SlideShare a Scribd company logo
1 of 23
unido.org/statistics
Analysis of Divergence of quarterly and Annual
Index of Industrial Production
Shyam Upadhyaya, Shohreh Mirzaei Yeganeh
United Nations Industrial Development
Organization (UNIDO), Vienna, Austria
unido.org/statistics
The Index of industrial production
One of the important Short-term economic indicators in official statistics which
measures the changes in value added over a given period.
Computation of the IIP
The laspeyres volume index for period t
Where:
pi0: Prices for Industry sector i at the base period 0,
qi0: Quantity for industry sector i at the base period 0,
qit: Quantity for industry sector i at period t,
wi0: Relative weight of industry sector i in the base period 0, and
i: Number of industry sectors
unido.org/statistics
Divergence of sub-annual and annual index series
unido.org/statistics
Reasons for divergence
• Difference in coverage and sample
• Difference in definition and variables
output replaces the value added
• Accounting period
Calendar year versus accounting year effect
• Estimation method, non-response treatment, imputation, etc.
unido.org/statistics
What is benchmarking?
• Statistical techniques which are aimed to ensure coherence
between time series data of the same target variable measured
at different frequencies, e.g., sub-annual and annual
• Underlying assumption: low frequency data tends to be more
comprehensive and accurate than high frequency data
• High frequency data (indicators) are aligned to low frequency
data (Benchmark)
• Inconsistency is detected by the movement of ratio between
Benchmark value (B) and Indicator value (I)
unido.org/statistics
Benchmarking methods
-Benchmarking techniques can be categorized into two approaches:
• Numerical approach:
Pro Rata Distribution, Proportional Denton Method
• Statistical modeling approach:
ARIMA-model based methods, GLS model, etc.
-Another aspect of benchmarking: Extrapolation
Linking of quarterly source data onto previous annual estimates, or
Constructing forward series by adjusting the last available benchmark level
unido.org/statistics
Pro Rata distribution
Splits the annual total based on the proportions indicated by the four (or
twelve) quarterly (monthly) observations
In mathematical phrase
Where
VAQt: estimated quarterly value added for quarter Q of year t;
IQt: indicator value in quarter Q of year t; and
AVAt: the annual value added for year t
Extrapolation:
unido.org/statistics
Estimation of monthly value added using Pro Rata distribution (India)
unido.org/statistics
unido.org/statistics
IIP and the Derived Benchmarked Monthly VA using Pro Rata Distribution (India)
unido.org/statistics
Benchmark-to-Indicator Ratio and the Step Problem (India)
unido.org/statistics
IIP and the Derived Benchmarked Quarterly VA using Pro Rata Distribution (China)
unido.org/statistics
Advantages
• Easy to compute and interpret
• No special software is needed
• Sub-annual estimates can be derived each year independently
Disadvantages
• Smoothens sub-annual estimates only within a year
• Concentrates bias in one quarter (month) and causes the abrupt change
• As a result, it creates so called “step problem”, therefore it is not
recommended for longer time series
unido.org/statistics
The Proportional Denton Method
Allows to find VA estimates by minimizing it’s difference with indicator values
subject to the constraints provided by the annual benchmarks.
Under the restriction that
Where
VAt: derived value added estimate for quarter/ month t;
It: value of the indicator for quarter/ month t;
AVA: annual value added
T: last quarter/ month for which quarterly/ monthly source data is available
unido.org/statistics
Discussion
• Unlike Pro Rata distribution BI ratio in this method changes
gradually so there is no jump from one year to another
• Computation for estimation of quarterly/ monthly VA is more
complicated, thus requiring specialized software such as
GAMS and CPLEX
• The quarterly/ monthly estimated derive by solving a so-called
quadratic programming problem (QP)
unido.org/statistics
Estimation of monthly value added using Proportional Denton Method (India)
unido.org/statistics
unido.org/statistics
IIP and the Derived Benchmarked Monthly VA using Denton Method (India)
unido.org/statistics
Benchmark-to-Indicator ratios (India)
unido.org/statistics
Discussion and Recommendations
• While seasonally adjusting the Pro Rata benchmarked series,
the significant changes in the first quarters (or first months) are
often recognized as outliers by seasonal adjustment software
• the significance of the step problem depends on the size of the
variations in the annual BI ratio
• The proportional Denton is most widely used benchmarking
method
• Denton method provides estimates which are closer to
preliminary index series than pro rating distribution on
preserves the short-term movements of the IIP time series
unido.org/statistics
• Running the QP problem for the whole series each
time a new benchmark is available
• The sub-annual data should be benchmarked to the
annual MVA as soon as it becomes available. The
benchmark time series must be revised based on the
revision policy
• Improving the estimates for the forward series and
reducing future revisions of benchmarked sub-annual
data by improving the extrapolation techniques
unido.org/statistics
• e.g., The enhanced version of proportional Denton
method introduced by IMF’s QNA manual
• UNIDO encourages developing countries to perform
the benchmarking exercise at country level
• Benchmarking the source data in earlier steps before
compiling the aggregations in highly recommended
unido.org/statistics
Thank you for your attention!

