Biofabrik WASTX Plastic solution
INTRODUCTION
QMRE have exclusive UK distribution rights for a German manufactured plastic recycling technology/ on-
site product. QMRE believes that there is a compelling investment case to locate a recycling machine
(P5000) with a payback of approximately 3 years on an investment of c£1.8m.
This note sets out further background to and details of QMRE’s proposal. A comprehensive presentation
has been attached with this note that covers off the below. All page numbers reference in this document
relate to the presentation.
The machine is still undergoing final testing and validation and is subject to UK regulatory approval but we
are confident that we will be in a position to take orders in early April 2020 for delivery at the end of this
year. A demonstration of the machine can be arranged in Germany any time from now or a visit to our UK
test site in Dover can be arranged for May when we expect it to be fully operational.
UK LEGSILATIVE CHANGE ON WASTE PRODUCTION
Plastic waste pollution has risen rapidly up the scale of priorities for governments as well as Industry and
business. As you are probably aware, UK Government legislation will soon make it prohibitively expensive
for businesses that produce plastic waste and that do nothing, with the recent Packaging Tax Consultation
document stating:
‘At Budget 2018, this government announced its intention to introduce a new tax on plastic packaging. The tax will
apply to businesses that produce or import plastic packaging which uses insufficient recycled content, taking effect
from April 2022. The tax will be set at a rate that provides a clear economic incentive for businesses to use recycled
material in the production of plastic packaging, which will create greater demand for recycled plastic, and in turn
stimulate increased levels of collection and recycling of plastic waste.’
QM Recycled Energy Ltd | Oast Farm | Addington | West Malling | Kent | ME19 5BA
BACKGROUND TO QMRE, BIOFABRIK & PYROLYSIS
QM Recycled Energy (QMRE) Ltd is solely focused on helping UK businesses to address their plastic waste
pollution problem. QMRE is run and owned by Tim StClair-Pearce and Dave Garbett both of whom have
extensive experience in the plastics, paper and synthetic packaging industries as well as project managing
large, multi-site industrial/commercial developments.
QMRE has been pursuing companies that can commercially apply pyrolysis, a thermal process where no
flame is created and that reverses the process of making plastic (depolymerisation). QMRE believes that
pyrolysis is the best solution for plastic waste recycling because pyrolysis creates power from the product
and the process is self-sufficient.
Following extensive research, QMRE signed an exclusive distribution agreement with Biofabrik. Pages 31-
38 show a report on all current technologies in use, competitors, sites and reports. Biofabrik was chosen by
QMRE because, unlike its competitors, it didn’t use burners to heat the thermal process and therefore
didn’t require additional planning consent, and doesn’t necessitate a much larger footprint to operate.
Biofabrik is a design company that owns the IP to the technology and has manufacturing capabilities
through its relationship via industrial partner Nurmont – a mechanical engineering company established in
1985 with an excellent reputation and owned by Baumuller Group. Biofabrik have taken 8 years developing
this system which has been extensively tested by Schur the world’s oldest packaging company. For further
information on Biofabrik, see Pages 19-30.
INFORMATION ON BIOFABRIK’S P5000 MACHINE & INSTALLATION
The P5000 machine is the only available compact, electronically-powered pyrolysis plant available in the
world. The machine can process 5 tonnes per day which, based on plastic polyolefins waste volumes.
The P5000 machine does not need planning permission given its size and is easily installed on site with
minimal set up costs.
We can confirm that BIOFABRIK have commenced production on multiple orders received from their
partners in UK, USA, Germany, UAE and Switzerland, including an international plastic producer.
BENEFITS OF USING THE P5000 MACHINE
By reducing the movement of plastic waste customers will reduce their carbon footprint by reducing plastic
waste movement. Condensing waste plastic into oil is more efficient than bulk waste, landfill, incineration
or export – all of which are disappearing as options.
