SlideShare a Scribd company logo
1 of 18
HONDA MOTORWORK
“MANUFACTURING DIVISION”
DEPARTMENT OF MECHINICAL ENGINEERING
Galgotias college of Engineering and Technology, Gr. Noida(U.P.)
PRESENTED BY:
NITISH KUMAR
1900970400077
● HONDAestablish in 1999 at Manesar ( Haryana )
● HONDAis a Japanese Public Multinational .
● HONDAis a largest motorcycle manufacturing company.
power
● HONDA deals with 2-wheeler, 4-wheeler and
products.
● Honda motorcycle and scooter India (HMSI)
● Honda Siel Cars India Ltd (HSCI)
● Honda Siel Power Products Limited (HSPP)
● First plant of HSMI in Manesar (Haryana).
● Second plant in Tapukara ,Dist.:-Alwar, Rajasthan
● Third plant in Narsapura, Bengaluru
● Forth plant inAhmadabad ,Gujarat
● My training is at HSMI Manesar in frameAssembly
MODELS COVERED IN PRESS SHOP
S. No MODELS SHAPE MODELS NAME
1 HONDA CITY
2
HONDA BRIO
3
HONDA AMAZE
● HR (Human Resource
and Development)
● IR(Industrial relation)
● A/F(Frame assemble)
● A/E(Engine assembly)
● Paint Shop
● P I (Part inspection)
● Utility
● Maintenance
● BOP
● Weld
● Steel machining
● Aluminum machining
● Safety
● Purchase
● Casting
● PPC(Production planning)
● VQ (Vehicle quality)
● Logistic
● Store
● Finance
● R & D
● Technical center
● SQA
Raw material Press
BOP WELD CASTING
PAINT PAINT SHOP
ENGINE
ASSEMBLY
BOP
FRAME ASSEMBLY
VQ
LOGISITICS
DISPATCH
MACHINING
Salient Features
Press Machine : 4
● 1500 Ton – 1Nos.
● 1000 Ton – 3Nos.
No. of Robot : 5
Scrap Conveyor : 1
Equipments In Press Line
Press Machine
Scrap Conveyor
Parts Handling Robot
De-Stack Feeder
BLANK STACK:- The stack feeder unit loads the sheet blanks into the unit to be forwarded
to the washing unit. The position of the sheets to be loaded is governed
by the laser pointer guides and stack feeder guides.
DE-STACK FEEDER:- A blank of sheet goes inside the De-stack feeder . There are position
and photographic sensors for the correct position of blanks and to
ensure the safety.
DE STACKER CUP:-
MAGNETIC FLOATER:-
These cups left the blank sheet to magnetic rollers. Then those rollers
hold the sheet and these cups leave them. There is a rubber
belt/conveyor belt on these magnetic rollers which take the sheet a bit
forward where thickness of sheet is measured using a sensor.
In a stack sheets are already washed by oil and when Die Stacker
cups come down and lift a sheet, it lifts two sheets together to
remove another sheet we use magnetic floater and stop motion.
The magnetic floater blows air towards the sheet to separate them
and it is magnetic so blowing air doesn’t change the position of
the sheet
MAGNETIC FLOATER
WASHING UNIT:-The washing unit is located in the initial state. The primary function of
this unit is to remove dust and dirt from the sheets. Before oil is supplied to the rollers for
cleaning the blanks, it goes through a filtering process
Centering unit
These kinds of stoppers are used to match the centre of the blank with the centre of die.
It is of three types:
1. Front stopper
2. Rear stopper
Side stopper
OPERATIONS OF THE PRESS:-
1.) DRAWING
 Draw Die:-Die for forming a hollow vessel from a flat sheet metal with use of punch and
die without application of heat.
 Draw Die Clearance:-The Clearance b/w die and punch shall be thickness of sheet
material plus 0.1 mm
 Draw Force:-The force required for drawing depends upon the shape of punch. For
general applications a simple load calculation is made by following formula
Drawing Force = L * t *35 (Numerical Constant)
L= Drawing Circumference
t=Sheet Thickness
2.) TRIMMING
For cutting excess material from a part made by
drawing.
3.) PIERCING
Piercing is the operation of cutting internal features (holes or slots) in stock.
 Trimming operations are generally combined with piercing operation and
accommodated in the same die.
PARTS STORAGE& HANDLING
Parts after production are needed to be stored safely to avoid small deformities such as
dent, ding etc. This is where the trolleys come into play.
Forklift: It is used to transport the trolleys from production area to the storage area.
Forklifts used in HCIL are mainly Toyota. It has a capacity of carrying 3 trolleys at a time.
It has a speed limit of 10 km/hr.
TROLLEY
A structure used to stack parts such as hood skin, SPOs, FR Fender, etc. for storing
purposes. After part stacking trolleys are in turn stacked upon each other according to the
name or code of the trolley. In HCIL, the parts manufactured are of brio, city and jazz.
 DESIGN AND FABRICATION OF FRAME.
Design and fabrication of frame.
DESCRIPTION: Frame was to be fabricated for the new model which is to be used in the
press no. 3. Jig is to be such designed that part after getting trimmed in the 2nd press is
placed in the press no. 3 and part are to be separated by a certain distance (390 mm) so
that bending process can be done at press no. 4.
FABRICATION:
 Keeping in mind the bolster area as well as the new part, THREE frames were
fabricated on which part is to be placed with the help of robots.
 There was the height difference between frame-1 and frame-2 and the smaller frame
(frame-2) contains a sliding frame (frame-3) above it which will be displayed 390 mm
with the help of a pneumatic cylinder.
COMBINED FRAME
FRAME-1FRAME-2,3
VARIOUS PROBLEMS INVOLVED IN THE PRESS LINE
 Vacuum miss:- Sometimes the pressure in the vacuum cup falls below the required value
and then cup does not lift the part and this is called vacuum miss.
 Set miss:-There are position sensors to sense the accurate position of the sheets in the
dies but when there is difference in the position occurs, sensors operate and this is called
set miss.
 Scrap jam in trim and piercing die:-Sometimes the scrap from the parts after going
through trim and piercing die jams there.
 Sheet abnormal fault:- Sometimes sheet bend in the die, sometimes two sheets come
together.
 Chip dent problem:-due to dust in the die, dents occurred in the parts. To overcome this,
die cleaning is done.
NITISH KUMAR HONDA INTERNSHIP PPT.pptx

