6. IT Innovations
• All mandis being linked by Video Conferencing
• RDBMS and Geo-referenced mapping of all Roads & assets
• to enable GPS assisted navigation and
• use of Google earth imageries and geo-referenced photographs (picked up at• use of Google earth imageries and geo-referenced photographs (picked up at
close intervals) to assist planning, monitoring and maintenance activities.
• Smart Cards to Farmers/ Traders/Employees for proper
accounting of farm produce and payments
• Computerization / E-Trading / E-Auctioning / Weigh Bridges.
• Smart card based RTGS Payments and online final bills for
transparency in civil works
7. Infrastructure Push- Marketing Infrastructure
• Centrally air conditioned modern Agro Malls will be operational at 4
locations this year.
• Special Markets
Timber / Apple / Cotton / Fish
- Planned/ operational .
• PHM Hubs (Grading, Packing, Storage) under NHM
10 created + 5 in progress + 13 planned.
8. • Constructed 11595 km of roads till 31/3/2012.
• 1207 km roads are under construction as on 31/03/2012.
• Since 1.4.2005, Expenditure on New Construction: Rs 431.78 cr.
Infrastructure Push - Roads
• The pavement thickness of roads sanctioned prior to 2005 had been 150mm.
• After that pavements have been constructed to thickness of 225 mm.
5688.14
21.92
609.78
1847.69
165.50
Good Condition
Ordinary repairs required /
ongoing
SR Sanctioned
Work Plan Approved
Transfer Under process
• Now, Pavement thickness is 400mm.
Maintenance (km)