QM Recycled Energy Ltd | Oast Farm | Addington | West Malling | Kent | ME19 5BA
Based on waste data, the waste managed by the machine is expected to deliver an attractive financial
return, with income from two sources:
1. Output material sales at an assumed £360 per tonne from the sale of oil, which QMRE will manage;
and
2. Packaging Recovery Notes (PRNs) at assumed £250 per tonne which are government incentives to
recycle packaging. QMRE are currently in discussions with the Environment Agency (EA) to provide
evidence and approve the qualifying of the oil for Packaging Recovery Notes.
We estimate a pay back period of c. 3 years from an initial investment of machine cost £1.681m + site set
up costs subject to survey. An optional reduction in Capex of £0.4m if customers wish to take up the
Partner Model option with shared revenue, with a payback of approximately 2.2 years on an investment of
c£1.35m which could prove an attractive alternative.
The operational cost include: Service £8k, Insurance 18k, Energy supply £32k Staff 43k Total £101k
We expect that capital allowances for early adopters of this technology will also be available but we have
not factored these into our analysis so this could be further upside.
Given recent movements in oil prices, we have provided below a worst case sensitivity analysis for the
material sales income and its impact on returns as well as historic oil prices over the last 5 years. This
demonstrated that even based on an oil price significantly lower than historic there is still an attractive
payback.
Oil price ($pb) $35 (Current price) $28 (Assumed case)
Oil £ per tonne of waste £268 £215
Output Material Sales income £442,200 £354,750
P&L pa £493,000 £406,000
Payback 3.4 4.1
In addition, there is likely to be an option in the near future to extend the machine (to a Phase 2 machine-
see page 41) which changes oil to electricity and provide Islip with an electricity supply and provide
significant additional financial and environmental benefits.
QM Recycled Energy Ltd | Oast Farm | Addington | West Malling | Kent | ME19 5BA
REGULATORY & OTHER APPROVALS
QMRE are in the process of obtaining a licence under a Small Waste Incineration Permit (SWIP) - burning
under three tonnes an hour which is site specific and regulated by Local Authorities. QMRE will apply for
the same on customers behalf.
We are active members of the Renewable Energy Association (REA) and are working with the central office
of the Environment Agency. QMRE is expected to obtain its own ‘EoW end-of-waste certificate’ once its
Dover test site is up and running (May 2020). We have appointed 360 Environmental who are expert
consultants in this area, and Constantine – an environmental agency specialist – both to provide advice and
guidance to QMRE. Once the EoW certificate is received, a site specific ‘local authority licence’ is required
for customer sites which will take up to six months to receive, target date November 2020 for orders
placed in April 2020.
An end of waste licence is required in order to receive PRN’s, which QMRE will project manage and expect
to receive by October 2020.
TIMELINES
• Delivery of test machine in UK: Projected April 2020
• UK Test machine demonstration: Projected May 2020 (Dresden April 2020)
• P5000 product testing complete: Projected August 2020
• Projected Approvals: Projected local authority licences expected to be received in November 2020
• Delivery of P5000: Projected December 2020 (assuming order placed in April 2020)
DETAILS ON THE CONTRACT
• Quotes available: Standard Purchase Model or Price Supported Partner Purchase Model.
• Warranties: 1 year guarantee included in price (this is extendable yearly for an extra cost with an
overall 10 year warranty)
• Servicing arrangements: The first two services at 6 months and 12 months are included – QMRE’s
contract with Biofabrik stipulates that an engineer must be on site within 12 hours of any
breakdown. Maintenance is between cycles estimated at 30 day intervals, training is provided.
• Contract: The guarantee and contract are written into the appended quotations.
• Deposit Insurance: Third party insurance cover is provided on UK deposits.
• Manufacturer additional breakdown and business interruption insurance, optional.
• Leasing: option available by request.
• Payment structure: A 50% deposit is required on placement of order. 30% is due once the machine
is shipped, 20% is due once machine is commissioned and running.

