  1. 1. ConstructSim V8i<br />Robin M. MikaelssonPMP<br />Senior Construction Work Process Consultant<br />
  2. 2. How do you address These Issues?<br />Visibility into the planned and current project status<br />Material availability / engineering drawing production<br />Cost to complete <br />Information management <br />Reactive construction management<br />Productivity of field labor <br />2 | WWW.BENTLEY.COM<br />
  3. 3. Look Familiar?<br />3 | WWW.BENTLEY.COM<br />
  4. 4. Workface Planning<br />Workface Planning is the process of organizing and delivering all the elements necessary, before work is started, to enable craft persons to perform quality work in a safe, effective and efficient manner.<br />COAA Best Practice<br />4 | WWW.BENTLEY.COM<br />
  5. 5. Crew Productivity<br />Tool Time on large construction projects is typically quite low: 31 to 40%<br />This number is largely due to resource-related issues.<br />Approx 32% of crew’s time is spent waiting or idle<br />COAA WFP Slide <br />5 | WWW.BENTLEY.COM<br />
  6. 6. Conventional VS WorkFace Planning<br />Tool Time<br />37%<br />Tool Time<br />47%<br />Wait<br />Time<br />15%<br />Wait<br />Time<br />~5%<br /><ul><li> 10% more tool time is a 25% improvement in productivity
  7. 7. Safety, morale and predictability improvements</li></ul>COAA WFP Slide <br />6 | WWW.BENTLEY.COM<br />
  8. 8. Construction Automation<br />Why isn’t everybody doing Workface Planning?<br />Manual MTOs and Level 5 Work Packs are extremely labor/time intensive and tedious <br />Management of Change at the component / spool level can be a mind boggling nightmare for even the most experienced constructor<br />Need a construction automation tool that integrates our various project IT systems (3D CAD, ISOs, Eng Lists, MMS, project controls, Primavera, etc) into an virtual construction model that is constantly kept up to date to facilitate and automate WorkFace Planning<br />ConstructSim V8i <br /> Solves these issues and is the leading workface planning automation tool on the market today <br />7 | WWW.BENTLEY.COM<br />
  9. 9. Workface Planning Benefits:<br /><ul><li>Improved site safety
  10. 10. Up to ~10% reduction in TIC
  11. 11. Better Coordination of Crews
  12. 12. Greater predictability
  13. 13. Lower Costs
  14. 14. Greater Quality
  15. 15. Less Rework
  16. 16. Improved Project morale
  17. 17. Ability to Compare across Contractors
  18. 18. Schedule Optimization</li></ul>8 | WWW.BENTLEY.COM<br />
  19. 19. ConstructSim Overview <br />
  20. 20. Introducing ConstructSim V8i<br />ConstructSim provides a dynamic planning environment that addresses the nature of a wicked problem.<br />For Who?<br /><ul><li>Owners
  21. 21. Construction Managers
  22. 22. Direct Hire</li></ul>When?<br /><ul><li>Early Planning
  23. 23. Field Installation
  24. 24. Turnover / Commissioning</li></ul>10 | WWW.BENTLEY.COM<br />
  25. 25. WFP Automation <br />Bring your data together in one location<br />Instrument Index<br />Cable Schedule<br />CAD Model<br />Fabricator Status<br />Erection Drawings<br />Project Controls<br />Primavera<br />Hydro Test Plan<br />Pipe isometrics<br />Line Lists<br />Equipment Lists<br />T/O Systems<br />MMS In/out<br />EH&S Assessment<br />ConstructSim<br />V8i<br />11 | WWW.BENTLEY.COM<br />
  26. 26. ConstructSim Highlights<br />Materials Management<br />Priorities<br />Priorities<br />Construction Work Areas<br />Feasibility Study<br />Expedite Install Work to Ready a System for Testing<br />Turnover Systems<br />Work Packs<br />Path of construction identified<br />Test Packs<br />Issued <br />Fab Packs<br />Expediting Reports <br /><ul><li>Dwgs Not Released
  27. 27. Spools Not Fab
  28. 28. Field Mat’ls Not Onsite</li></ul>Work Pack Reports <br /><ul><li>Spool List
  29. 29. Field Matl Issue
  30. 30. Steel Hang List
  31. 31. Jobcards</li></ul>System Reports<br />Pressure Test Record<br />Systems Completion<br />Track Spools<br />Work Complete <br />Location<br />12 | WWW.BENTLEY.COM<br />
