SlideShare a Scribd company logo
1 of 7
QUALITY CONTROL SYSTEM
Product Quality Control Procedures
1
ISO9001:2008
System/Product
Assurance
2
IQC
Incoming
Quality Control
3
IPQC/LQC
Process-control
4
OQC
Out-going control
5
Pre sales / after sales
Customer
Service
System Assurance
1
LUXMAN Quality Policy:To defend our quality as we defend our dignity.
LUXMAN Quality Goal :
Incoming Materials Qulification Rate:100%
Finished Product Qualification Rate: 100%
Out-going Product Qualification Rate: 100%
System Assurance
2
Quality Control Management System
Customer quality requirements are reflected in our quality system, from product R&D
to product realization.
Quality
management
Product
development
Market
Production
Logistic
Supplier quality
Assurance
Finished product
Quality Assurance
Supplier
Supplier
Supplier
Supplier
Supplier
Client requirement
Client requirement
Client requirement
Client requirement
Client requirement
Quality control procedures Chart
Supplier Quality
Contol
Warehouse
receipt
Accept &
Storage
IQC respection
requisition of
raw material
OK
NG
MRB
FAI by IPQCAssemble
LQC full
inspection
Water proof
test
Agiing test
LQC full
inspection
Packaging OQC Warehousing shipment
OK
OK
OK
OK
OK OK
Return
Reprocessing
Accept On
Deviation
analysis reason
and remake
NG
OK
Maintenance
and statistical
analysis
NG
NG
NG
NG
NG
Incoming
material
control
Production
control
Outgoing
product
control
Quality Control Procedures
Incoming Quality Control
1. Supplier delivery the materials to our warehouse area to be inspected, IQC check the Mat. number, name,specifications etc.according to the delivery
orders and related data.
2.IQC check OK/NG issued inspection notice to Mats, and make sampling check according to AQL standard on the basis of engineering data, BOM,
engineering drawings and other data of the samples were tested,And make the corresponding decision,Record incoming inspection report.
3.If IQC judge conforming materials if qualified, and notify the storekeeper for storage, if not qualified to inform IQC, PMC engineering, QC, production,
purchasing, and relative staff to make material nonconformity review, and ultimately make the decision: return, accept on deviation, selection.
InPut Process Quality Control
1.Production department arrange material according to the production schedule from PMC, line supervisor make first sample when all materials are
ready and fill in the first sample report to IPQC. After first sample qualified ,arrange the production to the product line, If the first sample not
qualified,then inform line supervisor to remake and analysis of the failure,starting production until the initail sample qualified.
2.IPQC do the full inspection for 5 initial samples and do finished product inspection during production process, the production staff to check their own
quality of their station, and then flow to the next station, line supervisor and IPQC do supervision. LQC do full inspection by electric
parameters,structure, and appearance to all the product during production.
3.LQC do waterproof test, aging test. Do aging test directly for indoor lights. IPQC check if there is exception during tests, and make the record.
Outgoing Quality Control
1.LQC retest the electric parameter after the aging test,then pack properly,transfer to the storage area. Warehouse keeper inform OQC to inspect, OQC
inspect according to AQL standard of sampling, and in accordance with the finished product inspection specifications, engineering information, customer
information etc. qualified to notify for storage, not qualified to notify the production department rework.
2.Warehouse keeper handle product storage and put the product in the designated position.
3.Deliver the goods as required by the client.
After sales procedures
4
Customer
Complaints
Sales
Verify complaint
information and fill out
RMA form.
Quality control
Engineers
Work out temporary
solutions within
2 working days
Working 8D report
within 7 working days
Sales

More Related Content

What's hot

Training criteria of new comer pharmacist QA officer in QA department
Training criteria of new comer pharmacist QA officer in QA departmentTraining criteria of new comer pharmacist QA officer in QA department
Training criteria of new comer pharmacist QA officer in QA department
Kamran shah
 
Finished products presentation 2 2
Finished products presentation 2 2Finished products presentation 2 2
Finished products presentation 2 2
shaik malangsha
 
