Kaizen lite 
S U B S E T O F K A I Z E N MO D E L 
LEAN, ITERATIVE AND INCREMENTAL DEVELOPMENT
Lifecycle 
Construction Support 
• Construction – is just beginning for the project, majorify of time we would spend 
maintaining it: bug fixes, small improvements etc. 
• Support period (budget) is much more bigger than construction period (budget) 
• With time - product tends to get more expensive to maintain 
• Process tends to get more bureaucratic (business waste) and implementation tends to 
deviate from agreed architecture (technical waste).
Challenges 
Business 
•With time - too many steps are introduced in the process 
•With time - procedures tend to become complicated 
•With time - amount of paperwork increases significantly 
•With time - amount of reporting increases significantly 
•Due to unbalanced process/procedure - sometimes people are waiting for work, or are overloaded with it 
Technical 
•Unhappiness with constant support which results in high attrition rate 
•Lack of pride in workmanship results in lack of commitment 
•High attrition rate results in constant training and lack of project knowledge 
•Due to above – quality of code 
•Small changes tend to break big picture (architecture) 
Waste 
v.1.0 v.2.0 v.3.0 v.4.0 v.5.0 v.6.0 ... Demise
Cycle 
Requirements (egg) 
• Business requirements 
• Design 
• Technical requirements 
• Definition of milestones, 
risks 
• Estimation / cycle length 
Construction (metamorphosis) 
• Daily progress update 
• Implementation 
• Brief showcase of 
milestones 
• Optimization / Testing / QA 
• Delivery 
• Reflection upon cycle 
• Due to relatively short duration of the 
cycle – deep planning is not required. 
• Due to relatively small size – extensive 
testing and QA are not required. 
• Due to relative simplicity – presentation 
and complicated transition (delivery) are 
not required.
Engagement 
Project 1 
Team SME Tech Lead BA PM TL 
Project 3 
BA PM TL 
Project 2 
SME Tech Lead BA PM TL
Kanban 
Lack of visibility 
Overload 
Vision Construction 
Vision Construction 
Waiting 
Lack of visibility 
• Provide visibility of workload and current status of the milestones 
• Provide visibility of progress and issues / blockers of process / procedures / systems 
• Provide visibility of efficiency and improve if needed 
• Waiting 
• (waiting) Not on time 
• (waiting) Not on budget 
• Overload 
• (overload) Not according to 
expectation 
• (overload) Lack of commitment 
• (overload) Lack of pride in 
workmanship 
• (overload) High attrition rate 
• (overload) Poor quality
Egg | 
Meta| 
Waste 
Risks 
Debt 
Issues Debt 
Checkpoint 
Checkpoint 
Perceived Debt vs Actual Debt Recycle plan 
Waste reduce 
Direction pair reviews Recycle log constantly and takes action to remove business debt 
At least every third cycle - action items in Recycle log reviewed and implemented to remove technical debt
Summary 
◦ Lifecycle 
◦ Support is the most costly and lengthy phase of product life cycle 
◦ Amount of waste in the process/product grows with time 
◦ Challenges 
◦ With time process/procedures tend to become complicated and amount of paperwork increases 
◦ With time architecture tends to become „broken” and quality of code decreases 
◦ Often people wait for work or are overloaded with it - due to unbalanced process/procedure 
◦ Due to lack of pride in workmanship – unhappiness, lack of commitment and high attrition rate 
◦ Kanban 
◦ Provide visibility and control supply of milestones (work) to the Team 
◦ Cycle 
◦ Two phases: Requirements (Egg) and Construction (Meta) instead of standard four 
◦ Cycle recommended length is 2 weeks 
◦ Checkpoints 
◦ It is recommended to have 2 checkpoints: 1h after Egg and 2-4h after Meta. Duration can be changed if cycle length is longer than 2 weeks 
◦ Roles 
◦ Vision pair (BA+Tech Lead) can work on multiple projects, but workload to be controlled to avoid overload (muri) 
◦ SME’s and Tech Lead can work on up to 2 projects (based on Kaizen Lite). BA, TL, PM can work on up to 3 projects (based on Kaizen lite) 
◦ Waste 
◦ Direction pair reviews Recycle log constantly and takes action to remove business debt 
◦ At least every third cycle - action items in Recycle log to be reviewed and implemented to remove technical debt 
◦ Unless explicitly specified – existing guidelines of Kaizen model apply
IMPROVE 
HTTP: / /PRYZACH.GITHUB. IO/KAIZEN-SWD-MODEL/ 
THANK YOU

