SlideShare a Scribd company logo
1 of 28
1
SUMMER TRAINING REPORT
For
THAI SUMMIT AUTOPARTS INDIA PRIVATE LIMITED
By
AKSHAYA.R
Reg No : 412818631005
Of
VALLIAMMAI ENGINEERING COLLEGE
Submitted to the
FACULTY OF MANAGEMENT STUDIES
In partial fulfilment of the requirements for the award of the degree
Of
MASTER OF BUSINESS ADMINISTRATION
ANNA UNIVERSITY CHENNAI – 600025
JULY 2019
2
BONAFIDE CERTIFICATE
This is to certify that this summer training report is the bonafide work of AKSHAYA.R
Reg.No:412818631005 for THAI SUMMIT AUTOPARTS INDIA PRIVATE
LIMITED who carried out the work under my supervision. Certified further, that to the best
of my knowledge, the work reported herein does not form part of any other summer training
report on the basis of which a degree or award was conferred on an earlier occasion on this
or any other candidate.
______________________________ ______________________________
Mr.senthamilselvan,M.B.A.,M.Phil,(Ph.D.,) Dr. J. Padmini M.B.A, Ph.D
Assistant Professor (S.Gr) Head of the Department
Valliammai Engineering College Valliammai Engineering College
Kattankulathur Kattankulathur
3
DECLARATION
I, AKSHAYA.R student of the Department of Management Studies, Valliammai
Engineering College, Kattankulathur, declare that the Summer Training Report, for THAI
SUMMITAUTOPARTS INDIA PRIVATE LIMITED is in partial fulfilment of Master’s
Degree of Business Administration. This is my original work and not submitted for the award
of any degree, diploma, fellowship or other similar title or prizes.
Place: Signature of the Candidate:
Date: (Akshaya.R)
4
ACKNOWLEDGEMENT
I would like to express my sincere thanks and gratitude to all those who made it
possible to complete this summer project. I am also indebted to thank our Principal,
Dr. B Chidhambararajan, M.E., Ph.D., for permitting me to do the summer training.
I furthermore thank the head of the department Dr. J. Padmini M.B.A., Ph.D. for
the support and constant encouragement given to me.
I am obliged to my guide Mr. senthamilselvan, M.B.A., of my department for his
valuable information’s and guidance throughout my summer training. He stood as a great
support and I am grateful for his cooperation during the period of my summer internship.
Finally, yet importantly I would like to express my heartfelt gratitude and thanks to
the Mr. SRINIVASALU SURESH, Finance Manager of THAI SUMMIT
AUTOPARTS PRIVATE LIMITED who guided me in all aspects of my project.
5
TABLE OF CONTENTS
CHAPTER NO. TITLE PAGE NO.
I INTRODUCTION 1
1.1 Profile Of The Company 2
1.3 company overview 15
1.4 product profile 20
1.5 Organization Chart 25
II PRODUCTION DEPARTMENT 27
2.1 Plant location 27
2.2 Plant layout 27
2.3 Production and Planning Control (PPC) 27
2.3.1 Production Process 27
2.3.2 Machinery Details 28
2.3.3 Types of production system 33
2.3.4 Flow Chart 34
2.4 Quality Policy and Control 35
2.5 Maintenance 37
2.6 Inventory control and management 39
2.7 Purchase
2.8 Material management
III HUMAN RESOURCE MANAGEMENT 41
3.1 Recruitment and Selection 42
3.2 Wages and Salary Administration 43
3.3 Performance Appraisal 43
3.4 Industrial Relations 45
3.5 Training and Development 47
6
IV FINANCE DEPARTMENT 50
4.1 Capital Structure 50
4.2 Mobilization of funds 50
4.3 Cost of Capital 50
4.4 Working Capital 53
4.5 Statement of Accounts 56
4.6 Monthly Turnover 57
V MARKETING DEPARTMENT 60
5.1 Organizational Structure 61
5.2 Roles And Responsibilities 61
5.3 SWOT Analysis 62
5.4 Marketing Strategy 64
VI SECRETARIAL DEPARTMENT 64
VII RESEARCH AND DEVELOPMENT 65
VIII CONCLUSION 68
BIBLIOGRAPHY
7
LIST OF TABLES
TABLE NO. DESCRIPTION PAGE NO.
1.1 Balance Sheet as on March2014-2018 45
1.2 Monthly Turnover of 2017 45
8
CHAPTER-1
INTRODUCTION
An automobile (or automotive) is a vehicle that is capable of propelling itself. Since
seventeenth century, several attempts have been made to design and construct a practically
operative automobile. Today, automobiles play an unimaginable role in the social, economic
and industrial growth of any country. After the introduction of internal combustion engines,
the Automobile industry has seen a tremendous growth. Automobiles which includes car,
motorbike, bus etc.
A car (or automobile) is a wheeled motor vehicle used for transportation. Most
definitions of car say they run primarily on roads, seat one to eight people, have four tires,
and mainly transport people rather than goods. It comprises of various components like
Engine or Power Plant, Frame and Chassis, Transmission, Body, And Accessories.
A motorcycle, often called a bike, motorbike, or cycle, is a two- or three-wheeled
motor vehicle. Motorcycle design varies greatly to suit a range of different purposes: long
distance travel, commuting, cruising, sport including racing, and off-road riding.
Motorcycling is riding a motorcycle and related social activity such as joining a motorcycle
club and attending motorcycle rallies.
Motorcycle components and systems for a motorcycle are engineered, manufactured,
and assembled in order to produce motorcycle models with the desired performance,
aesthetics, and cost.
The primary raw materials used in the manufacture of the body of motorcycle are
metal, plastic and rubber. The motorcycle frame is composed almost completely of metal, as
are the wheels. The frame may be overlaid with plastic. The tires are composed of rubber.
The seat is made from a synthetic substance, such as polyurethane.
9
1.1 COMPANYPROFILE
Thai Summit Group is the leading auto parts manufacturer of Thailand. The group was
established back in 1977 and has a major role to drive Thailand's important auto parts
industry. Thai Summit Group has manufacturing facilities at all major industrial clusters
based in Laemchabang, Nakornnayok, Rayong and SamutPrakan in Thailand and have
global manufacturing facilities in China, India, Indonesia, Japan, Malaysia, USA and
Vietnam.
Currently Thai Summit Group has more than 40 subsidiary companies covering
manufacturing activities for all important industries of Thailand.
Before We Build Parts, We Build People.
VISION OF THE COMPANY
“Be a leader in two-wheeler and automotive parts manufacturer and achieve customer,
stakeholder delight through excellence in all of system and activities”
MISSION OF THE COMPANY
“Committed to develop, manufacture and deliver with high quality parts at competitive cost
with profitability to our stakeholders through passion and happiness”
PASSION
“Customer and stakeholder happiness with service from team happiness”
QUALITY POLICY
 Happy work place organization and high quality awareness organization.
 Setup 4M complete in all areas and effectiveness in implementation.
 Produce high quality of product, On time delivery and suitable and sustainable cost
to make customer satisfaction.
VALUE
10
THAI SUMMIT INDIA PLEDGE
1) INTEGRITY
To be honest and open in all my dealings
2) FAIRNESS
To provide good value for money and top quality
3) RESPONSIBILITY
To meet all my statutory obligation and happiness to all stakeholders
4) PROFESSIONALISM
To maintain the highest appropriate standards of technology and employee skills
5) SUSTAINABILITY
To ensure the best possible financial, social and environmental performance of the
business
1.1.2 HISTORY OF THE COMPANY:
India is a fascinating country. By foreign investors from around the world are willing to
invest the most is Mauritius the investment is one followed by Singapore England Japanese
the Netherlands US Cyprus Germany etc The Indian government has opened to foreign
investment in many sectors. Such as Automotive and Parts flight Biotechnology
Construction energy IT medical supplies Electronic Knicks. And the service sector such as
Tourism and banking etc.
The company's factory Thailand Summit they met with Mr. Somchai. Thavisouk proper
Company executives Thailand Summit Autoparts India and team manager of the company
over Somchai's Team executives have told that Thailand plant of this Summit. As part
manufacturing structural steel for cars, scooters and motorbikes by name Thai Summit
Autoparts India Private Ltd. and began operations and production in the year of 2015. In the