More Related Content

What's hot

Modul 2 proses agregasi dan peramlan i
Modul 2 proses agregasi dan peramlan iModul 2 proses agregasi dan peramlan i
Modul 2 proses agregasi dan peramlan i
Amalia Syafitri
 
EHughes OSCUI Template
EHughes OSCUI TemplateEHughes OSCUI Template
EHughes OSCUI Template
Em'mia Hughes
 

What's hot (20)

CCXG Forum, June 2020, Agripina Jenkins
CCXG Forum, June 2020, Agripina JenkinsCCXG Forum, June 2020, Agripina Jenkins
CCXG Forum, June 2020, Agripina Jenkins
 
CCXG Forum, June 2020, Rueanna Haynes
CCXG Forum, June 2020, Rueanna HaynesCCXG Forum, June 2020, Rueanna Haynes
CCXG Forum, June 2020, Rueanna Haynes
 
CCXG Forum, June 2020, Marcia Rocha
CCXG Forum, June 2020, Marcia RochaCCXG Forum, June 2020, Marcia Rocha
CCXG Forum, June 2020, Marcia Rocha
 
A quality framwork for official statistics of Sweden, Joakim Malmdin, Statist...
A quality framwork for official statistics of Sweden, Joakim Malmdin, Statist...A quality framwork for official statistics of Sweden, Joakim Malmdin, Statist...
A quality framwork for official statistics of Sweden, Joakim Malmdin, Statist...
 
GSBPM-GAMSO_july 2015
GSBPM-GAMSO_july 2015GSBPM-GAMSO_july 2015
GSBPM-GAMSO_july 2015
 
CCXG Forum, June 2020, Anke Herold
CCXG Forum, June 2020, Anke HeroldCCXG Forum, June 2020, Anke Herold
CCXG Forum, June 2020, Anke Herold
 
Monitoring and Evaluation System for Adaptation Projects
 Monitoring and Evaluation System for Adaptation Projects Monitoring and Evaluation System for Adaptation Projects
Monitoring and Evaluation System for Adaptation Projects
 
CCXG Forum, June 2020, Alyssa Ng
CCXG Forum, June 2020, Alyssa NgCCXG Forum, June 2020, Alyssa Ng
CCXG Forum, June 2020, Alyssa Ng
 
Gsbpm
GsbpmGsbpm
Gsbpm
 
CCXG Global Forum March 2018, Specificity and Applicability: Accounting for “...
CCXG Global Forum March 2018, Specificity and Applicability: Accounting for “...CCXG Global Forum March 2018, Specificity and Applicability: Accounting for “...
CCXG Global Forum March 2018, Specificity and Applicability: Accounting for “...
 
Evaluation of regulations and beyond -- Christiane Arndt, OECD Secretariat
Evaluation of regulations and beyond -- Christiane Arndt, OECD SecretariatEvaluation of regulations and beyond -- Christiane Arndt, OECD Secretariat
Evaluation of regulations and beyond -- Christiane Arndt, OECD Secretariat
 
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
 
Data analysis and visualization
Data analysis and visualizationData analysis and visualization
Data analysis and visualization
 
Week 12 power_point-acct_101
Week 12 power_point-acct_101Week 12 power_point-acct_101
Week 12 power_point-acct_101
 
Modul 2 proses agregasi dan peramlan i
Modul 2 proses agregasi dan peramlan iModul 2 proses agregasi dan peramlan i
Modul 2 proses agregasi dan peramlan i
 
EHughes OSCUI Template
EHughes OSCUI TemplateEHughes OSCUI Template
EHughes OSCUI Template
 
Session 7 d dutch revisioniariw
Session 7 d dutch revisioniariwSession 7 d dutch revisioniariw
Session 7 d dutch revisioniariw
 
Spending reviews - Marjon Schols, Netherlands
Spending reviews - Marjon Schols, NetherlandsSpending reviews - Marjon Schols, Netherlands
Spending reviews - Marjon Schols, Netherlands
 
Unit 4
Unit 4Unit 4
Unit 4
 
CCXG Global Forum March 2018, Updates for BAU targets by Chao Feng
CCXG Global Forum March 2018, Updates for BAU targets by Chao FengCCXG Global Forum March 2018, Updates for BAU targets by Chao Feng
CCXG Global Forum March 2018, Updates for BAU targets by Chao Feng
 

Similar to UNIDO-Benchmarking

Enterprise Measurements_January 2015
Enterprise Measurements_January 2015Enterprise Measurements_January 2015
Enterprise Measurements_January 2015
David Wade
 