More Related Content

What's hot

460 operations - 4.20
460   operations - 4.20460   operations - 4.20
460 operations - 4.20Kyle Bakken
 
The Seven Wastes
The Seven WastesThe Seven Wastes
The Seven WastesJorge Ros
 
Lean Schedulng Case Study Providence Oct 09
Lean Schedulng Case Study   Providence Oct 09Lean Schedulng Case Study   Providence Oct 09
Lean Schedulng Case Study Providence Oct 09Graphicast
 
Standard Work And One Piece Flow
Standard Work And One Piece FlowStandard Work And One Piece Flow
Standard Work And One Piece Flowguest399e73
 
Mhs bpm conference- 04-11-2014
Mhs bpm conference- 04-11-2014Mhs bpm conference- 04-11-2014
Mhs bpm conference- 04-11-2014Brian D'Rosario
 
just-in-time-by-sashi-prabhu
 just-in-time-by-sashi-prabhu just-in-time-by-sashi-prabhu
just-in-time-by-sashi-prabhusashi prabhu
 
Lean DL Arsene
Lean DL ArseneLean DL Arsene
Lean DL ArseneLuciArsene
 
Value stream mapping study with example
Value stream mapping study with exampleValue stream mapping study with example
Value stream mapping study with exampleMouhcine Nahal
 
Lean Six Sigma How To Conduct A Lean Event
Lean Six Sigma How To Conduct A Lean EventLean Six Sigma How To Conduct A Lean Event
Lean Six Sigma How To Conduct A Lean EventStephen Deas
 
Value Stream Mapping Training - ADDVALUE - Nilesh Arora
Value Stream Mapping Training - ADDVALUE - Nilesh AroraValue Stream Mapping Training - ADDVALUE - Nilesh Arora
Value Stream Mapping Training - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
RDrew Six Sigma Overview
RDrew Six Sigma OverviewRDrew Six Sigma Overview
RDrew Six Sigma OverviewRon Drew
 
Identify 7 Wastes
Identify 7 WastesIdentify 7 Wastes
Identify 7 WastesLean for U
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 

What's hot (17)

460 operations - 4.20
460   operations - 4.20460   operations - 4.20
460 operations - 4.20
 
The Seven Wastes
The Seven WastesThe Seven Wastes
The Seven Wastes
 
Lean Schedulng Case Study Providence Oct 09
Lean Schedulng Case Study   Providence Oct 09Lean Schedulng Case Study   Providence Oct 09
Lean Schedulng Case Study Providence Oct 09
 
Standard Work And One Piece Flow
Standard Work And One Piece FlowStandard Work And One Piece Flow
Standard Work And One Piece Flow
 
Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Mhs bpm conference- 04-11-2014
Mhs bpm conference- 04-11-2014Mhs bpm conference- 04-11-2014
Mhs bpm conference- 04-11-2014
 
just-in-time-by-sashi-prabhu
 just-in-time-by-sashi-prabhu just-in-time-by-sashi-prabhu
just-in-time-by-sashi-prabhu
 
Lean DL Arsene
Lean DL ArseneLean DL Arsene
Lean DL Arsene
 
Seven wastes
Seven wastesSeven wastes
Seven wastes
 
Value stream mapping study with example
Value stream mapping study with exampleValue stream mapping study with example
Value stream mapping study with example
 
Lean Six Sigma How To Conduct A Lean Event
Lean Six Sigma How To Conduct A Lean EventLean Six Sigma How To Conduct A Lean Event
Lean Six Sigma How To Conduct A Lean Event
 
Focus on Growth - 7 Wastes
Focus on Growth - 7 WastesFocus on Growth - 7 Wastes
Focus on Growth - 7 Wastes
 
Value Stream Mapping Training - ADDVALUE - Nilesh Arora
Value Stream Mapping Training - ADDVALUE - Nilesh AroraValue Stream Mapping Training - ADDVALUE - Nilesh Arora
Value Stream Mapping Training - ADDVALUE - Nilesh Arora
 
RDrew Six Sigma Overview
RDrew Six Sigma OverviewRDrew Six Sigma Overview
RDrew Six Sigma Overview
 
Identify 7 Wastes
Identify 7 WastesIdentify 7 Wastes
Identify 7 Wastes
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
 

Similar to Kaizen lite

lean construction and integrated project delivery
lean construction and integrated project delivery lean construction and integrated project delivery
lean construction and integrated project delivery Mahendra Bhuva
 
Mba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management aMba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management aRai University
 
Kaizen software development model
Kaizen software development modelKaizen software development model
Kaizen software development modelZachar Prychoda
 
