3 Days ( Best Trend Line Selection)
y = 0.379x2 - 5.8282x + 36.332
R² = 0.94080.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
0 20 30 50 70
Strength(MPa)
GGBS value (%)
Percentage of GGBS (%)
vs strength (MPa)
Poly. (Percentage of
GGBS (%) vs strength
(MPa))
Figure 1
Analysis (3 Days)
Trend Type R square value
Exponential 0.9168
Linear 0.9260
Logarithmic 0.9225
Polynomial 0.9408
Power 0.8800
For 3 days analysis, graph was plotted as shown in Figure 1. Then, best line fit
was determined, together with equation of graph and R square value. There are
5 types of best fit line and their corresponding equation and R square value, as
shown in Table 1.
Table 1: Value of R square for 3 days
Based on R square value, polynomial trend type is the best fit line, with a value of
0.9408 and corresponding equation as shown in Figure 1
7 Days (Best Trend Line Selection)
y = 0.7996x2 - 6.2512x + 44.018
R² = 0.60060.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
0 20 30 50 70
Strength(MPa)
GGBS Value (%)
Percentage of GGBS (%)
vs strength (MPa)
Poly. (Percentage of
GGBS (%) vs strength
(MPa))
Figure 2
Analysis (7 Days)
Trend Type R square value
Exponential 0.3905
Linear 0.4218
Logarithmic 0.4992
Polynomial 0.6006
Power 0.4596
For 3 days analysis, graph was plotted as shown in Figure 2. Then, best line fit
was determined, together with equation of graph and R square value. There are
5 types of best fit line and their corresponding equation and R square value, as
shown in Table 2
Table 2: Value of R square for 7 days
Based on R square value, polynomial trend type is the best fit line, with a value of
0.6006 and corresponding equation as shown in Figure 2
28 Days (Best Trend Line Selection)
y = 0.5095x2 - 1.8705x + 46.592
R² = 0.7816
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
0 20 30 50 70
Strength(MPa)
GGBS Value (%)
Percentage of GGBS (%) vs
strength (MPa)
Poly. (Percentage of GGBS
(%) vs strength (MPa))
Figure 3
Analysis (28 Days)
Trend Type R square value
Exponential 0.6262
Linear 0.6213
Logarithmic 0.4826
Polynomial 0.7816
Power 0.4901
For 3 days analysis, graph was plotted as shown in Figure 3. Then, best line fit
was determined, together with equation of graph and R square value. There are
5 types of best fit line and their corresponding equation and R square value, as
shown in Table 3
Table 3: Value of R square for 28 days
Based on R square value, polynomial trend type is the best fit line, with a value of
0.7816 and corresponding equation as shown in Figure 3

More Related Content

Viewers also liked

Workman compensation act
Workman compensation actWorkman compensation act
Workman compensation act
moon2108
 
Employees compensation act 1923
Employees compensation act 1923Employees compensation act 1923
Employees compensation act 1923
DrPadma Nabhan
 
Factories act, 1948 with related attachments
Factories act, 1948 with related attachmentsFactories act, 1948 with related attachments
Factories act, 1948 with related attachments
ACS Shalu Saraf
 
The factories act, 1948
The factories act, 1948The factories act, 1948
The factories act, 1948
Ranjeet Yadav
 
workmen compensation act 1923
workmen compensation act 1923workmen compensation act 1923
workmen compensation act 1923
Swati Kackar
 
The Workmen's Compensation Act, 1923
The Workmen's Compensation Act, 1923The Workmen's Compensation Act, 1923
The Workmen's Compensation Act, 1923
Ranjeet Yadav
 
The workmen’s compensation act 1923
The workmen’s compensation act 1923The workmen’s compensation act 1923
The workmen’s compensation act 1923
Nidhi Shukla
 

Viewers also liked (20)

GGBS PPT
GGBS PPTGGBS PPT
GGBS PPT
 
GGBS
GGBSGGBS
GGBS
 
Factories act 1948
Factories act 1948Factories act 1948
Factories act 1948
 
Quality control in construction site
Quality control in construction siteQuality control in construction site
Quality control in construction site
 
Trade union act sg
Trade union act  sgTrade union act  sg
Trade union act sg
 
Workman compensation act
Workman compensation actWorkman compensation act
Workman compensation act
 
Workmen’s compensation act 1923
Workmen’s compensation act  1923Workmen’s compensation act  1923
Workmen’s compensation act 1923
 
The factories act, 1948
The factories act, 1948The factories act, 1948
The factories act, 1948
 
