SlideShare a Scribd company logo
1 of 2
Download to read offline
Page 1 of 2

Model CC1 Charging Cabinet
Installation Guide
Cabinet for charging the iPad and Tablets
Model CC1 has 30 numbered slots for the
iPads or tablets
Electrical outlets are UL approved . There is a
total of 32 outlets, They are arranged in 2 vertical rows of 16 outlets on a power strip. Each
strip has a separate power cord. The power
adapters for the iPads or tablets are plugged
into the power strip outlets.

GETTING STARTED
Please plan for a 32” X 24 X 12” location that is no more than 6 ft. from a dual (2) electrical outlet.
A wall or surface must be capable of holding 60 pounds which is the combined weight of the cabinet when filled with tablets. For a wall use heavy wall anchors with washers such as a Tapcon ™
anchors with a washer, and attach it at all 4 cabinet back anchor points. Use the appropriate wall
attachment procedure for the building wall type to insure the cabinet will not come loose.
Shown; Tapcon anchor
with washer in T slot on
back of cabinet

16”

Wall Mounting hardware ( not supplied ) should be
used at all 4 mounting holes located on the rear
panel. These are indicated by the arrows.

Countertop Mounting hardware should be used for the
4 mounting holes in the base of the cabinet.
NOTE: This cabinet must be
mounted or secured due to
the weight and propensity to
tip when the doors are open.

CC1 iPad Cabinet Installation Guide ver 00
Page 2 of 2

Model CC1 Charging Cabinet

IPAD or TABLET low voltage power cords ( thin white cords) are run under the shelf and attached at the
shelf front using the special J holes. Coil extra length of low voltage power cord in the cut out voids under the shelf. Insure that enough cord hangs free to fit the device in the slot.
Angle View

Front view

J Holes

Cabinet Sections , Front view

1

2

Section 1

3

iPad is a trademark of the Apple Corp. USA

Hookup cables to iPads or tablets
A wiring strategy should be used when running the
charging cables. This 4 Sections plan shows one
method to hook up the cables. Use the outlets on
the top half of the left power strip (Section 1) and
run them to the top shelf slots 1-7. Take the bottom half of the left power strip (Section 3) and run
them to the bottom shelf slots 16-24. Use the
same procedure for the other side power strip.

4
DUKANE CORP AV SERVICE DEPT
2900 Dukane Drive
St Charles, IL 60174
800-676-2487
Fax 630-584-5156
avservice@dukane.com
http://www.dukane.com/av/service/

More Related Content

Viewers also liked

Bairro 2, Maringá PR. Apresentação Prof. Nilzete Alves Campos
Bairro  2, Maringá PR.  Apresentação Prof. Nilzete Alves Campos Bairro  2, Maringá PR.  Apresentação Prof. Nilzete Alves Campos
Bairro 2, Maringá PR. Apresentação Prof. Nilzete Alves Campos Nilzetec Campos
 
Plataforma Ejecutiva Ana Rosa Payán Cervera
Plataforma Ejecutiva Ana Rosa Payán Cervera Plataforma Ejecutiva Ana Rosa Payán Cervera
Plataforma Ejecutiva Ana Rosa Payán Cervera AnaRosaPayan
 
Photos to be used
Photos to be usedPhotos to be used
Photos to be usedEmily852
 
Miguel soler ponencia ed y ddhh para difusión
Miguel soler ponencia ed y ddhh para difusiónMiguel soler ponencia ed y ddhh para difusión
Miguel soler ponencia ed y ddhh para difusiónIsabel Rodríguez Gomori
 
Course 102: Lecture 10: Learning About the Shell
Course 102: Lecture 10: Learning About the Shell Course 102: Lecture 10: Learning About the Shell
Course 102: Lecture 10: Learning About the Shell Ahmed El-Arabawy
 
Course 102: Lecture 18: Process Life Cycle
Course 102: Lecture 18: Process Life CycleCourse 102: Lecture 18: Process Life Cycle
Course 102: Lecture 18: Process Life CycleAhmed El-Arabawy
 
Hoja de vida henry andres saba
Hoja de vida henry andres sabaHoja de vida henry andres saba
Hoja de vida henry andres sabaHenry Saba Suarez
 
Course 102: Lecture 12: Basic Text Handling
Course 102: Lecture 12: Basic Text Handling Course 102: Lecture 12: Basic Text Handling
Course 102: Lecture 12: Basic Text Handling Ahmed El-Arabawy
 

Viewers also liked (11)

Bairro 2, Maringá PR. Apresentação Prof. Nilzete Alves Campos
Bairro  2, Maringá PR.  Apresentação Prof. Nilzete Alves Campos Bairro  2, Maringá PR.  Apresentação Prof. Nilzete Alves Campos
Bairro 2, Maringá PR. Apresentação Prof. Nilzete Alves Campos
 
Plataforma Ejecutiva Ana Rosa Payán Cervera
Plataforma Ejecutiva Ana Rosa Payán Cervera Plataforma Ejecutiva Ana Rosa Payán Cervera
Plataforma Ejecutiva Ana Rosa Payán Cervera
 
Continuar la lectura
Continuar la lecturaContinuar la lectura
Continuar la lectura
 
Photos to be used
Photos to be usedPhotos to be used
Photos to be used
 
Historia de la radio adventista
Historia de la radio adventista Historia de la radio adventista
Historia de la radio adventista
 
Miguel soler ponencia ed y ddhh para difusión
Miguel soler ponencia ed y ddhh para difusiónMiguel soler ponencia ed y ddhh para difusión
Miguel soler ponencia ed y ddhh para difusión
 
Course 102: Lecture 10: Learning About the Shell
Course 102: Lecture 10: Learning About the Shell Course 102: Lecture 10: Learning About the Shell
Course 102: Lecture 10: Learning About the Shell
 
Course 102: Lecture 18: Process Life Cycle
Course 102: Lecture 18: Process Life CycleCourse 102: Lecture 18: Process Life Cycle
Course 102: Lecture 18: Process Life Cycle
 
Luisa rocha peña
Luisa rocha peñaLuisa rocha peña
Luisa rocha peña
 
Hoja de vida henry andres saba
Hoja de vida henry andres sabaHoja de vida henry andres saba
Hoja de vida henry andres saba
 
Course 102: Lecture 12: Basic Text Handling
Course 102: Lecture 12: Basic Text Handling Course 102: Lecture 12: Basic Text Handling
Course 102: Lecture 12: Basic Text Handling
 

Similar to Ipad:tablet cc1 user manual

User manual for outdoor fixed installation led billboard display
User manual for outdoor fixed installation led billboard displayUser manual for outdoor fixed installation led billboard display
User manual for outdoor fixed installation led billboard displayMax Dan
 
Under Cabinet Lighting - UC2A Series from iLuXx - Installation Guide
Under Cabinet Lighting - UC2A Series from iLuXx - Installation GuideUnder Cabinet Lighting - UC2A Series from iLuXx - Installation Guide
Under Cabinet Lighting - UC2A Series from iLuXx - Installation Guideiluxx
 
EtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptxEtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptxssuser8298f2
 
Camden CM-325 Instruction Manual
Camden CM-325 Instruction ManualCamden CM-325 Instruction Manual
Camden CM-325 Instruction ManualJMAC Supply
 
Camden CM-324-4N Instruction Manual
Camden CM-324-4N Instruction ManualCamden CM-324-4N Instruction Manual
Camden CM-324-4N Instruction ManualJMAC Supply
 
SolarEdge Backup Interface Installation.pptx
SolarEdge Backup Interface Installation.pptxSolarEdge Backup Interface Installation.pptx
SolarEdge Backup Interface Installation.pptxjhonbruce4
 
Microwave Reserves for Installation, Preventative Maintenance and Acceptance
Microwave Reserves for Installation, Preventative Maintenance and AcceptanceMicrowave Reserves for Installation, Preventative Maintenance and Acceptance
Microwave Reserves for Installation, Preventative Maintenance and Acceptanceibrahimnabil17
 
Board of Education - USBTake a look at your board to get f.docx
Board of Education - USBTake a look at your board to get f.docxBoard of Education - USBTake a look at your board to get f.docx
Board of Education - USBTake a look at your board to get f.docxmoirarandell
 
solar battery Charger using adapter or solar panel
solar battery Charger using adapter or solar panelsolar battery Charger using adapter or solar panel
solar battery Charger using adapter or solar panelSwedel D'souza
 
Edwards Signaling E-278 Installation Manual
Edwards Signaling E-278 Installation ManualEdwards Signaling E-278 Installation Manual
Edwards Signaling E-278 Installation ManualJMAC Supply
 
load cell project ppt
load cell project ppt load cell project ppt
load cell project ppt GOKULKANNAN86
 
Webinar 03 electrical installation of pv system
Webinar 03 electrical installation of pv system Webinar 03 electrical installation of pv system
Webinar 03 electrical installation of pv system solpowerpeople
 
Under Cabinet Lighting - UC1 Series from iLuXx - Installation Guide
Under Cabinet Lighting - UC1 Series from iLuXx - Installation GuideUnder Cabinet Lighting - UC1 Series from iLuXx - Installation Guide
Under Cabinet Lighting - UC1 Series from iLuXx - Installation Guideiluxx
 

Similar to Ipad:tablet cc1 user manual (20)

User manual for outdoor fixed installation led billboard display
User manual for outdoor fixed installation led billboard displayUser manual for outdoor fixed installation led billboard display
User manual for outdoor fixed installation led billboard display
 
2010 Interworks EQ
2010 Interworks EQ2010 Interworks EQ
2010 Interworks EQ
 
Under Cabinet Lighting - UC2A Series from iLuXx - Installation Guide
Under Cabinet Lighting - UC2A Series from iLuXx - Installation GuideUnder Cabinet Lighting - UC2A Series from iLuXx - Installation Guide
Under Cabinet Lighting - UC2A Series from iLuXx - Installation Guide
 
EtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptxEtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptx
 
Camden CM-325 Instruction Manual
Camden CM-325 Instruction ManualCamden CM-325 Instruction Manual
Camden CM-325 Instruction Manual
 
Camden CM-324-4N Instruction Manual
Camden CM-324-4N Instruction ManualCamden CM-324-4N Instruction Manual
Camden CM-324-4N Instruction Manual
 
SolarEdge Backup Interface Installation.pptx
SolarEdge Backup Interface Installation.pptxSolarEdge Backup Interface Installation.pptx
SolarEdge Backup Interface Installation.pptx
 
Microwave Reserves for Installation, Preventative Maintenance and Acceptance
Microwave Reserves for Installation, Preventative Maintenance and AcceptanceMicrowave Reserves for Installation, Preventative Maintenance and Acceptance
Microwave Reserves for Installation, Preventative Maintenance and Acceptance
 
Board of Education - USBTake a look at your board to get f.docx
Board of Education - USBTake a look at your board to get f.docxBoard of Education - USBTake a look at your board to get f.docx
Board of Education - USBTake a look at your board to get f.docx
 
MK.pdf
MK.pdfMK.pdf
MK.pdf
 
solar battery Charger using adapter or solar panel
solar battery Charger using adapter or solar panelsolar battery Charger using adapter or solar panel
solar battery Charger using adapter or solar panel
 
Edwards Signaling E-278 Installation Manual
Edwards Signaling E-278 Installation ManualEdwards Signaling E-278 Installation Manual
Edwards Signaling E-278 Installation Manual
 
on-HewnHole.pdf
on-HewnHole.pdfon-HewnHole.pdf
on-HewnHole.pdf
 
User manual-part-2-3501466
User manual-part-2-3501466User manual-part-2-3501466
User manual-part-2-3501466
 
load cell project ppt
load cell project ppt load cell project ppt
load cell project ppt
 
Webinar 03 electrical installation of pv system
Webinar 03 electrical installation of pv system Webinar 03 electrical installation of pv system
Webinar 03 electrical installation of pv system
 
DC Chargers
DC Chargers DC Chargers
DC Chargers
 
1771 a1 b
1771 a1 b1771 a1 b
1771 a1 b
 
Under Cabinet Lighting - UC1 Series from iLuXx - Installation Guide
Under Cabinet Lighting - UC1 Series from iLuXx - Installation GuideUnder Cabinet Lighting - UC1 Series from iLuXx - Installation Guide
Under Cabinet Lighting - UC1 Series from iLuXx - Installation Guide
 
Rain collector sensor rainfall sensor
Rain collector sensor rainfall sensorRain collector sensor rainfall sensor
Rain collector sensor rainfall sensor
 

More from SchoolVision Inc.

More from SchoolVision Inc. (20)

Fl 910 ultra short throw lens
Fl 910 ultra short throw lensFl 910 ultra short throw lens
Fl 910 ultra short throw lens
 
Bill McIntosh, itutor
Bill McIntosh, itutorBill McIntosh, itutor
Bill McIntosh, itutor
 
Dukane digital signage
Dukane digital signageDukane digital signage
Dukane digital signage
 
Ipad cases from dukane
Ipad cases from dukaneIpad cases from dukane
Ipad cases from dukane
 
Dukane mcc3 a cart usermanual
Dukane mcc3 a cart usermanualDukane mcc3 a cart usermanual
Dukane mcc3 a cart usermanual
 
Dukane 8120 wia projector
Dukane 8120 wia projectorDukane 8120 wia projector
Dukane 8120 wia projector
 
Dukane 6430 hd projector
Dukane 6430 hd projectorDukane 6430 hd projector
Dukane 6430 hd projector
 
Dukane 6430 hd 6433w-usermanual
 Dukane 6430 hd 6433w-usermanual Dukane 6430 hd 6433w-usermanual
Dukane 6430 hd 6433w-usermanual
 
Dukane wired headset
Dukane wired headsetDukane wired headset
Dukane wired headset
 
Dukane products
Dukane products Dukane products
Dukane products
 
Dukane 6340 dlp projector
Dukane 6340 dlp projectorDukane 6340 dlp projector
Dukane 6340 dlp projector
 
Dukane itp84 pictures and screenshoots
Dukane itp84 pictures and screenshootsDukane itp84 pictures and screenshoots
Dukane itp84 pictures and screenshoots
 
Dukane ITP 84 monitor features
Dukane ITP 84 monitor featuresDukane ITP 84 monitor features
Dukane ITP 84 monitor features
 
Sr598 Floor Mount
Sr598 Floor MountSr598 Floor Mount
Sr598 Floor Mount
 
Sf680 wall moount for 84' disdplay
Sf680 wall moount for 84' disdplaySf680 wall moount for 84' disdplay
Sf680 wall moount for 84' disdplay
 
New dukane camera 122w
New dukane camera 122wNew dukane camera 122w
New dukane camera 122w
 
Dukane imagepro 8931 wb projector
Dukane imagepro 8931 wb projectorDukane imagepro 8931 wb projector
Dukane imagepro 8931 wb projector
 
Dukane image pro 8930b
Dukane image pro 8930bDukane image pro 8930b
Dukane image pro 8930b
 
Dukane 8940 w projector
Dukane 8940 w projectorDukane 8940 w projector
Dukane 8940 w projector
 
New dukane classroom projectors.
New dukane classroom projectors. New dukane classroom projectors.
New dukane classroom projectors.
 

Ipad:tablet cc1 user manual

  • 1. Page 1 of 2 Model CC1 Charging Cabinet Installation Guide Cabinet for charging the iPad and Tablets Model CC1 has 30 numbered slots for the iPads or tablets Electrical outlets are UL approved . There is a total of 32 outlets, They are arranged in 2 vertical rows of 16 outlets on a power strip. Each strip has a separate power cord. The power adapters for the iPads or tablets are plugged into the power strip outlets. GETTING STARTED Please plan for a 32” X 24 X 12” location that is no more than 6 ft. from a dual (2) electrical outlet. A wall or surface must be capable of holding 60 pounds which is the combined weight of the cabinet when filled with tablets. For a wall use heavy wall anchors with washers such as a Tapcon ™ anchors with a washer, and attach it at all 4 cabinet back anchor points. Use the appropriate wall attachment procedure for the building wall type to insure the cabinet will not come loose. Shown; Tapcon anchor with washer in T slot on back of cabinet 16” Wall Mounting hardware ( not supplied ) should be used at all 4 mounting holes located on the rear panel. These are indicated by the arrows. Countertop Mounting hardware should be used for the 4 mounting holes in the base of the cabinet. NOTE: This cabinet must be mounted or secured due to the weight and propensity to tip when the doors are open. CC1 iPad Cabinet Installation Guide ver 00
  • 2. Page 2 of 2 Model CC1 Charging Cabinet IPAD or TABLET low voltage power cords ( thin white cords) are run under the shelf and attached at the shelf front using the special J holes. Coil extra length of low voltage power cord in the cut out voids under the shelf. Insure that enough cord hangs free to fit the device in the slot. Angle View Front view J Holes Cabinet Sections , Front view 1 2 Section 1 3 iPad is a trademark of the Apple Corp. USA Hookup cables to iPads or tablets A wiring strategy should be used when running the charging cables. This 4 Sections plan shows one method to hook up the cables. Use the outlets on the top half of the left power strip (Section 1) and run them to the top shelf slots 1-7. Take the bottom half of the left power strip (Section 3) and run them to the bottom shelf slots 16-24. Use the same procedure for the other side power strip. 4 DUKANE CORP AV SERVICE DEPT 2900 Dukane Drive St Charles, IL 60174 800-676-2487 Fax 630-584-5156 avservice@dukane.com http://www.dukane.com/av/service/