A study conducted by Shadreck Phiri from May to Nov 2014, to
satisfy part of the requirements for the MBA offered by the University
of Pretoria’s Gordon Institute of Business Science (GIBS)
Supervised by Dr. Wayne Visser
PMI AFRICA CONFERENCE 2015
PMI AFRICA CONFERENCE 2015
Managerial
Recommendations
Research
Objectives
&
Design
General
Recommendations
Key Findings
PMI AFRICA CONFERENCE 2015
Research
Objectives
&
Design
Primary Research Objective
Incorporation of CSR?
What CSR means?
PMI AFRICA CONFERENCE 2015
Society
Economy
Environment
Secondary Research Objectives
Business Case
o Determine what the Business Case for
CSR?
Barriers
o CSR incorporation?
Enablers
o What can be done to further improve the
incorporation of CSR?
PMI AFRICA CONFERENCE 2015
CSR Principles
PMI AFRICA CONFERENCE 2015
personal
values
&
ethicstransparency
&
accountability
consuming
income,
NOT capital
local
&
global
orientation
both
short-term
&
long-term
orientation
balancing
social,
environmental
& economic
interests
DNA Model
of CSR
Value
Creation
Good
Governance
Societal
Contribution
Environmental
Integrity
Beneficial Products
Inclusive Business
Institutional Effectiveness
Ethical Effectiveness
Stakeholder Engagement
Zero-Waste
100% Renewable Energy
Fair Labour Practices
Community Participation
Research Propositions
o Little impact of the non-conformance
o Pressure groups - impact on enforcement
of CSR
o Intangible IT products
o CSR legislation as enabler of
incorporation
o Successful CSR case studies
o CSR drivers that address value creation,
good governance, and societal
contribution
PMI AFRICA CONFERENCE 2015
Semi-structured Interviews
PMI AFRICA CONFERENCE 2015
6.5
Hours
190 Pages of
Transcriptions
Respondent's Role and Industry Duration (Min:Sec)
Tools Manager_Project Management Consulting 49:20:00
Chief Technology Officer_Broadcast Media 41:29:00
Programme Quality Manager_Project Management Consulting 49:55:00
Delivery Manager_IT and IT-Enabled Services 28:27:00
Portfolio Manager_Financial Services 25:54:00
Project Consultant_Project Management Consulting 28:48:00
Team Lead (EPM, MSP, SharePoint)_Consulting Services and Development 17:07:00
Change Lead_Financial Services 26:20:00
Group IT Manager_Infrastructure and Facilities Solutions 25:36:00
Project Support Office: Head_Financial Services 22:43:00
Project Manager_Financial Services 20:03:00
Senior Manager: Application Architect_Financial Services 25:41:00
Director of Business Development_National Credit Bureau 18:02:00
13
Respondents
PMI AFRICA CONFERENCE 2015
Managerial
Recommendations
Research
Objectives
&
Design
General
Recommendations
Key Findings
Where Are We?
PMI AFRICA CONFERENCE 2015
9 out of 13 Respondents do not agree that CSR principles are well incorporated
into IT Projects.
3
6
0
4
0
0
1
2
3
4
5
6
7
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q1. CSR principles are well incorporated into IT Projects.
PMI AFRICA CONFERENCE 2015
10 out of 13 Respondents feel there is a strong Business Case for CSR in IT
Projects and IT Project Management
1 1 1
8
2
0
1
2
3
4
5
6
7
8
9
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q3. There is a strong Business Case for CSR in IT Projects
and IT Project Management.
Nature of Incorporation of CSR
o Non-deliberate
incorporation
o Accidental
o Often a “by-product”
of other processes
PMI AFRICA CONFERENCE 2015
Extent of Incorporation of CSR
o Incorporation at
organizational level
influences
incorporation in IT
Project Management
PMI AFRICA CONFERENCE 2015
PMI AFRICA CONFERENCE 2015
8 out of 13 Respondents feel that there are more barriers than enablers to
the adoption of CSR in IT Projects and IT Project Managers.
2
1
2
7
1
0
1
2
3
4
5
6
7
8
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q4. The barriers for the incorporation of CSR principles into
IT Projects and IT Project Management are a lot stronger than
the enablers.
PMI AFRICA CONFERENCE 2015
8 out of 13 Respondents feel that non-conforming firms do not face any
consequences.
0
4
1
6
2
0
1
2
3
4
5
6
7
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q8. Non-conformance to CSR Has Little Impact to the Non-
conforming firms in IT Project Management.
PMI AFRICA CONFERENCE 2015
10 out 13 Respondents agree that pressure groups have little impact on
the enforcement of CSR in IT Project Management.
2
1
0
9
1
0
1
2
3
4
5
6
7
8
9
10
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q9. Pressure Groups Have Little Impact on Enforcement of
CSR in IT Project Management.
Barriers of Incorporation of CSR
o Contradictory objectives
between CSR and IT
Project Management
o Project Managers are
not well-equipped to
address CSR
requirements
o Poor governance, with
lack of consequences
for non-compliance
PMI AFRICA CONFERENCE 2015
PMI AFRICA CONFERENCE 2015
10 out of 13 Respondents feel there is a strong Business Case for CSR in IT
Projects and IT Project Management
1 1 1
8
2
0
1
2
3
4
5
6
7
8
9
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q3. There is a strong Business Case for CSR in IT Projects
and IT Project Management.
PMI AFRICA CONFERENCE 2015
The Respondents are split equally between those who agree and those who
disagree with the given statement.
0
6
1
5
1
0
1
2
3
4
5
6
7
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q13. CSR Drivers that address Value Creation, Good
