC,PDB, MLDB, Bus-bar, motors ,transformers.
4. HV & LV cables: Laying & termination of HV & LV cables and connection to the panels .
5. Installation of LV Switchgear for the power supply to the LV motors & motor operated valves.
6. Installation of LV motors, Laying & termination of the cables & connection to the motors of different sizes of pumps.
7. Installation of motor operated valve (Mov) : Installation & Erection of control circuits, Laying & connection of LV cables.
8. Testing & commissioning of the electrical instrument such as HMD(Hot Metal Dictator) , pyrometers , proximity sensors ,pressure switches etc
9. Commissioning & Maintenance & Testing of all HT and LT switchgear equipment like Transformers, Relays and Breakers (ACB & VCB).
10. Shutdown maintenance of electrical equipment.
AREVA’s Transmission and Distribution division, with over one hundred years of experience,
is one of the world leaders in medium and high voltage transmission systems and equipment.
Our engineers were some of the pioneers in direct current technology and have been
innovators in the field for over 40 years.
1 Interconnect the member states’ electrical power networks by providing the necessary investments for power sharing
to anticipate power generation loss in emergency situations;
2 Reduce the spinning reserves of each member state;
3 Improve the economic power system efficiency throughout the member states;
4 Provide cost-effective power sharing capabilities amongst the member states and strengthen collective electrical
supply reliability;
5 Deal with the existing companies and authorities in charge of the electricity sector in the member states and elsewhere
in order to coordinate their operations and strengthen the efficiency of operation with due regard to the circumstances
relating to each state;
6 Apply modern technological developments in the field of electricity.
Objectives
The Interconnection Project
The GCC
Interconnection Grid
has been planned in
three phases:
Phase I: The GCC North Grid Challenge
Saudi Arabia runs its electricity transmission network at 380 kV, 60 Hz. The other five countries use 400 kV,
50 Hz. Based on the asynchronous nature of the states to be interconnected, the best solution was to add an
HVDC interconnection. The Phase I system components linking the networks of Kuwait, Saudi Arabia, Bahrain
and Qatar include:
A double-circuit 400 kV, 50 Hz line from Al Zour (Kuwait) to Doha South (Qatar) via Ghunan (Saudi Arabia) with an intermediate
connection at Al Fadhili (Saudi Arabia) and associated substations.
A back-to-back HVDC interconnection to the Saudi Arabia 380 kV, 60 Hz system at Al Fadhili.
A double-circuit 400 kV interconnection comprising overhead lines and submarine link from Ghunan to Al-Jasra (Bahrain)
and associated substations.
The Control Center located at Ghunan is linked with each member country’s national control center and will ensure security,
control interconnection access, perform frequency and interchange regulation, coordinate interconnection operation, and
transaction recording and billing.
Our expert design engineers create the most optimized
solutions for each network based on present needs and in
anticipation of future growth. All energy solutions are based
on a project-by-project assessment, whether it’s for long
distance power transmission, energy trading between independent
networks or connection between asynchronous
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Sanil Balakrishnan
8+ yrs of GCC exp. as electrical engineer with proficiency in testing & commissioning, operation & maintenance @ traction rail industry, oil & gas and in power plants.
1.Testing, commissioning and maintenance of SCADA /DCS systems and Electrical Drives.
2. Good knowledge of all IEC 61850 standards especially new one IEC 61850-90-1,IEC 61850-90-5 and IEC 61850-9-2LE and configuration process of IEC 61850 based substation automation system.
3. Testing and commissioning of relays of Siemens , SEL and ABB.And testing and commissioning of PCC,PDB, MLDB, Bus-bar, motors ,transformers.
4. HV & LV cables: Laying & termination of HV & LV cables and connection to the panels .
5. Installation of LV Switchgear for the power supply to the LV motors & motor operated valves.
6. Installation of LV motors, Laying & termination of the cables & connection to the motors of different sizes of pumps.
7. Installation of motor operated valve (Mov) : Installation & Erection of control circuits, Laying & connection of LV cables.
8. Testing & commissioning of the electrical instrument such as HMD(Hot Metal Dictator) , pyrometers , proximity sensors ,pressure switches etc
9. Commissioning & Maintenance & Testing of all HT and LT switchgear equipment like Transformers, Relays and Breakers (ACB & VCB).
10. Shutdown maintenance of electrical equipment.
AREVA’s Transmission and Distribution division, with over one hundred years of experience,
is one of the world leaders in medium and high voltage transmission systems and equipment.
Our engineers were some of the pioneers in direct current technology and have been
innovators in the field for over 40 years.