More Related Content

What's hot (9)

ALD/CVD applications, equipment and precursors in high volume manufacturing
ALD/CVD applications, equipment and precursors in high volume manufacturingALD/CVD applications, equipment and precursors in high volume manufacturing
ALD/CVD applications, equipment and precursors in high volume manufacturing
 
TireTech 2023 - Wolfersdorff - A global progress update on recovered carbon b...
TireTech 2023 - Wolfersdorff - A global progress update on recovered carbon b...TireTech 2023 - Wolfersdorff - A global progress update on recovered carbon b...
TireTech 2023 - Wolfersdorff - A global progress update on recovered carbon b...
 
Bio gas plant
Bio gas plantBio gas plant
Bio gas plant
 
Carbon credit
Carbon creditCarbon credit
Carbon credit
 
Nishil Malde - Anton Paar
Nishil Malde  - Anton PaarNishil Malde  - Anton Paar
Nishil Malde - Anton Paar
 
Thai IRPC UHV Project ENG
Thai IRPC UHV Project ENGThai IRPC UHV Project ENG
Thai IRPC UHV Project ENG
 
Project report
Project reportProject report
Project report
 
Biogas Upgrading Project Technology Considerations
Biogas Upgrading Project Technology ConsiderationsBiogas Upgrading Project Technology Considerations
Biogas Upgrading Project Technology Considerations
 
Thermo chemical conversion
Thermo chemical conversionThermo chemical conversion
Thermo chemical conversion
 

Similar to Biofabrik WASTX Plastic solution

From Mills to Refineries - The Evolution of Biorefining
From Mills to Refineries - The Evolution of BiorefiningFrom Mills to Refineries - The Evolution of Biorefining
From Mills to Refineries - The Evolution of BiorefiningNNFCC
 
Competition_Results_-_The_Sustainable_Innovation_Fund_-_SBRI_Phase_2.pdf
Competition_Results_-_The_Sustainable_Innovation_Fund_-_SBRI_Phase_2.pdfCompetition_Results_-_The_Sustainable_Innovation_Fund_-_SBRI_Phase_2.pdf
Competition_Results_-_The_Sustainable_Innovation_Fund_-_SBRI_Phase_2.pdfbeckycotton1
 
CBI Northern Ireland Annual Energy Forum - Energy: A customer viewpoint
CBI Northern Ireland Annual Energy Forum - Energy: A customer viewpointCBI Northern Ireland Annual Energy Forum - Energy: A customer viewpoint
CBI Northern Ireland Annual Energy Forum - Energy: A customer viewpointConfederation of British Industry
 
UK AD & BIogas 2016: Purple Seminar Room - 7 July
UK AD & BIogas 2016: Purple Seminar Room - 7 July  UK AD & BIogas 2016: Purple Seminar Room - 7 July
UK AD & BIogas 2016: Purple Seminar Room - 7 July UKADBiogas
 
Implementable Recommendation of Cleaner Production Progress in Pakistan
Implementable Recommendation of Cleaner Production Progress in PakistanImplementable Recommendation of Cleaner Production Progress in Pakistan
Implementable Recommendation of Cleaner Production Progress in PakistanUmay Habiba
 
SESPco Presentation for Crowd for Angels
SESPco Presentation for Crowd for AngelsSESPco Presentation for Crowd for Angels
SESPco Presentation for Crowd for AngelsSESPco
 
Cleaning up british industry
Cleaning up british industryCleaning up british industry
Cleaning up british industryBrian Worrall
 
CIWM-September-2016-Special-Focus
CIWM-September-2016-Special-FocusCIWM-September-2016-Special-Focus
CIWM-September-2016-Special-FocusConversocial
 
Plastics to oil report
Plastics to oil reportPlastics to oil report
Plastics to oil reportJay Ranvir
 
Bioenergy New Review October 2019
Bioenergy New Review October 2019Bioenergy New Review October 2019
Bioenergy New Review October 2019NNFCC
 
Ai operating results q2 2013
Ai operating results q2 2013Ai operating results q2 2013
Ai operating results q2 2013Pk Daily Watch
 