Governance, and Societal Contribution are more relevant to
IT Project Management than those that address
Environmental Integrity.
PMI AFRICA CONFERENCE 2015
8 out of 13 Respondents favour use of effective legislation.
0
5
0
6
2
0
1
2
3
4
5
6
7
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q11. Effecting new stringent CSR legislation or effectively
policing the implementation of existing CSR legislation for
the IT Project Management sector would encourage
companies to comply and incorporate CSR into their Project
Management processes.
Enablers of Incorporation of CSR
o Critical mass to be
achieved when
consumers and other
stakeholders
demand sustainable
products and
services
o Use case studies of
organizations that
have successfully
incorporated CSR to
provide proof-of-
concept
PMI AFRICA CONFERENCE 2015
PMI AFRICA CONFERENCE 2015
Managerial
Recommendations
Research
Objectives
&
Design
General
Recommendations
Key Findings
Where Are We?
PMI AFRICA CONFERENCE 2015
Meerkat
Enabling Scientific Research
Project
Loon
Internet For Everyone Energy Saving
Karoo
Fully Operational Mid-2020s 5bn Watt Hours Saved!
Develop Beneficial Products
PMI AFRICA CONFERENCE 2015
PMI AFRICA CONFERENCE 2015
Quantify CSR Financial Bottom-Line
PMI AFRICA CONFERENCE 2015
Cost &
Risk
Reduction
Positioning
Highest
Weighting
CSR
Impact on
Bottom-
Line
Incentivise
Business
Models
PMI AFRICA CONFERENCE 2015
Managerial
Recommendations
Research
Objectives
&
Design
General
Recommendations
Key Findings
Where Are We?
Managerial Recommendations
Engender Good Governance
Through the Project Management
Office (PMO)
o Good Governance is well
incorporated in organizations
that have PMOs
PMI AFRICA CONFERENCE 2015
Managerial Recommendations
Insist on Experienced and Certified
IT Project Managers
o Most providers of certifications
for Project Managers, such as
the Office of Government
Commerce (OGC) for PRINCE2
certification, and the Project
Management Institute (PMI) for
the Project Management
Professional (PMP) certification,
ensure that they stay abreast of
topical areas of interest such as
CSR in IT Project Management
PMI AFRICA CONFERENCE 2015
Managerial Recommendations
Drive for an Expanded
Project Management Role
That Includes CSR
Responsibilities
o Include CSR metrics in IT
Project Managers’
responsibilities and
accountabilities
PMI AFRICA CONFERENCE 2015
Managerial Recommendations
PMI AFRICA CONFERENCE 2015
How does my project
contribute to Environmental
Integrity, Societal
Contribution, Value
Creation and Good
Governance?
Managerial Recommendations
Diversity & Equal Opportunity
o Diversity and transformation should be an
organization-wide vision which would
then be inculcated into IT Projects and IT
Project Management processes
PMI AFRICA CONFERENCE 2015
Managerial Recommendations
Include a Deliberate, Planned
Skills Development Effort on Each
Project
o Create value through up-
skilling project team
o Contributes to the resource
pool of good quality resources
that would become available
for future projects
o Seek opportunities to develop
their project team members
and rely less on using
international consultants at
the expense of developing
local skills
PMI AFRICA CONFERENCE 2015
Managerial Recommendations
PMI AFRICA CONFERENCE 2015
Deliberate
Skills
Development
Good
Governance -
PMO
Experienced &
Certified PM’s
Expanded PM
Role
How does my
project impact
CSR?
Embrace
Diversity &
Equal
Opportunity
Recommendations for Future Research
o Extend to a multi-sectoral comparison on how
CSR is being incorporated into Project
Management across the various industries
o Conduct case studies of companies that have
successfully embraced CSR principles in their IT
Projects and IT Project Management to provide
proof of concept
o Examine the role of the IT Project Managers in
ensuring the incorporation of CSR principles in the
IT Projects they manage
 Is there a Business Case to expand the IT Project Managers’ roles
to allow them to take on more responsibility and accountability
for CSR in the IT Projects they manage?
 Would it be considered fair practice to load on this extra
responsibility to the Project Managers?
PMI AFRICA CONFERENCE 2015
PMI AFRICA CONFERENCE 2015
1
Results
3
References
2
Research
Design
&
Methodology
Appendices
o To request a copy of the Detailed Report or to get
in touch, contact Shadreck Phiri on
shaddy.phiri@hotmail.com
o Mobile No. +27 83 237 1120
o LinkedIn: https://za.linkedin.com/in/shaddyphiri
o Google+: https://plus.google.com/+ShaddyPhiri
o Website: http://shadreck-phiri-mba-pmp-prince2-
advdippm-bsc-hons-bit.strikingly.com
PMI AFRICA CONFERENCE 2015
PMI AFRICA CONFERENCE 2015
Results
Appendix 1
PMI AFRICA CONFERENCE 2015
9 out of 13 Respondents do not agree that CSR principles are well incorporated
into IT Projects.
3
6
0
4
0
0
1
2
3
4
5
6
7
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q1. CSR principles are well incorporated into IT Projects.
PMI AFRICA CONFERENCE 2015
9 out of 13 Respondents do not agree that CSR principles are well incorporated
into IT Project Management.
3
6
0
4
0
0
1
2
3
4
5
6
7
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q2. CSR principles are well incorporated into IT Project
Management.
PMI AFRICA CONFERENCE 2015
10 out of 13 Respondents feel there is a strong Business Case for CSR in IT