1 Interconnect the member states’ electrical power networks by providing the necessary investments for power sharing
to anticipate power generation loss in emergency situations;
2 Reduce the spinning reserves of each member state;
3 Improve the economic power system efficiency throughout the member states;
4 Provide cost-effective power sharing capabilities amongst the member states and strengthen collective electrical
supply reliability;
5 Deal with the existing companies and authorities in charge of the electricity sector in the member states and elsewhere
in order to coordinate their operations and strengthen the efficiency of operation with due regard to the circumstances
relating to each state;
6 Apply modern technological developments in the field of electricity.
Objectives
The Interconnection Project
The GCC
Interconnection Grid
has been planned in
three phases:
Phase I: The GCC North Grid Challenge
Saudi Arabia runs its electricity transmission network at 380 kV, 60 Hz. The other five countries use 400 kV,
50 Hz. Based on the asynchronous nature of the states to be interconnected, the best solution was to add an
HVDC interconnection. The Phase I system components linking the networks of Kuwait, Saudi Arabia, Bahrain
and Qatar include:
A double-circuit 400 kV, 50 Hz line from Al Zour (Kuwait) to Doha South (Qatar) via Ghunan (Saudi Arabia) with an intermediate
connection at Al Fadhili (Saudi Arabia) and associated substations.
A back-to-back HVDC interconnection to the Saudi Arabia 380 kV, 60 Hz system at Al Fadhili.
A double-circuit 400 kV interconnection comprising overhead lines and submarine link from Ghunan to Al-Jasra (Bahrain)
and associated substations.
The Control Center located at Ghunan is linked with each member country’s national control center and will ensure security,
control interconnection access, perform frequency and interchange regulation, coordinate interconnection operation, and
transaction recording and billing.
Our expert design engineers create the most optimized
solutions for each network based on present needs and in
anticipation of future growth. All energy solutions are based
on a project-by-project assessment, whether it’s for long
distance power transmission, energy trading between independent
networks or connection between asynchronous
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Sanil Balakrishnan
8+ yrs of GCC exp. as electrical engineer with proficiency in testing & commissioning, operation & maintenance @ traction rail industry, oil & gas and in power plants.
Experience in the field of Testing and Commissioning & QA/QC of power system products, look forward for an opportunity to display my skills in the field of Testing, commissioning Operation & Maintenance and Execution of projects related to power systems
With an experience in the field of Testing and Commissioning of power system products, I look forward for an opportunity to display my skills in the field of Testing & commissioning ,Operation & Maintenance and Execution of projects related to power systems.
1. RESUME
DINESH KUMAR.K Mobile No: +966 502505286(Saudi)
S/o. Mr. KANAGARAJ. K +91-8870102697 (INDIA)
Opp. Dalmia Factory, Skype id. : dineshkumar.k86
Salem – 636 012. TAMILNADU. Email id : dinesh.86eee@gmail.com
Objective
I am a self-starting and highly motivated individual looking to join a high performing team of
professionals that will utilize my skills.
Personal Skills
• Ability to work in a team.
• I can make friends easily.
Academic Qualification
Qualification Institution Board/University
Year of
Passing Percentage
B.E (EEE) K.S.R College of
Technology, Tiruchengodu
Anna University 2007 72%
Diploma (EEE) CSI Polytechnic ,Salem. Dept. of Technical
Education
2004 92%
SSLC Sri Ramakrishna Saradha
Higher Secondary School,
Salem.
State Board 2001 74%
Experience: (TOTAL : 8YEARS EXPERIENCE)
S. No. Name of the Company Designation Period
1. Northern Region Cement
Company.Saudiarabia
Electrical
Engineer
23-03-2014 to
Till Date
2. LNV Technology Pvt. Ltd.,(Sinoma
international Engineering ) Chennai.
Customer: Bhavya Cements Ltd, A.P
Customer: JKL Cements Ltd, Chattisgarh
Customer: City Cements Company, Saudi
arabia
Engineer – E&I 20-04-2010 to
17-03-2014
3. ENMAS O & M Services Pvt. Ltd.,
(1×8 MW Biomass Power Plant, Rajasthan)
Electrical
Engineer
18-11-2009 to
06-04-2010
4. Megawin Switchgear Pvt. Ltd., Salem. Asst. Engineer
(Electrical)
10-08-2007 to
12-11-2009
2. 1. Company Name: Northern Region Cement Company, Saudi Arabia.(9000TPD Plant)
Electrical & Instrumentation jobs carried out:
i. Responsible for Electrical maintenance (Preventive & breakdown) of Cement plant.
ii. Preparing schedule for preventive & breakdown maintenance of electrical equipments.
iii. Operation and maintenance experience of Distribution transformer(2MVA) &
converter duty transformer (3000KVA)
iv. Operation and maintenance experience of HT (Schneider) & LT (ABB) Electrical
switchgear.
v. Operation and maintenance experience of LT, HT (Siemens) motors up to
6.3MW.
vi. Operation and maintenance experience of LRS panels.
vii. Operation and maintenance experience of HT capacitor, APFC panel.
viii. Conduct root cause analysis and provide failure reports for electrical failures
ix. Trouble shooting of all electrical equipments.
x. Operation and maintenance experience of belt weigher, weigh feeders &bin
weigher
xi. Operation and maintenance experience of solid flow feeder, Dampers,Poppet
dampers.
xii. Operation and maintenance experience of instrumentation controls like level
sensors, PCS, BDS, ZSS, Pressure Switches and DP Switches
xiii. Operation and maintenance experience of VFD Panels (ACS 800, ACS 550).
xiv. I have good knowledge in single line diagrams, power layouts, wiring drawings/
control logic diagrams.
