Annex C
6	
  terms	
  
	
  
During	
  an	
  in-­‐service	
  inspection	
  of	
  a	
  tank,	
  the	
  site	
  around	
  the	
  tank	
  should	
  be	
  checked	
  
to	
  make	
  sure:	
  	
  
Water drains away from the tank and associated piping manifolds
The	
  indication	
  of	
  standing	
  water	
  and	
  significant	
  sagging	
  on	
  a	
  fixed	
  cone	
  tank	
  roof	
  
during	
  a	
  tank	
  in-­‐service	
  indicates:	
  	
  
Potential rafter failure
When	
  a	
  tank	
  is	
  out-­‐of-­‐service	
  the	
  bottom	
  interior	
  surface	
  may	
  be	
  quickly	
  checked	
  for	
  
pitting,	
  blisters,	
  low	
  or	
  high	
  spots,	
  etc.	
  by	
  using:	
  	
  
A flashlight close to and parallel with the tank bottom.
The	
  condition	
  (if	
  applicable)	
  of	
  an	
  internal	
  sump	
  of	
  an	
  out-­‐of-­‐service	
  tank	
  should	
  be	
  
checked	
  by:	
  	
  
Removing any liquid to allow for complete inspection.
If	
  an	
  emergency	
  drain	
  is	
  not	
  at	
  the	
  center	
  of	
  an	
  external	
  floating	
  roof,	
  how	
  many	
  
emergency	
  drains	
  should	
  the	
  roof	
  have?	
  	
  
3
If	
  the	
  floating	
  swing	
  line	
  in	
  a	
  floating	
  roof	
  tank	
  does	
  not	
  have	
  a	
  limiting	
  device	
  
preventing	
  the	
  swing	
  line	
  from	
  exceeding	
  60	
  degrees,	
  measure	
  and	
  calculate	
  the	
  
maximum	
  angle	
  on	
  the	
  overflow.	
  If	
  calculated	
  angle	
  exceeds	
  _____	
  degrees,	
  
recommended	
  installation	
  of	
  a	
  limiting	
  bracket.	
  	
  
65
	
  

More Related Content

What's hot

Cswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursCswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursRafik Guerbous
 
Storage tank inspection presentation
Storage tank inspection presentationStorage tank inspection presentation
Storage tank inspection presentationIan Moore
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1 MOHAMMAD ATIF ALI
 
Api practice questions
Api practice questions  Api practice questions
Api practice questions Hamza Khamkar
 
Storage vessel design
Storage vessel designStorage vessel design
Storage vessel designMASUKUMARA1
 
38785106 api-tank-design
38785106 api-tank-design38785106 api-tank-design
38785106 api-tank-design141jdf
 

What's hot (7)

Cswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursCswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 cours
 
Storage tank inspection presentation
Storage tank inspection presentationStorage tank inspection presentation
Storage tank inspection presentation
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1
 
Api practice questions
Api practice questions  Api practice questions
Api practice questions
 
Storage vessel design
Storage vessel designStorage vessel design
Storage vessel design
 
38785106 api-tank-design
38785106 api-tank-design38785106 api-tank-design
38785106 api-tank-design
 
Api 570 01_api_570
Api 570 01_api_570Api 570 01_api_570
Api 570 01_api_570
 

Similar to 8. api 653 annex c - 6 terms

Testing_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptTesting_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptSatish Pydimarla
 
4_5854850146042385629.pdf
4_5854850146042385629.pdf4_5854850146042385629.pdf
4_5854850146042385629.pdfsalem123gmaal
 
Spillways & energy dissipator
Spillways & energy dissipatorSpillways & energy dissipator
Spillways & energy dissipatorSAGAR RAUT
 
40+ TOP PIPING_INSTRUMENTATION INTERVIEW QUESTIONS.pdf
40+ TOP PIPING_INSTRUMENTATION INTERVIEW QUESTIONS.pdf40+ TOP PIPING_INSTRUMENTATION INTERVIEW QUESTIONS.pdf
40+ TOP PIPING_INSTRUMENTATION INTERVIEW QUESTIONS.pdfEmmanuelMatutu
 
design of hydraulic controls and structures
design of hydraulic  controls and structuresdesign of hydraulic  controls and structures
design of hydraulic controls and structuresavirup naskar
 
Stress analysis of storage tank piping - Jeba Anand
Stress analysis of storage tank  piping - Jeba AnandStress analysis of storage tank  piping - Jeba Anand
Stress analysis of storage tank piping - Jeba AnandJeba Anand Nadar
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valvesAmol Dudhate
 
General safety precautions for maintenance of extinguisher
General safety precautions for maintenance of extinguisherGeneral safety precautions for maintenance of extinguisher
General safety precautions for maintenance of extinguisherSalim Solanki
 
Rain Soft Gold Series Water Treatment System Installation & Service Manual (w...
Rain Soft Gold Series Water Treatment System Installation & Service Manual (w...Rain Soft Gold Series Water Treatment System Installation & Service Manual (w...
Rain Soft Gold Series Water Treatment System Installation & Service Manual (w...miscott57
 
FINAL The Owens Lake Turnout Facility End Cap Study
FINAL The Owens Lake Turnout Facility End Cap StudyFINAL The Owens Lake Turnout Facility End Cap Study
FINAL The Owens Lake Turnout Facility End Cap StudyKook Dean
 
Operation & maintenance 2011
Operation & maintenance 2011Operation & maintenance 2011
Operation & maintenance 2011Abdul Hakeem S.K.
 

