Booking.com engaged Integral Build to fit out their new Bristol office, which included bespoke joinery, breakout areas, meeting rooms, and digital wall prints selected by staff. The flooring consisted of printed Forbo 'Flotex' and Chateaux Box laminate. Integral Build provided a high design, modern fit out that served all of the staff's needs.
3. Client: Booking.com
Project: New Office, Bristol
Booking.com engaged Integral Build to fit out their new central
Bristol office. The scope was for a high design and modern feel
that serves all the staffs needs.
The office will accommodate staff on bench desking as well as
having meeting suites for dealing with hoteliers and holding video
conferencing.
4. Client: Booking.com
Project: New Office, Bristol
The fit out included a large amount of bespoke joinery including
banquette seating, store wall, worktops and coat cupboard.
Breakout areas and Ad Hoc meeting spaces are extremely
important to Booking.com who put comfortable working
environments as a top priority.
The office includes many references to the South West and various
digital wall prints as selected by staff and managers.
The flooring consists of digital printed Forbo ‘Flotex’ to walkways
and the ‘Clifton’ meeting room, which has pebbles to match the
sea view on the wall. In the Breakout spaces and Welcome space
we installed Chateaux Box rustic laminate flooring.
5. Client: Booking.com
Project: New Office, Bristol
All three meeting rooms are acoustic rated ‘Planet 20’ glazed
partition system, with full height vinyl wrapped doors.
Each room has individual controls for air conditioning and lighting
lux levels to suit their needs.
The comms and store rooms were formed from fully fired rated
stud partition with FD30 door sets.
6. Client: Booking.com
Project: New Office, Bristol
Amongst the feature lighting scheme were Jam Jar cluster light
fittings made from ‘Kilner’ jars, pendant light fittings and drum
lighting to the breakout space.
Glass back printed splash back in the kitchen features photography
from a local Bristol photographer.
We cannot forget to mention the fantastic pool table with its
bespoke top fabric giving it an edgy look!
7. Client: Cover Construction Co. Ltd / Airbus Military
Project: Airbus Military Headquarters, Oxfordshire
Airbus Military were looking to relocate operations to the RAF
Brize Norton locality. The new office is set up to facilitate the sale
of the new A400M military aircraft.
Integral Build were appointed Principal Contractor for fitting out
the new offices to serve as Airbus Military Headquarters, from
which the client will be selling their new military aircraft (The
A400M) to air forces throughout the world.
Our end Client has chosen the location strategically as it is located
opposite RAF Brize Norton (Oxfordshire) where the display planes
will be housed in an Airbus Military hanger.
8. Client: Cover Construction Co. Ltd / Airbus Military
Project: Airbus Military Headquarters, Oxfordshire
The new building is a grade A fit out with high specification
throughout, which features cellular offices, open plan office,
meeting rooms, a conference/ client suite, secure frame room, lab
space, secure copy room, staff shower, kitchen, WCs, Client WCs.
Integral Build have taken the building from a shell and fitted the
floors out. The installation includes lining all block work, new block
work, timber stud and glazed partitions with interstitial blinds,
Leaderflush doors with wrapped frames, a complex ceiling system
of suspended rafts, MF bulkheads and borders to work with
services and the varying ceiling heights.
The design includes an atrium extension, fully fitted out by Integral
Build with features such as bespoke stainless steel balustrade over
the voids leading to a glass lift which descends into a ceramic tile
lobby entered into through automatic circular doors.
9. Client: Cover Construction Co. Ltd / Airbus Military
Project: Airbus Military Headquarters, Oxfordshire
Our works included a complex, as well as compact, mechanical
and electrical installation. The building is served by a 3 pipe VRV
system to provide heating and cooling, each room/ area has
individual control to allow workers to adjust their environments
accordingly ‐ a number of the staff are native to the warmer
climate of Spain! The lighting includes use of recessed LED
technology, halo lighting within bulkheads and LG7 fittings within
suspended ceiling grid.
We have installed a new kitchen which is complete with a Staron
acrylic worktop ‐ a commercial alternative to Granite that has
excellent durability for the workplace as well the 'high end' feel
our client desired.
The building features a conference suite where visitors can be
taken into more detail about their purchase in complete privacy.
Windows are concealed and soundproofing installed 'above all
partitions'. The client has the high amount of IT/ Data
requirement, full access control/ security systems, CCTV and
monitoring.