first phase investment totaled upto 800 Crore.
Thailand Summit gain the trust of the Yamaha was persuaded to work together the
production of steel structures and components. Body part and frame part enter the Factory
Yamaha motorcycle with factories, suppliers of Japan 8 factories under the concept of "One
Factory Concept".
11
Factory Yamaha's commitments to both 9 Suppliers are located in the same area to reduce
management costs and transportation including reducing imports some parts from overseas.
"The plant is Thailand Summit produced the steel frame of the motorcycle at all. Thailand
is the only company that has been trusted by Yamaha. As a supplier of India, despite the
many but the point at issue is capacity Low It has quality problems"
For the Indian motorcycle market, it is the largest market in the world both in terms of
production and sales. By Two-wheel motorcycle market the car is a motorcycle and scooter
India's average growth percentage. 8.7 And total sales 16.5 million vehicles.
First company in India to do Joint Venture Company JBM group of India to produce
automotive parts manufacturers, automotive companies to enter many of the Indian and
Japanese.
Present Thailand factory employs Summit the Tamil Nadu including Thailand. 20 people
and some are bringing in employees from working more temporary. Especially if there is a
need for training and technology transfer to Indian employees however this plant is intended
to be used in production. By bringing automation systems (Automation) used more to
contribute to the 50 percentage.
1.2 COMPANY OVERVIEW:
Thai Summit Group is strongly committed for development of production capabilities
including enhancement of the management of the organization at the forefront of the Thai
automotive industry by utilizing the available resources efficiently and effectively, including
the development of innovation and technology. This commitment enables the group to
produce qualitative products, which is an important element for the automotive, Electronics
and agriculture industry and had ensured the steadily growth for more than past three
decades.
12
1.2.1 WELFARE
S.no. Subject To Whom
1 Marriage Gift To White Collar & Blue Collar Rs.2000/-
2 Festival Gift & Sweets To White Collar & Blue Collar
3 First Aid Medical Centre To all employees for first aid treatment.
4 Uniforms & Shoes
Trainee Uniform Per year
– T Shirts - 3 No.s
- Pants – 2 No.s
- Safety Shoes – 1 No.s
5 Canteen & Transport Food & Transport on subsidized prices.
6 Personal Accident Policy Insurance coverage of Rs. 2 Lacs per trainee
7
Employee State Insurance
Corporation (ESIC)
Towards medical facility to self & family
8 Self Transport
Those who are interested they can claim
Rs.83/- per day basis if self transport
1.2.2 THE VARIOUS DEPARTMENTS
1. Production and quality department
2. Finance department
3. Human resourece department
4. Marketing and purchase department
5. New product development department
6. Tools department
1.2.3 WORLD WIDE BRANCHES
1. THAILAND-(Headquarters)
13
2. INDIA – Chennai, Gurgaon, Pune, Himachal & Pant nagar
3. MALAYSIA - Shato alam, Tanjongmalim, Kliang & Tanjongmalim
4. INDONESIA - West jawa
5. JAPAN - Ota, Tatebajashi & Yabutsuka
6. AMERICA - Howell, Michigan
1.2.4 BUSINESS UNIT GROUP-WORLDWIDE:
Thai Summit Group has set the standards for the manufacturing of auto component for
Autoparts industry in Thailand. The group has expanded globally having manufacturing
facilities all around in Asia and America. Our group has always emphasized on modern &
standardized manufacturing facilities. We believe that use of modern and state of art
technologies in manufacturing will enable us to meet our global customers needs more
efficiently.
1.2.3 TYPES OF MANUFACTURING PRODUCTS BY ITS GROUP
 Car body
 Interior/exterior
 Wiring harness
 Machine, fogging, die casting
14
 Cario
 Chassis
 Tooling
 Motorcycle frame
1.2.4 THE MAJOR CUSTOMERS ARE,
 India Yamaha Motor Private - Surajpur
 India Yamaha Motor Private Limited - Sales
 Johoku Manufacturing Pvt.Ltd
 MINDA INDUSTRIES LTD
 Royal Enfield- (A Unit of Eicher Motors Ltd)
 SEKISUI DLJM MOLDING PVT LTD.
 TS SHAPE INDIA PRIVATE LIMITED
 VPS Enterprises
1.4 PROFILE OF THE PRODUCT
Thai Summit is a leading company producing motorcycle parts in South East Asia. For
motorcycle frames, our capacity of motorcycle frame is more than one million per year. And
it also produce other parts, such as fuel tanks, brakes, clutches, tail pipes and handle bars
and car’s frame.
In Thai Summit Autoparts India Private Limited (sriperumbathur) the products producing
are,
Bike body frame-HANDLE BAR,SEAT REAR,BRACKETS,STANDS,HEAD
TUBE,PIPES,FOOT REST ETC.(ROYAL ENFIELD,YAMAHA)
Car -BUMPER(FORD)
1.4.1 AUTOPARTS
1.4.1.1 BIKE BODY FRAME
BIKE frame is one of those parts that combines practicality and performance, mundanity
and marvel. On one hand, it's a simple hunk of metal it's a simple hunk of metal used to
secure pieces like the seat, engine and the suspension. And on the other, it has to be an ideal
15
structure: one that doesn't flex, weighs as little as possible and is accurately built with the
proper geometry so things like tank slappers don't become the norm.
The basics are pretty straightforward (as basics tend to be). The frame has to hold the rider
(and maybe a pillion), while mounting the engine, suspension, a steering mechanism and a
stack of smaller systems like electronics, bodywork, luggage, a fuel tank and exhaust (just
to name a few).
1.4.1.1.1 HANDLE BAR
A motorcycle handlebar is a tubular component of a motorcycle's steering mechanism.
Handlebars provide a mounting place for controls such as brake, throttle, clutch, horn, light
switches and rear view mirrors; and they help to support part of the rider's weight. Even
when a handlebar is a single piece it is usually referred to in the plural as handlebars.
1.4.1.1.2 FOOT REST
It allows the seated person to rest their feet upon it, supporting the legs at a mostly horizontal
level, thus giving rise to the alternate term footrest. High quality footstools are height–
adjustable.
16
1.4.1.1.3 SIDE AND MAIN STAND
Bikestand is a device on a bicycle or motorcycle that allows the bike to be kept upright
without leaning against another object or the aid of a person. It is usually a piece of metal
that flips down from the frame and makes contact with the ground. It is generally located in
the middle of the bike or towards the rear. Some touring bicycles have two: one at the rear,
and a second in the front.
1.4.1.1.4 HEAD TUBE
The head tube is the part of a cycle's tubular frame within which the front fork steerer tube
is mounted. On a motorcycle, the "head tube" is normally called the steering head. On
bicycles the manufacturer's brand located on the head tube is known as a head badge.
1.4.1.1.5 PIPE
The stem is the component on a bike that connects the handlebars to the steerer tube of the
frame fork. Sometimes called a goose neck, a stem's design belongs to either a quill or
threadless system, and each system is compatible with respective headset and fork designs.
1.4.1.1.6 BRACKETS
The bottom bracket shell is a short and wide tube, relative to the other tubes in the frame,
that runs side to side and holds the bottom bracket. It is usually threaded, often left-hand
threaded on the right (drive) side of the bike to prevent loosening by fretting induced
precession, and right-hand threaded on the left (non-drive) side. It will be over-sized,
unthreaded, and possibly split in the case of an eccentric bottom bracket. The chain stays,
seat tube, and down tube all connect to the bottom bracket shell.
1.4.1.1.7 SEAT STAY
The seat stays connect the top of the seat tube (often at or near the same point as the top
tube) to the rear dropouts. A style of seat stay that extends forward of the seat tube, below
the rear end of the top tube and connects to the top tube in front of the seat tube.
1.4.1.2 CAR BODY-BUMPER
A bumper is a structure attached to or integrated with the front and rear ends of a motor
