SlideShare a Scribd company logo
1 of 8
Download to read offline
A B C D E
6
5
4
3
2
1
1. REFERENCE ELEVATION TOP OF SLAB = 0'-0
PLATFORM FRAMING PLAN
2. [ ] MOMENT CONNECTION DETAIL #4
3. TYPICAL TOP OF STEEL = EL. 39'-2 1/4 U.N.O.
W16 x 26
6D
W16 x 31
6C
W16x31(LOW)
6A
W16x31
6B
W10 x 12
6G
W16 x 26
6F
W16x57
5D
HSS16x8x5/16(HIGH)
EL.41'-21/4
5A
HSS16x8x5/16
EL.41'-21/4
5B
1
-
1
-
W10 x 12
6G
SIM.
3
-
2
-
1
-
5
-
4
-
EL. 39'-6 - 3
4" PLYWOOD OVER
VERCO 3' TYPE W3 METAL DECKING 18 GA
W/#10 WOOD TO METAL SELF-DRILLING SCREWS
@ 6" O.C. ALL EDGES @12" O.C. FIELD
EL. 39'-6 TOP OF 3
4" PLYWOOD OVER
VERCO 3' TYPE W3 METAL DECKING 18 GA
W/#10 WOOD TO METAL SELF-DRILLING SCREWS
@ 6" O.C. ALL EDGES @12" O.C. FIELD
TOP OF EL. 48'-4
2A
TOP OF EL. 47'-10
2B
TOP OF EL.47'-6
3B
TOP OF EL.48'-0
3A
TOP OF EL. 47'-6
4A
TOP OF EL. 47'-5
4B
5C
HSS16 x 8 x 5
16
EL. 41'-21
4
5F
L3 x 3 x 1
4 BRACES
(8 REQ'D)
5G
7/S1.2
TYPICAL EDGE OF PLATFORM DETAIL
1
W16x BEAM
BT. PL 1
4" x 101
2 LG
(NOTCH PLATE AT PIPE SLEEVE)
21
2
W/2-3
8
@ 21
2" O.C. MIN.
3
4" PLYWOOD
L3 x 3 x 1
4
@ 4'-0 O.C. @ BRACE
3
4" PLYWOOD
METAL DECK PER PLAN
5/S1.2
PLATFORM DETAIL BELOW HSS
2
HSS16 x 8 x 5
16
W16x BEAM
L4 x 3 x 1
4 LLV
3
4" PLYWOOD
METAL DECK PER PLAN
3/S1.2
PLATFORM DETAIL BELOW HSS
3
HSS16 x 8 x 5
16
W16x BEAM
BT. PL 1
4" x 101
2 LG
(NOTCH PLATE AT PIPE SLEEVE)
21
2
W/2-3
8
@ 21
2" O.C. MIN.
137
8
3
8" BT. PL x 1'-41
2 LG
3
BRACE L3 x 3 x 1
4
@ 4'-0 O.C.
W/ 1 -5
8
PL 1
4" x 5 SQ.
4/S1.2
HSS TO HSS MOMENT CONNECTION
4 9/S1.2
HSS SPLICE DETAIL
5
0"
CJP
0"
CJP
CJP
HSS16 x 8 x 5
16
HSS8 x 8 x 5
16
PL 5
16" GUSSET
HSS8 x 8 x 5
16
3
8" BT. PL x 1'-0
BOLTS (A 325SC)
10/S1.2
TYPICAL HSS BM TO HSS COL CONNECTION
6
HSS16 x 8 x 5
16
HSS8 x 8 x 5
16
PL 1
2" x 12 x 1'-1
SLOT COL TYP.
PL 1
2 x 31
2 x 1'-0
PL 1
2 x 81
2 x 1'-41
2
2/S1.2
TYPICAL W16 TO HSS COL CONNECTION
7
W16
BEAM PER PLAN
HSS8 x 8 x 5
16
PL 3
8 x 12 x 1'-0
SLOT COL TYP.
PL 3
8 x 31
2 x 1'-0
PL 1
2 x 8 x 1'-1
1
4
TYP.
1
4
3
73
4
3
73
4
TYPICAL HOLLANDER PIPE BASE
INSTALL AFTER PROJECTOR
ALIGNMENT (BUYOUT)
TYPICAL HOLLANDER PIPE BASE
INSTALL AFTER PROJECTOR
ALIGNMENT (BUYOUT)
L21
2 x 2x 3
8 (LLV)
W/ 9
16
5
8" O.C.
Reference
Contractor
Description
Project
Engineer Sheet Number
Date
Drawn By
NO. DATE DESCRIPTION
0 FOR FABRICATION2/25/2014
PLATFORM FRAMING PLAN & DETAILS
E1
WHEELER & GRAY CONSULTING ENGINEER
1 / 6 / 2014
WM
S2.2
A B C D E
6
5
4
3
2
1
1. REFERENCE ELEVATION TOP OF SLAB = 0'-0
ROOF FRAMING PLAN
1
-
(E) TAPERED STEEL GIRDER
(E) TAPERED STEEL GIRDER
(E) TAPERED STEEL GIRDER
(E) TAPERED STEEL GIRDER
(E) TAPERED STEEL GIRDER
(E) TAPERED STEEL GIRDER
(E)"Z"PURLINSTYP.(E)"Z"PURLINSTYP.(E)"Z"PURLINSTYP.(E)"Z"PURLINSTYP.(E)"Z"PURLINSTYP.
MC12x317A
MC12x317A
MC12x317A
MC12x317A
MC12x317B
MC12x317B
TYP.
2
-
TYP.
2
-
SIM.
2:12
SLOPE
2:12
SLOPE
FIELD
VERIFY
FIELD
VERIFY
FIELD
VERIFY
5/S5.1
MC CHANNEL @ TAPERED GIRDER CONNECTION
1
(2) 3
4
L6 x 4 x 3
8 x 0'-8 (LLH)
W/ 2 -3
4
MC12 x 31 (FLAT)
3 & 4/S5.1
MC CHANNEL AT COLUMN CONNECTION
2
PLEASE CONFIRM PROPOSED FIELD
WELD IN LIEU OF BOLTS FOR FIELD
INSTALLATION TOLERANCES.
HSS8 x 8 x 5
16
1
4
TYP.
12"
TOTAL
L6 x 4 x 3
8 x 0'-10
W/2 -3
4
11
2" VERTICAL SLOTTED HOLES
HSS8 x 8 x 5
16
MC12 x 31
(FLAT)
(E) TAPERED GIRDER
MC12 x 31
(FLAT)
NEW "SPEED RAIL" GUARDRAIL
BY HOLLAENDER MANF. 2" ISP
(2.375" O.D. INDUSTRIAL FINSH)
(BUY OUT PARTS AND MATERIAL)
10/A20.0
GUARDRAIL AT PLATFORM
3
3
16" CAP PALTE
POST INSTALLED HOLLANDER
PIPE BASE #48 FOR ISP
W/ (4) -1
2" BOLTS (FIELD DRILL/TAP)
OR (4) - 5
16" BOXBOLTS SIZE 2 BY
LNA SOLUTIONS (ICC-ES ESR
#3217) TO BE FIELD LOCATED
AFTER PROJECTORS ARE IN
PLACE. (BUYOUT)
A B C D E
6
5
4
3
2
1
1. REFERENCE ELEVATION TOP OF PLATFORM = EL. 39'-6
NEW GUARDRAIL LAYOUT PLAN
PLEASE CONFIRM LADDER
AND GATE LOCATION
3
-
4
-
7C LADDER
NEW "SPEED RAIL" GUARDRAIL
BY HOLLAENDER MANF. 2" ISP
(2.375" O.D. INDUSTRIAL FINSH)
(BUY OUT PARTS AND MATERIAL)
7, 8 & 9 /S5.1
PLATFORM ACCESS LADDER
4
W/ GRIP MATERIAL
PL 1
2" x 21
2
SIDE RAILS
1
4
TYP.
PL 1
2" STIFFNER
@ EACH RAIL
PLATFORM W16
ELLIS GRAB SAFE
WELD ON,
PART NO: GBS-CMP
(BUY OUT)
CONFIRM
PRIOR TO FAB
Reference
Contractor
Description
Project
Engineer Sheet Number
Date
Drawn By
NO. DATE DESCRIPTION
0 FOR FABRICATION1/25/2014
ROOF FRAMING PLAN AND GUARDRAIL LAYOUT
E2
WHEELER & GRAY CONSULTING ENGINEER
1 / 6 / 2014
WM
S2.2
- COLUMN - 2AONE
CP1
CP3
1
4
TYP.
1
4
1
4
TYP.
1
4
1
4
TYP.
1
4
TYP.
TYP.
1
4
TYP.
15
16
13
16 x 1 1
2
VETICAL
SLOTTED
ON HSS
SECTION "A"
SECTION "B"
SECTION "C"
"A"
"B"
"C"
- COLUMN - 2BONE
TYP.
1
4
TYP.
15
16