Similar to 8. api 653 annex c - 6 terms (20)

Testing_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptTesting_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.ppt
 
4_5854850146042385629.pdf
4_5854850146042385629.pdf4_5854850146042385629.pdf
4_5854850146042385629.pdf
 
Spillways & energy dissipator
Spillways & energy dissipatorSpillways & energy dissipator
Spillways & energy dissipator
 
Barometric condensor
Barometric condensorBarometric condensor
Barometric condensor
 
40+ TOP PIPING_INSTRUMENTATION INTERVIEW QUESTIONS.pdf
40+ TOP PIPING_INSTRUMENTATION INTERVIEW QUESTIONS.pdf40+ TOP PIPING_INSTRUMENTATION INTERVIEW QUESTIONS.pdf
40+ TOP PIPING_INSTRUMENTATION INTERVIEW QUESTIONS.pdf
 
design of hydraulic controls and structures
design of hydraulic  controls and structuresdesign of hydraulic  controls and structures
design of hydraulic controls and structures
 
Stress analysis of storage tank piping - Jeba Anand
Stress analysis of storage tank  piping - Jeba AnandStress analysis of storage tank  piping - Jeba Anand
Stress analysis of storage tank piping - Jeba Anand
 
PSV Sizing.pdf
PSV Sizing.pdfPSV Sizing.pdf
PSV Sizing.pdf
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valves
 
Piping interview
Piping interviewPiping interview
Piping interview
 
Smpv(u) rules 2016-18
Smpv(u) rules  2016-18Smpv(u) rules  2016-18
Smpv(u) rules 2016-18
 
unit-3.pdf
unit-3.pdfunit-3.pdf
unit-3.pdf
 
SPILLWAYS.pdf
SPILLWAYS.pdfSPILLWAYS.pdf
SPILLWAYS.pdf
 
Flushing plans
Flushing plansFlushing plans
Flushing plans
 
General safety precautions for maintenance of extinguisher
General safety precautions for maintenance of extinguisherGeneral safety precautions for maintenance of extinguisher
General safety precautions for maintenance of extinguisher
 
Boiler Mountings
Boiler MountingsBoiler Mountings
Boiler Mountings
 
Rain Soft Gold Series Water Treatment System Installation & Service Manual (w...
Rain Soft Gold Series Water Treatment System Installation & Service Manual (w...Rain Soft Gold Series Water Treatment System Installation & Service Manual (w...
Rain Soft Gold Series Water Treatment System Installation & Service Manual (w...
 
FINAL The Owens Lake Turnout Facility End Cap Study
FINAL The Owens Lake Turnout Facility End Cap StudyFINAL The Owens Lake Turnout Facility End Cap Study
FINAL The Owens Lake Turnout Facility End Cap Study
 
API 653 TANK INSPECTION.pdf
API 653 TANK INSPECTION.pdfAPI 653 TANK INSPECTION.pdf
API 653 TANK INSPECTION.pdf
 
Operation & maintenance 2011
Operation & maintenance 2011Operation & maintenance 2011
Operation & maintenance 2011
 

Recently uploaded

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptxrouholahahmadi9876
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 

Recently uploaded (20)

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 

8. api 653 annex c - 6 terms

  • 1. Annex C 6  terms     During  an  in-­‐service  inspection  of  a  tank,  the  site  around  the  tank  should  be  checked   to  make  sure:     Water drains away from the tank and associated piping manifolds The  indication  of  standing  water  and  significant  sagging  on  a  fixed  cone  tank  roof   during  a  tank  in-­‐service  indicates:     Potential rafter failure When  a  tank  is  out-­‐of-­‐service  the  bottom  interior  surface  may  be  quickly  checked  for   pitting,  blisters,  low  or  high  spots,  etc.  by  using:     A flashlight close to and parallel with the tank bottom. The  condition  (if  applicable)  of  an  internal  sump  of  an  out-­‐of-­‐service  tank  should  be   checked  by:     Removing any liquid to allow for complete inspection. If  an  emergency  drain  is  not  at  the  center  of  an  external  floating  roof,  how  many   emergency  drains  should  the  roof  have?     3 If  the  floating  swing  line  in  a  floating  roof  tank  does  not  have  a  limiting  device   preventing  the  swing  line  from  exceeding  60  degrees,  measure  and  calculate  the   maximum  angle  on  the  overflow.  If  calculated  angle  exceeds  _____  degrees,   recommended  installation  of  a  limiting  bracket.     65