vehicle, to absorb impact in a minor collision, ideally minimizing repair costs. Numerous
developments, improvements in materials and technologies, as well as greater focus on
functionality for protecting vehicle components and improving safety have changed bumpers
over the years. Bumpers ideally minimize height mismatches between vehicles and protect
pedestrians from injury.
17
18
DEPARTMENTATION
Departmentation is a means of dividing the large functional organisation into smaller, flexible
administrative units. It makes grouping of activities into units and sub-units created through
departmentation which are known as department, division, section, branch etc.
LIST OF DEPARTMENTS
19
CHAPTER-2
PRODUCTION DEPARTMENT
A production department is the process by which raw materials are converted into finished
products. This department plays important role in the development of the company’s turnover.
The production department must ensure that the products are done by a cheap method and it is
done at the proper time
2.1 Plant location
Thai Summit It is located in an industrial estate Vallam Vadagal SIPCOT Industrial Park
Kan's key district board (Kancheepuram) away from the city of Chennai. Tamil Nadu to the
southwest around. 46 kilometer
20
2.2 Production planning control
The stages of Production planning and control has three phases namely:
 Planning Phase
 Action Phase
 Control Phase
Phases of production planning and control:
21
2.2.1PLANNING
Planning is an exercise of intelligent anticipation in order to establish how an objective can be
achieved or a need fulfilled in circumstances, which are invariably restrictive. Production
planning determines the optimal schedule and sequence of operations economic batch quantity,
machine assignment and dispatching priorities for sequencing. It has two categories of planning
namely
 Prior planning
 Active planning.
2.2.1.1PRIORPLANNING
Prior planning means pre-production planning. This includes all the planning efforts, which are
taking place prior to the active planning.
 Module-of-preplanning
The modules of prior planning are as follows:
 Product development and design is the process of developing a new product with
all the features, which are essential for effective use in the field, and designing it
accordingly. At the design stage, one has to take several aspects of design like, design
for selling, design for manufacturing and design for usage.
 Forecasting is an estimate of demand, which will happen in future. Since, it is only
an estimate based on the past demand, proper care must be taken while estimating it.
Given the sales forecast, the factory capacity, the aggregate inventory levels and size
of the work force, the manager must decide at what rate of production to operate the
plant over an intermediate planning horizon.
 Aggregate planning aims to find out a product wise planning over the intermediate
planning horizon.
 Material requirement planning is a technique for determining the quantity and
timing for the acquisition of dependent items needed to satisfy the master production
schedule.
2.2.1.2ACTIVEPLANNING
The modules of active planning are: Process planning and routing, Materials planning. Tools
planning, Loading, Scheduling etc.
 Process planning and routing is a complete determination of the specific
technological process steps and their sequence to produce products at the desired
quality, quantity and cost. It determines the method of manufacturing a product selects
22
the tools and equipments, analyses how the manufacturing of the product will fit into
the facilities. Routing in particular prescribes the flow of work in the plant and it is
related to the considerations of layout, temporary locations for raw materials and
components and materials handling systems.
 A material planning is a process which determines the requirements of various raw
materials/subassemblies by considering the trade-off between various cost
components like, carrying cost, ordering cost, shortage cost, and so forth.
 Tools’ planning determines the requirements of various tools by taking process
specification (surface finish, length of the job, overall depth of cut etc.), material
specifications (type of material used, hardness of the material, shape and size of the
material etc.) and equipment specifications (speed range, feed range, depth of cut
range etc.).
 Loading is the process of assigning jobs to several machines such that there is a load
balance among the machines. This is relatively a complex task, which can be managed
with the help of efficient heuristic procedures.
 Scheduling is the time phase of loading and determines when and in what sequence
the work will be carried out. This fixes the starting as well as the finishing time for
each job.
2.2.2ACTION
Action phase has the major step of dispatching. Dispatching is the transition from planning
phase to action phase. In this phase, the worker is ordered to start manufacturing the product.
The tasks which are included in dispatching are job order, store issue order, tool order, time
ticket, inspection order, move order etc.
 The job order number is the key item which is to be mentioned in all other
reports/orders.
 Stores issue order gives instruction to stores to issue materials for manufacturing the
product as per product specifications. As per tooling requirements for manufacturing
the product, the tool Order instruct the tool room to issue necessary tools.
 Time ticket is nothing but a card which is designed to note down the actual time taken
at various processes. This information is used for deciding the costs for future jobs of
similar nature and also for performing variance analysis, which helps to exercise
control.
23
 Job order is the official authorization to the shop floor to start manufacturing the
product. Generally, the process sequence will contain some testing and inspection. So,
these are to be instructed to inspection wing in the form of inspection order for timely
testing and inspection so that the amount of rework is minimized. The manufacture of
product involves moving raw materials/subassemblies to the main line. This is done by
a well-designed materials handling system. So, proper instruction is given to the
materials handling facilities for major movements of materials/subassemblies in the
form of a move order. Movements which involve less distance and fewer loads are
managed at the shop floor level based on requests from operators.
2.2CONTROL
The control phase has the following two major modules:
 Progress reporting, and
 Corrective action.
1. PROGRESS-REPORTING
In progress reporting, the data regarding what is happening with the job is collected. Also,
it helps to make comparison with the present level of performance. The various data
pertaining to materials rejection, process variations, equipment failures, operator efficiency,
operator absenteeism, tool life, etc., are collected and analyzed for the purpose of progress
reporting. These data are used for performing variance analysis, which would help us to
identify critical areas that deserve immediate attention for corrective actions.
2. CORRECTIVE-ACTION
The tasks under corrective action primarily make provisions for an unexpected event. Some
examples of corrective actions are creating schedule flexibility, schedule modifications,
capacity modifications, make or buy decisions, expediting the work, pre-planning, and so
on. Due to unforeseen reasons such as, machine breakdown, labor absenteeism, too much
rejection due to poor material quality etc., it may not be possible to realize the schedule as
per the plan. Under such condition, it is better to reschedule the whole product mix so that
we get a clear picture of the situation to progress further. Under such situation, it is to be re-
examined for selecting appropriate course of action. Expediting means taking action if the
progress reporting indicates deviations from the originally set targets. Pre-planning of the
whole affair becomes essential in case the expediting fails to bring the deviated plan to its
right path.
24
25
26
27
28