13
16 x 1 1
2
VETICAL
SLOTTED
ON HSS
"D"
"C"MK;NORTH
MK;NORTH
1
4
TYP.
1
4
TYP.
SECTION "D"
CP1
CP2 CP3
1
4
TYP.
1
4
CP4
CP5
CP7(B.S.)
CP6
CP7
CP7
CP7(B.S.)
CP7
CP7
CP2
CP3
CP4
CP4
(N.S.)
CP3
(N.S.)
13
16 @ ANGLE
13
16 @ ANGLE
CP7
CP7
CP5
CP2
CP4
CP3
CP2
CP4
CP4
(F.S.)
CP3
(F.S.)
2
COLUMNS E1
WHEELER & GRAY CONSULTING ENGINEER
1 / 6 / 2014
WM
Reference
Contractor
Description
Project
Engineer Sheet Number
Date
Drawn By
44
WELD U.N.PAINT
NO. DATE
HOLES U.N.
DESCRIPTION
52
48
50
51
49
47
46
45
40
43
42
41
39
38
37
35
36
34
33
31
32
30
29
21
25
28
27
26
24
23
22
20
19
18
17
16
15
14
BILL OF MATERIALS
12
13
11
10
6
8
9
7
2
5
4
3
1
LINE MARK
DETAIL
MRK.
SHIP
QUAN. DESCRIPTION LENGTH REMARKS
1. ALL PLATE & ANGLES A36 U.N.O
2. ALL BEAM A922 U.N.O
3. ALL HSS A500 GR. "B" U.N.O
4. ALL PIPE A53 U.N.O
5. ALL WELDS 1
4" U.N.O.
GENERAL NOTES
ONE SHOP COAT 1 1
16 E70-XX
2A ONE HSS8 x 8 x 5
16 48'-0 9
16 A500 GR "B"
CP1 ONE PL 3
4 x 14 1'-2
CP2 ONE PL 3
8 x 12 1'-0
CP3 ONE PL 1
2 x 8 1'-0
CP4 ONE PL 3
8 x 31
2 1'-0
CP5 ONE PL 1
2 x 12 1'-1
CP6 ONE PL 3
16 x 8 0'-8 CAP PLATE
CP7 2 L6 x 4 x 3
8 0'-10
a2 2 3
4 0'-101
2 A307
2B ONE HSS8 x 8 x 5
16 47'-6 9
16 A500 GR "B"
CP1 ONE
CP2 ONE
CP3 ONE
CP4 ONE
CP6 ONE
CP7 2
a2 2
0 FOR FABRICATION1/25/2014
- COLUMN - 3AONE
CP1
1
4
TYP.
1
4
1
4
TYP.
1
4
TYP.
TYP.
1
4
TYP.
15
16
13
16 x 1 1
2
VETICAL
SLOTTED
ON HSS
SECTION "A"
SECTION "C"
"A"
"C"
- COLUMN - 3BONE
1
4
TYP.
15
16
"D"
MK;NORTH
MK;NORTH 1
4
TYP.
1
4
TYP.
SECTION "D"
CP1
CP2 CP3
1
4
TYP.
1
4
CP4
CP7(B.S.)
CP6
CP7
CP7
CP3
CP4
13
16 @ ANGLE
0"
CJP TYP.
CP3
CP2
CP4
CP3
CP2
CP4
CP8
CP8
12
12ALL
R
O
U
N
D
TYP.
CP4
(F.S.)
CP3
(F.S.)
CP2
CP4
(N.S.)
CP3
(N.S.)
a3
b3
a3
b3
CP8
CP8
TYP.
13
16 x 1 1
2
VETICAL
SLOTTED
ON HSS
"C"
CP7(B.S.)
CP6
CP7
CP7
13
16 @ ANGLE
CP7
CP7
3
COLUMNS E1
WHEELER & GRAY CONSULTING ENGINEER
1 / 6 / 2014
WM
Reference
Contractor
Description
Project
Engineer Sheet Number
Date
Drawn By
44
WELD U.N.PAINT
NO. DATE
HOLES U.N.
DESCRIPTION
52
48
50
51
49
47
46
45
40
43
42
41
39
38
37
35
36
34
33
31
32
30
29
21
25
28
27
26
24
23
22
20
19
18
17
16
15
14
BILL OF MATERIALS
12
13
11
10
6
8
9
7
2
5
4
3
1
LINE MARK
DETAIL
MRK.
SHIP
QUAN. DESCRIPTION LENGTH REMARKS
1. ALL PLATE & ANGLES A36 U.N.O
2. ALL BEAM A922 U.N.O
3. ALL HSS A500 GR. "B" U.N.O
4. ALL PIPE A53 U.N.O
5. ALL WELDS 1
4" U.N.O.
GENERAL NOTES
ONE SHOP COAT 1 1
16 E70-XX
3A ONE HSS8 x 8 x 5
16 39'-8 A500 GR "B"
a3 ONE HSS8 x 8 x 5
16 1'-33
8
b3 ONE HSS8 x 8 x 5
16 6'-8 9
16
CP1 ONE PL 3
4 x 14 1'-2
CP2 ONE PL 3
8 x 12 1'-0
CP3 ONE PL 1
2 x 8 1'-0
CP4 ONE PL 3
8 x 31
2 1'-0
CP6 ONE PL 3
16 x 8 0'-8 CAP PLATE
CP7 2 L6 x 4 x 3
8 0'-10
a2 2 3
4 0'-101
2 A307
CP8 2 PL 5
16 x 8 0'-8 MOMENT GUSSET
3B ONE HSS8 x 8 x 5
16 47'-2 9
16 A500 GR "B"
CP1 ONE
CP2 ONE
CP3 ONE
CP4 ONE
CP6 ONE CAP PLATE
CP7 2
a2 2
0 FOR FABRICATION1/25/2014
- COLUMN - 4AONE
CP1
1
4
TYP.
1
4
1
4
TYP.
1
4
TYP.
1
4
TYP.
15
16
13
16 x 1 1
2
VETICAL
SLOTTED
ON HSS
SECTION "A"
SECTION "B"
SECTION "C"
"A"
"B"
"C"
- COLUMN - 4BONE
1
4
TYP.
15
16
"D"
MK;NORTH
MK;NORTH
1
4
TYP.
1
4
TYP.
SECTION "D"
CP1
CP2
1
4
TYP.
1
4
CP5
CP7(B.S.)
CP6
CP7
CP7
CP3
CP4
CP4
(N.S.)
CP3
(N.S.)
13
16 @ ANGLE
CP5
CP2
CP3
CP2
CP4
CP2
TYP.
13
16 x 1 1
2
VETICAL
SLOTTED
ON HSS
"C"
CP7(B.S.)
CP6
CP7
CP7
13
16 @ ANGLE
CP7
CP7
4
COLUMNS E1
WHEELER & GRAY CONSULTING ENGINEER
1 / 6 / 2014
WM
Reference
Contractor
Description
Project
Engineer Sheet Number
Date
Drawn By
44
WELD U.N.PAINT
NO. DATE
HOLES U.N.
DESCRIPTION
52
48
50
51
49
47
46
45
40
43
42
41
39
38
37
35
36
34
33
31
32
30
29
21
25
28
27
26
24
23
22
20
19
18
17
16
15
14
BILL OF MATERIALS
12
13
11
10
6
8
9
7
2
5
4
3
1
LINE MARK
DETAIL
MRK.
SHIP
QUAN. DESCRIPTION LENGTH REMARKS
1. ALL PLATE & ANGLES A36 U.N.O
2. ALL BEAM A922 U.N.O
3. ALL HSS A500 GR. "B" U.N.O
4. ALL PIPE A53 U.N.O
5. ALL WELDS 1
4" U.N.O.
GENERAL NOTES
ONE SHOP COAT 1 1
16 E70-XX
4A ONE HSS8 x 8 x 5
16 47'-2 9
16 A500 GR "B"
CP1 ONE PL 3
4 x 14 1'-2
CP2 ONE PL 3
8 x 12 1'-0
CP5 ONE PL 1
2 x 12 1'-1
CP6 ONE PL 3
16 x 8 0'-8 CAP PLATE
CP7 2 L6 x 4 x 3
8 0'-10
a2 2 3
4 0'-101
2 A307
4B ONE HSS8 x 8 x 5
16 47'-1 9
16 A500 GR "B"
CP1 ONE
CP2 ONE
CP3 ONE PL 1
2 x 8 1'-0
CP4 ONE PL 3
8 x 31
2 1'-0
CP6 ONE
CP7 2
a2 2
0 FOR FABRICATION1/25/2014
12
12
TO
P
&
BO
TT.
1
4
TYP.
1
4
TYP.
13
16
- HSS BEAM - 5AONE
SECTION "A"
1
4
TYP.
1
4
TYP.
- HSS BEAM - 5BONE
12
1 1
16
12
12
TO
P
&
BO
TT.
12
1 1
16
"A"
TYP.
12
21
8
12
21
8
1
4
TYP.
- HSS BEAM - 5CONE - BEAM - 5DONE
3
16
TYP.
3
16
3
16
BT. PL TO
HSS TYP.2 - 6
"A"
TYP.
11
4
3
13
4
3
13
16
SECTION "B"
13
16
13
16
3
16