Projects and IT Project Management
1 1 1
8
2
0
1
2
3
4
5
6
7
8
9
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q3. There is a strong Business Case for CSR in IT Projects
and IT Project Management.
PMI AFRICA CONFERENCE 2015
8 out of 13 Respondents feel that there are more barriers than enablers to
the adoption of CSR in IT Projects and IT Project Managers.
2
1
2
7
1
0
1
2
3
4
5
6
7
8
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q4. The barriers for the incorporation of CSR principles into
IT Projects and IT Project Management are a lot stronger than
the enablers.
PMI AFRICA CONFERENCE 2015
9 out of 13 agree that failed institutions undermine CSR efforts.
0
1
3
6
3
0
1
2
3
4
5
6
7
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q5. Failed institutions undermine the very principles that
CSR champions.
PMI AFRICA CONFERENCE 2015
12 out of 13 Respondents agree with the given statement.
1
0 0
7
5
0
1
2
3
4
5
6
7
8
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q6. Societal Contribution should consider issues such as
stakeholder engagement, community participation and
supply chain integrity, in addition to putting the spotlight on
the fairness of an organisation's labour practices.
PMI AFRICA CONFERENCE 2015
12 out of 13 Respondents agree with the given statement.
0 0
1
4
8
0
1
2
3
4
5
6
7
8
9
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q7. IT projects should include training, education and
development of stakeholders.
PMI AFRICA CONFERENCE 2015
8 out of 13 Respondents feel that non-conforming firms do not face any
consequences.
0
4
1
6
2
0
1
2
3
4
5
6
7
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q8. Non-conformance to CSR Has Little Impact to the Non-
conforming firms in IT Project Management.
PMI AFRICA CONFERENCE 2015
10 out 13 Respondents agree that pressure groups have little impact on
the enforcement of CSR in IT Project Management.
2
1
0
9
1
0
1
2
3
4
5
6
7
8
9
10
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q9. Pressure Groups Have Little Impact on Enforcement of
CSR in IT Project Management.
PMI AFRICA CONFERENCE 2015
11 out of 13 Respondents agree that IT Projects and IT Project
Management really do not come under scrutiny.
0
2
0
9
2
0
2
4
6
8
10
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q10. IT Projects and IT Project Management are not likely to
receive the same scrutiny as other domains would, thus
presenting a potential barrier to the incorporation of CSR
principles.
PMI AFRICA CONFERENCE 2015
8 out of 13 Respondents favour use of effective legislation.
0
5
0
6
2
0
1
2
3
4
5
6
7
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q11. Effecting new stringent CSR legislation or effectively
policing the implementation of existing CSR legislation for
the IT Project Management sector would encourage
companies to comply and incorporate CSR into their Project
Management processes.
PMI AFRICA CONFERENCE 2015
11 out 13 Respondents feel that using successful case studies would help drive
adoption of CSR.
0 0
2
7
4
0
1
2
3
4
5
6
7
8
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q12. Using Successful CSR Case Studies in IT Project
Management as Enabler of Incorporation of CSR in IT Project
Management would help drive adoption of CSR in IT Project
Management.
PMI AFRICA CONFERENCE 2015
The Respondents are split equally between those who agree and those who
disagree with the given statement.
0
6
1
5
1
0
1
2
3
4
5
6
7
Strongly
Disagree
Disagree Undecided Agree Strongly Agree
Q13. CSR Drivers that address Value Creation, Good
Governance, and Societal Contribution are more relevant to
IT Project Management than those that address
Environmental Integrity.
PMI AFRICA CONFERENCE 2015
Research
Design
&
Methodology
Appendix 2
Respondents’ Roles and Primary Business
PMI AFRICA CONFERENCE 2015
Respondent’s Role Primary Business
Tools Manager Project Management Consulting
Chief Technology Officer Broadcast Media
Programme Quality Manager Project Management Consulting
Delivery Manager IT and IT-Enabled Services
Portfolio Manager Financial Services
Project Consultant Project Management Consulting
Team Lead (EPM, MSP, SharePoint) Consulting Services and Development
Change Lead Financial Services
Group IT Manager Infrastructure and Facilities Solutions
Project Support Office: Head Financial Services
Project Manager Financial Services
Senior Manager: Application Architect Financial Services
Director of Business Development National Credit Bureau
Experience in IT
PMI AFRICA CONFERENCE 2015
11 out of 13 Respondents had experience in IT of more than 6 years,
making them a very experienced group.
1 1
4
7
0
1
2
3
4
5
6
7
8
<2 years 2-5 years 6-10 years 11 years or over
IT Experience
Experience in Project Management
PMI AFRICA CONFERENCE 2015
10 out of 13 Respondents had experience in Project Management of
more than 6 years, making them a very experienced group.
2
1
3
7
0
1
2
3
4
5
6
7
8
<2 years 2-5 years 6-10 years 11 years or over
Project Management Experience
Experience in IT Project Management
PMI AFRICA CONFERENCE 2015
9 out of 13 Respondents had experience in IT Project Management of
more than 6 years, making them a very experienced group.
2 2
1
8
0
1
2
3
4
5
6
7
8
9
<2 years 2-5 years 6-10 years 11 years or over