In order to deliver this project we have worked closely with the
Lead Designer for Airbus 'Studio LIME', the Airbus Military team
(UK & Madrid) and Cover Construction Company Ltd.
10. Client: Eurest / GE Capital
Project: Aztec West
GE’s Aztec West office is one the fastest growing in The UK. As a
result of this the Oil & Gas division required a large number of new
offices and desk space for the new starters and other staff re‐
locating.
The works were carried out with the client in occupation and as
such, much of the works were carried out at night and at
weekends. Strict processes were in place to ensure that the offices
were clean and dust free for the next shift.
Works involved high specification double glazed partitions with
associated mechanical and electrical alterations as well as a
substantial amount of manifestation and graphics to ensure the
new offices were on brand with GE.
Client: 14Forty / GE Capital
Project: Oil & Gas Offices, Bristol
GE’s Aztec West office is one the fastest growing in The UK. As a
result of this the Oil & Gas division required a large number of new
offices and desk space for the new starters and other staff re‐
locating.
The works were carried out with the client in occupation and as
such, much of the works were carried out at night and at
weekends. Strict processes were in place to ensure that the offices
were clean and dust free for the next shift.
Works involved high specification double glazed partitions,
acoustic solid stud partition systems with associated mechanical
and electrical alterations as well as a substantial amount of
manifestation and graphics to ensure the new offices were on
brand with GE Capital globally.
These new offices ‘all’ have wall talker paint on one wall so the
individuals can plan or mind map.
11. Client: 14Forty / GE Capital
Project: Smartcenter, Bristol
GE Capital have a number of Smartcenter spaces for staff to
partake in teleconference with global partners.
12. Client: Eurest / GE Capital
Project: Aztec West
GE’s Aztec West office is one the fastest growing in The UK. As a
result of this the Oil & Gas division required a large number of new
offices and desk space for the new starters and other staff re‐
locating.
The works were carried out with the client in occupation and as
such, much of the works were carried out at night and at
weekends. Strict processes were in place to ensure that the offices
were clean and dust free for the next shift.
Works involved high specification double glazed partitions with
associated mechanical and electrical alterations as well as a
substantial amount of manifestation and graphics to ensure the
new offices were on brand with GE.
Client: 14Forty / GE Capital
Project: Quiet Pods , Bristol Office
Our client required quiet rooms for staff to utilise. The individuals
are communicating via a number of media and needed suitable
space.
13. Client: Eddisons
Project: The Pithay, Bristol
The brief was simple – A functional new Bristol Office. To
provide a modern suitable space for professionals to work, a
meeting area for clients and comfortable facilities for the
staff.
“Many thanks to the team for the great effort to
complete our Fit Out at such short notice; it was good
to work together and I am sure we will continue to do
so.”
A Rogers MBIFM, Director Corporate Facilities
Management, Eddisons.
14. Client: Eddisons
Project: The Pithay, Bristol
Our client Eddisons are a leading firm of Chartered Surveyors
operating from ten offices across the UK and Ireland. They
were looking to relocate from another Bristol city centre
office to a more suitable building which met the needs of
their business.
They required a seamless transition between buildings due
to the nature of their 24hr operations and ensuring their
clients were not affected by the works taking place. This was
achieved through a tight programme and working closely
with the building management of Alder King as well as our
maintenance team who service the building.
15. Client: Eddisons
Project: The Pithay, Bristol
The boardroom was linked into the existing building
management system which ensures ventilation requirements
are met. Audio visual equipment by way of video
conferencing and screen was installed with associated power
supplies. Complete with black out blinds for when
presentations are underway.
16. Client: Lafarge
Project: Gordano House, Portishead
Our client Lafarge was founded in 1987 and has its principal
manufacturing facility on the outskirts of Bristol. Lafarge's Bristol
facility is amongst the most technically advanced drywall
production units in the world and has the capacity to supply in
excess of 50 million square metres of plasterboard each year.
As part of Lafarge's on going expansion and development the Head
Office in Gordano House required a make over to provide much
needed and upgraded office accommodation for the Executive
Team. This included Jean‐Michel Desmoutier the CEO and the
Main Board.
17. Client: Lafarge
Project: Gordano House, Portishead
We were appointed as Main Contractor after a lengthy tender
process. The team then worked closely with Design at Work to
ensure the strict programme and budget were adhered to.
The works on site involved a full strip out and the construction of
high specification glazed and solid partition cellular offices and
meeting rooms (utilising Lafarge materials), with a full mechanical
and electrical installation that included full air conditioning
controls to each office.