BT. PL TO
HSS TYP.2 - 8
3
16 2 - 8
3
16
TYP.
3
16
1
4
TYP.
"B"
TYP.
CONFIRM AND VERIFY GATE
LOCATION WITH LADDER
LOCATION
- BRACES - 5F8 - BRACE - 5GONE
12
21
8
3
4
TYP.
3
4
FIELD
VERIFY
13
16
13
16
P1
P2
P2
P1
P1
P2
P2
P4
(8 REQ'D)
P4
b5(FS)
c5
P4
P5
P6
P3(CTRD)
(12 REQ'D)
3
8" BT. PL
3
16
BT. PL TO
HSS TYP.2 - 6
P7
(9 REQ'D)
P7
P3
1
4
TYP.
3 - 6
1
4 3 - 6
f5(BS)
9
16
9
16
g5(BS)
3
8" DRILL
& TAP
5
BEAMS E1
WHEELER & GRAY CONSULTING ENGINEER
1 / 6 / 2014
WM
Reference
Contractor
Description
Project
Engineer Sheet Number
Date
Drawn By
44
WELD U.N.PAINT
NO. DATE
HOLES U.N.
DESCRIPTION
52
48
50
51
49
47
46
45
40
43
42
41
39
38
37
35
36
34
33
31
32
30
29
21
25
28
27
26
24
23
22
20
19
18
17
16
15
14
BILL OF MATERIALS
12
13
11
10
6
8
9
7
2
5
4
3
1
LINE MARK
DETAIL
MRK.
SHIP
QUAN. DESCRIPTION LENGTH REMARKS
1. ALL PLATE & ANGLES A36 U.N.O
2. ALL BEAM A922 U.N.O
3. ALL HSS A500 GR. "B" U.N.O
4. ALL PIPE A53 U.N.O
5. ALL WELDS 1
4" U.N.O.
GENERAL NOTES
ONE SHOP COAT 1 1
16 E70-XX
5A ONE HSS16 x 8 x 5
16 22'-111
2 A500 GR "B"
P1 ONE PL 1
2 x 31
2 1'-0
P2 ONE PL 1
2 x 81
2 1'-41
2
5B ONE HSS16 x 8 x 5
16 30'-6 3
16 A500 GR "B"
P1 ONE
P2 ONE
f5 2 L21
2 x 2 x 3
8 30'-0
P4 8 L3 x 3 x 1
4 1'-0
b5 ONE 3
8" BT. PL x 161
2 30'-0
5C ONE HSS16 x 8 x 5
16 3'-41
4 A500 GR "B"
P4 ONE
P5 ONE PL 3
8 x 71
2 1'-0
P6 ONE PL 3
8 x 9 1'-0
c5 ONE 3
8" BT. PL x 165
8 2'-81
4
g5 2 L21
2 x 2 x 3
8 2'-81
4
5D ONE W16 x 57 35'-6 7
16 A992
P3 12 21
2 0'-73
4
a5 24 3
8 JS-600
P7 9 PL 1
4 x 5 0'-5
d5 ONE 1
4" BT. PL x 101
2 35'-3 7
16
5F ONE L3 x 3 x 1
4 5'-1011
16
5G ONE L3 x 3 x 1
4 6'-211
16
< FIELD BOLTS >
12 0'-21
2 A325SC
4 0'-21
4 A325SC
4 3
4 0'-101
2 A325SC
18 3
4 0'-13
4 A307
0 FOR FABRICATION1/25/2014
- BEAM - 6AONE
3
16
ANGLE TO
BM TYP. 2 - 8
3
16 2 - 8
SECTION "A"
- BEAM - 6BONE
3
16
2 - 8
3
16 2 - 8
SECTION "B"
TYP.
1
4
TYP.
"A"
TYP.
"B"
TYP.
3
8 DRILL
&TAP
- BEAM - 6CONE
"B"
TYP.
- BEAM - 6DONE
"B"
TYP.
3
4
TYP.
3
4
C
LIP
11
2
11
2
12
21
8
TYP.
1
4
1
4
TYP.
1
4
1
4
SECTION "C"
- BEAM - 6FONE
"B"
TYP.
"C"
- BEAMS - 6G2
3
4
TYP.
3
4
C
LIP
11
2
11
2
TYP.
1
4
1
4
TYP.
1
4
1
4
SECTION "D"
"D" "D"
"D" "D"
11
4
3
11
4
3
13
16
13
16
13
16
P3(CTRD)
(6 REQ'D)
P3(CTRD)
(4 REQ'D)
P3(CTRD)P3(CTRD)
P8(NS)
P9(FS)
P8(NS)
P9(FS)
a6
P8
P9
P9(NS)
P8(FS)
P9(NS)
P8(FS)
b6
P3
a6
c6
c6
b6
P8(NS)
P10(FS)
P8
P10
d6
d6
P3 (FS)(CTRD)
(3 REQ'D)
f6
f6
6
BEAMS E1
WHEELER & GRAY CONSULTING ENGINEER
1 / 6 / 2014
WM
Reference
Contractor
Description
Project
Engineer Sheet Number
Date
Drawn By
44
WELD U.N.PAINT
NO. DATE
HOLES U.N.
DESCRIPTION
52
48
50
51
49
47
46
45
40
43
42
41
39
38
37
35
36
34
33
31
32
30
29
21
25
28
27
26
24
23
22
20
19
18
17
16
15
14
BILL OF MATERIALS
12
13
11
10
6
8
9
7
2
5
4
3
1
LINE MARK
DETAIL
MRK.
SHIP
QUAN. DESCRIPTION LENGTH REMARKS
1. ALL PLATE & ANGLES A36 U.N.O
2. ALL BEAM A922 U.N.O
3. ALL HSS A500 GR. "B" U.N.O
4. ALL PIPE A53 U.N.O
5. ALL WELDS 1
4" U.N.O.
GENERAL NOTES
ONE SHOP COAT 1 1
16 E70-XX
6A ONE W16 x 31 23'-3 A992
P8 2 PL 3
8 x 3 1'-3
P9 2 PL 3
8 x 41
2 0'-7 1
16
a6 ONE L5 x 3 x 1
4 23'-3
6B ONE W16 x 31 23'-3 A992
P3 6 21
2 0'- 73
4
P8 2
P9 2
b6 ONE 1
4" BT. PL x 101
2 23'-3
6C ONE W16 x 31 8'-10 A992
P3 2
c6 ONE 1
4" BT. PL x 101
2 2'-3
P8 ONE
P10 ONE PL 3
8 x 41
2 0'-1115
16
6D ONE W16 x 26 8'-10 A992
P3 4
d6 ONE 1
4" BT. PL x 101
2 8'-10
6F ONE W16 x 26 5'-2 A992
P3 3
f6 ONE 1
4" BT. PL x 101
2 5'-2
6G 2 W10 x 12 9'-63
4 A992
< FIELD BOLTS >
40 0'-21
4 A325SC
8 3
4 0'-2 A325SC
0 FOR FABRICATION1/25/2014
- CHANNELS- 7A4 - CHANNELS- 7B2
- LADDER - 7CONE
DETAIL #1
GRIND SMOOTH
1 1
16 @ PL 1
2"
FIELD
VERIFY
FIELD
VERIFY
FIELD
VERIFY
a7 a7
b7
(5 REQ'D)
f7
f7
3
4
TYP.
3
4
1
4
TYP.
d7d7
d7
- ANGLES- 7D12
13
16
7
ROOF CHANNELS AND LADDER E2
WHEELER & GRAY CONSULTING ENGINEER
1 / 6 / 2014
WM
Reference
Contractor
Description
Project
Engineer Sheet Number
Date
Drawn By
44
WELD U.N.PAINT
NO. DATE
HOLES U.N.
DESCRIPTION
52
48
50
51
49
47
46
45
40
43
42
41
39
38
37
35
36
34
33
31
32
30
29
21
25
28
27
26
24
23
22
20
19
18
17
16
15
14
BILL OF MATERIALS
12
13
11
10
6
8
9
7
2
5
4
3
1
LINE MARK
DETAIL
MRK.
SHIP
QUAN. DESCRIPTION LENGTH REMARKS
1. ALL PLATE & ANGLES A36 U.N.O
2. ALL BEAM A922 U.N.O
3. ALL HSS A500 GR. "B" U.N.O
4. ALL PIPE A53 U.N.O
5. ALL WELDS 1
4" U.N.O.
GENERAL NOTES
ONE SHOP COAT
13
16 E70-XX
7A 4 MC12 x 31 19'-01
2
7B 2 MC12 x 31 18'-21
2
7C ONE LADDER
a7 2 PL 1
2 x 21
2 8'-6 LF
b7 5 1'-63
4 WITH GRIP MATRL
d7 2 PL 1
2 x 113
8 1'-3
f7 2 ELLIS GRAB SAFE WELD ON GBS-CMP(BUY OUT)
7D 12 L6 x 4 x 3
8 0'-8
< FIELD BOLTS >
24 3
4 0'-2 A307
0 FOR FABRICATION1/25/2014