RubricRubric for Assignment 5a- MetricsMaxYour PointsCommentsTop.docx
RubricRubric for Assignment 5a- MetricsMaxYour PointsCommentsTop.docxRubricRubric for Assignment 5a- MetricsMaxYour PointsCommentsTop.docx
RubricRubric for Assignment 5a- MetricsMaxYour PointsCommentsTop.docx
toddr4
 
Regional Development and RBM: Proposals for improvement
Regional Development and RBM: Proposals for improvementRegional Development and RBM: Proposals for improvement
Regional Development and RBM: Proposals for improvement
GIZ Moldova
 
Generic Presentation EEIS
Generic Presentation EEISGeneric Presentation EEIS
Generic Presentation EEIS
Jim Thayer
 
Professional Work samples
Professional Work samplesProfessional Work samples
Professional Work samples
debbiegkatz
 

Similar to UNIDO-Benchmarking (20)

Enterprise Measurements_January 2015
Enterprise Measurements_January 2015Enterprise Measurements_January 2015
Enterprise Measurements_January 2015
 
Reporting Within a PMO
Reporting Within a PMOReporting Within a PMO
Reporting Within a PMO
 
AMS Delivery Portfolio tailored to the strategic accounts in BFSI microvertic...
AMS Delivery Portfolio tailored to the strategic accounts in BFSI microvertic...AMS Delivery Portfolio tailored to the strategic accounts in BFSI microvertic...
AMS Delivery Portfolio tailored to the strategic accounts in BFSI microvertic...
 
2016 Annual Programme Reporting Webinar
2016 Annual Programme Reporting Webinar2016 Annual Programme Reporting Webinar
2016 Annual Programme Reporting Webinar
 
RubricRubric for Assignment 5a- MetricsMaxYour PointsCommentsTop.docx
RubricRubric for Assignment 5a- MetricsMaxYour PointsCommentsTop.docxRubricRubric for Assignment 5a- MetricsMaxYour PointsCommentsTop.docx
RubricRubric for Assignment 5a- MetricsMaxYour PointsCommentsTop.docx
 
Estimation and measuring of software size within the atos gobal delivery plat...
Estimation and measuring of software size within the atos gobal delivery plat...Estimation and measuring of software size within the atos gobal delivery plat...
Estimation and measuring of software size within the atos gobal delivery plat...
 
Ssp june 2007
Ssp june 2007Ssp june 2007
Ssp june 2007
 
Regional Development and RBM: Proposals for improvement
Regional Development and RBM: Proposals for improvementRegional Development and RBM: Proposals for improvement
Regional Development and RBM: Proposals for improvement
 
Intro to Quality Control with Tutorial on using Statgraphics
Intro to Quality Control with Tutorial on using StatgraphicsIntro to Quality Control with Tutorial on using Statgraphics
Intro to Quality Control with Tutorial on using Statgraphics
 
What's new in journal metrics CiteScore and more 29 June 2017
What's new in journal metrics CiteScore and more 29 June 2017What's new in journal metrics CiteScore and more 29 June 2017
What's new in journal metrics CiteScore and more 29 June 2017
 
Generic Presentation EEIS
Generic Presentation EEISGeneric Presentation EEIS
Generic Presentation EEIS
 
IAOS 2018 - Evaluation of nowcasting/flash-estimation based on a big set of ...
IAOS 2018 - Evaluation of nowcasting/flash-estimation based on a big set of ...IAOS 2018 - Evaluation of nowcasting/flash-estimation based on a big set of ...
IAOS 2018 - Evaluation of nowcasting/flash-estimation based on a big set of ...
 
7 M&E: Indicators
7 M&E: Indicators7 M&E: Indicators
7 M&E: Indicators
 
BRD - Work Estimate - Client example
BRD - Work Estimate - Client exampleBRD - Work Estimate - Client example
BRD - Work Estimate - Client example
 
IAOS 2018 - The status quo and issues of R&D statistics in China, M. Gao, X. ...
IAOS 2018 - The status quo and issues of R&D statistics in China, M. Gao, X. ...IAOS 2018 - The status quo and issues of R&D statistics in China, M. Gao, X. ...
IAOS 2018 - The status quo and issues of R&D statistics in China, M. Gao, X. ...
 