18. GE Capital, Aztec WestClient: Phoenix
Project: Lakeside House ,Northampton
Our client was relocating to new offices (8,000 sq ft) and required a
fit out of the new space to suit their growing requirements.
Phoenix are one of the UK’s leading providers of hosting, Cloud,
managed IT services and business continuity. They have been
delivering such services and technology to UK businesses since
1979.
The work was phased and included a full mechanical, electrical and
data upgrade to existing systems in place. We refurbished the
office space, a meeting suite and training wing and provided two
new kitchen/ break out areas for staff.
Work was carried out with our on‐site Integral UK maintenance
team who control the BMS system and carried out works to the
existing fire alarms and access control systems.
19. Client: Capita Symonds
Project: Office Refurbishment, Portishead
Capita Symonds are one the UK's largest, multi‐discipline consultancies delivering property and infrastructure projects on a local, national
and international scale.
When the Portishead office required refurbishing they approached Burtt‐Jones & Brewer, a leading strategic design consultancy who
specialise in creative interiors solutions to maximise the use of any space. They aim to increase wellbeing, productivity and improve
business efficiency.
All they needed then was a fit out company to undertake the work! By working closely with Burtt‐Jones & Brewer and Furniture 23 Integral
Build were able to deliver a really fast track solution in a live environment that met everyone's expectations. The works consisted of new
flooring, electrical alterations, re‐decorations, floor box moves data moves, new partitioning and a very small element of bespoke joinery.
“We are over the moon with Integral Builds
work on our office refurbishment. The quality
of workmanship and materials was first class.
The work was completed on‐time and budget.
And, moreover, Integral Interiors completed
the job in a live office working environment
without disrupting our day to‐ day business.
We are delighted with the end product, and
would be happy to recommend Integral Build.”
Dr Jon Folly, Capita Symonds Associate Director
21. Client: Fusion Lifestyle
Project: Tottenham Green Leisure Centre
Fusion Lifestyle are a highly experienced sports and leisure
management organisation, working in partnership with local
authorities, schools, colleges, as well as other public sector
organisations, to provide recreational sport, health and fitness
activities to local communities. They are a registered charity,
which means that all their incoming resources are used to improve
and develop their facilities and activities.
The £7.0m refurbishment project at Tottenham Green Leisure
Centre in North London included the sports hall, three pools and
wet and dry changing. New aerobics, cardio theatre and fitness
suites on the first floor completed the works. Detailed planning
and phasing ensured that the centre stayed operational
throughout the entire project.
22. Client: Fusion Lifestyle
Project: Tottenham Green Leisure Centre
As part of Integral Build’s scope we undertook to install a
relaxation suite which includes a large 20 person sauna, a steam
room, rainbow showers and an infinity ice bath facility.
The area is also equipped with heated tiled seating around with a
glazed viewing panel overlooking the main pool.
23. Client: Fusion Lifestyle
Project: Tottenham Green Leisure Centre
The ‘wet change’ area was completely demolished and re‐built ,
including new underground drainage and ground floor slab. The
facility includes installation of new lockers, a new cubicle system,
upgraded vanity units with integrated hair drying facility., family
changing facilities and team changing facilities.
Elsewhere in the dry change we installed new walnut finish
lockers, glazed wall showers as well as upgraded drying facilities as
with the wet change.
24. Client: Fusion Lifestyle
Project: Braintree Leisure Centre
As part of the ongoing programme of development Integral Build
were engaged to carry out a large scale refurbishment and fit out
at Braintree Leisure Centre in Essex.
25. Client: Fusion Lifestyle
Project: Braintree Leisure Centre
Logistics: With the centre being attached to the local secondary
school the logistics of the site were particularly challenging with
regard to programme and day to day deliveries. Whilst at the
same time ensuring that the leisure centre was kept fully
operational during the 15 week project, this was achieved via a
multiple phase programme and the introduction of temporary
screens and hoardings to ensure site works and members were
kept safely apart.
The works in involved an enlarged modern hi‐tec gym
incorporating functional fitness and free weights area, an
improved and upgraded first floor studio, a new spin studio, crèche
area, upgraded changing facilities across the centre including
upgraded mechanical and electrical installations. A new food
servery was constructed & installed to allow the supply of light
meals during functions. A new swipe card entrance door access
system was installed for better control/segregation of the School
pupils during School hours.