More Related Content

What's hot

Ultratech project
Ultratech projectUltratech project
Ultratech project
smart_ana
 
Comaparative Analysis of Cement Industry
Comaparative Analysis of Cement IndustryComaparative Analysis of Cement Industry
Comaparative Analysis of Cement Industry
Jaynand Patalia
 
Tata group of companies &buisness leading tycoon o
Tata group of companies &buisness leading tycoon  oTata group of companies &buisness leading tycoon  o
Tata group of companies &buisness leading tycoon o
Sumit Soni
 

What's hot (20)

Nexa project priyesh gaurav
Nexa project priyesh gauravNexa project priyesh gaurav
Nexa project priyesh gaurav
 
Indian cement industry
Indian cement industryIndian cement industry
Indian cement industry
 
India cement ltd
India cement ltd India cement ltd
India cement ltd
 
ratan tata
ratan tataratan tata
ratan tata
 
Ultratech project
Ultratech projectUltratech project
Ultratech project
 
Project report on apollo tyres ltd
Project report on apollo tyres ltdProject report on apollo tyres ltd
Project report on apollo tyres ltd
 
Comaparative Analysis of Cement Industry
Comaparative Analysis of Cement IndustryComaparative Analysis of Cement Industry
Comaparative Analysis of Cement Industry
 
The India Cement Report
The India Cement ReportThe India Cement Report
The India Cement Report
 
Tata group of companies &buisness leading tycoon o
Tata group of companies &buisness leading tycoon  oTata group of companies &buisness leading tycoon  o
Tata group of companies &buisness leading tycoon o
 
An Internship Project Report on Reliance Industries Limited
An Internship Project Report on Reliance Industries LimitedAn Internship Project Report on Reliance Industries Limited
An Internship Project Report on Reliance Industries Limited
 
Case study - Tata Motors Reputation Management
Case study - Tata Motors Reputation ManagementCase study - Tata Motors Reputation Management
Case study - Tata Motors Reputation Management
 
Aditya birla cement training report
Aditya birla cement training reportAditya birla cement training report
Aditya birla cement training report
 
Toyota project
Toyota projectToyota project
Toyota project
 
Tata Group
Tata GroupTata Group
Tata Group
 
Tata Motors Company Analysis Report 2015-2016
Tata Motors Company Analysis Report 2015-2016Tata Motors Company Analysis Report 2015-2016
Tata Motors Company Analysis Report 2015-2016
 
Tata motors project
Tata motors projectTata motors project
Tata motors project
 
Indian cement industry
Indian cement industryIndian cement industry
Indian cement industry
 
jaypee cement cps
jaypee cement cpsjaypee cement cps
jaypee cement cps
 
Automobile sector ppt
Automobile sector pptAutomobile sector ppt
Automobile sector ppt
 
Birla white - Aditya Birla Group
Birla white - Aditya Birla GroupBirla white - Aditya Birla Group
Birla white - Aditya Birla Group
 

Similar to Summer training report

Motorcycle Manufacturing and Spare Parts 2015
Motorcycle Manufacturing and Spare Parts 2015Motorcycle Manufacturing and Spare Parts 2015
Motorcycle Manufacturing and Spare Parts 2015
Uli Kaiser
 