Ray Hopkinson Resume Feb 15_2015
Ray Hopkinson Resume Feb 15_2015Ray Hopkinson Resume Feb 15_2015
Ray Hopkinson Resume Feb 15_2015
Ray Hopkinson
 
Carol Chadwick Sutton Resume
Carol Chadwick Sutton  Resume Carol Chadwick Sutton  Resume
Carol Chadwick Sutton Resume
Carol Sutton
 
Benjamin Floyd - Resume (2)
Benjamin Floyd - Resume (2)Benjamin Floyd - Resume (2)
Benjamin Floyd - Resume (2)
Benjamin Floyd
 
Assessment Executive Summary_DENSO
Assessment Executive Summary_DENSOAssessment Executive Summary_DENSO
Assessment Executive Summary_DENSO
Luca Pomero
 
Sistel Control Profile [EN]
Sistel Control Profile [EN]Sistel Control Profile [EN]
Sistel Control Profile [EN]
Sistel CONTROL
 

What's hot (15)

Training criteria of new comer pharmacist QA officer in QA department
Training criteria of new comer pharmacist QA officer in QA departmentTraining criteria of new comer pharmacist QA officer in QA department
Training criteria of new comer pharmacist QA officer in QA department
 
Finished products presentation 2 2
Finished products presentation 2 2Finished products presentation 2 2
Finished products presentation 2 2
 
Technical compliance requirement PPT.
Technical compliance requirement PPT.Technical compliance requirement PPT.
Technical compliance requirement PPT.
 
Inbound Materials Management(IMM)
Inbound Materials Management(IMM)Inbound Materials Management(IMM)
Inbound Materials Management(IMM)
 
Quality assurance versus quality control
Quality assurance versus quality controlQuality assurance versus quality control
Quality assurance versus quality control
 
Guidance on BRC food issue 8 documentation requirements
Guidance on BRC food issue 8 documentation requirementsGuidance on BRC food issue 8 documentation requirements
Guidance on BRC food issue 8 documentation requirements
 
Countries’ presentation on internal quality control: Thailand
Countries’ presentation on internal quality control: ThailandCountries’ presentation on internal quality control: Thailand
Countries’ presentation on internal quality control: Thailand
 
Quality assurance road map
Quality assurance road mapQuality assurance road map
Quality assurance road map
 
Ray Hopkinson Resume Feb 15_2015
Ray Hopkinson Resume Feb 15_2015Ray Hopkinson Resume Feb 15_2015
Ray Hopkinson Resume Feb 15_2015
 
Carol Chadwick Sutton Resume
Carol Chadwick Sutton  Resume Carol Chadwick Sutton  Resume
Carol Chadwick Sutton Resume
 
Benjamin Floyd - Resume (2)
Benjamin Floyd - Resume (2)Benjamin Floyd - Resume (2)
Benjamin Floyd - Resume (2)
 
Assessment Executive Summary_DENSO
Assessment Executive Summary_DENSOAssessment Executive Summary_DENSO
Assessment Executive Summary_DENSO
 
Sistel Control Profile [EN]
Sistel Control Profile [EN]Sistel Control Profile [EN]
Sistel Control Profile [EN]
 
Presentation - G Howlett - BRC Issue 6 Seminar
Presentation - G Howlett - BRC Issue 6 SeminarPresentation - G Howlett - BRC Issue 6 Seminar
Presentation - G Howlett - BRC Issue 6 Seminar
 
Validation and Verification of HACCP Plans - Webinar Presentation
Validation and Verification of HACCP Plans - Webinar PresentationValidation and Verification of HACCP Plans - Webinar Presentation
Validation and Verification of HACCP Plans - Webinar Presentation
 

Viewers also liked (14)

Exposiciòn Proyecto
Exposiciòn ProyectoExposiciòn Proyecto
Exposiciòn Proyecto
 
Unidad 3
Unidad 3Unidad 3
Unidad 3
 
Sureka-Resume
Sureka-ResumeSureka-Resume
Sureka-Resume
 
CV
CVCV
CV
 
Outcome 4
Outcome 4Outcome 4
Outcome 4
 
THE PRESENTATION
THE PRESENTATIONTHE PRESENTATION
THE PRESENTATION
 
Como ganar amigos_e_influir_en_las_personas
Como ganar amigos_e_influir_en_las_personasComo ganar amigos_e_influir_en_las_personas
Como ganar amigos_e_influir_en_las_personas
 