26. Client: Fusion Lifestyle
Project: Braintree Leisure Centre
Integral Build’s on site Project Manager worked closely with centre
and school management to ensure no works interfered with the
ongoing operations in the centre and the school, this was
successfully achieved with handover taking place as planned at the
end of the school holidays.
“From the outset it was obvious that the Project Manager and team were on top of everything on
site. They managed the work well, particularly since works had to take into account school hours
and with people there. They were fantastic at keeping contractors ‘at bay’ with a wholly appropriate
stern approach. I was impressed with his management of the team. At completion works still require
a few snagging issues to be completed but I am very happy with the facility. All snags were dealt
with very promptly. The Project Manager was brilliant.– he saw the whole thing from the client’s
point of view and this is to be commended.
I’ve worked in the leisure sector for many years and if there was another centre requiring work
similar to this I would certainly recommend the Integral Build team. Good job done. “
Jon Richardson, Fusion Lifestyle General Manger
27. Client: AMT Coffee
Project: London Heathrow Departures
AMT Coffee are the founders and leaders of gourmet take‐away
coffee in the UK and were the first UK coffee company to go 100%
Fair‐trade with coffee and 100% organic with their milk. AMT's
award winning coffee is individually made for each and every
customer from coffee bars located at stations and airports around
the UK. AMT's premier outlet is at Heathrow's Terminal 3, where
Integral Build completed a total re‐fit.
28. Client: AMT Coffee
Project: London Heathrow Departures
Time really was of the essence on this project as the shop could only be closed for
4 weeks so Integral Builds' programme had to ensure all trades worked closely
together on what was a very tight site, made all the more difficult due to the
constraints placed upon the project by Heathrow Airport Holdings ( formally BAA).
Only by working very closely with the landlords to ensure all procedures were
followed did Integral deliver the project on time. The works involved a total strip
out back to a bare shell and then a full re‐fit including new counters, LED light
features, specialist plastering, re‐claimed oak fittings, air con, ceilings, flooring,
furniture and all other fixtures. The concept of the new outlet was to create fresh
new and modern face of AMT, and LHR T3 was the forerunner of all future AMT's.
30. Client: National Grid
Project: Control Room Kitchen
This project was carried out by Integral Build over a three week
programme. It was logistically challenging due to a location within
the live 24hr environment of National Grids main UK control room.
The control room itself had to remain operational for the duration
of the project with temporary welfare facilities provided.
Our focus was to provide a functional yet comfortable space for
the control room staff whilst ensuring a Zero tolerance Health and
safety policy was adhered to. The space gives five separate teams
their own storage spaces as they cook in shifts and share
responsibilities for making refreshments. The nature of their work
dictates that most of the time is spent at their work stations within
a secure environment.
31. National Grid – Control Room Kitchen
“I would like to thank the Integral Build ‘Interiors’
team for the fantastic work carried out in completing
the Control Room kitchen. We are extremely pleased
with the outcome of the project. The work is of a high
quality and has brought to fruition a very attractive
and functional space for the Control Staff. Everyone
involved was driven by the desire to complete the
project on time but most of all to the best standard
possible”
Lisa Hughes, National Grid
Operational Projects Specialist
Client: National Grid
Project: Control Room Kitchen
Powder coated stainless steel units throughout, Low Iron glass
splash backs, magnetic & dry wipe back printed glass notice
boards, as well as acrylic solid worktops for durability. New
technology was used with LED modular panel lighting technology,
energy efficient LED strip and integrated appliances and
convenience functions such as a Zip Tap and roll out recycling
systems.
From the outset, we worked very closely with the National Grid
team based on site to deliver a solution tailored and fine tuned to
meet their requirements and wish List! The knowledge of the
facility from our Integral UK site based engineers and managers
ensured any service or access requirements were organised with
minimal disruption to the client.
“I would like to thank the Integral Build ‘Interiors’ team
for the fantastic work carried out in completing the
Control Room kitchen. We are extremely pleased with
the outcome of the project. The work is of a high quality
and has brought to fruition a very attractive and
functional space for the Control Staff. Everyone involved
was driven by the desire to complete the project on
time but most of all to the best standard possible”
Lisa Hughes, National Grid
Operational Projects Specialist
32. National Grid – Control Room Kitchen
“I would like to thank the Integral Build ‘Interiors’
team for the fantastic work carried out in completing
the Control Room kitchen. We are extremely pleased
with the outcome of the project. The work is of a high
quality and has brought to fruition a very attractive
and functional space for the Control Staff. Everyone
involved was driven by the desire to complete the
project on time but most of all to the best standard
possible”
Lisa Hughes, National Grid
Operational Projects Specialist
Client: National Grid
Project: Control Room Kitchen
We introduced subtle colour to the kitchen through wall art
featuring their winning design for a new pylon (below) and taking
the main ‘Picasso’ grid and using back printed vinyl, displaying it
on their functional glass splash back.