More Related Content

What's hot

What's hot (19)

71 westbourne full set
71 westbourne full set71 westbourne full set
71 westbourne full set
 
SHOP_DRAWING Hand Grinder
SHOP_DRAWING Hand GrinderSHOP_DRAWING Hand Grinder
SHOP_DRAWING Hand Grinder
 
Slatkin
SlatkinSlatkin
Slatkin
 
Willden Residence
Willden ResidenceWillden Residence
Willden Residence
 
ProcContSite
ProcContSiteProcContSite
ProcContSite
 
Duro-Sense Temperature Sensor Catalog
Duro-Sense Temperature Sensor CatalogDuro-Sense Temperature Sensor Catalog
Duro-Sense Temperature Sensor Catalog
 
3D Drawing Samples
3D Drawing Samples3D Drawing Samples
3D Drawing Samples
 
Pismo Beach Hotel- Basement plan- Waste & Vent
Pismo Beach Hotel- Basement plan- Waste & VentPismo Beach Hotel- Basement plan- Waste & Vent
Pismo Beach Hotel- Basement plan- Waste & Vent
 
Cnc projeto completo (só montar)
Cnc projeto completo (só montar)Cnc projeto completo (só montar)
Cnc projeto completo (só montar)
 
Punch_Die_Drawing1-8
Punch_Die_Drawing1-8Punch_Die_Drawing1-8
Punch_Die_Drawing1-8
 
05 multiple control stations
05 multiple control stations05 multiple control stations
05 multiple control stations
 
TAN HOLDINGS FULL PACKAGE
TAN HOLDINGS FULL PACKAGETAN HOLDINGS FULL PACKAGE
TAN HOLDINGS FULL PACKAGE
 
P2
P2P2
P2
 
Elsegundopor tbinder008
Elsegundopor tbinder008Elsegundopor tbinder008
Elsegundopor tbinder008
 
TYE71000 Series Rev A
TYE71000 Series Rev ATYE71000 Series Rev A
TYE71000 Series Rev A
 
04 working details-wooden cladding-by prof dr. ehab ezzat 2019
04 working details-wooden cladding-by prof dr. ehab ezzat 201904 working details-wooden cladding-by prof dr. ehab ezzat 2019
04 working details-wooden cladding-by prof dr. ehab ezzat 2019
 
01-Working details-cladding-structural glazing-by Prof Dr. Ehab Ezzat 2018
01-Working details-cladding-structural glazing-by Prof Dr. Ehab Ezzat 201801-Working details-cladding-structural glazing-by Prof Dr. Ehab Ezzat 2018
01-Working details-cladding-structural glazing-by Prof Dr. Ehab Ezzat 2018
 
Nlc co y-na60_02
Nlc co y-na60_02Nlc co y-na60_02
Nlc co y-na60_02
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITHSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
 

Similar to Cad samples

45 in beam mAIN ASSEM 05-05-2015
45 in beam mAIN ASSEM 05-05-201545 in beam mAIN ASSEM 05-05-2015
45 in beam mAIN ASSEM 05-05-2015Javier Pena
 
STEEL BUILDING DETAILs -006.pdf
STEEL BUILDING DETAILs -006.pdfSTEEL BUILDING DETAILs -006.pdf
STEEL BUILDING DETAILs -006.pdfAdnan Lazem
 
planos de una Bomba centrifuga en solidworks
planos de una Bomba centrifuga en solidworksplanos de una Bomba centrifuga en solidworks
planos de una Bomba centrifuga en solidworksadrianbravo32
 
Kf ball-floating flangedseriesf-fe
Kf ball-floating flangedseriesf-feKf ball-floating flangedseriesf-fe
Kf ball-floating flangedseriesf-fesuraj_2011
 
COSTELLO_ANNAPOLIS SINGLE FAMILY
COSTELLO_ANNAPOLIS SINGLE FAMILYCOSTELLO_ANNAPOLIS SINGLE FAMILY
COSTELLO_ANNAPOLIS SINGLE FAMILYSara Costello
 
