This pertains to Project Management
Develop a project on the following scenario:
You work for the CARE Foundation. The fundraising campaign was a success. While fundraising
is still on-going, there is enough to proceed with daycare center development and to begin
operations. You have been assigned the task of developing the project plan for adapting the
donated space (assume it is a 5,000-square-foot, single-story retail site on a detached pad site
(that does not touch other buildings), securing all required permits, and staffing and equipping the
proposed center. You decide on operating parameters and adjust your plan accordingly.
The following are the Required Elements of the project:
Brief description (1 paragraph) detailing how your proposed project fits within the definition of a
project.
Perform a stakeholder analysis: Identify members (occupation/position) of a stakeholder register
and offer a brief (bullet point style) narrative for each stakeholder describing how they relate to the
project. Be sure to note if stakeholder interest covers the whole of the project or part of the project.
Internal stakeholders
External stakeholders
Develop a stakeholder engagement plan (table would work or brief narratives) showing the type
of communication and timing of communication for each stakeholder type during the project.
Provide a one or two sentence project vision.
Provide a description of your project team. You may use an organization chart or provide the
information in a bullet point narrative. Show team members by organizational department or
occupation, or both if needed.
Describe your project plan. Use a combination of brief narratives and graphics (tables, etc).
Identify the type of project life cycle
Develop a task list
Sequence the tasks
Estimate duration of the tasks
What is the delivery cadence?
Create a CPM style network diagram showing tasks, time for tasks, and the critical path
1. You may use the post-it notes method and take a picture to embed in your document , or
For each task, identify key positions/occupations needed and develop a RACI matrix
Develop a Gantt chart appropriate to your project.
i. Show or describe dependencies in your Gantt chart

More Related Content

Similar to This pertains to Project Management Develop a project on the.pdf

Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
iutiuriaolcom
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
dgahdazncvn
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
scorpiosns123
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
iutiuriaolcom
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
dfdhdfhdg
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
adadscacascas
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
fdbdfbdx
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
dsvxxcvxc
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
sacascscasc
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
fdbdfbdx
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
scorpiosns123
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
dfdhdfhdg
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
adadscacascas
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
iutiuriaolcom
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
dsvxxcvxc
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete course
svsdvsdv
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete course
gjghnmgmghm
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete course
gnffg
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete course
dfdhdfhdg
 

Similar to This pertains to Project Management Develop a project on the.pdf (20)

Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Project Charter Tips.pptx
Project Charter Tips.pptxProject Charter Tips.pptx
Project Charter Tips.pptx
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete course
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete course
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete course
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete course
 

More from adinathfashion1

This is my visual studio C code how do I make it so that w.pdf
This is my visual studio C code how do I make it so that w.pdfThis is my visual studio C code how do I make it so that w.pdf
This is my visual studio C code how do I make it so that w.pdf
adinathfashion1
 
This problem is referred to as Exon chaining in bioinformati.pdf
This problem is referred to as Exon chaining in bioinformati.pdfThis problem is referred to as Exon chaining in bioinformati.pdf
This problem is referred to as Exon chaining in bioinformati.pdf
adinathfashion1
 
This project is broken up into Windows and Mac versions lis.pdf
This project is broken up into Windows and Mac versions lis.pdfThis project is broken up into Windows and Mac versions lis.pdf
This project is broken up into Windows and Mac versions lis.pdf
adinathfashion1
 
THis is from an Applied Mixed Models class Answer just part.pdf
THis is from an Applied Mixed Models class Answer just part.pdfTHis is from an Applied Mixed Models class Answer just part.pdf
THis is from an Applied Mixed Models class Answer just part.pdf
adinathfashion1
 
Title Media culture Objectives 1 To apply aseptic techniq.pdf
Title Media culture Objectives 1 To apply aseptic techniq.pdfTitle Media culture Objectives 1 To apply aseptic techniq.pdf
Title Media culture Objectives 1 To apply aseptic techniq.pdf
adinathfashion1
 
TitleInvestigating the effect of counterfeit permits on the.pdf
TitleInvestigating the effect of counterfeit permits on the.pdfTitleInvestigating the effect of counterfeit permits on the.pdf
TitleInvestigating the effect of counterfeit permits on the.pdf
adinathfashion1
 

More from adinathfashion1 (20)

This is based on lab activity in week 34 You will explore t.pdf
This is based on lab activity in week 34 You will explore t.pdfThis is based on lab activity in week 34 You will explore t.pdf
This is based on lab activity in week 34 You will explore t.pdf
 
This is my visual studio C code how do I make it so that w.pdf
This is my visual studio C code how do I make it so that w.pdfThis is my visual studio C code how do I make it so that w.pdf
This is my visual studio C code how do I make it so that w.pdf
 
This problem is referred to as Exon chaining in bioinformati.pdf
This problem is referred to as Exon chaining in bioinformati.pdfThis problem is referred to as Exon chaining in bioinformati.pdf
This problem is referred to as Exon chaining in bioinformati.pdf
 
This project is broken up into Windows and Mac versions lis.pdf
This project is broken up into Windows and Mac versions lis.pdfThis project is broken up into Windows and Mac versions lis.pdf
This project is broken up into Windows and Mac versions lis.pdf
 
Tim and Stephanie are devastated when they find out their ne.pdf
Tim and Stephanie are devastated when they find out their ne.pdfTim and Stephanie are devastated when they find out their ne.pdf
Tim and Stephanie are devastated when they find out their ne.pdf
 
