Construction safety and productivity are the top priority of improvement for Hong Kong construction industry. BIM, IoT, AI and Robotic are the hot topics being discussed. But these need time and resources to make it happen. There is an alternative that can be implemented quickly, easy and at very low cost by using mobile Apps.
In this evening seminar, the speakers will explain the new approach for site safety and quality inspection for site task management. Several real case studies will be demonstrated by using the mobile / cloud computing technologies for improving safety, quality and productivity.
3. Topics
Construction Quality vs. Safety
Aproplan for Corrective Actions
Checklist for Preventive Actions
Conclusion
WWW.MTECH.COM.HK
4. Topics
Construction Quality vs. Safety
Aproplan for Corrective Actions
Checklist for Preventive Actions
Conclusion
WWW.MTECH.COM.HK
5. SAFETY AND QUALITY
Relationship between Construction Safety and Quality Performance
| Journal of Construction Engineering and M . . .
http://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0 . . .
WWW.MTECH.COM.HK
6. Construction Quality vs Safety
WWW.MTECH.COM.HK
The recordable injury rate is positively correlated to rework
The first-aid rate is positively correlated to number of defects.
7. Sum Up
The most compelling reason for the strong positive
correlation between rework and injuries is the fact that
rework involves demolition, schedule pressure, and
unstable work processes.
Devoting resources to preplanning, allowing the
necessary time to complete tasks correctly the first time,
encouraging leadership at the workface, and encouraging
workers to take pride in their work are all strategies that
promote both safety and quality.
WWW.MTECH.COM.HK
8. Safety / Quality Inspection
Create a Safety / Quality Checklist with Clear Instructions and
information
Implementing “each shift”, “monthly” and “annual /
comprehensive” inspections
• Reduce workers’ exposure to accidents and equipment failure
Collection of Near Miss / Non-compliance items
Instant correction
Monitoring
Record keeping
WWW.MTECH.COM.HK
9. ON SITE IN THE OFFICE
1 HOUR 1 HOUR=>
Each site visit creates an important administrative burden
1 hour of work on site is equivalent to 1 hour of administration in the office
The Administrative Burden
WWW.MTECH.COM.HK
12. New Way of Doing by Mobile Technology
Collaborative Safety / Quality Management
System to access & prevent potential
construction risk or defects through a cloud
based mobile platform to enable instant respond
and total safety & quality management for
building construction industry.
WWW.MTECH.COM.HK
13. Topics
Construction Quality vs. Safety
Aproplan for Corrective Actions
Checklist for Preventive Actions
Conclusion
WWW.MTECH.COM.HK
19. Steps To Safety
WWW.MTECH.COM.HK
Plan
• Site petro
• Plan a list of
safety or work
items to
check from a
predefined
catalogues in
AproPLAN
Patrol
inspection
• Quick and
complete
check of
points on
site
• Provide the
potential
risk items
with
picture,
time,
comment
and pin
down the
position on
a plan.
Level of
emergency
• Depending
on your
observatio
n on site,
define a
level of
emergency
to each
point.
• Make sure
that all the
most
important
points are
group
together.
Corrective
Actions
• Sorting
• Automatic
creation of
the to do
list
• Rapid
distribution
to the right
person in
charge
Monitor
• Traceability
of the follow
up actions
guaranteed
• Keep record
• Safety
performance
analysis
http://try.aproplan.com/safety-visit/
20. FOLLOW THE SAFETY
ISSUES
FROM THE APPLICATION
ON
SITE
AT
THE OFFICE
AproPLAN offers a complete solution
Solutions To The Challenges
WWW.MTECH.COM.HK
21. On Line Safety Reaction
Supports “Instant Collaboration in the line management”. You
can collaborate with everyone within the extended enterprise to
share information and tasks.
WWW.MTECH.COM.HK
I find a potential risk,
please look at it ..(share the
on site information)
Yes, I can see it (photo +
map) and I am assigning
the task to specific
person.
I get the request and I
make the corrective
action.
Visual observation of physical
conditions and work activities
23. Detail
Point
Project
List
Everything is about the project or the file, in the
construction sector.
Each project consists of several safety lists :
Electrical, Working At Height, Machinery,
Signage,…
Each list contains different safety issue.
Each issue contains several details like a person in
charge, an end date, a plan, a photo,…
Structure Of The Project
WWW.MTECH.COM.HK
35. Construction Task Management
WWW.MTECH.COM.HK
Consultants Client Contractors
Input
Work plan
Photo
CommentsStatus
IssueTask
Actors
Schedule
Real Time
Collaborative
Works
Output
Working lists
Meetings
Task Reports
Performance
Analysis
Lock-in &
navigate
36. Construction Task Management Process
WWW.MTECH.COM.HK
Task
Capture
Task
Distribution
Task Follow
Up
Task
Monitoring
38. On Line – On Site Integration
WWW.MTECH.COM.HK
Drawing marked with Task list Task with people, time, photo,
deliverables and comment
39. Daily Task Distribution & Update via Email
WWW.MTECH.COM.HK
List of your tasks in AproPLAN for the 10-08-16
Hi Stephen AU,
Please find below a table with all the tasks assigned to you yesterday.
Click on a project's code in the table to display its tasks in your default browser
Project code Due date
Point
number
Point title From
裙樓
H3NWDSY
222 安装未完成 Albert Ng
裙樓
H3NWDSY
224 安装未完成 Albert Ng
裙樓
H3NWDSY
225 破损 Albert Ng
裙樓
H3NWDSY
226 有綘隙 Albert Ng
We wish you a constructive day,
The AproPLA N team
This mail was sent automatically. Do not reply to this email.