KASSIN TRELLIS
KASSIN TRELLISKASSIN TRELLIS
KASSIN TRELLISSean Roper
 
Farmers Grand Rapids MI Print Distribution Center
Farmers Grand Rapids MI Print Distribution CenterFarmers Grand Rapids MI Print Distribution Center
Farmers Grand Rapids MI Print Distribution CenterRichard Clark
 
Lcl users manual electrical drawings
Lcl users manual electrical drawingsLcl users manual electrical drawings
Lcl users manual electrical drawingsbibimisael
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examplesLoren Davis
 
GWC Valve International Forged Steel Gate, Globe, and Check
GWC Valve International Forged Steel Gate, Globe, and CheckGWC Valve International Forged Steel Gate, Globe, and Check
GWC Valve International Forged Steel Gate, Globe, and CheckGWC Valve International
 
Bobcat 773 g series skid steer loader parts catalogue manual (sn 5190 11001 &...
Bobcat 773 g series skid steer loader parts catalogue manual (sn 5190 11001 &...Bobcat 773 g series skid steer loader parts catalogue manual (sn 5190 11001 &...
Bobcat 773 g series skid steer loader parts catalogue manual (sn 5190 11001 &...fjjkefkksem
 
PCB manufacture design rule
PCB manufacture design rulePCB manufacture design rule
PCB manufacture design ruleJane Soong
 
M15N0247A TALLY-SPL
M15N0247A TALLY-SPLM15N0247A TALLY-SPL
M15N0247A TALLY-SPLDongze Di
 

Similar to Cad samples (20)

IC3D example dwgs
IC3D example dwgsIC3D example dwgs
IC3D example dwgs
 
45 in beam mAIN ASSEM 05-05-2015
45 in beam mAIN ASSEM 05-05-201545 in beam mAIN ASSEM 05-05-2015
45 in beam mAIN ASSEM 05-05-2015
 
STEEL BUILDING DETAILs -006.pdf
STEEL BUILDING DETAILs -006.pdfSTEEL BUILDING DETAILs -006.pdf
STEEL BUILDING DETAILs -006.pdf
 
5104800
51048005104800
5104800
 
COURTYARD-STAIR
COURTYARD-STAIRCOURTYARD-STAIR
COURTYARD-STAIR
 
planos de una Bomba centrifuga en solidworks
planos de una Bomba centrifuga en solidworksplanos de una Bomba centrifuga en solidworks
planos de una Bomba centrifuga en solidworks
 
Kf ball-floating flangedseriesf-fe
Kf ball-floating flangedseriesf-feKf ball-floating flangedseriesf-fe
Kf ball-floating flangedseriesf-fe
 
COSTELLO_ANNAPOLIS SINGLE FAMILY
COSTELLO_ANNAPOLIS SINGLE FAMILYCOSTELLO_ANNAPOLIS SINGLE FAMILY
COSTELLO_ANNAPOLIS SINGLE FAMILY
 
KASSIN TRELLIS
KASSIN TRELLISKASSIN TRELLIS
KASSIN TRELLIS
 
Farmers Grand Rapids MI Print Distribution Center
Farmers Grand Rapids MI Print Distribution CenterFarmers Grand Rapids MI Print Distribution Center
Farmers Grand Rapids MI Print Distribution Center
 
Lcl users manual electrical drawings
Lcl users manual electrical drawingsLcl users manual electrical drawings
Lcl users manual electrical drawings
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examples
 
GWC Valve International Forged Steel Gate, Globe, and Check
GWC Valve International Forged Steel Gate, Globe, and CheckGWC Valve International Forged Steel Gate, Globe, and Check
GWC Valve International Forged Steel Gate, Globe, and Check
 
Speed Reducer
Speed ReducerSpeed Reducer
Speed Reducer
 
Csp0000535 01.large drawings 5of5
Csp0000535 01.large drawings 5of5Csp0000535 01.large drawings 5of5
Csp0000535 01.large drawings 5of5
 
ETP Drawing.pdf
ETP Drawing.pdfETP Drawing.pdf
ETP Drawing.pdf
 
Bobcat 773 g series skid steer loader parts catalogue manual (sn 5190 11001 &...
Bobcat 773 g series skid steer loader parts catalogue manual (sn 5190 11001 &...Bobcat 773 g series skid steer loader parts catalogue manual (sn 5190 11001 &...
Bobcat 773 g series skid steer loader parts catalogue manual (sn 5190 11001 &...
 
PCB manufacture design rule
PCB manufacture design rulePCB manufacture design rule
PCB manufacture design rule
 
M15N0247A TALLY-SPL
M15N0247A TALLY-SPLM15N0247A TALLY-SPL
M15N0247A TALLY-SPL
 
Hidraulic jack
Hidraulic jackHidraulic jack
Hidraulic jack
 

Recently uploaded

Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 

Recently uploaded (20)

Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 

Cad samples

  • 1. A B C D E 6 5 4 3 2 1 1. REFERENCE ELEVATION TOP OF SLAB = 0'-0 PLATFORM FRAMING PLAN 2. [ ] MOMENT CONNECTION DETAIL #4 3. TYPICAL TOP OF STEEL = EL. 39'-2 1/4 U.N.O. W16 x 26 6D W16 x 31 6C W16x31(LOW) 6A W16x31 6B W10 x 12 6G W16 x 26 6F W16x57 5D HSS16x8x5/16(HIGH) EL.41'-21/4 5A HSS16x8x5/16 EL.41'-21/4 5B 1 - 1 - W10 x 12 6G SIM. 3 - 2 - 1 - 5 - 4 - EL. 39'-6 - 3 4" PLYWOOD OVER VERCO 3' TYPE W3 METAL DECKING 18 GA W/#10 WOOD TO METAL SELF-DRILLING SCREWS @ 6" O.C. ALL EDGES @12" O.C. FIELD EL. 39'-6 TOP OF 3 4" PLYWOOD OVER VERCO 3' TYPE W3 METAL DECKING 18 GA W/#10 WOOD TO METAL SELF-DRILLING SCREWS @ 6" O.C. ALL EDGES @12" O.C. FIELD TOP OF EL. 48'-4 2A TOP OF EL. 47'-10 2B TOP OF EL.47'-6 3B TOP OF EL.48'-0 3A TOP OF EL. 47'-6 4A TOP OF EL. 47'-5 4B 5C HSS16 x 8 x 5 16 EL. 41'-21 4 5F L3 x 3 x 1 4 BRACES (8 REQ'D) 5G 7/S1.2 TYPICAL EDGE OF PLATFORM DETAIL 1 W16x BEAM BT. PL 1 4" x 101 2 LG (NOTCH PLATE AT PIPE SLEEVE) 21 2 W/2-3 8 @ 21 2" O.C. MIN. 3 4" PLYWOOD L3 x 3 x 1 4 @ 4'-0 O.C. @ BRACE 3 4" PLYWOOD METAL DECK PER PLAN 5/S1.2 PLATFORM DETAIL BELOW HSS 2 HSS16 x 8 x 5 16 W16x BEAM L4 x 3 x 1 4 LLV 3 4" PLYWOOD METAL DECK PER PLAN 3/S1.2 PLATFORM DETAIL BELOW HSS 3 HSS16 x 8 x 5 16 W16x BEAM BT. PL 1 4" x 101 2 LG (NOTCH PLATE AT PIPE SLEEVE) 21 2 W/2-3 8 @ 21 2" O.C. MIN. 137 8 3 8" BT. PL x 1'-41 2 LG 3 BRACE L3 x 3 x 1 4 @ 4'-0 O.C. W/ 1 -5 8 PL 1 4" x 5 SQ. 4/S1.2 HSS TO HSS MOMENT CONNECTION 4 9/S1.2 HSS SPLICE DETAIL 5 0" CJP 0" CJP CJP HSS16 x 8 x 5 16 HSS8 x 8 x 5 16 PL 5 16" GUSSET HSS8 x 8 x 5 16 3 8" BT. PL x 1'-0 BOLTS (A 325SC) 10/S1.2 TYPICAL HSS BM TO HSS COL CONNECTION 6 HSS16 x 8 x 5 16 HSS8 x 8 x 5 16 PL 1 2" x 12 x 1'-1 SLOT COL TYP. PL 1 2 x 31 2 x 1'-0 PL 1 2 x 81 2 x 1'-41 2 2/S1.2 TYPICAL W16 TO HSS COL CONNECTION 7 W16 BEAM PER PLAN HSS8 x 8 x 5 16 PL 3 8 x 12 x 1'-0 SLOT COL TYP. PL 3 8 x 31 2 x 1'-0 PL 1 2 x 8 x 1'-1 1 4 TYP. 1 4 3 73 4 3 73 4 TYPICAL HOLLANDER PIPE BASE INSTALL AFTER PROJECTOR ALIGNMENT (BUYOUT) TYPICAL HOLLANDER PIPE BASE INSTALL AFTER PROJECTOR ALIGNMENT (BUYOUT) L21 2 x 2x 3 8 (LLV) W/ 9 16 5 8" O.C. Reference Contractor Description Project Engineer Sheet Number Date Drawn By NO. DATE DESCRIPTION 0 FOR FABRICATION2/25/2014 PLATFORM FRAMING PLAN & DETAILS E1 WHEELER & GRAY CONSULTING ENGINEER 1 / 6 / 2014 WM S2.2
  • 2. A B C D E 6 5 4 3 2 1 1. REFERENCE ELEVATION TOP OF SLAB = 0'-0 ROOF FRAMING PLAN 1 - (E) TAPERED STEEL GIRDER (E) TAPERED STEEL GIRDER (E) TAPERED STEEL GIRDER (E) TAPERED STEEL GIRDER (E) TAPERED STEEL GIRDER (E) TAPERED STEEL GIRDER (E)"Z"PURLINSTYP.(E)"Z"PURLINSTYP.(E)"Z"PURLINSTYP.(E)"Z"PURLINSTYP.(E)"Z"PURLINSTYP. MC12x317A MC12x317A MC12x317A MC12x317A MC12x317B MC12x317B TYP. 2 - TYP. 2 - SIM. 2:12 SLOPE 2:12 SLOPE FIELD VERIFY FIELD VERIFY FIELD VERIFY 5/S5.1 MC CHANNEL @ TAPERED GIRDER CONNECTION 1 (2) 3 4 L6 x 4 x 3 8 x 0'-8 (LLH) W/ 2 -3 4 MC12 x 31 (FLAT) 3 & 4/S5.1 MC CHANNEL AT COLUMN CONNECTION 2 PLEASE CONFIRM PROPOSED FIELD WELD IN LIEU OF BOLTS FOR FIELD INSTALLATION TOLERANCES. HSS8 x 8 x 5 16 1 4 TYP. 12" TOTAL L6 x 4 x 3 8 x 0'-10 W/2 -3 4 11 2" VERTICAL SLOTTED HOLES HSS8 x 8 x 5 16 MC12 x 31 (FLAT) (E) TAPERED GIRDER MC12 x 31 (FLAT) NEW "SPEED RAIL" GUARDRAIL BY HOLLAENDER MANF. 2" ISP (2.375" O.D. INDUSTRIAL FINSH) (BUY OUT PARTS AND MATERIAL) 10/A20.0 GUARDRAIL AT PLATFORM 3 3 16" CAP PALTE POST INSTALLED HOLLANDER PIPE BASE #48 FOR ISP W/ (4) -1 2" BOLTS (FIELD DRILL/TAP) OR (4) - 5 16" BOXBOLTS SIZE 2 BY LNA SOLUTIONS (ICC-ES ESR #3217) TO BE FIELD LOCATED AFTER PROJECTORS ARE IN PLACE. (BUYOUT) A B C D E 6 5 4 3 2 1 1. REFERENCE ELEVATION TOP OF PLATFORM = EL. 39'-6 NEW GUARDRAIL LAYOUT PLAN PLEASE CONFIRM LADDER AND GATE LOCATION 3 - 4 - 7C LADDER NEW "SPEED RAIL" GUARDRAIL BY HOLLAENDER MANF. 2" ISP (2.375" O.D. INDUSTRIAL FINSH) (BUY OUT PARTS AND MATERIAL) 7, 8 & 9 /S5.1 PLATFORM ACCESS LADDER 4 W/ GRIP MATERIAL PL 1 2" x 21 2 SIDE RAILS 1 4 TYP. PL 1 2" STIFFNER @ EACH RAIL PLATFORM W16 ELLIS GRAB SAFE WELD ON, PART NO: GBS-CMP (BUY OUT) CONFIRM PRIOR TO FAB Reference Contractor Description Project Engineer Sheet Number Date Drawn By NO. DATE DESCRIPTION 0 FOR FABRICATION1/25/2014 ROOF FRAMING PLAN AND GUARDRAIL LAYOUT E2 WHEELER & GRAY CONSULTING ENGINEER 1 / 6 / 2014 WM S2.2
