2. About Us
We are a Nasik based consulting firm operating in Costing &
Cost Control
We help decision makers take informed decisions
Trained staff & expert guidance
Tangible savings and improved data administrations are
achieved in the past
Contact Us
Phone: 9822991463
Email: ceo@costicon.org
Web: www.costicon.org
Our Mission
To partner with industry in their internal growth through design of data
flow system & ensuring data availability for analysis & decision support
Review & Recommendations
Execution & Maintenance
Tangible Cost Savings
Cost Consciousness –
Need of the Hour
Competitive market has put a cap on
pricing
Bottom line improvement has to be
primarily achieved internally
Consciousness about the cost is the key
to achieve target margins
This consciousness can be assured only by
availability of cost relevant data at right time
& right place
COSTICON
Applied Solutions in Costing And Cost Control
CostICon
B29, Madhoor Mangal
Avenue, Phase-II, Opp.
NICE Industrial Estate,
Kamgar Nagar Road,
Satpur, Nasik.
PIN - 422007
5/25/2015 Prepared by CostICon. All rights reserved by CostICon 2
3. What We Offer
To establish a robust Costing and
Controlling framework on project basis
To maintain the entire Costing and
Controlling function on retainer ship
basis
Training to end users, key users
including cross functional users
Expert functional support services for
implementation or optimization of SAP
CO functionality
5/25/2015 Prepared by CostICon. All rights reserved by CostICon 3
Illustrative Services
Performance linked cost control system
Comprehensive planning & budgeting involving all
departments
Design & implementation of performance monitoring
system & MIS to facilitate operational decision making
On job training to end users & documentation of controlling
procedures
Investment Appraisal & Incidental data support for quick
decisions
Improvement in efficiency of data administration through
automation
Reconciliation of actual P&L with cost of production
Vendor Cost assessment to optimize material cost wherever
applicable
4. 5/25/2015 Prepared by CostICon. All rights reserved by CostICon 4
Why These Services Are Needed
You are concerned with your bottom line which is
direct function of your cost
Cost is direct function of your performances
Following questions reveal need for robust costing and
controlling framework
Does your present data mechanism allow you to
correlate performance with cost?
Does your existing system give you triggers for
cost control?
Are you sure about inclusion of all costs into your
products, scientifically?
Do you feel need for meaningful data for decision
making?
What do you think is more dangerous – Known
cost leakage or a hidden one?
How We Are Different
Actual execution of improvement solutions. Not only
mere advice
Emphasizing on developing in house competency to
minimize dependency
Customized solutions suitable to organizations
controlling needs and operational constraints
Creative approach aiming at developing a solution
rather than discussing the problem
Transformation of the solutions in the form of
software is available in house
Excellent conceptual training to users beyond
procedural training
SAP CO expertise coupled with rich experience in
operational level controlling
Experienced resources having 38 years of rich
exposure to world class systems in a large MNC
5. Selected Portfolio Summary
Costing System Development at Kothari Agritech Pvt. Ltd, Sholapur
Optimization of CO functionality in SAP at Bajajsons Ltd
Design & Maintenance of In House controlling system for Controlling at
Dynamic Pre-stress India Pvt. Ltd
Expert support in SAP CO module during SAP implementation at
Rishabh Instruments Pvt. Ltd
Customization of Tally ERP for data control at SMP Auto-tech Pvt. Ltd
Conceptualized, designed, developed & maintained Department wise
expense report at Bosch Ltd
Development of Template to arrive at Machine Hour Rate in Tool room
of Bosch Ltd
Development of Template to capture impact of Cost reduction Projects
on Product Cost at Bosch Ltd
Design of dynamic Cost per kg template at Sad Guru Enterprises, Pune
(Major vendor of Finolex Pipes Ltd)
Design & Development of Memo wise Profitability Program for Swastik
Pack-N-Shift Services, Pune
Development of in house ERP system at Om Foods, Malegaon
Recognition and Appreciation
Recognition by BDO, the 5th largest accounting firm in the world
Appreciation by Garry Cockins, an internationally recognized expert,
speaker, and author in performance improvement systems and advanced
cost management
Appreciation by senior officials of PSUs like BPCL,HPCL, DLW, Indian
Railways and director of MSME – DI during MSME exhibition
5/25/2015 Prepared by CostICon. All rights reserved by CostICon 5
Answering Queries of Engineering Head, DLW Answering Queries of Purchase Manager, HPCL
Felicitation by Director, MSME - DI
6. Development of Method to arrive at Machine Hour
Rate in Tool room of Bosch Ltd. Nasik
Project Brief
Exercise done for 63 machines
Total cost with respect to machine was classified into direct
machine related cost & indirect cost
All non monitory information about resources are compiled for