IT Project Management Experience
Semi-structured Interviews
PMI AFRICA CONFERENCE 2015
6.5
Hours
190 Pages of
Transcriptions
Respondent's Role and Industry Duration (Min:Sec)
Tools Manager_Project Management Consulting 49:20:00
Chief Technology Officer_Broadcast Media 41:29:00
Programme Quality Manager_Project Management Consulting 49:55:00
Delivery Manager_IT and IT-Enabled Services 28:27:00
Portfolio Manager_Financial Services 25:54:00
Project Consultant_Project Management Consulting 28:48:00
Team Lead (EPM, MSP, SharePoint)_Consulting Services and Development 17:07:00
Change Lead_Financial Services 26:20:00
Group IT Manager_Infrastructure and Facilities Solutions 25:36:00
Project Support Office: Head_Financial Services 22:43:00
Project Manager_Financial Services 20:03:00
Senior Manager: Application Architect_Financial Services 25:41:00
Director of Business Development_National Credit Bureau 18:02:00
13
Respondents
Research Limitations
o Purposive sampling with possible
sampling bias
o Absence of sampling frame
o Possible bias from patriotic
respondents
o Limited to South African companies, so
may not be generalisable
o Maturity level of organisations
assumed, not measured
PMI AFRICA CONFERENCE 2015
PMI AFRICA CONFERENCE 2015
References
Appendix 3
List of References
1. Attaran, M. (2003). Information technology and business-process redesign. Business Process Management Journal 9(4), 440-458.
2. Brent, A.C., and Labuschagne, C. (2007). An appraisal of social aspects in project and technology life cycle management in the process industry.
Management of Environmental Quality: An International Journal, 18(4), 413-426.
3. CGI Group. (2008). Emerging Trends in IT. Retrieved from www.cgi.com/files/white-papers/cgi_whpr_84_emerging_trends_in_green_it_e.pdf.
4. Creswell, J. W. (2003). Research Design: Qualitative, Quantitative, and Mixed Methods Approaches, Second Edition. London: Sage Publications.
5. Creswell, J. W. (2014). Research Design: Qualitative, Quantitative, and Mixed Methods Approaches, International Student Edition. London: Sage
Publications.
6. Elkington, J. (2008). Corporate Sustainability. In Visser, W., Matten, D., Pohl, M., Tolhurst, N. The A to Z of Corporate Social Responsibility (p. 132-139). USA:
Wiley.
7. Elkington, J. (1994). Towards the Sustainable Corporation: Win-Win-Win Business Strategies for Sustainable Development. Califonia Management Review,
36(2), 90-100.
8. Kurucz, E. C., Colbert, B.A., and Wheeler, D. (2008). The Business Case for Corporate Social Responsibility. In Crane, A., McWilliams, A., Matten, D., Moon,
J., and Seigel, D. (Eds.), The Oxford Handbook on Corporate Social Responsibility (pp. 8-112). Oxford: Oxford University Press.
9. Labuschagne, C., and Brent, A. C. (2005). Sustainable Project Life Cycle Management: the need to integrate life cycles in the manufacturing sector.
International Journal of Project Management, 23(2), 159-168.
10. Lim, J., Stratopoulos, T.S., and Wirjanto, T.S. (2013). Sustainability of a Firm’s Reputation for Information Technology Capability: The Role of Senior IT
Executives. Journal of Management Information Systems, 30(1), 57-95.
11. Melville, N.P., and Ross, S.M. (2010). Information Systems Innovation For Environmental Sustainability. MIS Quarterly Review, 34(1), 1-21.
12. Project Management Institute (2008). A Guide to the Project Management Body of Knowledge (PMBOK Guide) - Fourth Edition. Newton Square: Project
Management Institute, Inc.
13. Project Management Institute. (2011). The Bottom Line on Sustainability. Retrieved from www.pmi.ord/business-solutions/~/media/PDF/Business-
Solutions/The%20Bottom%20Line%20on%20Sustainability_FINAL.ashx.
14. Rahman, N., and Akhter, S. (2010). Incorporating Sustainability Into Information Technology Management. International Journal of Technology
Management & Sustainable Development, 9(2), 95-111.
15. Saunders, M., and Lewis, P. (2012). Doing Research in Business & Management. United Kingdom: Pearson.
16. Shen, L., Wu, Y., and Zhang, X. (2011). Key Assessment Indicators for the Sustainability of Infrastructure Projects. Journal of Construction Engineering and
Management, 137(6).
17. Silvius, A.J.G., Schipper, R., and Nedeski, S. (2012). "Sustainability in Project Management: Reality Bites." 26th IPMA World Congress. Elsevier Ltd., 1-11.
18. Silvius, G., Schipper, R., Planko, J., van den Brink, J., and Kohler, A. (2012). Sustainability in Project Management. Gower Publishing Limited: England.
19. Valdes-Vasquez, R., and Klotz, L. E. (2013). Social sustainability considerations during planning and design: Framework of processes for construction
projects. Journal of Construction Engineering & Management, 139(1), 80-89. doi: 10.1061/ (ASCE) CO.1943-7862.0000566.
20. Visser, W. (2013). Corporate Sustainability & Responsibility. Kaleidoscope Futures Ltd.: London.
21. Watson, R.T., Boudreau, M.-C., and Chen, A.J. (2010). Information systems and Environmentally Sustainable Development: Energy Informatics and New
Directions for the IS Community. MIS Quarterly, 34(1), 23-38.
22. World Commission on Environment and Development (1987). Chapter 2: Towards Sustainable Development. In World Commission on Environment and
Development, Our Common Future (pp. 41-59). Oxford University Press: Great Britain.
PMI AFRICA CONFERENCE 2015