Visualisation&agile practices ai2014
Visualisation&agile practices ai2014Visualisation&agile practices ai2014
Visualisation&agile practices ai2014Balaji Muniraja
 
QC_Supplier Management_ALL En
QC_Supplier Management_ALL EnQC_Supplier Management_ALL En
QC_Supplier Management_ALL EnJorge Torres
 
Supplier Management Service
Supplier Management ServiceSupplier Management Service
Supplier Management ServiceJorge Torres
 
Moving The OEE Needle -Tips for Surpassing 85%
Moving The OEE Needle -Tips for Surpassing 85% Moving The OEE Needle -Tips for Surpassing 85%
Moving The OEE Needle -Tips for Surpassing 85% SafetyChain Software
 
Going & seeing in construction
Going & seeing in constructionGoing & seeing in construction
Going & seeing in constructionKartikeya Pandey
 
GOLL+-+Practical+Project+Management+for+Clinical-Biomedical+Engineering.pdf
GOLL+-+Practical+Project+Management+for+Clinical-Biomedical+Engineering.pdfGOLL+-+Practical+Project+Management+for+Clinical-Biomedical+Engineering.pdf
GOLL+-+Practical+Project+Management+for+Clinical-Biomedical+Engineering.pdfKarthikaSampathkumar2
 
Simply a matter of process: Building operational resilience in times of crisis
Simply a matter of process: Building operational resilience in times of crisisSimply a matter of process: Building operational resilience in times of crisis
Simply a matter of process: Building operational resilience in times of crisisStephanieOrgan1
 
Agile Implementation
Agile ImplementationAgile Implementation
Agile ImplementationOlga Sa
 
04. Project Management
04. Project Management04. Project Management
04. Project ManagementBhuWan Khadka
 
Technical debt a Business Perspective
Technical debt a Business PerspectiveTechnical debt a Business Perspective
Technical debt a Business PerspectiveMichael Vax
 
D22MB040_Unit_6.pptx
D22MB040_Unit_6.pptxD22MB040_Unit_6.pptx
D22MB040_Unit_6.pptxkiranroy6777
 
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...admford
 
INAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications ProfessionalsINAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications ProfessionalsRory McKenna
 

Similar to Kaizen lite (20)

lean construction and integrated project delivery
lean construction and integrated project delivery lean construction and integrated project delivery
lean construction and integrated project delivery
 
Mba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management aMba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management a
 
Kaizen software development model
Kaizen software development modelKaizen software development model
Kaizen software development model
 
Visualisation&agile practices ai2014
Visualisation&agile practices ai2014Visualisation&agile practices ai2014
Visualisation&agile practices ai2014
 
Project made easy
Project made easyProject made easy
Project made easy
 
QC_Supplier Management_ALL En
QC_Supplier Management_ALL EnQC_Supplier Management_ALL En
QC_Supplier Management_ALL En
 
Supplier Management Service
Supplier Management ServiceSupplier Management Service
Supplier Management Service
 
Moving The OEE Needle -Tips for Surpassing 85%
Moving The OEE Needle -Tips for Surpassing 85% Moving The OEE Needle -Tips for Surpassing 85%
Moving The OEE Needle -Tips for Surpassing 85%
 
Going & seeing in construction
Going & seeing in constructionGoing & seeing in construction
Going & seeing in construction
 
GOLL+-+Practical+Project+Management+for+Clinical-Biomedical+Engineering.pdf
GOLL+-+Practical+Project+Management+for+Clinical-Biomedical+Engineering.pdfGOLL+-+Practical+Project+Management+for+Clinical-Biomedical+Engineering.pdf
GOLL+-+Practical+Project+Management+for+Clinical-Biomedical+Engineering.pdf
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
Simply a matter of process: Building operational resilience in times of crisis
Simply a matter of process: Building operational resilience in times of crisisSimply a matter of process: Building operational resilience in times of crisis
Simply a matter of process: Building operational resilience in times of crisis
 
Agile Implementation
Agile ImplementationAgile Implementation
Agile Implementation
 
04. Project Management
04. Project Management04. Project Management
04. Project Management
 
Technical debt a Business Perspective
Technical debt a Business PerspectiveTechnical debt a Business Perspective
Technical debt a Business Perspective
 
D22MB040_Unit_6.pptx
D22MB040_Unit_6.pptxD22MB040_Unit_6.pptx
D22MB040_Unit_6.pptx
 
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...
 