Employees compensation act 1923
Employees compensation act 1923Employees compensation act 1923
Employees compensation act 1923
 
Factories act, 1948 with related attachments
Factories act, 1948 with related attachmentsFactories act, 1948 with related attachments
Factories act, 1948 with related attachments
 
Brick masonry
Brick masonryBrick masonry
Brick masonry
 
The factories act, 1948
The factories act, 1948The factories act, 1948
The factories act, 1948
 
Quality control and inspection
Quality control and inspectionQuality control and inspection
Quality control and inspection
 
M.tech ppt
M.tech pptM.tech ppt
M.tech ppt
 
Moisture Control for Masonry
Moisture Control for MasonryMoisture Control for Masonry
Moisture Control for Masonry
 
workmen compensation act 1923
workmen compensation act 1923workmen compensation act 1923
workmen compensation act 1923
 
Employees compensation act, 1923
Employees compensation act, 1923Employees compensation act, 1923
Employees compensation act, 1923
 
The Workmen's Compensation Act, 1923
The Workmen's Compensation Act, 1923The Workmen's Compensation Act, 1923
The Workmen's Compensation Act, 1923
 
The workmen’s compensation act 1923
The workmen’s compensation act 1923The workmen’s compensation act 1923
The workmen’s compensation act 1923
 
Occupational Safety and Health Management in Construction Industry
Occupational Safety and Health Management in Construction IndustryOccupational Safety and Health Management in Construction Industry
Occupational Safety and Health Management in Construction Industry
 

Recently uploaded

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 

Relationship between the amount of GGBFS and Compressive Strength

  • 1. Relationship between the amount of GGBS and the strength Hume Concrete Sdn. Bhd.
  • 2. 3 Days ( Best Trend Line Selection) y = 0.379x2 - 5.8282x + 36.332 R² = 0.94080.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 0 20 30 50 70 Strength(MPa) GGBS value (%) Percentage of GGBS (%) vs strength (MPa) Poly. (Percentage of GGBS (%) vs strength (MPa)) Figure 1
  • 3. Analysis (3 Days) Trend Type R square value Exponential 0.9168 Linear 0.9260 Logarithmic 0.9225 Polynomial 0.9408 Power 0.8800 For 3 days analysis, graph was plotted as shown in Figure 1. Then, best line fit was determined, together with equation of graph and R square value. There are 5 types of best fit line and their corresponding equation and R square value, as shown in Table 1. Table 1: Value of R square for 3 days Based on R square value, polynomial trend type is the best fit line, with a value of 0.9408 and corresponding equation as shown in Figure 1
  • 4. 7 Days (Best Trend Line Selection) y = 0.7996x2 - 6.2512x + 44.018 R² = 0.60060.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 0 20 30 50 70 Strength(MPa) GGBS Value (%) Percentage of GGBS (%) vs strength (MPa) Poly. (Percentage of GGBS (%) vs strength (MPa)) Figure 2
  • 5. Analysis (7 Days) Trend Type R square value Exponential 0.3905 Linear 0.4218 Logarithmic 0.4992 Polynomial 0.6006 Power 0.4596 For 3 days analysis, graph was plotted as shown in Figure 2. Then, best line fit was determined, together with equation of graph and R square value. There are 5 types of best fit line and their corresponding equation and R square value, as shown in Table 2 Table 2: Value of R square for 7 days Based on R square value, polynomial trend type is the best fit line, with a value of 0.6006 and corresponding equation as shown in Figure 2
  • 6. 28 Days (Best Trend Line Selection) y = 0.5095x2 - 1.8705x + 46.592 R² = 0.7816 41.0 42.0 43.0 44.0 45.0 46.0 47.0 48.0 49.0 50.0 51.0 52.0 0 20 30 50 70 Strength(MPa) GGBS Value (%) Percentage of GGBS (%) vs strength (MPa) Poly. (Percentage of GGBS (%) vs strength (MPa)) Figure 3
  • 7. Analysis (28 Days) Trend Type R square value Exponential 0.6262 Linear 0.6213 Logarithmic 0.4826 Polynomial 0.7816 Power 0.4901 For 3 days analysis, graph was plotted as shown in Figure 3. Then, best line fit was determined, together with equation of graph and R square value. There are 5 types of best fit line and their corresponding equation and R square value, as shown in Table 3 Table 3: Value of R square for 28 days Based on R square value, polynomial trend type is the best fit line, with a value of 0.7816 and corresponding equation as shown in Figure 3