More Related Content

What's hot

The UN Global Compact-Accenture CEO Study on Sustainability 2013
The UN Global Compact-Accenture CEO Study on Sustainability 2013The UN Global Compact-Accenture CEO Study on Sustainability 2013
The UN Global Compact-Accenture CEO Study on Sustainability 2013Sustainable Brands
 
A Peek Into GE's Open Innovation Approach
A Peek Into GE's Open Innovation ApproachA Peek Into GE's Open Innovation Approach
A Peek Into GE's Open Innovation ApproachBigHeads Network
 
Аліна Піддубна - "The future of project management: РМ у 2030" Kharkiv PMDay ...
Аліна Піддубна - "The future of project management: РМ у 2030" Kharkiv PMDay ...Аліна Піддубна - "The future of project management: РМ у 2030" Kharkiv PMDay ...
Аліна Піддубна - "The future of project management: РМ у 2030" Kharkiv PMDay ...Lviv Startup Club
 
Remote Leadership: Rocking the Digital Workplace
Remote Leadership: Rocking the Digital WorkplaceRemote Leadership: Rocking the Digital Workplace
Remote Leadership: Rocking the Digital WorkplaceCynthia Clay
 
Preparing New Leaders for Frontline Management
Preparing New Leaders for Frontline ManagementPreparing New Leaders for Frontline Management
Preparing New Leaders for Frontline ManagementCynthia Clay
 
Differences Between Project and Product Management - H. Del Castillo, AIPMM -...
Differences Between Project and Product Management - H. Del Castillo, AIPMM -...Differences Between Project and Product Management - H. Del Castillo, AIPMM -...
Differences Between Project and Product Management - H. Del Castillo, AIPMM -...Hector Del Castillo, CPM, CPMM
 
Workshop: Strategies and Tactics To Improve Your Broken Search Experience (Gr...
Workshop: Strategies and Tactics To Improve Your Broken Search Experience (Gr...Workshop: Strategies and Tactics To Improve Your Broken Search Experience (Gr...
Workshop: Strategies and Tactics To Improve Your Broken Search Experience (Gr...Digital Workplace Experience
 
Rocking the Digital Workplace
Rocking the Digital Workplace Rocking the Digital Workplace
Rocking the Digital Workplace Cynthia Clay
 
A White Paper by SMART: achieving broad deployment of collaboration technologies
A White Paper by SMART: achieving broad deployment of collaboration technologiesA White Paper by SMART: achieving broad deployment of collaboration technologies
A White Paper by SMART: achieving broad deployment of collaboration technologiesSteljes
 
Are project tracking tools helping or complicating Continuous Improvement Pro...
Are project tracking tools helping or complicating Continuous Improvement Pro...Are project tracking tools helping or complicating Continuous Improvement Pro...
Are project tracking tools helping or complicating Continuous Improvement Pro...Kubilay Balci
 
4th Wheel Profile
4th Wheel Profile4th Wheel Profile
4th Wheel Profile4thWheel
 
TDI Virtual events and webinars – listening and innovating
TDI Virtual events and webinars – listening and innovatingTDI Virtual events and webinars – listening and innovating
TDI Virtual events and webinars – listening and innovatingThe Digital Insurer
 
Government Innovation Country Specific Report - Germany
Government Innovation Country Specific Report - GermanyGovernment Innovation Country Specific Report - Germany
Government Innovation Country Specific Report - Germanyaccenture
 
Preparing New Leaders for Frontline Management
Preparing New Leaders for Frontline ManagementPreparing New Leaders for Frontline Management
Preparing New Leaders for Frontline ManagementCynthia Clay
 
Preparing New Leaders for Frontline Management
Preparing New Leaders for Frontline ManagementPreparing New Leaders for Frontline Management
Preparing New Leaders for Frontline ManagementCynthia Clay
 
Empowering a High-Performance Organization
Empowering a High-Performance OrganizationEmpowering a High-Performance Organization
Empowering a High-Performance OrganizationCisco Canada
 
How to Overcome the Innovation and Strategic Business Alignment Disconnect
How to Overcome the Innovation and Strategic Business Alignment DisconnectHow to Overcome the Innovation and Strategic Business Alignment Disconnect
How to Overcome the Innovation and Strategic Business Alignment DisconnectSopheon
 
Five Common Mistakes of Remote Leaders
Five Common Mistakes of Remote LeadersFive Common Mistakes of Remote Leaders
Five Common Mistakes of Remote LeadersCynthia Clay
 

What's hot (20)

The UN Global Compact-Accenture CEO Study on Sustainability 2013
The UN Global Compact-Accenture CEO Study on Sustainability 2013The UN Global Compact-Accenture CEO Study on Sustainability 2013
The UN Global Compact-Accenture CEO Study on Sustainability 2013
 
A Peek Into GE's Open Innovation Approach
A Peek Into GE's Open Innovation ApproachA Peek Into GE's Open Innovation Approach
A Peek Into GE's Open Innovation Approach
 
Аліна Піддубна - "The future of project management: РМ у 2030" Kharkiv PMDay ...
Аліна Піддубна - "The future of project management: РМ у 2030" Kharkiv PMDay ...Аліна Піддубна - "The future of project management: РМ у 2030" Kharkiv PMDay ...
Аліна Піддубна - "The future of project management: РМ у 2030" Kharkiv PMDay ...
 