  • 3. - COLUMN - 2AONE CP1 CP3 1 4 TYP. 1 4 1 4 TYP. 1 4 1 4 TYP. 1 4 TYP. TYP. 1 4 TYP. 15 16 13 16 x 1 1 2 VETICAL SLOTTED ON HSS SECTION "A" SECTION "B" SECTION "C" "A" "B" "C" - COLUMN - 2BONE TYP. 1 4 TYP. 15 16 13 16 x 1 1 2 VETICAL SLOTTED ON HSS "D" "C"MK;NORTH MK;NORTH 1 4 TYP. 1 4 TYP. SECTION "D" CP1 CP2 CP3 1 4 TYP. 1 4 CP4 CP5 CP7(B.S.) CP6 CP7 CP7 CP7(B.S.) CP7 CP7 CP2 CP3 CP4 CP4 (N.S.) CP3 (N.S.) 13 16 @ ANGLE 13 16 @ ANGLE CP7 CP7 CP5 CP2 CP4 CP3 CP2 CP4 CP4 (F.S.) CP3 (F.S.) 2 COLUMNS E1 WHEELER & GRAY CONSULTING ENGINEER 1 / 6 / 2014 WM Reference Contractor Description Project Engineer Sheet Number Date Drawn By 44 WELD U.N.PAINT NO. DATE HOLES U.N. DESCRIPTION 52 48 50 51 49 47 46 45 40 43 42 41 39 38 37 35 36 34 33 31 32 30 29 21 25 28 27 26 24 23 22 20 19 18 17 16 15 14 BILL OF MATERIALS 12 13 11 10 6 8 9 7 2 5 4 3 1 LINE MARK DETAIL MRK. SHIP QUAN. DESCRIPTION LENGTH REMARKS 1. ALL PLATE & ANGLES A36 U.N.O 2. ALL BEAM A922 U.N.O 3. ALL HSS A500 GR. "B" U.N.O 4. ALL PIPE A53 U.N.O 5. ALL WELDS 1 4" U.N.O. GENERAL NOTES ONE SHOP COAT 1 1 16 E70-XX 2A ONE HSS8 x 8 x 5 16 48'-0 9 16 A500 GR "B" CP1 ONE PL 3 4 x 14 1'-2 CP2 ONE PL 3 8 x 12 1'-0 CP3 ONE PL 1 2 x 8 1'-0 CP4 ONE PL 3 8 x 31 2 1'-0 CP5 ONE PL 1 2 x 12 1'-1 CP6 ONE PL 3 16 x 8 0'-8 CAP PLATE CP7 2 L6 x 4 x 3 8 0'-10 a2 2 3 4 0'-101 2 A307 2B ONE HSS8 x 8 x 5 16 47'-6 9 16 A500 GR "B" CP1 ONE CP2 ONE CP3 ONE CP4 ONE CP6 ONE CP7 2 a2 2 0 FOR FABRICATION1/25/2014
  • 4. - COLUMN - 3AONE CP1 1 4 TYP. 1 4 1 4 TYP. 1 4 TYP. TYP. 1 4 TYP. 15 16 13 16 x 1 1 2 VETICAL SLOTTED ON HSS SECTION "A" SECTION "C" "A" "C" - COLUMN - 3BONE 1 4 TYP. 15 16 "D" MK;NORTH MK;NORTH 1 4 TYP. 1 4 TYP. SECTION "D" CP1 CP2 CP3 1 4 TYP. 1 4 CP4 CP7(B.S.) CP6 CP7 CP7 CP3 CP4 13 16 @ ANGLE 0" CJP TYP. CP3 CP2 CP4 CP3 CP2 CP4 CP8 CP8 12 12ALL R O U N D TYP. CP4 (F.S.) CP3 (F.S.) CP2 CP4 (N.S.) CP3 (N.S.) a3 b3 a3 b3 CP8 CP8 TYP. 13 16 x 1 1 2 VETICAL SLOTTED ON HSS "C" CP7(B.S.) CP6 CP7 CP7 13 16 @ ANGLE CP7 CP7 3 COLUMNS E1 WHEELER & GRAY CONSULTING ENGINEER 1 / 6 / 2014 WM Reference Contractor Description Project Engineer Sheet Number Date Drawn By 44 WELD U.N.PAINT NO. DATE HOLES U.N. DESCRIPTION 52 48 50 51 49 47 46 45 40 43 42 41 39 38 37 35 36 34 33 31 32 30 29 21 25 28 27 26 24 23 22 20 19 18 17 16 15 14 BILL OF MATERIALS 12 13 11 10 6 8 9 7 2 5 4 3 1 LINE MARK DETAIL MRK. SHIP QUAN. DESCRIPTION LENGTH REMARKS 1. ALL PLATE & ANGLES A36 U.N.O 2. ALL BEAM A922 U.N.O 3. ALL HSS A500 GR. "B" U.N.O 4. ALL PIPE A53 U.N.O 5. ALL WELDS 1 4" U.N.O. GENERAL NOTES ONE SHOP COAT 1 1 16 E70-XX 3A ONE HSS8 x 8 x 5 16 39'-8 A500 GR "B" a3 ONE HSS8 x 8 x 5 16 1'-33 8 b3 ONE HSS8 x 8 x 5 16 6'-8 9 16 CP1 ONE PL 3 4 x 14 1'-2 CP2 ONE PL 3 8 x 12 1'-0 CP3 ONE PL 1 2 x 8 1'-0 CP4 ONE PL 3 8 x 31 2 1'-0 CP6 ONE PL 3 16 x 8 0'-8 CAP PLATE CP7 2 L6 x 4 x 3 8 0'-10 a2 2 3 4 0'-101 2 A307 CP8 2 PL 5 16 x 8 0'-8 MOMENT GUSSET 3B ONE HSS8 x 8 x 5 16 47'-2 9 16 A500 GR "B" CP1 ONE CP2 ONE CP3 ONE CP4 ONE CP6 ONE CAP PLATE CP7 2 a2 2 0 FOR FABRICATION1/25/2014
  • 5. - COLUMN - 4AONE CP1 1 4 TYP. 1 4 1 4 TYP. 1 4 TYP. 1 4 TYP. 15 16 13 16 x 1 1 2 VETICAL SLOTTED ON HSS SECTION "A" SECTION "B" SECTION "C" "A" "B" "C" - COLUMN - 4BONE 1 4 TYP. 15 16 "D" MK;NORTH MK;NORTH 1 4 TYP. 1 4 TYP. SECTION "D" CP1 CP2 1 4 TYP. 1 4 CP5 CP7(B.S.) CP6 CP7 CP7 CP3 CP4 CP4 (N.S.) CP3 (N.S.) 13 16 @ ANGLE CP5 CP2 CP3 CP2 CP4 CP2 TYP. 13 16 x 1 1 2 VETICAL SLOTTED ON HSS "C" CP7(B.S.) CP6 CP7 CP7 13 16 @ ANGLE CP7 CP7 4 COLUMNS E1 WHEELER & GRAY CONSULTING ENGINEER 1 / 6 / 2014 WM Reference Contractor Description Project Engineer Sheet Number Date Drawn By 44 WELD U.N.PAINT NO. DATE HOLES U.N. DESCRIPTION 52 48 50 51 49 47 46 45 40 43 42 41 39 38 37 35 36 34 33 31 32 30 29 21 25 28 27 26 24 23 22 20 19 18 17 16 15 14 BILL OF MATERIALS 12 13 11 10 6 8 9 7 2 5 4 3 1 LINE MARK DETAIL MRK. SHIP QUAN. DESCRIPTION LENGTH REMARKS 1. ALL PLATE & ANGLES A36 U.N.O 2. ALL BEAM A922 U.N.O 3. ALL HSS A500 GR. "B" U.N.O 4. ALL PIPE A53 U.N.O 5. ALL WELDS 1 4" U.N.O. GENERAL NOTES ONE SHOP COAT 1 1 16 E70-XX 4A ONE HSS8 x 8 x 5 16 47'-2 9 16 A500 GR "B" CP1 ONE PL 3 4 x 14 1'-2 CP2 ONE PL 3 8 x 12 1'-0 CP5 ONE PL 1 2 x 12 1'-1 CP6 ONE PL 3 16 x 8 0'-8 CAP PLATE CP7 2 L6 x 4 x 3 8 0'-10 a2 2 3 4 0'-101 2 A307 4B ONE HSS8 x 8 x 5 16 47'-1 9 16 A500 GR "B" CP1 ONE CP2 ONE CP3 ONE PL 1 2 x 8 1'-0 CP4 ONE PL 3 8 x 31 2 1'-0 CP6 ONE CP7 2 a2 2 0 FOR FABRICATION1/25/2014