33. Client: Audit Commission
Project: Nicholson House, Bristol
The landlords, Audit Commission, required a refurbishment of one
of their existing buildings and to modernise the communal areas
for their new tenants.
Our project involved ensuring that health and safety standards
were top priority, communication with the tenants in occupation
was consistent throughout as they operate a 24hour business.
We worked with the local Audit Commission team as well as the
clients property consultants GVA to deliver the project efficiently
and to a high standard.
34. Client: Audit Commission
Project: Nicholson House, Bristol
We installed new commercial grade broadloom carpet to the
entrance lobby, stairs and landings. All the existing communal
areas were stripped of wall coverings and received new
decorations. Fixtures and fittings were upgraded and the lighting
was replaced with a more energy efficient solution.
35. Client: Ultima Business Solutions
Project: Cheltenham Racecourse
When Integral UK Ltd took over the maintenance of the
racecourses owned by the Jockey Club in early 2010,
Integral Build, the fit out and refurbishment division of the
company, were on hand to assist in the delivery of several
fast track projects at Cheltenham. None were more fast
track, and indeed high quality, than the complete strip out
and re‐fit of a hospitality box for Ultima Business Solutions.
As the box was now under new ownership Ultima wanted
to upgrade the tired 1980's design and decor into
something more modern and contemporary. Integral Build
were approached only 4 weeks before the annual
Cheltenham Festival to design and fit out the box to an
extremely exacting specification. With time being of the
essence Integral Build worked closely with a joinery
partner, Simon Kohn (Furniture) Ltd, to ensure design,
procurement and fabrication could start without delay.
36. Client: Ultima Business Solutions
Project: Cheltenham Racecourse
The work consisted of new ceilings, partition alterations, new electrical wiring, new plumbing works and total
re‐decoration. The bespoke joinery components ‐ kitchen units, bar and media wall were manufactured from
high quality American Walnut. Additional seating was catered for by constructing a bar /shelf along each side
in easy to clean Minerelle (Acrylic based worktop), a material that gives long life and clean lines. The works
were all delivered on site in 3 weeks from the instruction to proceed, thus enabling the Ultima and their guests
to enjoy the 2010 Festival in comfort.
38. Client: The Red Maids’ School
Project: New Entrance Refurbishment
Integral Build has completed an eight month refurbishment
project at the country's oldest girls' school, creating new,
contemporary facilities for students, teachers and visitors
within its original Edwardian complex.
The £1.9m transformation at the school in Westbury‐on‐Trym,
Bristol, has resulted in a new library built in a two storey void in
the centre of the historic main school building, extensive
modernisation and expansion of he school's dining hall and
remodelling of the school's visitor reception area.
39. Client: The Red Maids’ School
Project: Dining Hall Refurbishment
Integral Build took the old dining hall and completely
transformed it by opening up walls into former classrooms to
create a much more open feel the restaurant. New feature
ceiling rafts were installed with feature lighting inset as well as
on the walls.
Part of the works included protecting the 400 hundred year old
fire place that had to remain insitu.
40. Client: The Red Maids’ School
Project: Dining Hall Refurbishment
This was a technically challenging project because we
were working in a live and very dynamic environment and to very
specific constraints regarding both the working landscape and
term times. Health and safety, cost control and communication
were key. Despite some unpredicted structural challenges as the
project unfolded, the end result is stunning and we are very
grateful to the school which has been immensely flexible.
41. Client: The Red Maids’ School
Project: Servery Refurbishment
The new facilities now include a 'show cooking' station where hot
meals are cooked to order, sparkling water on tap and a brand new
servery area.
The area has been opened up and benefits from a new lighting
installation as well as improved ventilation.
42. Client: The Red Maids’ School
Project: New Library
Integral Build opened up existing roofing and made way to
install a new roof for creation of a much needed new library
space.
This included installation of a new bespoke timber staircase,
feature lighting, new ceiling bulkheads , mezzanine floor and
soft furnishings. The steel frame required for this involved
major structural works in the ground floor ceiling void and new
foundations. All of which had to be carried out while keeping
the school operational.