More Related Content

Similar to NITISH KUMAR HONDA INTERNSHIP PPT.pptx

Iaetsd advancement in clicker machine and die
Iaetsd advancement in clicker machine and dieIaetsd advancement in clicker machine and die
Iaetsd advancement in clicker machine and die
Iaetsd Iaetsd
 
Rohit Kumar ppt
Rohit Kumar pptRohit Kumar ppt
Rohit Kumar ppt
Rohit Boss
 
Automatic SMT Tape Cutting Machine R-TC950.pdf
Automatic SMT Tape Cutting Machine R-TC950.pdfAutomatic SMT Tape Cutting Machine R-TC950.pdf
Automatic SMT Tape Cutting Machine R-TC950.pdf
KC Chan Liang
 

Similar to NITISH KUMAR HONDA INTERNSHIP PPT.pptx (20)

Micro powder grinder machine
Micro powder grinder machineMicro powder grinder machine
Micro powder grinder machine
 
internship report
internship reportinternship report
internship report
 
Bwel presentation
Bwel presentationBwel presentation
Bwel presentation
 
Design and modification of bale cutting machine to improve its productivity
Design and modification of bale cutting machine to improve its productivityDesign and modification of bale cutting machine to improve its productivity
Design and modification of bale cutting machine to improve its productivity
 
SURFACE MINERS
SURFACE MINERSSURFACE MINERS
SURFACE MINERS
 
IRJET- Design and Development of Collet Chuck
IRJET- Design and Development of Collet ChuckIRJET- Design and Development of Collet Chuck
IRJET- Design and Development of Collet Chuck
 
The general tyre and rubber company
The general tyre and rubber companyThe general tyre and rubber company
The general tyre and rubber company
 
Iaetsd advancement in clicker machine and die
Iaetsd advancement in clicker machine and dieIaetsd advancement in clicker machine and die
Iaetsd advancement in clicker machine and die
 
Conceptual design of injection mold tool for the chair hand rest component
Conceptual design of injection mold tool for the chair hand rest componentConceptual design of injection mold tool for the chair hand rest component
Conceptual design of injection mold tool for the chair hand rest component
 
Hmt machine tools
Hmt machine toolsHmt machine tools
Hmt machine tools
 
Rohit Kumar ppt
Rohit Kumar pptRohit Kumar ppt
Rohit Kumar ppt
 
training report
training report training report
training report
 
IRJET- Semi-Automatic Ceramic Sleeve Surface Finishing Machine
IRJET- Semi-Automatic Ceramic Sleeve Surface Finishing MachineIRJET- Semi-Automatic Ceramic Sleeve Surface Finishing Machine
IRJET- Semi-Automatic Ceramic Sleeve Surface Finishing Machine
 