Industri Minyak di Masa Depan
Industri Minyak di Masa DepanIndustri Minyak di Masa Depan
Industri Minyak di Masa DepanYanu Priandana
 
Agatha Biomass Power Project Brief
Agatha Biomass Power Project BriefAgatha Biomass Power Project Brief
Agatha Biomass Power Project BriefMamiki Matlawa
 

Similar to Biofabrik WASTX Plastic solution (20)

C Williamson CV
C Williamson CVC Williamson CV
C Williamson CV
 
From Mills to Refineries - The Evolution of Biorefining
From Mills to Refineries - The Evolution of BiorefiningFrom Mills to Refineries - The Evolution of Biorefining
From Mills to Refineries - The Evolution of Biorefining
 
Competition_Results_-_The_Sustainable_Innovation_Fund_-_SBRI_Phase_2.pdf
Competition_Results_-_The_Sustainable_Innovation_Fund_-_SBRI_Phase_2.pdfCompetition_Results_-_The_Sustainable_Innovation_Fund_-_SBRI_Phase_2.pdf
Competition_Results_-_The_Sustainable_Innovation_Fund_-_SBRI_Phase_2.pdf
 
CBI Northern Ireland Annual Energy Forum - Energy: A customer viewpoint
CBI Northern Ireland Annual Energy Forum - Energy: A customer viewpointCBI Northern Ireland Annual Energy Forum - Energy: A customer viewpoint
CBI Northern Ireland Annual Energy Forum - Energy: A customer viewpoint
 
ITM Power Interim Report
ITM Power Interim ReportITM Power Interim Report
ITM Power Interim Report
 
UK AD & BIogas 2016: Purple Seminar Room - 7 July
UK AD & BIogas 2016: Purple Seminar Room - 7 July  UK AD & BIogas 2016: Purple Seminar Room - 7 July
UK AD & BIogas 2016: Purple Seminar Room - 7 July
 
Implementable Recommendation of Cleaner Production Progress in Pakistan
Implementable Recommendation of Cleaner Production Progress in PakistanImplementable Recommendation of Cleaner Production Progress in Pakistan
Implementable Recommendation of Cleaner Production Progress in Pakistan
 
SESPco Presentation for Crowd for Angels
SESPco Presentation for Crowd for AngelsSESPco Presentation for Crowd for Angels
SESPco Presentation for Crowd for Angels
 
Cleaning up british industry
Cleaning up british industryCleaning up british industry
Cleaning up british industry
 
CIWM-September-2016-Special-Focus
CIWM-September-2016-Special-FocusCIWM-September-2016-Special-Focus
CIWM-September-2016-Special-Focus
 
Plastics to oil report
Plastics to oil reportPlastics to oil report
Plastics to oil report
 
Sgcp13mackenzie
Sgcp13mackenzieSgcp13mackenzie
Sgcp13mackenzie
 
Masterfilter
MasterfilterMasterfilter
Masterfilter
 
Climate Adaptation
Climate AdaptationClimate Adaptation
Climate Adaptation
 
Reducing carbon footprint in the asphalt pavement industry
Reducing carbon footprint in the asphalt pavement industryReducing carbon footprint in the asphalt pavement industry
Reducing carbon footprint in the asphalt pavement industry
 
Bioenergy New Review October 2019
Bioenergy New Review October 2019Bioenergy New Review October 2019
Bioenergy New Review October 2019
 
Ai operating results q2 2013
Ai operating results q2 2013Ai operating results q2 2013
Ai operating results q2 2013
 
ITM Briefing 29-30.11.11
ITM Briefing 29-30.11.11ITM Briefing 29-30.11.11
ITM Briefing 29-30.11.11
 
Industri Minyak di Masa Depan
Industri Minyak di Masa DepanIndustri Minyak di Masa Depan
Industri Minyak di Masa Depan
 
Agatha Biomass Power Project Brief
Agatha Biomass Power Project BriefAgatha Biomass Power Project Brief
Agatha Biomass Power Project Brief
 