Tecnologia aplicada à la educacion
Tecnologia aplicada à la educacionTecnologia aplicada à la educacion
Tecnologia aplicada à la educacion
 
Oracle Management Cloud
Oracle Management CloudOracle Management Cloud
Oracle Management Cloud
 
REPORT
REPORTREPORT
REPORT
 
8466_Syn_AnalyticsToolkit_11 155
8466_Syn_AnalyticsToolkit_11 1558466_Syn_AnalyticsToolkit_11 155
8466_Syn_AnalyticsToolkit_11 155
 
How Music Affects The Brain
How Music Affects The BrainHow Music Affects The Brain
How Music Affects The Brain
 
Antivirus
AntivirusAntivirus
Antivirus
 
Alimentación saludable
Alimentación saludableAlimentación saludable
Alimentación saludable
 

Similar to Quality Control

Validation of water supply system
Validation of water supply systemValidation of water supply system
Validation of water supply system
ceutics1315
 
02Good Laboratory Practice (GLP)(1).pptx
02Good Laboratory Practice (GLP)(1).pptx02Good Laboratory Practice (GLP)(1).pptx
02Good Laboratory Practice (GLP)(1).pptx
hailemeskelteshome
 
13 lv switchboard inspection guide
13   lv switchboard inspection guide13   lv switchboard inspection guide
13 lv switchboard inspection guide
Sơn Trà
 

Similar to Quality Control (20)

Inspection and Quality Control.pptx
Inspection and Quality Control.pptxInspection and Quality Control.pptx
Inspection and Quality Control.pptx
 
Qa and qc seminar
Qa and qc seminarQa and qc seminar
Qa and qc seminar
 
AS Brochure Warehouse Inspection 2016
AS Brochure Warehouse Inspection 2016AS Brochure Warehouse Inspection 2016
AS Brochure Warehouse Inspection 2016
 
Validation utility system
Validation utility systemValidation utility system
Validation utility system
 
Validation of water supply system
Validation of water supply systemValidation of water supply system
Validation of water supply system
 
Water system validation
Water system validationWater system validation
Water system validation
 
Validation of water supply system
Validation of water supply systemValidation of water supply system
Validation of water supply system
 
Validation of water supply system
Validation of water supply systemValidation of water supply system
Validation of water supply system
 
02Good Laboratory Practice (GLP)(1).pptx
02Good Laboratory Practice (GLP)(1).pptx02Good Laboratory Practice (GLP)(1).pptx
02Good Laboratory Practice (GLP)(1).pptx
 
13 lv switchboard inspection guide
13   lv switchboard inspection guide13   lv switchboard inspection guide
13 lv switchboard inspection guide
 
Validation utility system
Validation utility systemValidation utility system
Validation utility system
 
QUALITY CONTROLPROCEDURE
QUALITY CONTROLPROCEDUREQUALITY CONTROLPROCEDURE
QUALITY CONTROLPROCEDURE
 
Instrument qualification
Instrument qualificationInstrument qualification
Instrument qualification
 
ANALYSIS OF RAW MATERIALS, FINISHED PRODUCTS, PACKAGING MATERIALS, IPQC, CPCS...
ANALYSIS OF RAW MATERIALS, FINISHED PRODUCTS, PACKAGING MATERIALS, IPQC, CPCS...ANALYSIS OF RAW MATERIALS, FINISHED PRODUCTS, PACKAGING MATERIALS, IPQC, CPCS...
ANALYSIS OF RAW MATERIALS, FINISHED PRODUCTS, PACKAGING MATERIALS, IPQC, CPCS...
 