Remote Leadership: Rocking the Digital Workplace
Remote Leadership: Rocking the Digital WorkplaceRemote Leadership: Rocking the Digital Workplace
Remote Leadership: Rocking the Digital Workplace
 
Preparing New Leaders for Frontline Management
Preparing New Leaders for Frontline ManagementPreparing New Leaders for Frontline Management
Preparing New Leaders for Frontline Management
 
Digital disruption – dive in to thrive
Digital disruption – dive in to thriveDigital disruption – dive in to thrive
Digital disruption – dive in to thrive
 
Differences Between Project and Product Management - H. Del Castillo, AIPMM -...
Differences Between Project and Product Management - H. Del Castillo, AIPMM -...Differences Between Project and Product Management - H. Del Castillo, AIPMM -...
Differences Between Project and Product Management - H. Del Castillo, AIPMM -...
 
Value-driven business in the Clowd
Value-driven business in the ClowdValue-driven business in the Clowd
Value-driven business in the Clowd
 
Workshop: Strategies and Tactics To Improve Your Broken Search Experience (Gr...
Workshop: Strategies and Tactics To Improve Your Broken Search Experience (Gr...Workshop: Strategies and Tactics To Improve Your Broken Search Experience (Gr...
Workshop: Strategies and Tactics To Improve Your Broken Search Experience (Gr...
 
Rocking the Digital Workplace
Rocking the Digital Workplace Rocking the Digital Workplace
Rocking the Digital Workplace
 
A White Paper by SMART: achieving broad deployment of collaboration technologies
A White Paper by SMART: achieving broad deployment of collaboration technologiesA White Paper by SMART: achieving broad deployment of collaboration technologies
A White Paper by SMART: achieving broad deployment of collaboration technologies
 
Are project tracking tools helping or complicating Continuous Improvement Pro...
Are project tracking tools helping or complicating Continuous Improvement Pro...Are project tracking tools helping or complicating Continuous Improvement Pro...
Are project tracking tools helping or complicating Continuous Improvement Pro...
 
4th Wheel Profile
4th Wheel Profile4th Wheel Profile
4th Wheel Profile
 
TDI Virtual events and webinars – listening and innovating
TDI Virtual events and webinars – listening and innovatingTDI Virtual events and webinars – listening and innovating
TDI Virtual events and webinars – listening and innovating
 
Government Innovation Country Specific Report - Germany
Government Innovation Country Specific Report - GermanyGovernment Innovation Country Specific Report - Germany
Government Innovation Country Specific Report - Germany
 
Preparing New Leaders for Frontline Management
Preparing New Leaders for Frontline ManagementPreparing New Leaders for Frontline Management
Preparing New Leaders for Frontline Management
 
Preparing New Leaders for Frontline Management
Preparing New Leaders for Frontline ManagementPreparing New Leaders for Frontline Management
Preparing New Leaders for Frontline Management
 
Empowering a High-Performance Organization
Empowering a High-Performance OrganizationEmpowering a High-Performance Organization
Empowering a High-Performance Organization
 
How to Overcome the Innovation and Strategic Business Alignment Disconnect
How to Overcome the Innovation and Strategic Business Alignment DisconnectHow to Overcome the Innovation and Strategic Business Alignment Disconnect
How to Overcome the Innovation and Strategic Business Alignment Disconnect
 
Five Common Mistakes of Remote Leaders
Five Common Mistakes of Remote LeadersFive Common Mistakes of Remote Leaders
Five Common Mistakes of Remote Leaders
 

Viewers also liked

CSR FINAL PROJECT ABOUT CSR PRACTICES OF DIFFERENT COMAPNIES
CSR FINAL PROJECT ABOUT CSR PRACTICES OF DIFFERENT COMAPNIESCSR FINAL PROJECT ABOUT CSR PRACTICES OF DIFFERENT COMAPNIES
CSR FINAL PROJECT ABOUT CSR PRACTICES OF DIFFERENT COMAPNIESHafiz Nawaz
 
CSR ACTIVITY BY LARSEN & TOUBRO
CSR ACTIVITY BY LARSEN & TOUBROCSR ACTIVITY BY LARSEN & TOUBRO
CSR ACTIVITY BY LARSEN & TOUBROBidyut Bikash
 
Audit on compay- company audit
Audit on compay- company auditAudit on compay- company audit
Audit on compay- company auditpillai college
 
LinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedLinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedSlideShare
 

Viewers also liked (6)

