Pa ustad
- 1. No UraianPeker'aan Volume Har asatuan Jumlah Total
l. PEKERJAAN PERSIAPAN
Pek. Pengukuran / bouplang 1.00 500.000.00 500.000.00
Pembelianalat bantu 1
.
250.000.00 250.000.00
750.000.00
2. PEKERJAAN TANAH
Pek. Galian 97.2 M 10.200.00 991.440.00
Pek. Urugan Tanah 40 M
2
3.394.00 135.760.00
Pek. UruganPasir 6.75 M
2
293.280.00 197.640.00
1.324.840.00
3. PEKERJAAN PASANGAN
Pek. Pas. Batu kosong 6.2 M 124.050.00 ?69.110.00
Pek. Pas. Batu belah 6 M 190.0$5.00 1.140.510.00
Pek. Beton bertulang 2.8 M 1.009.245.00 3.835.165.20
Pek. Dinding bata 18.5 M 28.898.00 534.613.00
Pek. Plesteran 36M2
9.381.00 337.716.00
Pek. Lantai keramik 35 M 48.710.00 1.704.850.00
Pek. Rabat beton 1.3 M 208.922.00 271.598.60
Pek. Closed Z M
2
I 50.000,00 300.000.000
8.893.562.80
4. PEK. KAYU DAN A'f AP
Pek. Kuda-kuda 4.32 M 925.600.00 4.100.352.00
Pek. Kusen pintu dan jendela 2.4 M 833.588.00 2.052.400.00
Pek. Rangka atap 19 M
2
105.068.06 2.527.304.00
Pek. Genteng pres Jatiwangi 19 M 105.232.00 .602.404.00
Pek. Bumbung genteng 20 M 20.422.00 408.440.00
Pek. Langit-langit 7 M 33.835.00 236.845.00
Pek. Lisping 6.5 M 175.400.00 1.140.100.00
Pek. Daunpintu double 4.8 M 136.953.00 657.378.24
Pek. Rangka jendela kaca 26.8 M
2
55.850.00 1.496.780.00
15.222.003.24
- PEK. CAT DAN LABURAN
Pek. Memeni kayu 154.6 M 3.440.75 531.939.95
Pek. Mengecat kayu 120 M 10.200.00 1.224.000.00
Pek. Laburan dinding tembok 589 M 5.327.00 5.137.603.00
Pek. Meresidu 230 M
2
2.143.00 492.890.00
7.386.432.95
6. PEK. LAIN-LAIN
Pek. Kunci tanam l M 52.000.00 52.000.00
Pek. Engsel pintu 4 M 11.300.00 45.200.00
Pek. Grendel pintu 2 M 6.700.00 13.400.000
Pek. Engsel jendela 8 M
2
7.200.00 57.600.00
Pek. Grendel 8 M 6.700.00 53.600.00
Pek. kacapolos 3 mm 4 M 55.850.00 223.400.00
Keb. Besi U 6
M
13.000.00 78.000.00
Keb. Besi plat 6 M 12.000.00 72.000.00
Keb. Moor dan boud 56 M
2
500.00 28.000.00
623.200.00
7. PEK. FINISHING
Pek. Finishing 5.591.000.00
5.591.000.00
JU MLA H 40.000.089.99 ~