Documentation with respect to release of finished pharmaceutical product
Documentation with respect to release of finished pharmaceutical productDocumentation with respect to release of finished pharmaceutical product
Documentation with respect to release of finished pharmaceutical product
 
Kemwell Analytical presentation
Kemwell Analytical presentation Kemwell Analytical presentation
Kemwell Analytical presentation
 
Quality assurance
Quality assuranceQuality assurance
Quality assurance
 
QUALIFICATION OF HPTLC,HPTLC
QUALIFICATION  OF HPTLC,HPTLCQUALIFICATION  OF HPTLC,HPTLC
QUALIFICATION OF HPTLC,HPTLC
 
Finished product release, quality review, quality audit and batch release d...
Finished product  release, quality review, quality audit and batch release  d...Finished product  release, quality review, quality audit and batch release  d...
Finished product release, quality review, quality audit and batch release d...
 
ASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdfASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdf
 

Quality Control

  • 2. Product Quality Control Procedures 1 ISO9001:2008 System/Product Assurance 2 IQC Incoming Quality Control 3 IPQC/LQC Process-control 4 OQC Out-going control 5 Pre sales / after sales Customer Service
  • 3. System Assurance 1 LUXMAN Quality Policy:To defend our quality as we defend our dignity. LUXMAN Quality Goal : Incoming Materials Qulification Rate:100% Finished Product Qualification Rate: 100% Out-going Product Qualification Rate: 100%
  • 4. System Assurance 2 Quality Control Management System Customer quality requirements are reflected in our quality system, from product R&D to product realization. Quality management Product development Market Production Logistic Supplier quality Assurance Finished product Quality Assurance Supplier Supplier Supplier Supplier Supplier Client requirement Client requirement Client requirement Client requirement Client requirement
  • 5. Quality control procedures Chart Supplier Quality Contol Warehouse receipt Accept & Storage IQC respection requisition of raw material OK NG MRB FAI by IPQCAssemble LQC full inspection Water proof test Agiing test LQC full inspection Packaging OQC Warehousing shipment OK OK OK OK OK OK Return Reprocessing Accept On Deviation analysis reason and remake NG OK Maintenance and statistical analysis NG NG NG NG NG Incoming material control Production control Outgoing product control
  • 6. Quality Control Procedures Incoming Quality Control 1. Supplier delivery the materials to our warehouse area to be inspected, IQC check the Mat. number, name,specifications etc.according to the delivery orders and related data. 2.IQC check OK/NG issued inspection notice to Mats, and make sampling check according to AQL standard on the basis of engineering data, BOM, engineering drawings and other data of the samples were tested,And make the corresponding decision,Record incoming inspection report. 3.If IQC judge conforming materials if qualified, and notify the storekeeper for storage, if not qualified to inform IQC, PMC engineering, QC, production, purchasing, and relative staff to make material nonconformity review, and ultimately make the decision: return, accept on deviation, selection. InPut Process Quality Control 1.Production department arrange material according to the production schedule from PMC, line supervisor make first sample when all materials are ready and fill in the first sample report to IPQC. After first sample qualified ,arrange the production to the product line, If the first sample not qualified,then inform line supervisor to remake and analysis of the failure,starting production until the initail sample qualified. 2.IPQC do the full inspection for 5 initial samples and do finished product inspection during production process, the production staff to check their own quality of their station, and then flow to the next station, line supervisor and IPQC do supervision. LQC do full inspection by electric parameters,structure, and appearance to all the product during production. 3.LQC do waterproof test, aging test. Do aging test directly for indoor lights. IPQC check if there is exception during tests, and make the record. Outgoing Quality Control 1.LQC retest the electric parameter after the aging test,then pack properly,transfer to the storage area. Warehouse keeper inform OQC to inspect, OQC inspect according to AQL standard of sampling, and in accordance with the finished product inspection specifications, engineering information, customer information etc. qualified to notify for storage, not qualified to notify the production department rework. 2.Warehouse keeper handle product storage and put the product in the designated position. 3.Deliver the goods as required by the client.
  • 7. After sales procedures 4 Customer Complaints Sales Verify complaint information and fill out RMA form. Quality control Engineers Work out temporary solutions within 2 working days Working 8D report within 7 working days Sales