Summer Training Presentation On HMT Machine Tools Ltd
Summer Training Presentation On HMT Machine Tools LtdSummer Training Presentation On HMT Machine Tools Ltd
Summer Training Presentation On HMT Machine Tools Ltd
 
CNC Shop Industrial trening..
CNC Shop Industrial trening..CNC Shop Industrial trening..
CNC Shop Industrial trening..
 
training report at hindustan copper limited
training report at hindustan copper limitedtraining report at hindustan copper limited
training report at hindustan copper limited
 
DESIGN AND DEVELOPMENT OF MACHINING FIXTURE FOR BD65 FINAL DRIVE CASE ON HORI...
DESIGN AND DEVELOPMENT OF MACHINING FIXTURE FOR BD65 FINAL DRIVE CASE ON HORI...DESIGN AND DEVELOPMENT OF MACHINING FIXTURE FOR BD65 FINAL DRIVE CASE ON HORI...
DESIGN AND DEVELOPMENT OF MACHINING FIXTURE FOR BD65 FINAL DRIVE CASE ON HORI...
 
DrawBotAssemblyUserGuideV3.pdf
DrawBotAssemblyUserGuideV3.pdfDrawBotAssemblyUserGuideV3.pdf
DrawBotAssemblyUserGuideV3.pdf
 
[IJET-V1I2P4] Authors :Mrs.Rita S. Pimpalkar, Rutuja U. Joshi, Rakesh R. Khan...
[IJET-V1I2P4] Authors :Mrs.Rita S. Pimpalkar, Rutuja U. Joshi, Rakesh R. Khan...[IJET-V1I2P4] Authors :Mrs.Rita S. Pimpalkar, Rutuja U. Joshi, Rakesh R. Khan...
[IJET-V1I2P4] Authors :Mrs.Rita S. Pimpalkar, Rutuja U. Joshi, Rakesh R. Khan...
 
Automatic SMT Tape Cutting Machine R-TC950.pdf
Automatic SMT Tape Cutting Machine R-TC950.pdfAutomatic SMT Tape Cutting Machine R-TC950.pdf
Automatic SMT Tape Cutting Machine R-TC950.pdf
 

More from Shivansh725543 (6)

MS Access - Supriya.pptx
MS Access - Supriya.pptxMS Access - Supriya.pptx
MS Access - Supriya.pptx
 
govind-150712115505-lva1-app6892.pptx
govind-150712115505-lva1-app6892.pptxgovind-150712115505-lva1-app6892.pptx
govind-150712115505-lva1-app6892.pptx
 
Nitish.pptx
Nitish.pptxNitish.pptx
Nitish.pptx
 
Climate.ppt
Climate.pptClimate.ppt
Climate.ppt
 
Satyam.pptx
Satyam.pptxSatyam.pptx
Satyam.pptx
 
bsnl
bsnlbsnl
bsnl
 

Recently uploaded

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 

Recently uploaded (20)

Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 

NITISH KUMAR HONDA INTERNSHIP PPT.pptx

  • 1. HONDA MOTORWORK “MANUFACTURING DIVISION” DEPARTMENT OF MECHINICAL ENGINEERING Galgotias college of Engineering and Technology, Gr. Noida(U.P.) PRESENTED BY: NITISH KUMAR 1900970400077
  • 2. ● HONDAestablish in 1999 at Manesar ( Haryana ) ● HONDAis a Japanese Public Multinational . ● HONDAis a largest motorcycle manufacturing company. power ● HONDA deals with 2-wheeler, 4-wheeler and products. ● Honda motorcycle and scooter India (HMSI) ● Honda Siel Cars India Ltd (HSCI) ● Honda Siel Power Products Limited (HSPP) ● First plant of HSMI in Manesar (Haryana). ● Second plant in Tapukara ,Dist.:-Alwar, Rajasthan ● Third plant in Narsapura, Bengaluru ● Forth plant inAhmadabad ,Gujarat ● My training is at HSMI Manesar in frameAssembly
  • 3. MODELS COVERED IN PRESS SHOP S. No MODELS SHAPE MODELS NAME 1 HONDA CITY 2 HONDA BRIO 3 HONDA AMAZE
  • 4. ● HR (Human Resource and Development) ● IR(Industrial relation) ● A/F(Frame assemble) ● A/E(Engine assembly) ● Paint Shop ● P I (Part inspection) ● Utility ● Maintenance ● BOP ● Weld ● Steel machining ● Aluminum machining ● Safety ● Purchase ● Casting ● PPC(Production planning) ● VQ (Vehicle quality) ● Logistic ● Store ● Finance ● R & D ● Technical center ● SQA
  • 5. Raw material Press BOP WELD CASTING PAINT PAINT SHOP ENGINE ASSEMBLY BOP FRAME ASSEMBLY VQ LOGISITICS DISPATCH MACHINING
  • 6.
  • 7. Salient Features Press Machine : 4 ● 1500 Ton – 1Nos. ● 1000 Ton – 3Nos. No. of Robot : 5 Scrap Conveyor : 1 Equipments In Press Line Press Machine Scrap Conveyor Parts Handling Robot De-Stack Feeder
  • 8. BLANK STACK:- The stack feeder unit loads the sheet blanks into the unit to be forwarded to the washing unit. The position of the sheets to be loaded is governed by the laser pointer guides and stack feeder guides. DE-STACK FEEDER:- A blank of sheet goes inside the De-stack feeder . There are position and photographic sensors for the correct position of blanks and to ensure the safety.
  • 9. DE STACKER CUP:- MAGNETIC FLOATER:- These cups left the blank sheet to magnetic rollers. Then those rollers hold the sheet and these cups leave them. There is a rubber belt/conveyor belt on these magnetic rollers which take the sheet a bit forward where thickness of sheet is measured using a sensor. In a stack sheets are already washed by oil and when Die Stacker cups come down and lift a sheet, it lifts two sheets together to remove another sheet we use magnetic floater and stop motion. The magnetic floater blows air towards the sheet to separate them and it is magnetic so blowing air doesn’t change the position of the sheet MAGNETIC FLOATER
  • 10. WASHING UNIT:-The washing unit is located in the initial state. The primary function of this unit is to remove dust and dirt from the sheets. Before oil is supplied to the rollers for cleaning the blanks, it goes through a filtering process
  • 11. Centering unit These kinds of stoppers are used to match the centre of the blank with the centre of die. It is of three types: 1. Front stopper 2. Rear stopper Side stopper
  • 12. OPERATIONS OF THE PRESS:- 1.) DRAWING  Draw Die:-Die for forming a hollow vessel from a flat sheet metal with use of punch and die without application of heat.  Draw Die Clearance:-The Clearance b/w die and punch shall be thickness of sheet material plus 0.1 mm  Draw Force:-The force required for drawing depends upon the shape of punch. For general applications a simple load calculation is made by following formula Drawing Force = L * t *35 (Numerical Constant) L= Drawing Circumference t=Sheet Thickness 2.) TRIMMING For cutting excess material from a part made by drawing.
  • 13. 3.) PIERCING Piercing is the operation of cutting internal features (holes or slots) in stock.  Trimming operations are generally combined with piercing operation and accommodated in the same die.
  • 14. PARTS STORAGE& HANDLING Parts after production are needed to be stored safely to avoid small deformities such as dent, ding etc. This is where the trolleys come into play. Forklift: It is used to transport the trolleys from production area to the storage area. Forklifts used in HCIL are mainly Toyota. It has a capacity of carrying 3 trolleys at a time. It has a speed limit of 10 km/hr. TROLLEY A structure used to stack parts such as hood skin, SPOs, FR Fender, etc. for storing purposes. After part stacking trolleys are in turn stacked upon each other according to the name or code of the trolley. In HCIL, the parts manufactured are of brio, city and jazz.
  • 15.  DESIGN AND FABRICATION OF FRAME. Design and fabrication of frame. DESCRIPTION: Frame was to be fabricated for the new model which is to be used in the press no. 3. Jig is to be such designed that part after getting trimmed in the 2nd press is placed in the press no. 3 and part are to be separated by a certain distance (390 mm) so that bending process can be done at press no. 4. FABRICATION:  Keeping in mind the bolster area as well as the new part, THREE frames were fabricated on which part is to be placed with the help of robots.  There was the height difference between frame-1 and frame-2 and the smaller frame (frame-2) contains a sliding frame (frame-3) above it which will be displayed 390 mm with the help of a pneumatic cylinder.
  • 17. VARIOUS PROBLEMS INVOLVED IN THE PRESS LINE  Vacuum miss:- Sometimes the pressure in the vacuum cup falls below the required value and then cup does not lift the part and this is called vacuum miss.  Set miss:-There are position sensors to sense the accurate position of the sheets in the dies but when there is difference in the position occurs, sensors operate and this is called set miss.  Scrap jam in trim and piercing die:-Sometimes the scrap from the parts after going through trim and piercing die jams there.  Sheet abnormal fault:- Sometimes sheet bend in the die, sometimes two sheets come together.  Chip dent problem:-due to dust in the die, dents occurred in the parts. To overcome this, die cleaning is done.