Recently uploaded

Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfngoud9212
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Neo4j
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 

Recently uploaded (20)

Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdf
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 

Biofabrik WASTX Plastic solution

  • 1. QM Recycled Energy Ltd | Oast Farm | Addington | West Malling | Kent | ME19 5BA Biofabrik WASTX Plastic solution INTRODUCTION QMRE have exclusive UK distribution rights for a German manufactured plastic recycling technology/ on- site product. QMRE believes that there is a compelling investment case to locate a recycling machine (P5000) with a payback of approximately 3 years on an investment of c£1.8m. This note sets out further background to and details of QMRE’s proposal. A comprehensive presentation has been attached with this note that covers off the below. All page numbers reference in this document relate to the presentation. The machine is still undergoing final testing and validation and is subject to UK regulatory approval but we are confident that we will be in a position to take orders in early April 2020 for delivery at the end of this year. A demonstration of the machine can be arranged in Germany any time from now or a visit to our UK test site in Dover can be arranged for May when we expect it to be fully operational. UK LEGSILATIVE CHANGE ON WASTE PRODUCTION Plastic waste pollution has risen rapidly up the scale of priorities for governments as well as Industry and business. As you are probably aware, UK Government legislation will soon make it prohibitively expensive for businesses that produce plastic waste and that do nothing, with the recent Packaging Tax Consultation document stating: ‘At Budget 2018, this government announced its intention to introduce a new tax on plastic packaging. The tax will apply to businesses that produce or import plastic packaging which uses insufficient recycled content, taking effect from April 2022. The tax will be set at a rate that provides a clear economic incentive for businesses to use recycled material in the production of plastic packaging, which will create greater demand for recycled plastic, and in turn stimulate increased levels of collection and recycling of plastic waste.’
  • 2. QM Recycled Energy Ltd | Oast Farm | Addington | West Malling | Kent | ME19 5BA BACKGROUND TO QMRE, BIOFABRIK & PYROLYSIS QM Recycled Energy (QMRE) Ltd is solely focused on helping UK businesses to address their plastic waste pollution problem. QMRE is run and owned by Tim StClair-Pearce and Dave Garbett both of whom have extensive experience in the plastics, paper and synthetic packaging industries as well as project managing large, multi-site industrial/commercial developments. QMRE has been pursuing companies that can commercially apply pyrolysis, a thermal process where no flame is created and that reverses the process of making plastic (depolymerisation). QMRE believes that pyrolysis is the best solution for plastic waste recycling because pyrolysis creates power from the product and the process is self-sufficient. Following extensive research, QMRE signed an exclusive distribution agreement with Biofabrik. Pages 31- 38 show a report on all current technologies in use, competitors, sites and reports. Biofabrik was chosen by QMRE because, unlike its competitors, it didn’t use burners to heat the thermal process and therefore didn’t require additional planning consent, and doesn’t necessitate a much larger footprint to operate. Biofabrik is a design company that owns the IP to the technology and has manufacturing capabilities through its relationship via industrial partner Nurmont – a mechanical engineering company established in 1985 with an excellent reputation and owned by Baumuller Group. Biofabrik have taken 8 years developing this system which has been extensively tested by Schur the world’s oldest packaging company. For further information on Biofabrik, see Pages 19-30. INFORMATION ON BIOFABRIK’S P5000 MACHINE & INSTALLATION The P5000 machine is the only available compact, electronically-powered pyrolysis plant available in the world. The machine can process 5 tonnes per day which, based on plastic polyolefins waste volumes. The P5000 machine does not need planning permission given its size and is easily installed on site with minimal set up costs. We can confirm that BIOFABRIK have commenced production on multiple orders received from their partners in UK, USA, Germany, UAE and Switzerland, including an international plastic producer. BENEFITS OF USING THE P5000 MACHINE By reducing the movement of plastic waste customers will reduce their carbon footprint by reducing plastic waste movement. Condensing waste plastic into oil is more efficient than bulk waste, landfill, incineration or export – all of which are disappearing as options.