SUMMER TRAINING PROJECT REPORT MAIN
SUMMER TRAINING PROJECT REPORT MAINSUMMER TRAINING PROJECT REPORT MAIN
SUMMER TRAINING PROJECT REPORT MAIN
Prabhat Tiwari
 

Similar to Summer training report (20)

Thailand AutoBook 2018 Preview
Thailand AutoBook 2018 PreviewThailand AutoBook 2018 Preview
Thailand AutoBook 2018 Preview
 
Motorcycle Manufacturing and Spare Parts 2015
Motorcycle Manufacturing and Spare Parts 2015Motorcycle Manufacturing and Spare Parts 2015
Motorcycle Manufacturing and Spare Parts 2015
 
SEKISUI DLJM Molding Pvt. Ltd. Industrial Report(Plastic Injection Molding)
SEKISUI DLJM Molding Pvt. Ltd. Industrial Report(Plastic Injection Molding)SEKISUI DLJM Molding Pvt. Ltd. Industrial Report(Plastic Injection Molding)
SEKISUI DLJM Molding Pvt. Ltd. Industrial Report(Plastic Injection Molding)
 
Thailand AutoBook 2019 Preview
Thailand AutoBook 2019 PreviewThailand AutoBook 2019 Preview
Thailand AutoBook 2019 Preview
 
SUMMER TRAINING PROJECT REPORT MAIN
SUMMER TRAINING PROJECT REPORT MAINSUMMER TRAINING PROJECT REPORT MAIN
SUMMER TRAINING PROJECT REPORT MAIN
 
hi tech arai pvt ltd madurai
hi tech arai pvt ltd maduraihi tech arai pvt ltd madurai
hi tech arai pvt ltd madurai
 
Thailand: Global Green Automotive Production Hub
Thailand: Global Green Automotive Production HubThailand: Global Green Automotive Production Hub
Thailand: Global Green Automotive Production Hub
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Internship Report Tata Motors.pdf
Internship Report Tata Motors.pdfInternship Report Tata Motors.pdf
Internship Report Tata Motors.pdf
 
Amtek training Aman (11 me-06)
 Amtek training Aman (11 me-06) Amtek training Aman (11 me-06)
Amtek training Aman (11 me-06)
 
project report
project reportproject report
project report
 
Study conducted at kinetic communication ltd, pune to analyze performance app...
Study conducted at kinetic communication ltd, pune to analyze performance app...Study conducted at kinetic communication ltd, pune to analyze performance app...
Study conducted at kinetic communication ltd, pune to analyze performance app...
 
HIREN DEVALIYA
HIREN DEVALIYAHIREN DEVALIYA
HIREN DEVALIYA
 
Automotive industry
Automotive industryAutomotive industry
Automotive industry
 
Honda showroom pratical repoat
Honda showroom pratical repoat Honda showroom pratical repoat
Honda showroom pratical repoat
 
Tvs motors summer internship report a study on customer satisfaction towards ...
Tvs motors summer internship report a study on customer satisfaction towards ...Tvs motors summer internship report a study on customer satisfaction towards ...
Tvs motors summer internship report a study on customer satisfaction towards ...
 
OEE Improvement
OEE ImprovementOEE Improvement
OEE Improvement
 
Sandeep project toyota
Sandeep project toyotaSandeep project toyota
Sandeep project toyota
 
Automotive brochure3
Automotive brochure3Automotive brochure3
Automotive brochure3
 
SWOT Analysis of TOYOTA and 4 major management functions of TOYOTA
SWOT Analysis of TOYOTA and 4 major management functions of TOYOTASWOT Analysis of TOYOTA and 4 major management functions of TOYOTA
SWOT Analysis of TOYOTA and 4 major management functions of TOYOTA
 

Recently uploaded

Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
laloo_007
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Recently uploaded (20)

Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 

Summer training report

  • 1. 1 SUMMER TRAINING REPORT For THAI SUMMIT AUTOPARTS INDIA PRIVATE LIMITED By AKSHAYA.R Reg No : 412818631005 Of VALLIAMMAI ENGINEERING COLLEGE Submitted to the FACULTY OF MANAGEMENT STUDIES In partial fulfilment of the requirements for the award of the degree Of MASTER OF BUSINESS ADMINISTRATION ANNA UNIVERSITY CHENNAI – 600025 JULY 2019
  • 2. 2 BONAFIDE CERTIFICATE This is to certify that this summer training report is the bonafide work of AKSHAYA.R Reg.No:412818631005 for THAI SUMMIT AUTOPARTS INDIA PRIVATE LIMITED who carried out the work under my supervision. Certified further, that to the best of my knowledge, the work reported herein does not form part of any other summer training report on the basis of which a degree or award was conferred on an earlier occasion on this or any other candidate. ______________________________ ______________________________ Mr.senthamilselvan,M.B.A.,M.Phil,(Ph.D.,) Dr. J. Padmini M.B.A, Ph.D Assistant Professor (S.Gr) Head of the Department Valliammai Engineering College Valliammai Engineering College Kattankulathur Kattankulathur
  • 3. 3 DECLARATION I, AKSHAYA.R student of the Department of Management Studies, Valliammai Engineering College, Kattankulathur, declare that the Summer Training Report, for THAI SUMMITAUTOPARTS INDIA PRIVATE LIMITED is in partial fulfilment of Master’s Degree of Business Administration. This is my original work and not submitted for the award of any degree, diploma, fellowship or other similar title or prizes. Place: Signature of the Candidate: Date: (Akshaya.R)
  • 4. 4 ACKNOWLEDGEMENT I would like to express my sincere thanks and gratitude to all those who made it possible to complete this summer project. I am also indebted to thank our Principal, Dr. B Chidhambararajan, M.E., Ph.D., for permitting me to do the summer training. I furthermore thank the head of the department Dr. J. Padmini M.B.A., Ph.D. for the support and constant encouragement given to me. I am obliged to my guide Mr. senthamilselvan, M.B.A., of my department for his valuable information’s and guidance throughout my summer training. He stood as a great support and I am grateful for his cooperation during the period of my summer internship. Finally, yet importantly I would like to express my heartfelt gratitude and thanks to the Mr. SRINIVASALU SURESH, Finance Manager of THAI SUMMIT AUTOPARTS PRIVATE LIMITED who guided me in all aspects of my project.
  • 5. 5 TABLE OF CONTENTS CHAPTER NO. TITLE PAGE NO. I INTRODUCTION 1 1.1 Profile Of The Company 2 1.3 company overview 15 1.4 product profile 20 1.5 Organization Chart 25 II PRODUCTION DEPARTMENT 27 2.1 Plant location 27 2.2 Plant layout 27 2.3 Production and Planning Control (PPC) 27 2.3.1 Production Process 27 2.3.2 Machinery Details 28 2.3.3 Types of production system 33 2.3.4 Flow Chart 34 2.4 Quality Policy and Control 35 2.5 Maintenance 37 2.6 Inventory control and management 39 2.7 Purchase 2.8 Material management III HUMAN RESOURCE MANAGEMENT 41 3.1 Recruitment and Selection 42 3.2 Wages and Salary Administration 43 3.3 Performance Appraisal 43 3.4 Industrial Relations 45 3.5 Training and Development 47
  • 6. 6 IV FINANCE DEPARTMENT 50 4.1 Capital Structure 50 4.2 Mobilization of funds 50 4.3 Cost of Capital 50 4.4 Working Capital 53 4.5 Statement of Accounts 56 4.6 Monthly Turnover 57 V MARKETING DEPARTMENT 60 5.1 Organizational Structure 61 5.2 Roles And Responsibilities 61 5.3 SWOT Analysis 62 5.4 Marketing Strategy 64 VI SECRETARIAL DEPARTMENT 64 VII RESEARCH AND DEVELOPMENT 65 VIII CONCLUSION 68 BIBLIOGRAPHY
  • 7. 7 LIST OF TABLES TABLE NO. DESCRIPTION PAGE NO. 1.1 Balance Sheet as on March2014-2018 45 1.2 Monthly Turnover of 2017 45
  • 8. 8 CHAPTER-1 INTRODUCTION An automobile (or automotive) is a vehicle that is capable of propelling itself. Since seventeenth century, several attempts have been made to design and construct a practically operative automobile. Today, automobiles play an unimaginable role in the social, economic and industrial growth of any country. After the introduction of internal combustion engines, the Automobile industry has seen a tremendous growth. Automobiles which includes car, motorbike, bus etc. A car (or automobile) is a wheeled motor vehicle used for transportation. Most definitions of car say they run primarily on roads, seat one to eight people, have four tires, and mainly transport people rather than goods. It comprises of various components like Engine or Power Plant, Frame and Chassis, Transmission, Body, And Accessories. A motorcycle, often called a bike, motorbike, or cycle, is a two- or three-wheeled motor vehicle. Motorcycle design varies greatly to suit a range of different purposes: long distance travel, commuting, cruising, sport including racing, and off-road riding. Motorcycling is riding a motorcycle and related social activity such as joining a motorcycle club and attending motorcycle rallies. Motorcycle components and systems for a motorcycle are engineered, manufactured, and assembled in order to produce motorcycle models with the desired performance, aesthetics, and cost. The primary raw materials used in the manufacture of the body of motorcycle are metal, plastic and rubber. The motorcycle frame is composed almost completely of metal, as are the wheels. The frame may be overlaid with plastic. The tires are composed of rubber. The seat is made from a synthetic substance, such as polyurethane.
  • 9. 9 1.1 COMPANYPROFILE Thai Summit Group is the leading auto parts manufacturer of Thailand. The group was established back in 1977 and has a major role to drive Thailand's important auto parts industry. Thai Summit Group has manufacturing facilities at all major industrial clusters based in Laemchabang, Nakornnayok, Rayong and SamutPrakan in Thailand and have global manufacturing facilities in China, India, Indonesia, Japan, Malaysia, USA and Vietnam. Currently Thai Summit Group has more than 40 subsidiary companies covering manufacturing activities for all important industries of Thailand. Before We Build Parts, We Build People. VISION OF THE COMPANY “Be a leader in two-wheeler and automotive parts manufacturer and achieve customer, stakeholder delight through excellence in all of system and activities” MISSION OF THE COMPANY “Committed to develop, manufacture and deliver with high quality parts at competitive cost with profitability to our stakeholders through passion and happiness” PASSION “Customer and stakeholder happiness with service from team happiness” QUALITY POLICY  Happy work place organization and high quality awareness organization.  Setup 4M complete in all areas and effectiveness in implementation.  Produce high quality of product, On time delivery and suitable and sustainable cost to make customer satisfaction. VALUE
  • 10. 10 THAI SUMMIT INDIA PLEDGE 1) INTEGRITY To be honest and open in all my dealings 2) FAIRNESS To provide good value for money and top quality 3) RESPONSIBILITY To meet all my statutory obligation and happiness to all stakeholders 4) PROFESSIONALISM To maintain the highest appropriate standards of technology and employee skills 5) SUSTAINABILITY To ensure the best possible financial, social and environmental performance of the business 1.1.2 HISTORY OF THE COMPANY: India is a fascinating country. By foreign investors from around the world are willing to invest the most is Mauritius the investment is one followed by Singapore England Japanese the Netherlands US Cyprus Germany etc The Indian government has opened to foreign investment in many sectors. Such as Automotive and Parts flight Biotechnology Construction energy IT medical supplies Electronic Knicks. And the service sector such as Tourism and banking etc. The company's factory Thailand Summit they met with Mr. Somchai. Thavisouk proper Company executives Thailand Summit Autoparts India and team manager of the company over Somchai's Team executives have told that Thailand plant of this Summit. As part manufacturing structural steel for cars, scooters and motorbikes by name Thai Summit Autoparts India Private Ltd. and began operations and production in the year of 2015. In the first phase investment totaled upto 800 Crore. Thailand Summit gain the trust of the Yamaha was persuaded to work together the production of steel structures and components. Body part and frame part enter the Factory Yamaha motorcycle with factories, suppliers of Japan 8 factories under the concept of "One Factory Concept".