  • 6. 12 12 TO P & BO TT. 1 4 TYP. 1 4 TYP. 13 16 - HSS BEAM - 5AONE SECTION "A" 1 4 TYP. 1 4 TYP. - HSS BEAM - 5BONE 12 1 1 16 12 12 TO P & BO TT. 12 1 1 16 "A" TYP. 12 21 8 12 21 8 1 4 TYP. - HSS BEAM - 5CONE - BEAM - 5DONE 3 16 TYP. 3 16 3 16 BT. PL TO HSS TYP.2 - 6 "A" TYP. 11 4 3 13 4 3 13 16 SECTION "B" 13 16 13 16 3 16 BT. PL TO HSS TYP.2 - 8 3 16 2 - 8 3 16 TYP. 3 16 1 4 TYP. "B" TYP. CONFIRM AND VERIFY GATE LOCATION WITH LADDER LOCATION - BRACES - 5F8 - BRACE - 5GONE 12 21 8 3 4 TYP. 3 4 FIELD VERIFY 13 16 13 16 P1 P2 P2 P1 P1 P2 P2 P4 (8 REQ'D) P4 b5(FS) c5 P4 P5 P6 P3(CTRD) (12 REQ'D) 3 8" BT. PL 3 16 BT. PL TO HSS TYP.2 - 6 P7 (9 REQ'D) P7 P3 1 4 TYP. 3 - 6 1 4 3 - 6 f5(BS) 9 16 9 16 g5(BS) 3 8" DRILL & TAP 5 BEAMS E1 WHEELER & GRAY CONSULTING ENGINEER 1 / 6 / 2014 WM Reference Contractor Description Project Engineer Sheet Number Date Drawn By 44 WELD U.N.PAINT NO. DATE HOLES U.N. DESCRIPTION 52 48 50 51 49 47 46 45 40 43 42 41 39 38 37 35 36 34 33 31 32 30 29 21 25 28 27 26 24 23 22 20 19 18 17 16 15 14 BILL OF MATERIALS 12 13 11 10 6 8 9 7 2 5 4 3 1 LINE MARK DETAIL MRK. SHIP QUAN. DESCRIPTION LENGTH REMARKS 1. ALL PLATE & ANGLES A36 U.N.O 2. ALL BEAM A922 U.N.O 3. ALL HSS A500 GR. "B" U.N.O 4. ALL PIPE A53 U.N.O 5. ALL WELDS 1 4" U.N.O. GENERAL NOTES ONE SHOP COAT 1 1 16 E70-XX 5A ONE HSS16 x 8 x 5 16 22'-111 2 A500 GR "B" P1 ONE PL 1 2 x 31 2 1'-0 P2 ONE PL 1 2 x 81 2 1'-41 2 5B ONE HSS16 x 8 x 5 16 30'-6 3 16 A500 GR "B" P1 ONE P2 ONE f5 2 L21 2 x 2 x 3 8 30'-0 P4 8 L3 x 3 x 1 4 1'-0 b5 ONE 3 8" BT. PL x 161 2 30'-0 5C ONE HSS16 x 8 x 5 16 3'-41 4 A500 GR "B" P4 ONE P5 ONE PL 3 8 x 71 2 1'-0 P6 ONE PL 3 8 x 9 1'-0 c5 ONE 3 8" BT. PL x 165 8 2'-81 4 g5 2 L21 2 x 2 x 3 8 2'-81 4 5D ONE W16 x 57 35'-6 7 16 A992 P3 12 21 2 0'-73 4 a5 24 3 8 JS-600 P7 9 PL 1 4 x 5 0'-5 d5 ONE 1 4" BT. PL x 101 2 35'-3 7 16 5F ONE L3 x 3 x 1 4 5'-1011 16 5G ONE L3 x 3 x 1 4 6'-211 16 < FIELD BOLTS > 12 0'-21 2 A325SC 4 0'-21 4 A325SC 4 3 4 0'-101 2 A325SC 18 3 4 0'-13 4 A307 0 FOR FABRICATION1/25/2014
  • 7. - BEAM - 6AONE 3 16 ANGLE TO BM TYP. 2 - 8 3 16 2 - 8 SECTION "A" - BEAM - 6BONE 3 16 2 - 8 3 16 2 - 8 SECTION "B" TYP. 1 4 TYP. "A" TYP. "B" TYP. 3 8 DRILL &TAP - BEAM - 6CONE "B" TYP. - BEAM - 6DONE "B" TYP. 3 4 TYP. 3 4 C LIP 11 2 11 2 12 21 8 TYP. 1 4 1 4 TYP. 1 4 1 4 SECTION "C" - BEAM - 6FONE "B" TYP. "C" - BEAMS - 6G2 3 4 TYP. 3 4 C LIP 11 2 11 2 TYP. 1 4 1 4 TYP. 1 4 1 4 SECTION "D" "D" "D" "D" "D" 11 4 3 11 4 3 13 16 13 16 13 16 P3(CTRD) (6 REQ'D) P3(CTRD) (4 REQ'D) P3(CTRD)P3(CTRD) P8(NS) P9(FS) P8(NS) P9(FS) a6 P8 P9 P9(NS) P8(FS) P9(NS) P8(FS) b6 P3 a6 c6 c6 b6 P8(NS) P10(FS) P8 P10 d6 d6 P3 (FS)(CTRD) (3 REQ'D) f6 f6 6 BEAMS E1 WHEELER & GRAY CONSULTING ENGINEER 1 / 6 / 2014 WM Reference Contractor Description Project Engineer Sheet Number Date Drawn By 44 WELD U.N.PAINT NO. DATE HOLES U.N. DESCRIPTION 52 48 50 51 49 47 46 45 40 43 42 41 39 38 37 35 36 34 33 31 32 30 29 21 25 28 27 26 24 23 22 20 19 18 17 16 15 14 BILL OF MATERIALS 12 13 11 10 6 8 9 7 2 5 4 3 1 LINE MARK DETAIL MRK. SHIP QUAN. DESCRIPTION LENGTH REMARKS 1. ALL PLATE & ANGLES A36 U.N.O 2. ALL BEAM A922 U.N.O 3. ALL HSS A500 GR. "B" U.N.O 4. ALL PIPE A53 U.N.O 5. ALL WELDS 1 4" U.N.O. GENERAL NOTES ONE SHOP COAT 1 1 16 E70-XX 6A ONE W16 x 31 23'-3 A992 P8 2 PL 3 8 x 3 1'-3 P9 2 PL 3 8 x 41 2 0'-7 1 16 a6 ONE L5 x 3 x 1 4 23'-3 6B ONE W16 x 31 23'-3 A992 P3 6 21 2 0'- 73 4 P8 2 P9 2 b6 ONE 1 4" BT. PL x 101 2 23'-3 6C ONE W16 x 31 8'-10 A992 P3 2 c6 ONE 1 4" BT. PL x 101 2 2'-3 P8 ONE P10 ONE PL 3 8 x 41 2 0'-1115 16 6D ONE W16 x 26 8'-10 A992 P3 4 d6 ONE 1 4" BT. PL x 101 2 8'-10 6F ONE W16 x 26 5'-2 A992 P3 3 f6 ONE 1 4" BT. PL x 101 2 5'-2 6G 2 W10 x 12 9'-63 4 A992 < FIELD BOLTS > 40 0'-21 4 A325SC 8 3 4 0'-2 A325SC 0 FOR FABRICATION1/25/2014
  • 8. - CHANNELS- 7A4 - CHANNELS- 7B2 - LADDER - 7CONE DETAIL #1 GRIND SMOOTH 1 1 16 @ PL 1 2" FIELD VERIFY FIELD VERIFY FIELD VERIFY a7 a7 b7 (5 REQ'D) f7 f7 3 4 TYP. 3 4 1 4 TYP. d7d7 d7 - ANGLES- 7D12 13 16 7 ROOF CHANNELS AND LADDER E2 WHEELER & GRAY CONSULTING ENGINEER 1 / 6 / 2014 WM Reference Contractor Description Project Engineer Sheet Number Date Drawn By 44 WELD U.N.PAINT NO. DATE HOLES U.N. DESCRIPTION 52 48 50 51 49 47 46 45 40 43 42 41 39 38 37 35 36 34 33 31 32 30 29 21 25 28 27 26 24 23 22 20 19 18 17 16 15 14 BILL OF MATERIALS 12 13 11 10 6 8 9 7 2 5 4 3 1 LINE MARK DETAIL MRK. SHIP QUAN. DESCRIPTION LENGTH REMARKS 1. ALL PLATE & ANGLES A36 U.N.O 2. ALL BEAM A922 U.N.O 3. ALL HSS A500 GR. "B" U.N.O 4. ALL PIPE A53 U.N.O 5. ALL WELDS 1 4" U.N.O. GENERAL NOTES ONE SHOP COAT 13 16 E70-XX 7A 4 MC12 x 31 19'-01 2 7B 2 MC12 x 31 18'-21 2 7C ONE LADDER a7 2 PL 1 2 x 21 2 8'-6 LF b7 5 1'-63 4 WITH GRIP MATRL d7 2 PL 1 2 x 113 8 1'-3 f7 2 ELLIS GRAB SAFE WELD ON GBS-CMP(BUY OUT) 7D 12 L6 x 4 x 3 8 0'-8 < FIELD BOLTS > 24 3 4 0'-2 A307 0 FOR FABRICATION1/25/2014