THis is from an Applied Mixed Models class Answer just part.pdf
THis is from an Applied Mixed Models class Answer just part.pdfTHis is from an Applied Mixed Models class Answer just part.pdf
THis is from an Applied Mixed Models class Answer just part.pdf
 
This is not working for me at allAnd I cannot edit anythi.pdf
This is not working for me at allAnd I cannot edit anythi.pdfThis is not working for me at allAnd I cannot edit anythi.pdf
This is not working for me at allAnd I cannot edit anythi.pdf
 
This is false please explain Assuming that the reserve req.pdf
This is false please explain Assuming that the reserve req.pdfThis is false please explain Assuming that the reserve req.pdf
This is false please explain Assuming that the reserve req.pdf
 
This is NOT TRUE concerning courtship sounds Question 2 opt.pdf
This is NOT TRUE concerning courtship sounds Question 2 opt.pdfThis is NOT TRUE concerning courtship sounds Question 2 opt.pdf
This is NOT TRUE concerning courtship sounds Question 2 opt.pdf
 
This is what I got for 54 but Im unsure if its right Prepa.pdf
This is what I got for 54 but Im unsure if its right Prepa.pdfThis is what I got for 54 but Im unsure if its right Prepa.pdf
This is what I got for 54 but Im unsure if its right Prepa.pdf
 
This PNF technique starts with the same process as the the h.pdf
This PNF technique starts with the same process as the the h.pdfThis PNF technique starts with the same process as the the h.pdf
This PNF technique starts with the same process as the the h.pdf
 
This is where you set up the project infrastructure to help .pdf
This is where you set up the project infrastructure to help .pdfThis is where you set up the project infrastructure to help .pdf
This is where you set up the project infrastructure to help .pdf
 
This is a true case study A woman kept coming to the doctor.pdf
This is a true case study A woman kept coming to the doctor.pdfThis is a true case study A woman kept coming to the doctor.pdf
This is a true case study A woman kept coming to the doctor.pdf
 
To answer Questions 14 and 15 read the article Britain.pdf
To answer Questions 14 and 15 read the article Britain.pdfTo answer Questions 14 and 15 read the article Britain.pdf
To answer Questions 14 and 15 read the article Britain.pdf
 
To adhere to Endangered Species Act ESA guidelines the Fi.pdf
To adhere to Endangered Species Act ESA guidelines the Fi.pdfTo adhere to Endangered Species Act ESA guidelines the Fi.pdf
To adhere to Endangered Species Act ESA guidelines the Fi.pdf
 
Title Media culture Objectives 1 To apply aseptic techniq.pdf
Title Media culture Objectives 1 To apply aseptic techniq.pdfTitle Media culture Objectives 1 To apply aseptic techniq.pdf
Title Media culture Objectives 1 To apply aseptic techniq.pdf
 
TitleInvestigating the effect of counterfeit permits on the.pdf
TitleInvestigating the effect of counterfeit permits on the.pdfTitleInvestigating the effect of counterfeit permits on the.pdf
TitleInvestigating the effect of counterfeit permits on the.pdf
 
Tketici talebindeki kk deiiklikler aadaki nedenlerle ve.pdf
Tketici talebindeki kk deiiklikler aadaki nedenlerle ve.pdfTketici talebindeki kk deiiklikler aadaki nedenlerle ve.pdf
Tketici talebindeki kk deiiklikler aadaki nedenlerle ve.pdf
 
Titanic Project Management Blunders Links to an external s.pdf
Titanic  Project Management Blunders Links to an external s.pdfTitanic  Project Management Blunders Links to an external s.pdf
Titanic Project Management Blunders Links to an external s.pdf
 
This is my table met Mry anlea Nole isch studein las diru ev.pdf
This is my table met Mry anlea Nole isch studein las diru ev.pdfThis is my table met Mry anlea Nole isch studein las diru ev.pdf
This is my table met Mry anlea Nole isch studein las diru ev.pdf
 

Recently uploaded

Recently uploaded (20)

How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 

This pertains to Project Management Develop a project on the.pdf

  • 1. This pertains to Project Management Develop a project on the following scenario: You work for the CARE Foundation. The fundraising campaign was a success. While fundraising is still on-going, there is enough to proceed with daycare center development and to begin operations. You have been assigned the task of developing the project plan for adapting the donated space (assume it is a 5,000-square-foot, single-story retail site on a detached pad site (that does not touch other buildings), securing all required permits, and staffing and equipping the proposed center. You decide on operating parameters and adjust your plan accordingly. The following are the Required Elements of the project: Brief description (1 paragraph) detailing how your proposed project fits within the definition of a project. Perform a stakeholder analysis: Identify members (occupation/position) of a stakeholder register and offer a brief (bullet point style) narrative for each stakeholder describing how they relate to the project. Be sure to note if stakeholder interest covers the whole of the project or part of the project. Internal stakeholders External stakeholders Develop a stakeholder engagement plan (table would work or brief narratives) showing the type of communication and timing of communication for each stakeholder type during the project. Provide a one or two sentence project vision. Provide a description of your project team. You may use an organization chart or provide the information in a bullet point narrative. Show team members by organizational department or occupation, or both if needed. Describe your project plan. Use a combination of brief narratives and graphics (tables, etc). Identify the type of project life cycle Develop a task list Sequence the tasks Estimate duration of the tasks What is the delivery cadence? Create a CPM style network diagram showing tasks, time for tasks, and the critical path 1. You may use the post-it notes method and take a picture to embed in your document , or For each task, identify key positions/occupations needed and develop a RACI matrix Develop a Gantt chart appropriate to your project. i. Show or describe dependencies in your Gantt chart