each machine & expressed in monitory terms
Indirect expenses are allocated based on suitable basis of
allocation to each machine
Result
Quick & accurate machine hour rates computed scientifically
Flexible architecture of template to accommodate changes in
assumptions or variables
Reconciliation with P&L account
Testimony
Adopted as bench mark practice in other tool rooms of Bosch
Employees from other Bosch Plants are trained to operate this
model
Material Cost Optimization Project at Dynamic Prestress Pvt. Ltd
Project Brief
For manufacturing of center plate, type of material which can be possibly
used is either cast steel or mild steel
Working methodology to determine differential cost, is missing
It’s observed that owing to the lower rate per kg, Mild Steel is being
dominantly used, despite extra cost of processing
From drawings & discussion with engineer, the extra material to be removed
in M.S. is determined
Extra time required to remove the material in case of M.S. is invariably found
to be the excess tool travel time
Representative geometric diagrams to find out the path across which tool
travels, are drawn
From these diagrams, a ready made formula to determine the tool travel time
is determined
A database of theoretically calculated differential time for all the sizes of
material, is prepared for ready reference
When user enters dimensions & choose the machine, differential time &
hence differential cost will be automatically calculated
Result
Average monthly cost reduction computed based on present level of
operation, is 1,00,000 INR. This is perpetual saving
144 Hours of extra production capacity is released per month equivalent to
an additional profit margin of 1,000,000 INR per month perpetually.
Optimization of CO functionality in SAP at Bajajsons Ltd
Flaws & voids in functional logic defined at the time of
implementation partners are brought on surface
Resulted in waiver of support fees to the tune of 1.2 MINR.
Selected Project/Portfolio - Details
To be
continued….
5/25/2015 Prepared by CostICon. All rights reserved by CostICon 6
7. Conceptualized, designed, developed &
maintained Department wise expense report
Project Brief
Target is set in respect of each expense head for each
functional department
Cost center structure is designed to represent each
department
Actual expenses booked against each cost center are
monitored each month
Comparison of YTD status with pro rata target for each
department
Result
Quick reference to cost performance of departments is
available online
Participative involvement by all the departments in cost
control
Culture of cost consciousness is inculcated across the
plant
Resulted in tangible & measurable control on cost even
beyond shop floor
Testimony
Model is rolled over in other plants located across India
Model has been made dynamically available online
through BI tools
Appreciation by FICCI in the form of an award
Expert support in Defining Deliverables of SAP - CO Module
at Rishabh Instruments Pvt. Ltd.
Controlling needs of the organization is effectively conveyed to implementation
partners
Tremendous saving in time & resources is resulted in case of designing CO related Key
data structures & data flow
Preparation of testing plan & designing cases to be tested especially in case of
integrated testing
Implication of Cross functional configurations on CO module is highlighted well in
advance
Simplified training to end users with correlation to day to day life
Awareness training to Cross Functional users & documentation of procedures
Resulted in easy understanding by implementation partners about the controlling
needs
Resulted in speeding up implementation process
Design & Maintenance of In House Data Flow System for Controlling
at Dynamic Prestress India Pvt. Ltd.
Some serious flaws in operations are brought to surface by virtue of this system
Compulsion of recording has brought transparency & enhanced sense of responsibility
Data retrieval & data processing has become very handy
Employees are getting accustomed to work in a systemized environment before
investing heavily in high end systems like SAP
Selected Project/Portfolio – Details (Contd.)
5/25/2015 Prepared by CostICon. All rights reserved by CostICon 7
8. Highlights
Establishing linkage of cost to its underlying performance
indicator
Scientific determination of machine hour rates on real time data
Identifying exact areas to initiate cost control or cost
reduction projects
Inculcating awareness amongst all in the plant about their role
in cost control
Ensuring transparency in flow of data
Preparation of user friendly training documents and Standard
Operating Procedures for controlling function & routine
processes in SAP CO
Achieved real time cost savings in the past through cost
control measures & system performance improvement
initiatives
5/25/2015 Prepared by CostICon. All rights reserved by CostICon 8
9. Please feel free to write us at
ceo@costicon.org
Or
suyash6277@gmail.com
Alternately, call us on
98 22 99 14 63
Website – www.costicon.org
5/25/2015 Prepared by CostICon. All rights reserved by CostICon 9