43. Client: The Red Maids’ School
Project: New Library
Integral Build constructed a new roof over the existing lightwell
to create the library, formed from a steel frame with a
”standing seam” roof and clerestory glazing. On the inside
there is an acoustic perforated plasterboard ceiling complete
with specialist pendant light fittings from Belgium.
45. Client: Bristol Grammar School
Project: Science Refurbishment
Bristol Grammar School (BGS) is one of Bristol’s most prestigious
and well known private schools. As part of the school’s eight year
plan to modernise its Gothic architecture estate, Integral Build
were taken on during the summer recess to carry out a fast track
fit out of the science block.
The work involved the total strip out and substantial demolition
works before construction could start, the raised floor housed
state of the art IT and services for each lab bench. The benches
themselves were custom built from our specialist supplier.
The project was completed safely, on time and on budget for the
new school year in September.
46. Client: Bristol Grammar School
Project: Food Technology Refurbishment
We were asked to convert an sports studio into a food technology
suite to take 24 pupils, consisting of a wide range of unique
storage units, installation of new white goods to cater for their
needs. This was accompanied by the installation of air conditioning
units and associated electrical works. A new back office and
storage areas were also created.
47. Client: Bristol Grammar School
Project: Music Department Refurbishment
Our project for the BGS music department included converting an
existing food technology area to a music practice centre within the
basement of the school. On the first floor of the building, Integral
Build were tasked with dismantling a supporting wall which
separated two teaching rooms, thus creating one. To cope with
structural pressures, the building was supported with steel
supports allowing for the installation of an in‐situ structural beam..
49. Client: Care UK
Project: NHS MRI Scanner Facility, High Wycombe
Care UK are a leading independent provider of health and social
care services. Working in close partnership with Local Authorities
and Primary Care Trusts, they provide care and support for older
people, GP surgeries and treatment centres and also provide a
range of specialist care and children's services.
Mid and South Buckinghamshire NHS Diagnostic Centre is run by
Care UK on behalf of the NHS. Only NHS patients are treated by
highly trained clinical staff using the latest diagnostic imaging
equipment to ensure that treatment is of the highest standard.
50. Client: Care UK
Project: NHS MRI Scanner Facility, High Wycombe
With the successfully received physio / MSK scheme recently
completed, Care UK decided to take the next step of their
development plans and convert some of their further vacant space
into an MRI scanning facility.
The works consisted of strip out of existing raised access flooring
and structural block work walls and fit out on the existing concrete
slab including block work walls, mezzanine timber floor to
encompass a Faraday cage in which the MRI scanner was sited, as
well as a totally stand alone M&E installation including air
conditioning. Integral Build's dedicated site Project Manager
oversaw the project and co‐ordinated specialist contractors. The
works were carried out in a live environment as the remaining
areas of the Centre were fully operational and could not be
affected by the works.
51. Client: Care UK
Project: NHS Walk‐in centre, Brighton
Care UK are a leading independent provider of health and social
care services. Working in close partnership with Local Authorities
and Primary Care Trusts, they provide care and support for older
people, GP surgeries and treatment centres and also provide a
range of specialist care and children's services. In Brighton Care
UK won a 5 year contract to provide GP services to a the busy
Queens Road area.
The project consisted of the fitting out of an existing open plan
office over two floors of a 5 storey building. With no on site
parking, minimal storage facilities and a busy town centre location,
logistics and planning were a key factor to the success of the
project. One floor consisted of a waiting and reception area,
complete with triage and a self help point, plus a suite of
consulting and treatment rooms. On the lower floor an office
area, meeting room, rest area and records area were constructed.
Due to the change of use, the project involved considerable M&E
alterations including cooling to the treatment rooms and
additional drainage. With time being of the essence the project
was completed in 9 weeks, this enabled a 10 day lead in time for
the new staff to be inducted and trained in the new facility.
52. Client: BMI Healthcare Ltd
Project: The London Independent Hospital
BMI Healthcare, part of the The General Healthcare Group, are the
UK's premier private health care provider with acute private
patient hospitals and outpatients centres in 56 locations around
the country. As part of a national roll out of reception re‐branding
projects, Integral Build were tasked with completing a complete
refurbishment of the main reception at The London Independent.
The works were planned on a phased basis to ensure minimal
disruption to hospital staff, patients and visitors. The works
consisted of a new main reception desk, nurse station reception
desk, all new decorations, Amtico flooring and a "feature" wall
constructed of ‘Armourcoat’, a specialist form of plaster.