  • 11. 11 Factory Yamaha's commitments to both 9 Suppliers are located in the same area to reduce management costs and transportation including reducing imports some parts from overseas. "The plant is Thailand Summit produced the steel frame of the motorcycle at all. Thailand is the only company that has been trusted by Yamaha. As a supplier of India, despite the many but the point at issue is capacity Low It has quality problems" For the Indian motorcycle market, it is the largest market in the world both in terms of production and sales. By Two-wheel motorcycle market the car is a motorcycle and scooter India's average growth percentage. 8.7 And total sales 16.5 million vehicles. First company in India to do Joint Venture Company JBM group of India to produce automotive parts manufacturers, automotive companies to enter many of the Indian and Japanese. Present Thailand factory employs Summit the Tamil Nadu including Thailand. 20 people and some are bringing in employees from working more temporary. Especially if there is a need for training and technology transfer to Indian employees however this plant is intended to be used in production. By bringing automation systems (Automation) used more to contribute to the 50 percentage. 1.2 COMPANY OVERVIEW: Thai Summit Group is strongly committed for development of production capabilities including enhancement of the management of the organization at the forefront of the Thai automotive industry by utilizing the available resources efficiently and effectively, including the development of innovation and technology. This commitment enables the group to produce qualitative products, which is an important element for the automotive, Electronics and agriculture industry and had ensured the steadily growth for more than past three decades.
  • 12. 12 1.2.1 WELFARE S.no. Subject To Whom 1 Marriage Gift To White Collar & Blue Collar Rs.2000/- 2 Festival Gift & Sweets To White Collar & Blue Collar 3 First Aid Medical Centre To all employees for first aid treatment. 4 Uniforms & Shoes Trainee Uniform Per year – T Shirts - 3 No.s - Pants – 2 No.s - Safety Shoes – 1 No.s 5 Canteen & Transport Food & Transport on subsidized prices. 6 Personal Accident Policy Insurance coverage of Rs. 2 Lacs per trainee 7 Employee State Insurance Corporation (ESIC) Towards medical facility to self & family 8 Self Transport Those who are interested they can claim Rs.83/- per day basis if self transport 1.2.2 THE VARIOUS DEPARTMENTS 1. Production and quality department 2. Finance department 3. Human resourece department 4. Marketing and purchase department 5. New product development department 6. Tools department 1.2.3 WORLD WIDE BRANCHES 1. THAILAND-(Headquarters)
  • 13. 13 2. INDIA – Chennai, Gurgaon, Pune, Himachal & Pant nagar 3. MALAYSIA - Shato alam, Tanjongmalim, Kliang & Tanjongmalim 4. INDONESIA - West jawa 5. JAPAN - Ota, Tatebajashi & Yabutsuka 6. AMERICA - Howell, Michigan 1.2.4 BUSINESS UNIT GROUP-WORLDWIDE: Thai Summit Group has set the standards for the manufacturing of auto component for Autoparts industry in Thailand. The group has expanded globally having manufacturing facilities all around in Asia and America. Our group has always emphasized on modern & standardized manufacturing facilities. We believe that use of modern and state of art technologies in manufacturing will enable us to meet our global customers needs more efficiently. 1.2.3 TYPES OF MANUFACTURING PRODUCTS BY ITS GROUP  Car body  Interior/exterior  Wiring harness  Machine, fogging, die casting
  • 14. 14  Cario  Chassis  Tooling  Motorcycle frame 1.2.4 THE MAJOR CUSTOMERS ARE,  India Yamaha Motor Private - Surajpur  India Yamaha Motor Private Limited - Sales  Johoku Manufacturing Pvt.Ltd  MINDA INDUSTRIES LTD  Royal Enfield- (A Unit of Eicher Motors Ltd)  SEKISUI DLJM MOLDING PVT LTD.  TS SHAPE INDIA PRIVATE LIMITED  VPS Enterprises 1.4 PROFILE OF THE PRODUCT Thai Summit is a leading company producing motorcycle parts in South East Asia. For motorcycle frames, our capacity of motorcycle frame is more than one million per year. And it also produce other parts, such as fuel tanks, brakes, clutches, tail pipes and handle bars and car’s frame. In Thai Summit Autoparts India Private Limited (sriperumbathur) the products producing are, Bike body frame-HANDLE BAR,SEAT REAR,BRACKETS,STANDS,HEAD TUBE,PIPES,FOOT REST ETC.(ROYAL ENFIELD,YAMAHA) Car -BUMPER(FORD) 1.4.1 AUTOPARTS 1.4.1.1 BIKE BODY FRAME BIKE frame is one of those parts that combines practicality and performance, mundanity and marvel. On one hand, it's a simple hunk of metal it's a simple hunk of metal used to secure pieces like the seat, engine and the suspension. And on the other, it has to be an ideal
  • 15. 15 structure: one that doesn't flex, weighs as little as possible and is accurately built with the proper geometry so things like tank slappers don't become the norm. The basics are pretty straightforward (as basics tend to be). The frame has to hold the rider (and maybe a pillion), while mounting the engine, suspension, a steering mechanism and a stack of smaller systems like electronics, bodywork, luggage, a fuel tank and exhaust (just to name a few). 1.4.1.1.1 HANDLE BAR A motorcycle handlebar is a tubular component of a motorcycle's steering mechanism. Handlebars provide a mounting place for controls such as brake, throttle, clutch, horn, light switches and rear view mirrors; and they help to support part of the rider's weight. Even when a handlebar is a single piece it is usually referred to in the plural as handlebars. 1.4.1.1.2 FOOT REST It allows the seated person to rest their feet upon it, supporting the legs at a mostly horizontal level, thus giving rise to the alternate term footrest. High quality footstools are height– adjustable.
  • 16. 16 1.4.1.1.3 SIDE AND MAIN STAND Bikestand is a device on a bicycle or motorcycle that allows the bike to be kept upright without leaning against another object or the aid of a person. It is usually a piece of metal that flips down from the frame and makes contact with the ground. It is generally located in the middle of the bike or towards the rear. Some touring bicycles have two: one at the rear, and a second in the front. 1.4.1.1.4 HEAD TUBE The head tube is the part of a cycle's tubular frame within which the front fork steerer tube is mounted. On a motorcycle, the "head tube" is normally called the steering head. On bicycles the manufacturer's brand located on the head tube is known as a head badge. 1.4.1.1.5 PIPE The stem is the component on a bike that connects the handlebars to the steerer tube of the frame fork. Sometimes called a goose neck, a stem's design belongs to either a quill or threadless system, and each system is compatible with respective headset and fork designs. 1.4.1.1.6 BRACKETS The bottom bracket shell is a short and wide tube, relative to the other tubes in the frame, that runs side to side and holds the bottom bracket. It is usually threaded, often left-hand threaded on the right (drive) side of the bike to prevent loosening by fretting induced precession, and right-hand threaded on the left (non-drive) side. It will be over-sized, unthreaded, and possibly split in the case of an eccentric bottom bracket. The chain stays, seat tube, and down tube all connect to the bottom bracket shell. 1.4.1.1.7 SEAT STAY The seat stays connect the top of the seat tube (often at or near the same point as the top tube) to the rear dropouts. A style of seat stay that extends forward of the seat tube, below the rear end of the top tube and connects to the top tube in front of the seat tube. 1.4.1.2 CAR BODY-BUMPER A bumper is a structure attached to or integrated with the front and rear ends of a motor vehicle, to absorb impact in a minor collision, ideally minimizing repair costs. Numerous developments, improvements in materials and technologies, as well as greater focus on functionality for protecting vehicle components and improving safety have changed bumpers over the years. Bumpers ideally minimize height mismatches between vehicles and protect pedestrians from injury.