  32. 32. Early Construction Planning<br />Above<br />CWA 04 - Weather Deck <br />Below<br />CWA 03 - Mezzanine Deck <br />CWA 02 - Cellar Deck <br />CWA 01 - Lower Deck <br />
  33. 33. Early Construction Planning<br />Construction Work Areas (CWAs) and Construction Work Packages (CWPs) are built in ConstructSim and organized by the schedule WBS<br />
  34. 34. Streamline Materials<br />Visualize Materials OnSite<br />Track Purchase Orders / ETAs<br />Drive Trial Allocation Priorities<br />Bag-and-Tag By Work Pack<br />
  35. 35. Feasibility Run – Matls Forecast, 30-Nov-2008<br /><ul><li>Shop & Erection Materials
  36. 36. Feasibility View by Priority CWAs
  37. 37. Target Date: 30-Nov-2008 </li></ul>CWA 01 – Lower Deck <br />Overall View<br />Full Materials<br />Partial Materials<br />No Materials<br />
  38. 38. Feasibility Run – Matls Forecast, 28-Feb-2009<br /><ul><li>Shop & Erection Materials
  39. 39. Feasibility View by Priority CWAs
  40. 40. Target Date: 28-Feb-2009 </li></ul>CWA 01 – Lower Deck <br />Overall View<br />Full Materials<br />Partial Materials<br />No Materials<br />
  41. 41. Levels of Planning & Scheduling <br />L3 - Schedule Activity <br />Example – A/G Piping Field Installation – Area 3A<br />ConstructSim “Auto-links” Model Components to L3 Activities By Attribute Matching Rules<br />L4 – Crew Work Packs<br />Example – One “shift” of work (~1-2 weeks), includes scope identified with associated L5 tasks <br />Work face planner “Builds”optimal path of construction using ConstructSim<br />L5 - Tasks<br />Example – Spool 101-A Erect, Fit-Up, Connect <br />ConstructSim “Auto-Generates” L5 Tasks from Template “Rules of Progress”<br />18 | WWW.BENTLEY.COM<br />
  42. 42. Field Installation Work Packs<br />
  43. 43. FIWP Templates<br />20 | WWW.BENTLEY.COM<br />
  44. 44. Field Installation Work Packs – 3D PDFs<br />3D Model for use in the field<br />Live easy to manipulate PDF model<br />21 | WWW.BENTLEY.COM<br />
  45. 45. Status Visualization – Standard Modes<br /><ul><li>Spool fabrication
  46. 46. Equipment installation
  47. 47. ISO release status
  48. 48. Pipe material availability
  49. 49. Advance revision notices
  50. 50. Work step tracking
  51. 51. Test pack status
  52. 52. QA/QC status
  53. 53. Work package constraints</li></ul>Project / user specific status modes can also be created.<br />22 | WWW.BENTLEY.COM<br />
  54. 54. Streamline Materials<br />Visualize Materials On-Site<br />Track Purchase Orders / ETAs<br />Drive Trial Allocation Priorities<br />Bag-and-Tag By Work Pack<br />23 | WWW.BENTLEY.COM<br />
  55. 55. Work Pack Reports / Scorecards <br />Material Lists<br />Progressing Checklist<br />24 | WWW.BENTLEY.COM<br />
  56. 56. Expediting Reports<br />Drawings Not Yet Released<br />Spools Not Yet Fabricated<br />25 | WWW.BENTLEY.COM<br />
  57. 57. Work Package Tracking<br />Work Packs<br />CPM Schedule Data<br />Est & Earn Hrs <br />Filter By Work Pack Type<br />Filter By CWA / CWP<br />26 | WWW.BENTLEY.COM<br />
  58. 58. Work Package Tracking<br />Work Pack Scheduling<br />27 | WWW.BENTLEY.COM<br />
  59. 59. Work Package Tracking<br />Crew Assignments<br />28 | WWW.BENTLEY.COM<br />
  60. 60. Constraint Analysis<br />Set Constraints <br />Color Coded Status – Work Pack Constraints <br />Work Pack Status <br />29 | WWW.BENTLEY.COM<br />
  61. 61. Man loading Graph<br />Resource Loading View<br />30 | WWW.BENTLEY.COM<br />
  62. 62. Work Pack Reports / Scorecards <br />Material Lists<br />Progressing Checklist<br />31 | WWW.BENTLEY.COM<br />
  63. 63. Systems Turnover / Completions<br />Identify and Expedite Outstanding Installation Work Scope by Test Pack or by System <br />32 | WWW.BENTLEY.COM<br />
  64. 64. ConstructSim Users<br />33 | WWW.BENTLEY.COM<br />
  65. 65. If you would like more information contact:<br />Robin M. Mikaelsson<br />Senior Work Process Consultant<br />Bentley Systems<br />+1 587 777 0407<br />Robin.Mikaelsson@Bentley.com<br />Thank You!<br />Eric Crivella<br />Plant Construction Executive<br />Bentley<br />+1 713 249 4407<br />Eric.crivella@Bentley.com<br />34 | WWW.BENTLEY.COM<br />

×