Best Practices: Planning Data Analytic into Your Audits
Best Practices: Planning Data Analytic into Your AuditsBest Practices: Planning Data Analytic into Your Audits
Best Practices: Planning Data Analytic into Your Audits
 
Iba pa pm solution
Iba pa pm solutionIba pa pm solution
Iba pa pm solution
 
Cv mohan vydianathan
Cv mohan vydianathanCv mohan vydianathan
Cv mohan vydianathan
 
Professional Work samples
Professional Work samplesProfessional Work samples
Professional Work samples
 
HM 418 2e hcpm08
HM 418 2e hcpm08HM 418 2e hcpm08
HM 418 2e hcpm08
 

UNIDO-Benchmarking

  • 1. unido.org/statistics Analysis of Divergence of quarterly and Annual Index of Industrial Production Shyam Upadhyaya, Shohreh Mirzaei Yeganeh United Nations Industrial Development Organization (UNIDO), Vienna, Austria
  • 2. unido.org/statistics The Index of industrial production One of the important Short-term economic indicators in official statistics which measures the changes in value added over a given period. Computation of the IIP The laspeyres volume index for period t Where: pi0: Prices for Industry sector i at the base period 0, qi0: Quantity for industry sector i at the base period 0, qit: Quantity for industry sector i at period t, wi0: Relative weight of industry sector i in the base period 0, and i: Number of industry sectors
  • 4. unido.org/statistics Reasons for divergence • Difference in coverage and sample • Difference in definition and variables output replaces the value added • Accounting period Calendar year versus accounting year effect • Estimation method, non-response treatment, imputation, etc.
  • 5. unido.org/statistics What is benchmarking? • Statistical techniques which are aimed to ensure coherence between time series data of the same target variable measured at different frequencies, e.g., sub-annual and annual • Underlying assumption: low frequency data tends to be more comprehensive and accurate than high frequency data • High frequency data (indicators) are aligned to low frequency data (Benchmark) • Inconsistency is detected by the movement of ratio between Benchmark value (B) and Indicator value (I)
  • 6. unido.org/statistics Benchmarking methods -Benchmarking techniques can be categorized into two approaches: • Numerical approach: Pro Rata Distribution, Proportional Denton Method • Statistical modeling approach: ARIMA-model based methods, GLS model, etc. -Another aspect of benchmarking: Extrapolation Linking of quarterly source data onto previous annual estimates, or Constructing forward series by adjusting the last available benchmark level
  • 7. unido.org/statistics Pro Rata distribution Splits the annual total based on the proportions indicated by the four (or twelve) quarterly (monthly) observations In mathematical phrase Where VAQt: estimated quarterly value added for quarter Q of year t; IQt: indicator value in quarter Q of year t; and AVAt: the annual value added for year t Extrapolation:
  • 8. unido.org/statistics Estimation of monthly value added using Pro Rata distribution (India)
  • 10. unido.org/statistics IIP and the Derived Benchmarked Monthly VA using Pro Rata Distribution (India)
  • 12. unido.org/statistics IIP and the Derived Benchmarked Quarterly VA using Pro Rata Distribution (China)
  • 13. unido.org/statistics Advantages • Easy to compute and interpret • No special software is needed • Sub-annual estimates can be derived each year independently Disadvantages • Smoothens sub-annual estimates only within a year • Concentrates bias in one quarter (month) and causes the abrupt change • As a result, it creates so called “step problem”, therefore it is not recommended for longer time series
  • 14. unido.org/statistics The Proportional Denton Method Allows to find VA estimates by minimizing it’s difference with indicator values subject to the constraints provided by the annual benchmarks. Under the restriction that Where VAt: derived value added estimate for quarter/ month t; It: value of the indicator for quarter/ month t; AVA: annual value added T: last quarter/ month for which quarterly/ monthly source data is available
  • 15. unido.org/statistics Discussion • Unlike Pro Rata distribution BI ratio in this method changes gradually so there is no jump from one year to another • Computation for estimation of quarterly/ monthly VA is more complicated, thus requiring specialized software such as GAMS and CPLEX • The quarterly/ monthly estimated derive by solving a so-called quadratic programming problem (QP)
  • 16. unido.org/statistics Estimation of monthly value added using Proportional Denton Method (India)
  • 18. unido.org/statistics IIP and the Derived Benchmarked Monthly VA using Denton Method (India)
  • 20. unido.org/statistics Discussion and Recommendations • While seasonally adjusting the Pro Rata benchmarked series, the significant changes in the first quarters (or first months) are often recognized as outliers by seasonal adjustment software • the significance of the step problem depends on the size of the variations in the annual BI ratio • The proportional Denton is most widely used benchmarking method • Denton method provides estimates which are closer to preliminary index series than pro rating distribution on preserves the short-term movements of the IIP time series
  • 21. unido.org/statistics • Running the QP problem for the whole series each time a new benchmark is available • The sub-annual data should be benchmarked to the annual MVA as soon as it becomes available. The benchmark time series must be revised based on the revision policy • Improving the estimates for the forward series and reducing future revisions of benchmarked sub-annual data by improving the extrapolation techniques
  • 22. unido.org/statistics • e.g., The enhanced version of proportional Denton method introduced by IMF’s QNA manual • UNIDO encourages developing countries to perform the benchmarking exercise at country level • Benchmarking the source data in earlier steps before compiling the aggregations in highly recommended