  • 3. QM Recycled Energy Ltd | Oast Farm | Addington | West Malling | Kent | ME19 5BA Based on waste data, the waste managed by the machine is expected to deliver an attractive financial return, with income from two sources: 1. Output material sales at an assumed £360 per tonne from the sale of oil, which QMRE will manage; and 2. Packaging Recovery Notes (PRNs) at assumed £250 per tonne which are government incentives to recycle packaging. QMRE are currently in discussions with the Environment Agency (EA) to provide evidence and approve the qualifying of the oil for Packaging Recovery Notes. We estimate a pay back period of c. 3 years from an initial investment of machine cost £1.681m + site set up costs subject to survey. An optional reduction in Capex of £0.4m if customers wish to take up the Partner Model option with shared revenue, with a payback of approximately 2.2 years on an investment of c£1.35m which could prove an attractive alternative. The operational cost include: Service £8k, Insurance 18k, Energy supply £32k Staff 43k Total £101k We expect that capital allowances for early adopters of this technology will also be available but we have not factored these into our analysis so this could be further upside. Given recent movements in oil prices, we have provided below a worst case sensitivity analysis for the material sales income and its impact on returns as well as historic oil prices over the last 5 years. This demonstrated that even based on an oil price significantly lower than historic there is still an attractive payback. Oil price ($pb) $35 (Current price) $28 (Assumed case) Oil £ per tonne of waste £268 £215 Output Material Sales income £442,200 £354,750 P&L pa £493,000 £406,000 Payback 3.4 4.1 In addition, there is likely to be an option in the near future to extend the machine (to a Phase 2 machine- see page 41) which changes oil to electricity and provide Islip with an electricity supply and provide significant additional financial and environmental benefits.
  • 4. QM Recycled Energy Ltd | Oast Farm | Addington | West Malling | Kent | ME19 5BA REGULATORY & OTHER APPROVALS QMRE are in the process of obtaining a licence under a Small Waste Incineration Permit (SWIP) - burning under three tonnes an hour which is site specific and regulated by Local Authorities. QMRE will apply for the same on customers behalf. We are active members of the Renewable Energy Association (REA) and are working with the central office of the Environment Agency. QMRE is expected to obtain its own ‘EoW end-of-waste certificate’ once its Dover test site is up and running (May 2020). We have appointed 360 Environmental who are expert consultants in this area, and Constantine – an environmental agency specialist – both to provide advice and guidance to QMRE. Once the EoW certificate is received, a site specific ‘local authority licence’ is required for customer sites which will take up to six months to receive, target date November 2020 for orders placed in April 2020. An end of waste licence is required in order to receive PRN’s, which QMRE will project manage and expect to receive by October 2020. TIMELINES • Delivery of test machine in UK: Projected April 2020 • UK Test machine demonstration: Projected May 2020 (Dresden April 2020) • P5000 product testing complete: Projected August 2020 • Projected Approvals: Projected local authority licences expected to be received in November 2020 • Delivery of P5000: Projected December 2020 (assuming order placed in April 2020) DETAILS ON THE CONTRACT • Quotes available: Standard Purchase Model or Price Supported Partner Purchase Model. • Warranties: 1 year guarantee included in price (this is extendable yearly for an extra cost with an overall 10 year warranty) • Servicing arrangements: The first two services at 6 months and 12 months are included – QMRE’s contract with Biofabrik stipulates that an engineer must be on site within 12 hours of any breakdown. Maintenance is between cycles estimated at 30 day intervals, training is provided. • Contract: The guarantee and contract are written into the appended quotations. • Deposit Insurance: Third party insurance cover is provided on UK deposits. • Manufacturer additional breakdown and business interruption insurance, optional. • Leasing: option available by request. • Payment structure: A 50% deposit is required on placement of order. 30% is due once the machine is shipped, 20% is due once machine is commissioned and running.