Managing Project Transitions
Managing Project TransitionsManaging Project Transitions
Managing Project Transitions
 
Technical debt
Technical debtTechnical debt
Technical debt
 
INAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications ProfessionalsINAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications Professionals
 

Recently uploaded

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...apidays
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfOverkill Security
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
Cyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfCyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfOverkill Security
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKJago de Vreede
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024The Digital Insurer
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 

Recently uploaded (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Cyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfCyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdf
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 

Kaizen lite

  • 1. Kaizen lite S U B S E T O F K A I Z E N MO D E L LEAN, ITERATIVE AND INCREMENTAL DEVELOPMENT
  • 2. Lifecycle Construction Support • Construction – is just beginning for the project, majorify of time we would spend maintaining it: bug fixes, small improvements etc. • Support period (budget) is much more bigger than construction period (budget) • With time - product tends to get more expensive to maintain • Process tends to get more bureaucratic (business waste) and implementation tends to deviate from agreed architecture (technical waste).
  • 3. Challenges Business •With time - too many steps are introduced in the process •With time - procedures tend to become complicated •With time - amount of paperwork increases significantly •With time - amount of reporting increases significantly •Due to unbalanced process/procedure - sometimes people are waiting for work, or are overloaded with it Technical •Unhappiness with constant support which results in high attrition rate •Lack of pride in workmanship results in lack of commitment •High attrition rate results in constant training and lack of project knowledge •Due to above – quality of code •Small changes tend to break big picture (architecture) Waste v.1.0 v.2.0 v.3.0 v.4.0 v.5.0 v.6.0 ... Demise
  • 4. Cycle Requirements (egg) • Business requirements • Design • Technical requirements • Definition of milestones, risks • Estimation / cycle length Construction (metamorphosis) • Daily progress update • Implementation • Brief showcase of milestones • Optimization / Testing / QA • Delivery • Reflection upon cycle • Due to relatively short duration of the cycle – deep planning is not required. • Due to relatively small size – extensive testing and QA are not required. • Due to relative simplicity – presentation and complicated transition (delivery) are not required.
  • 5. Engagement Project 1 Team SME Tech Lead BA PM TL Project 3 BA PM TL Project 2 SME Tech Lead BA PM TL
  • 6. Kanban Lack of visibility Overload Vision Construction Vision Construction Waiting Lack of visibility • Provide visibility of workload and current status of the milestones • Provide visibility of progress and issues / blockers of process / procedures / systems • Provide visibility of efficiency and improve if needed • Waiting • (waiting) Not on time • (waiting) Not on budget • Overload • (overload) Not according to expectation • (overload) Lack of commitment • (overload) Lack of pride in workmanship • (overload) High attrition rate • (overload) Poor quality
  • 7. Egg | Meta| Waste Risks Debt Issues Debt Checkpoint Checkpoint Perceived Debt vs Actual Debt Recycle plan Waste reduce Direction pair reviews Recycle log constantly and takes action to remove business debt At least every third cycle - action items in Recycle log reviewed and implemented to remove technical debt
  • 8. Summary ◦ Lifecycle ◦ Support is the most costly and lengthy phase of product life cycle ◦ Amount of waste in the process/product grows with time ◦ Challenges ◦ With time process/procedures tend to become complicated and amount of paperwork increases ◦ With time architecture tends to become „broken” and quality of code decreases ◦ Often people wait for work or are overloaded with it - due to unbalanced process/procedure ◦ Due to lack of pride in workmanship – unhappiness, lack of commitment and high attrition rate ◦ Kanban ◦ Provide visibility and control supply of milestones (work) to the Team ◦ Cycle ◦ Two phases: Requirements (Egg) and Construction (Meta) instead of standard four ◦ Cycle recommended length is 2 weeks ◦ Checkpoints ◦ It is recommended to have 2 checkpoints: 1h after Egg and 2-4h after Meta. Duration can be changed if cycle length is longer than 2 weeks ◦ Roles ◦ Vision pair (BA+Tech Lead) can work on multiple projects, but workload to be controlled to avoid overload (muri) ◦ SME’s and Tech Lead can work on up to 2 projects (based on Kaizen Lite). BA, TL, PM can work on up to 3 projects (based on Kaizen lite) ◦ Waste ◦ Direction pair reviews Recycle log constantly and takes action to remove business debt ◦ At least every third cycle - action items in Recycle log to be reviewed and implemented to remove technical debt ◦ Unless explicitly specified – existing guidelines of Kaizen model apply
  • 9. IMPROVE HTTP: / /PRYZACH.GITHUB. IO/KAIZEN-SWD-MODEL/ THANK YOU