42. Where To Use
Site Patrol Checking
COW Checking (Audit)
Site Works Progress Monitoring
Site Commissioning for OP
Construction / Installation change management
Site safety management
Drawing version control
Informal AI drawing management
WWW.MTECH.COM.HK
43. Topics
Construction Quality vs. Safety
Aproplan for Corrective Actions
Checklist for Preventive Actions
Conclusion
WWW.MTECH.COM.HK
45. Collection of structured safety issues onsite and
follow up with immediate corrective actions and
improve the preventive safety plan.
STRUCTURED VISIT AND DATA
AQUISITION TOOL
46. Steps To Success
WWW.MTECH.COM.HK
Plan
• Site petro
• Plan a list
of safety
items to
check from
a
predefined
checklist
Inspection
• Quick and
complete
check of
items on
site
• Provide the
non-
conforming
elements
with a
picture and
a specific
explanation
and place
them on a
plan.
Level of
emergency
• Depending
on your
observation
on site,
define a
level of
emergency
to each
point.
• Make sure
that all the
most
important
points are
group
together.
To-Do-List
• Sorting
• Automatic
creation of
the to do
list
• Rapid
distribution
to the right
person in
charge
Monitor
• Traceability
of the
follow up
actions
guaranteed
• Keep
record
48. Structural Checklist
Check items (conditioning)
Value with range & unit
Place & Equipment
Time
People
Score
# of visits
Reference information
Past record
WWW.MTECH.COM.HK
49. Types of Checklist Visit
Standard
Recurring
Non-compliance or partial
Audit
Co-visit
Ah-hoc
WWW.MTECH.COM.HK
50. Safety Management Process Flow
CREATE STANDARD
CHECKLISTS
PLAN THE VISIT
INSPECTION
DATA AQUISITION
FOLLOW UP
SAFETY
MEASUREMENT
NON-COMPLIANCE
CHECKLIST
WWW.MTECH.COM.HK
62. Changes
By adopting the cloud computing with mobile
devices to enable self-disciplined real-time
construction QC/QA management that
significantly cut cost, improve productivity and
quality of projects.
WWW.MTECH.COM.HK
63. Site Works Quality Management Best
Practices
WWW.MTECH.COM.HK
Creation of Check Visit by
Site Forman (2)
Quality Inspection by
Site Forman / BSI (3)
Auto Generation of NC visit
(6)
Quality Improvement meeting
(11)
Auto Generation of CV report
to Sub-contractor for
corrective actions (5)
Completion of QC
Inspection (7)
Monitoring of Site Inspection
Flow
Quality Manager (9)
Monthly Quality System
Review meeting
Quality Manager (10)
QC Analysis reports (8)
Specific Trade Checklist
Creation (1)
Design
Specification
or Site Mock
Up Sample
NC = Non Compliance
Non-Compliance (4)
64. Checklist Sample: Water Proof Work
WWW.MTECH.COM.HK
Line Name Answer
1Concrete defect are rectified and inspected 石屎問題已執妥及驗收 Yes/No
2
Water proof test is done for concrete before the water proof members are
layered 在做防水前,先作石矢試水 Yes/No
3Surfaces are cleaned and dry 表面已清潔及乾爽 Yes/No
4Material not expired and mixing correctly 材料無過期 Yes/No
5
# of Water proof coating follows the instruction of material suppliers 防水層數
量已跟足"廠商施工章程指引" Yes/No
6Waterproof membrene thickness is as per required 防水料厚度足夠 Yes/No
7Water test completed and satisfactory 已試水並合格沒有漏水情況出現 Yes/No
8Wall height for water proof us as per specification 牆身防水高度是足夠 Yes/No
9
Protection to the waterproof membrane is checked (2 days after the
completion of water proof test)已於防水表面做妥保護 (試水合格後兩天內完
成) Yes/No
10Others 其他 :
72. Close Loop Safety / Quality Management System
WWW.MTECH.COM.HK
Safety /
Quality Plan
Safety /
Quality
Checklist
Safety /
Quality
Inspection
Problem
Occurs
Immediate
Corrections
Access
Root
Cause
Improvement
73. Be Prepared and Proactive… Save
time… Save Lives… Save Money
WWW.MTECH.COM.HK
By implementing “each shift”,
“monthly” and “annual/comprehensive”
inspections by trained competent and
qualified inspectors on crane and hoist
equipment, companies will
• Increase human safety providing
a safer and more productive environment for
their employees
• Reduce their exposure to accidents and
equipment failure
• Improve equipment reliability by reducing
safety related defects
by 60 to 95%
Source: OSHA Enforcement: Committed to Safe and Healthful Workplaces, , U.S. Department of Labor Occupational Safety and Health Administration; Why do I have to have my overhead cranes and
hoists inspected? Best Practices, Industrial Lift and Hoist, May-June 2008
74. Qualitative Return
Evidence of work done - exemplary
Customer satisfaction
Employee satisfaction
Quality of the asset information
Consistent repeatable process
Proof data-centric workflow driven tools work
WWW.MTECH.COM.HK
75. Take control. Stay secure
Control sharing
• Limit who sees what and keep sensitive data
protected
Monitor activity
• Instant update task / issue status and propagate
feedback to the field directly
At-a-glance report
• Automatic report and meeting minutes generation
WWW.MTECH.COM.HK
78. OPEN DISCUSSION
It's one thing to have the technology at your fingertips and
use it to it's full extent. Some people just like to do things the
way they have always done it, even if it's inefficient, costly
and not very accurate.
http://checklists.be/en/#home
www.mtech.com.hk
http://try.aproplan.com/safety-visit/
Achieve 1Achieve 1stst TimeTime Safety & QualitySafety & Quality
WWW.MTECH.COM.HK