  • 17. 17
  • 18. 18 DEPARTMENTATION Departmentation is a means of dividing the large functional organisation into smaller, flexible administrative units. It makes grouping of activities into units and sub-units created through departmentation which are known as department, division, section, branch etc. LIST OF DEPARTMENTS
  • 19. 19 CHAPTER-2 PRODUCTION DEPARTMENT A production department is the process by which raw materials are converted into finished products. This department plays important role in the development of the company’s turnover. The production department must ensure that the products are done by a cheap method and it is done at the proper time 2.1 Plant location Thai Summit It is located in an industrial estate Vallam Vadagal SIPCOT Industrial Park Kan's key district board (Kancheepuram) away from the city of Chennai. Tamil Nadu to the southwest around. 46 kilometer
  • 20. 20 2.2 Production planning control The stages of Production planning and control has three phases namely:  Planning Phase  Action Phase  Control Phase Phases of production planning and control:
  • 21. 21 2.2.1PLANNING Planning is an exercise of intelligent anticipation in order to establish how an objective can be achieved or a need fulfilled in circumstances, which are invariably restrictive. Production planning determines the optimal schedule and sequence of operations economic batch quantity, machine assignment and dispatching priorities for sequencing. It has two categories of planning namely  Prior planning  Active planning. 2.2.1.1PRIORPLANNING Prior planning means pre-production planning. This includes all the planning efforts, which are taking place prior to the active planning.  Module-of-preplanning The modules of prior planning are as follows:  Product development and design is the process of developing a new product with all the features, which are essential for effective use in the field, and designing it accordingly. At the design stage, one has to take several aspects of design like, design for selling, design for manufacturing and design for usage.  Forecasting is an estimate of demand, which will happen in future. Since, it is only an estimate based on the past demand, proper care must be taken while estimating it. Given the sales forecast, the factory capacity, the aggregate inventory levels and size of the work force, the manager must decide at what rate of production to operate the plant over an intermediate planning horizon.  Aggregate planning aims to find out a product wise planning over the intermediate planning horizon.  Material requirement planning is a technique for determining the quantity and timing for the acquisition of dependent items needed to satisfy the master production schedule. 2.2.1.2ACTIVEPLANNING The modules of active planning are: Process planning and routing, Materials planning. Tools planning, Loading, Scheduling etc.  Process planning and routing is a complete determination of the specific technological process steps and their sequence to produce products at the desired quality, quantity and cost. It determines the method of manufacturing a product selects
  • 22. 22 the tools and equipments, analyses how the manufacturing of the product will fit into the facilities. Routing in particular prescribes the flow of work in the plant and it is related to the considerations of layout, temporary locations for raw materials and components and materials handling systems.  A material planning is a process which determines the requirements of various raw materials/subassemblies by considering the trade-off between various cost components like, carrying cost, ordering cost, shortage cost, and so forth.  Tools’ planning determines the requirements of various tools by taking process specification (surface finish, length of the job, overall depth of cut etc.), material specifications (type of material used, hardness of the material, shape and size of the material etc.) and equipment specifications (speed range, feed range, depth of cut range etc.).  Loading is the process of assigning jobs to several machines such that there is a load balance among the machines. This is relatively a complex task, which can be managed with the help of efficient heuristic procedures.  Scheduling is the time phase of loading and determines when and in what sequence the work will be carried out. This fixes the starting as well as the finishing time for each job. 2.2.2ACTION Action phase has the major step of dispatching. Dispatching is the transition from planning phase to action phase. In this phase, the worker is ordered to start manufacturing the product. The tasks which are included in dispatching are job order, store issue order, tool order, time ticket, inspection order, move order etc.  The job order number is the key item which is to be mentioned in all other reports/orders.  Stores issue order gives instruction to stores to issue materials for manufacturing the product as per product specifications. As per tooling requirements for manufacturing the product, the tool Order instruct the tool room to issue necessary tools.  Time ticket is nothing but a card which is designed to note down the actual time taken at various processes. This information is used for deciding the costs for future jobs of similar nature and also for performing variance analysis, which helps to exercise control.
  • 23. 23  Job order is the official authorization to the shop floor to start manufacturing the product. Generally, the process sequence will contain some testing and inspection. So, these are to be instructed to inspection wing in the form of inspection order for timely testing and inspection so that the amount of rework is minimized. The manufacture of product involves moving raw materials/subassemblies to the main line. This is done by a well-designed materials handling system. So, proper instruction is given to the materials handling facilities for major movements of materials/subassemblies in the form of a move order. Movements which involve less distance and fewer loads are managed at the shop floor level based on requests from operators. 2.2CONTROL The control phase has the following two major modules:  Progress reporting, and  Corrective action. 1. PROGRESS-REPORTING In progress reporting, the data regarding what is happening with the job is collected. Also, it helps to make comparison with the present level of performance. The various data pertaining to materials rejection, process variations, equipment failures, operator efficiency, operator absenteeism, tool life, etc., are collected and analyzed for the purpose of progress reporting. These data are used for performing variance analysis, which would help us to identify critical areas that deserve immediate attention for corrective actions. 2. CORRECTIVE-ACTION The tasks under corrective action primarily make provisions for an unexpected event. Some examples of corrective actions are creating schedule flexibility, schedule modifications, capacity modifications, make or buy decisions, expediting the work, pre-planning, and so on. Due to unforeseen reasons such as, machine breakdown, labor absenteeism, too much rejection due to poor material quality etc., it may not be possible to realize the schedule as per the plan. Under such condition, it is better to reschedule the whole product mix so that we get a clear picture of the situation to progress further. Under such situation, it is to be re- examined for selecting appropriate course of action. Expediting means taking action if the progress reporting indicates deviations from the originally set targets. Pre-planning of the whole affair becomes essential in case the expediting fails to bring the deviated plan to its right path.
  • 24. 24
  • 25. 25
  • 26. 26
  • 27. 27
  • 28. 28