DOWNLOAD Brochure For MBA in Corporate Social Responsibility, PhD in CSR
DOWNLOAD Brochure For MBA in Corporate Social Responsibility, PhD in CSRDOWNLOAD Brochure For MBA in Corporate Social Responsibility, PhD in CSR
DOWNLOAD Brochure For MBA in Corporate Social Responsibility, PhD in CSR
 
CSR FINAL PROJECT ABOUT CSR PRACTICES OF DIFFERENT COMAPNIES
CSR FINAL PROJECT ABOUT CSR PRACTICES OF DIFFERENT COMAPNIESCSR FINAL PROJECT ABOUT CSR PRACTICES OF DIFFERENT COMAPNIES
CSR FINAL PROJECT ABOUT CSR PRACTICES OF DIFFERENT COMAPNIES
 
CSR ACTIVITY BY LARSEN & TOUBRO
CSR ACTIVITY BY LARSEN & TOUBROCSR ACTIVITY BY LARSEN & TOUBRO
CSR ACTIVITY BY LARSEN & TOUBRO
 
Company Auditor ppt
Company Auditor pptCompany Auditor ppt
Company Auditor ppt
 
Audit on compay- company audit
Audit on compay- company auditAudit on compay- company audit
Audit on compay- company audit
 
LinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedLinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-Presented
 

Similar to CSR in ITProject Management - Why Bother?

201501 Technology CIO Survey 2014 - Deloitte
201501 Technology CIO Survey 2014 - Deloitte201501 Technology CIO Survey 2014 - Deloitte
201501 Technology CIO Survey 2014 - DeloitteFrancisco Calzado
 
Being digital: Fast-forward to the right digital strategy
Being digital: Fast-forward to the right digital strategyBeing digital: Fast-forward to the right digital strategy
Being digital: Fast-forward to the right digital strategyaccenture
 
What Is Oracle Primavera Unifier
What Is Oracle Primavera UnifierWhat Is Oracle Primavera Unifier
What Is Oracle Primavera UnifierJessica Tanner
 
Leveraging Best Practice Methods in an Age of Digital Transformation Belfast ...
Leveraging Best Practice Methods in an Age of Digital Transformation Belfast ...Leveraging Best Practice Methods in an Age of Digital Transformation Belfast ...
Leveraging Best Practice Methods in an Age of Digital Transformation Belfast ...Google
 
Governance and Management of Enterprise IT with COBIT 5 Framework
Governance and Management of Enterprise IT with COBIT 5 FrameworkGovernance and Management of Enterprise IT with COBIT 5 Framework
Governance and Management of Enterprise IT with COBIT 5 FrameworkGoutama Bachtiar
 
Digital transformation master class for CXOs
Digital transformation master class for CXOsDigital transformation master class for CXOs
Digital transformation master class for CXOsSandeep Raut
 
Fujitsu PACT financial services 2018
Fujitsu PACT financial services 2018Fujitsu PACT financial services 2018
Fujitsu PACT financial services 2018Luis Asenjo Perez
 
كيف يمكن لمنظمات المجتمع المدني ومؤسسات القطاع العام معالجة تحديات التحول الر...
كيف يمكن لمنظمات المجتمع المدني ومؤسسات القطاع العام معالجة تحديات التحول الر...كيف يمكن لمنظمات المجتمع المدني ومؤسسات القطاع العام معالجة تحديات التحول الر...
كيف يمكن لمنظمات المجتمع المدني ومؤسسات القطاع العام معالجة تحديات التحول الر...Charity Innovation
 
IDC Nordics - Directions 2015 Digital transformation Services and sourcing
IDC Nordics - Directions 2015 Digital transformation Services and sourcingIDC Nordics - Directions 2015 Digital transformation Services and sourcing
IDC Nordics - Directions 2015 Digital transformation Services and sourcingJohan Hallberg
 
Governance: The key to effecting successful Digital Transformation
Governance: The key to effecting successful Digital TransformationGovernance: The key to effecting successful Digital Transformation
Governance: The key to effecting successful Digital TransformationGuy Pearce
 
Aligning Business and Technology for Competitive Advantage
Aligning Business and Technology for Competitive AdvantageAligning Business and Technology for Competitive Advantage
Aligning Business and Technology for Competitive AdvantageDijitle
 
Digital transformation new zealand presentation 13 march 2018 final
Digital transformation new zealand presentation   13 march 2018 finalDigital transformation new zealand presentation   13 march 2018 final
Digital transformation new zealand presentation 13 march 2018 finalClaudia Howlett
 
Digital Transformation in New Zealand
Digital Transformation in New Zealand Digital Transformation in New Zealand
Digital Transformation in New Zealand Barrie Sheers
 
Leveraging Design Thinking for Value Enhancement of Digital Transformation
Leveraging Design Thinking for Value Enhancement of  Digital Transformation Leveraging Design Thinking for Value Enhancement of  Digital Transformation
Leveraging Design Thinking for Value Enhancement of Digital Transformation Innomantra
 
FuturePMO 2018 - Michael Cooch PwC - The Future of Work - A Closer Look at Ar...
FuturePMO 2018 - Michael Cooch PwC - The Future of Work - A Closer Look at Ar...FuturePMO 2018 - Michael Cooch PwC - The Future of Work - A Closer Look at Ar...
FuturePMO 2018 - Michael Cooch PwC - The Future of Work - A Closer Look at Ar...Wellingtone
 
