Using ICT to improve water productivity introduction by Amgad Elmahdi
1. Water Productivity WaPOR project
Webinar
Use of ICT tools in Agriculture and Water Management in Lebanon
Dr Amgad Elmahdi
Head of MENA Region-IWMI
2. Agenda 28th and 29th April 2020
Item Presenter
10 min: Introduction to the project Dr. Amgad El Mahdi
Director of IWMI MENA Office (Cairo)
20 min: Results of the Needs Assessment Study
on the role of ICT tools
in Water Management and Agriculture
Dr. Marie-Helene Nassif
IWMI Consultant (Lebanon)
15 min: Presentation of the creation and
history of LARI App
Dr. Ihab Jomaa
LARI-Director of Tal Amara Research Station/Irrigation
and Agro-Meteorology Department(Lebanon)
25 min: Presentation of the upgrade of LARI
App
Dr. Marie-Therese Abi Saab
LARI- Director of Water and Climate Unit(Lebanon)
25 min: Questions and Answers Everyone
Closure and next step Dr. Amgad El Mahdi
Director of IWMI MENA Office (Cairo)
3. Who we Are
• Think tank conducting research to
generative Innovative Water Solutions for
Sustainable Development
• Provider of science for a transformative
agenda (science-based products and tools)
Food – To improve food security will
sustainably managing water resources and
ecosystems.
Climate – To adapt to and mitigate climate
change while building resilience to water
related disasters and disruption.
Growth – To reduce poverty and advance
inclusion with equality as agriculture
transforms, energy transitions and
urbanization intensifies.
• Facilitator of learning to strengthen capacity
and achieve uptake of research findings
4. Water Productivity WaPOR Project
Four Components:
• COMPONENT 1: AN OPEN ACCESS, OPERATIONAL, NEAR REAL TIME SPATIAL DATABASE
• COMPONENT 2: ASSESSMENT OF WATER AND LAND PRODUCTIVITY
• COMPONENT 3: ASSESSMENT OF THE CONSEQUENCES AND SUSTAINABILITY OF POSSIBLE
INCREASES IN WATER PRODUCTIVITY BY MEANS OF WATER ACCOUNTING
• COMPONENT 4: CAPACITY DEVELOPMENT OF STAKEHOLDERS TO INCREASE WATER
PRODUCTIVITY SUSTAINABLY (IWMI)
• cross-cutting component
• built on the information gathered in outputs of the other 3 components.
• three pilot countries (Ethiopia, Mali, Lebanon and Egypt)
5. Component 4
• Objective 1: Identify relevant
stakeholders and undertake
stakeholder needs assessment
• Objective 2: Identify current activities
for ICT and other solutions in
agricultural water management and
undertake capacity building with
identified partners
• Objective 3: Develop, design, pilot,
and evaluate potential solutions to
increase water productivity sustainably
7. The Focus Today
• Stakeholder mapping and needs
assessment
• Project Intervention in Lebanon
(Upgrade LARI LEB Application
Using WaPOR for Irrigation Req
and Crop health)
• Collect your feedbacks
8. Agenda 28th and 29th April 2020
Item Presenter
10 min: Introduction to the project Dr. Amgad El Mahdi
Director of IWMI MENA Office (Cairo)
20 min: Results of the Needs Assessment Study
on the role of ICT tools
in Water Management and Agriculture
Dr. Marie-Helene Nassif
IWMI Consultant (Lebanon)
15 min: Presentation of the creation and
history of LARI App
Dr. Ihab Jomaa
LARI-Director of Tal Amara Research Station/Irrigation
and Agro-Meteorology Department(Lebanon)
25 min: Presentation of the upgrade of LARI
App
Dr. Marie-Therese Abi Saab
LARI- Director of Water and Climate Unit(Lebanon)
25 min: Questions and Answers Everyone
Closure and next step Dr. Amgad El Mahdi
Director of IWMI MENA Office (Cairo)