3. Fleet Description
3 www.seai.ie
• Generate a comprehensive picture of the entire fleet.
• Consider which vehicles may be compatible with EVs
• Look a little to the future
• Consider what vehicles are available
• Are there any auxiliary requirements such as refrigeration?
• Where and when will EVs be parked?
4. EV Charging Description
4 www.seai.ie
• What charge point sizes are most appropriate?
• Do you really need fast charging?
• What is the site power supply size and spare capacity?
• Where is the best location for charge points?
• Do you need power management? If so, what limitations?
• Do you need open protocols for the communication with
charge point management system?
• Do you need a charge point management system?
Describe your requirements.