2. Company Name: LNV Technology Pvt. Ltd., (Sinoma International)Chennai.
Customer: Bhavya Cements Ltd, Guntur, A.P (1.3 MTPA PLANT).
Customer: JK Lakshmi Cements Ltd, Chattisgarh(1.4MTPA PLANT).
Customer: City Cements Company, Saudi Arabia
Responsibilities
i. Responsible for Project coordination of Electrical and instrumentation activities for
cement plant.
ii. Responsible for Electrical and instrumentation erection, inspection, testing &
commissioning activities at site.
iii. Operation and maintenance experience of electrical equipments in cement plant.
iv. Inspection and testing of equipment (i.e. Transformers, HT & LT Panels, HT motors)
at vendor works.
v. Preparation & submission of erection, Inspection & commissioning protocols.
vi. Handing over of system to client with necessary O & M manuals and documents.
3. Electrical & Instrumentation jobs carried out:
i. Erection, Testing & commissioning of 132KV,6.6KV High voltage,medium voltage &
low voltage Electrical system comprising of
1. (15/18MVA ) Power transformer & (2.5MVA) Distribution transformer.
2. Power control centre.
3. Intelligent Motor control centre.
4. HT & LT Electrical switchgear of various makes.
ii. Installation & commissioning of MV Panels (abb), PCC, IMCC Panels, LRS Panels, GRR
Panels & Having good knowledge in fault tracing.
iii. Testing of Relays and relay setting calculation like REF610 (Feeder protection relay),
REM610(motor protection relay) and NI 40(over current & earth fault relay).
iv. Testing & commissioning of DOL Starters,RDOL Starters(using Siemocode
software)
v. Having good knowledge in Design of control circuits, fault tracing and rectification.
vi. Having good knowledge in laying and termination of various types of H.T & L.T
cables.
vii. Installation, testing & commissioning of HT capacitors and APFC Panels.
viii. Testing & commissioning of HT motors & LT motors.
ix. Erection, testing & commissioning of belt weigher, weigh feeders &bin
weigher(Make: Shenck systems)
x. Erection, testing & commissioning of solid flow feeder (Make: Transweigh),
Dampers (Auma),Poppet dampers.
xi. Erection and signal checking of instrumentation controls like level sensors, PCS, BDS,
ZSS, Pressure Switches and DP Switches.
xii. Installation, testing & commissioning of VFD Panels (ACS 800, ACS 550).
3. Company Name: Enmas O&M Services Pvt Ltd.,
Client: Amrit Environmental Technologies Pvt Ltd., Kotputli, Rajasthan.
Nature of job carried out
i. Looking after the total operation and maintenance of Control Panels and Motors.
ii. Operation and maintenance experience of 11KV / 8 MW BHEL Alternator.
iii. Operation and maintenance experience of 11KV Indoor VCB (SIEMENS) and
LT Breaker ACB (L & T) upto 3500A.
iv. Trouble shooting in HV and LV system like PCC, MCC and Motors.
v.Operation and maintenance experience of LT Induction Motors upto 200KW.
vi. Operation and maintenance experience of AVR Panel includes Auto Transformer of
excitation System in 8 MW Alternator (SANELEC).
vii. Commissioning, Operation and maintenance of Trouble shooting experience of DOL
4. Starter, Star delta Starter.
4. Megawin Switchgear Pvt. Ltd., Salem.
(Manufacturing of HT & LT Control Panels & Switchgears)
Nature of job carried out
i. Testing of Medium HT Panels and other Electrical installation.
ii. Testing of Porcelain clad vacuum circuit breaker.
iii. Testing of Different types of Relays.
iv. Testing of Current transformer & Potential transformer.
v. Designing Electrical & Mechanical components for switchgears.
vi. Worked in Microsoft Excel, Microsoft Word, Power Point, Adobe Photoshop
Personal Details:
Name : DINESH KUMAR. K
Father’s Name : KANAGARAJ. K
DOB & Age : 06-06-1986 & 30 years
Sex : Male
Marital status : Single
Nationality : Indian
Languages known : English ,Tamil
Permanent Address : 4/37 Gandhi Nagar,
Opp. Dalmia Factory,
Salem – 636 012. Tamilnadu.
Passport Details
• Passport No :G4569937
• Date Of Issue :20/08/2007
• Date Of Expiry:19/08/2017
• Issued by : Regional Passport Office, Chennai.
I hereby declare that the information furnished above is true to the best of my knowledge
and belief.
Place: Salem [DINESH KUMAR.K]
Date: