Air pollution is a change in the physical,
chemical and biological characteristic of air that
causes adverse effects on humans and other
organisms. The ultimate result is a change in the
natural environment and/or ecosystem.
What is Air Pollution?
Types of Air Pollutants:
Major primary pollutants produced by
human activity include:
i. Sulphur oxides (SOx)
ii. Nitrogen oxides (NOx)
iii. Carbon monoxide
iv. Carbon dioxide (CO2)
v.Volatile organic compounds
Secondary pollutants include:
1) Smog
2) Ground level ozone (O3)
3) Peroxyacetyl nitrate (PAN)
Pollution due to Construction
Prevention of environment
From the constructional pollution
Loading, Unloading or Transfer of
Dusty Materials
Wet dusty materials with water spraying prior
to operation.
 Enclose the belt conveyor
from the top and the 2 sides.
 Enclose the transfer point
between conveyors.
 Install belt scraper and
bottom plates.
 Maintain vertical distance
between belt conveyor outlet
and material landing point at
<1 m.
 Enclose the unloading area.
Transfer of Dusty Materials with a
Belt Conveyor System
Transfer point
enclosed
Drilling, Cutting & Polishing, etc
 Spray surface
continuously with water.
 Equip with effective dust
extraction and filtering
device.
Blasting
 Wet area within 30 m before blasting.
 No blasting during the strong wind signal or
tropical cyclone warning No.3 or above is
hoisted unless permitted by Commissioner of
Mines.
Construction of the
Superstructure of Building
 Provide
effective dust
screen where a
scaffolding is
erected.
 Enclose the
skip hoist.
THANK
S

More Related Content

What's hot

Chapter 5 introduction of noise and noise pollution
Chapter 5 introduction of noise and noise pollutionChapter 5 introduction of noise and noise pollution
Chapter 5 introduction of noise and noise pollution
Noor Farahin
 
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEMPROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
AB MAKASANA
 

What's hot (20)

Design of effluent treatment plant
Design of effluent treatment plantDesign of effluent treatment plant
Design of effluent treatment plant
 
Disposal of wastewater
Disposal of wastewaterDisposal of wastewater
Disposal of wastewater
 
Water treatment reuse ppt
Water treatment reuse pptWater treatment reuse ppt
Water treatment reuse ppt
 
L 2 effluent standards and stream standards
L 2 effluent standards and stream standardsL 2 effluent standards and stream standards
L 2 effluent standards and stream standards
 
Environmental Engineering
Environmental EngineeringEnvironmental Engineering
Environmental Engineering
 
Air pollution control m4
Air pollution control m4Air pollution control m4
Air pollution control m4
 
Chapter 5 introduction of noise and noise pollution
Chapter 5 introduction of noise and noise pollutionChapter 5 introduction of noise and noise pollution
Chapter 5 introduction of noise and noise pollution
 
Hazardous waste management
Hazardous waste managementHazardous waste management
Hazardous waste management
 
Unit operations; processes in waste water treatment
Unit operations; processes in waste water treatmentUnit operations; processes in waste water treatment
Unit operations; processes in waste water treatment
 
Classification, Characterization & Identification of Hazardous Waste
Classification, Characterization & Identification of Hazardous Waste Classification, Characterization & Identification of Hazardous Waste
Classification, Characterization & Identification of Hazardous Waste
 
Environmental Considerations in Construction
Environmental Considerations in ConstructionEnvironmental Considerations in Construction
Environmental Considerations in Construction
 
Environmental pollution
Environmental pollutionEnvironmental pollution
Environmental pollution
 
Leachate Treatment
Leachate TreatmentLeachate Treatment
Leachate Treatment
 
EIA
EIAEIA
EIA
 
Noise pollution lecture
Noise pollution lectureNoise pollution lecture
Noise pollution lecture
 
Water demand
Water demandWater demand
Water demand
 
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEMPROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
 
Noise pollution
Noise pollutionNoise pollution
Noise pollution
 
AIR POLLUTION CONTROL L 3
AIR POLLUTION CONTROL L 3AIR POLLUTION CONTROL L 3
AIR POLLUTION CONTROL L 3
 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projects
 

Similar to Air pollution due to construction

Environmental polluttion
Environmental polluttionEnvironmental polluttion
Environmental polluttion
surajkumarpadhy
 
To what extent did the change to an overground meteropolitan light-rail syste...
To what extent did the change to an overground meteropolitan light-rail syste...To what extent did the change to an overground meteropolitan light-rail syste...
To what extent did the change to an overground meteropolitan light-rail syste...
Alex Reavley
 

Similar to Air pollution due to construction (20)

cpcb report
cpcb reportcpcb report
cpcb report
 
Environmental polluttion
Environmental polluttionEnvironmental polluttion
Environmental polluttion
 
A brief information on Air Pollution.pptx
A brief information on Air Pollution.pptxA brief information on Air Pollution.pptx
A brief information on Air Pollution.pptx
 
06 129 air pollution
06   129 air pollution06   129 air pollution
06 129 air pollution
 
Air pollution
Air pollutionAir pollution
Air pollution
 
Air Pollution Concerns & Efforts
Air Pollution Concerns & EffortsAir Pollution Concerns & Efforts
Air Pollution Concerns & Efforts
 
Unit iv Air and Noise Pollution
Unit iv Air and Noise PollutionUnit iv Air and Noise Pollution
Unit iv Air and Noise Pollution
 
Lesson 5_Air Pollution Management.pdf
Lesson 5_Air Pollution Management.pdfLesson 5_Air Pollution Management.pdf
Lesson 5_Air Pollution Management.pdf
 
Air pollution
Air pollutionAir pollution
Air pollution
 
2. Pollution
2. Pollution2. Pollution
2. Pollution
 
how we can control environmental pollution in cities
how we can control environmental pollution in citieshow we can control environmental pollution in cities
how we can control environmental pollution in cities
 
Air Pollution that affect human health and it's environment
Air Pollution that affect human health and it's environmentAir Pollution that affect human health and it's environment
Air Pollution that affect human health and it's environment
 
AIR POLLUTION - NOIDA CITY
AIR POLLUTION - NOIDA CITYAIR POLLUTION - NOIDA CITY
AIR POLLUTION - NOIDA CITY
 
Air pollution
Air pollutionAir pollution
Air pollution
 
Script
ScriptScript
Script
 
IRJET- Biofilter System for Air Pollution Control: A Review
IRJET- Biofilter System for Air Pollution Control: A ReviewIRJET- Biofilter System for Air Pollution Control: A Review
IRJET- Biofilter System for Air Pollution Control: A Review
 
AIR POLLUTION EPISODE DHAKA-AIR POLLUTION EPISODE (1997) ARSENIC POISONING IN...
AIR POLLUTION EPISODE DHAKA-AIR POLLUTION EPISODE (1997) ARSENIC POISONING IN...AIR POLLUTION EPISODE DHAKA-AIR POLLUTION EPISODE (1997) ARSENIC POISONING IN...
AIR POLLUTION EPISODE DHAKA-AIR POLLUTION EPISODE (1997) ARSENIC POISONING IN...
 
Environmental reporting
Environmental reportingEnvironmental reporting
Environmental reporting
 
Nihitha blog article 1
Nihitha blog article 1Nihitha blog article 1
Nihitha blog article 1
 
To what extent did the change to an overground meteropolitan light-rail syste...
To what extent did the change to an overground meteropolitan light-rail syste...To what extent did the change to an overground meteropolitan light-rail syste...
To what extent did the change to an overground meteropolitan light-rail syste...
 

Recently uploaded

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 

Air pollution due to construction

  • 1. A presentation On AIR POLLUTION DUE T0 CONSTRUCTION Presented by- Rahul chaudhary B. Tech, C E(4th year) Roll- 1436000096 Submitted to : Department of Civil Engg. G I T M Lucknow
  • 2. Air pollution is a change in the physical, chemical and biological characteristic of air that causes adverse effects on humans and other organisms. The ultimate result is a change in the natural environment and/or ecosystem. What is Air Pollution?
  • 3.
  • 4. Types of Air Pollutants: Major primary pollutants produced by human activity include: i. Sulphur oxides (SOx) ii. Nitrogen oxides (NOx) iii. Carbon monoxide iv. Carbon dioxide (CO2) v.Volatile organic compounds
  • 5. Secondary pollutants include: 1) Smog 2) Ground level ozone (O3) 3) Peroxyacetyl nitrate (PAN)
  • 6. Pollution due to Construction
  • 7. Prevention of environment From the constructional pollution Loading, Unloading or Transfer of Dusty Materials Wet dusty materials with water spraying prior to operation.
  • 8.  Enclose the belt conveyor from the top and the 2 sides.  Enclose the transfer point between conveyors.  Install belt scraper and bottom plates.  Maintain vertical distance between belt conveyor outlet and material landing point at <1 m.  Enclose the unloading area. Transfer of Dusty Materials with a Belt Conveyor System Transfer point enclosed
  • 9. Drilling, Cutting & Polishing, etc  Spray surface continuously with water.  Equip with effective dust extraction and filtering device.
  • 10. Blasting  Wet area within 30 m before blasting.  No blasting during the strong wind signal or tropical cyclone warning No.3 or above is hoisted unless permitted by Commissioner of Mines.
  • 11. Construction of the Superstructure of Building  Provide effective dust screen where a scaffolding is erected.  Enclose the skip hoist.