Change Management Fundamentals - 4/12/19
Change Management Fundamentals - 4/12/19Change Management Fundamentals - 4/12/19
Change Management Fundamentals - 4/12/19MiaGarcia19
 
Project Governance - Past, Present and Future the Key to Success slides.pdf
Project Governance - Past, Present and Future the Key to Success slides.pdfProject Governance - Past, Present and Future the Key to Success slides.pdf
Project Governance - Past, Present and Future the Key to Success slides.pdfAssociation for Project Management
 
Successful Digital Transformation starts with a well defined Strategy
Successful Digital Transformation starts with a well defined StrategySuccessful Digital Transformation starts with a well defined Strategy
Successful Digital Transformation starts with a well defined StrategyGlen Alleman
 

Similar to CSR in ITProject Management - Why Bother? (20)

201501 Technology CIO Survey 2014 - Deloitte
201501 Technology CIO Survey 2014 - Deloitte201501 Technology CIO Survey 2014 - Deloitte
201501 Technology CIO Survey 2014 - Deloitte
 
Lise Hagen IDC
Lise Hagen   IDCLise Hagen   IDC
Lise Hagen IDC
 
Being digital: Fast-forward to the right digital strategy
Being digital: Fast-forward to the right digital strategyBeing digital: Fast-forward to the right digital strategy
Being digital: Fast-forward to the right digital strategy
 
What Is Oracle Primavera Unifier
What Is Oracle Primavera UnifierWhat Is Oracle Primavera Unifier
What Is Oracle Primavera Unifier
 
Leveraging Best Practice Methods in an Age of Digital Transformation Belfast ...
Leveraging Best Practice Methods in an Age of Digital Transformation Belfast ...Leveraging Best Practice Methods in an Age of Digital Transformation Belfast ...
Leveraging Best Practice Methods in an Age of Digital Transformation Belfast ...
 
Governance and Management of Enterprise IT with COBIT 5 Framework
Governance and Management of Enterprise IT with COBIT 5 FrameworkGovernance and Management of Enterprise IT with COBIT 5 Framework
Governance and Management of Enterprise IT with COBIT 5 Framework
 
Digital transformation master class for CXOs
Digital transformation master class for CXOsDigital transformation master class for CXOs
Digital transformation master class for CXOs
 
Fujitsu PACT financial services 2018
Fujitsu PACT financial services 2018Fujitsu PACT financial services 2018
Fujitsu PACT financial services 2018
 
كيف يمكن لمنظمات المجتمع المدني ومؤسسات القطاع العام معالجة تحديات التحول الر...
كيف يمكن لمنظمات المجتمع المدني ومؤسسات القطاع العام معالجة تحديات التحول الر...كيف يمكن لمنظمات المجتمع المدني ومؤسسات القطاع العام معالجة تحديات التحول الر...
كيف يمكن لمنظمات المجتمع المدني ومؤسسات القطاع العام معالجة تحديات التحول الر...
 
IDC Nordics - Directions 2015 Digital transformation Services and sourcing
IDC Nordics - Directions 2015 Digital transformation Services and sourcingIDC Nordics - Directions 2015 Digital transformation Services and sourcing
IDC Nordics - Directions 2015 Digital transformation Services and sourcing
 
Governance: The key to effecting successful Digital Transformation
Governance: The key to effecting successful Digital TransformationGovernance: The key to effecting successful Digital Transformation
Governance: The key to effecting successful Digital Transformation
 
Aligning Business and Technology for Competitive Advantage
Aligning Business and Technology for Competitive AdvantageAligning Business and Technology for Competitive Advantage
Aligning Business and Technology for Competitive Advantage
 
Digital transformation new zealand presentation 13 march 2018 final
Digital transformation new zealand presentation   13 march 2018 finalDigital transformation new zealand presentation   13 march 2018 final
Digital transformation new zealand presentation 13 march 2018 final
 
Digital Transformation in New Zealand
Digital Transformation in New Zealand Digital Transformation in New Zealand
Digital Transformation in New Zealand
 
Digital decodedv1.3
Digital decodedv1.3Digital decodedv1.3
Digital decodedv1.3
 
Leveraging Design Thinking for Value Enhancement of Digital Transformation
Leveraging Design Thinking for Value Enhancement of  Digital Transformation Leveraging Design Thinking for Value Enhancement of  Digital Transformation
Leveraging Design Thinking for Value Enhancement of Digital Transformation
 
FuturePMO 2018 - Michael Cooch PwC - The Future of Work - A Closer Look at Ar...
FuturePMO 2018 - Michael Cooch PwC - The Future of Work - A Closer Look at Ar...FuturePMO 2018 - Michael Cooch PwC - The Future of Work - A Closer Look at Ar...
FuturePMO 2018 - Michael Cooch PwC - The Future of Work - A Closer Look at Ar...
 
Change Management Fundamentals - 4/12/19
Change Management Fundamentals - 4/12/19Change Management Fundamentals - 4/12/19
Change Management Fundamentals - 4/12/19
 
Project Governance - Past, Present and Future the Key to Success slides.pdf
Project Governance - Past, Present and Future the Key to Success slides.pdfProject Governance - Past, Present and Future the Key to Success slides.pdf
Project Governance - Past, Present and Future the Key to Success slides.pdf
 
Successful Digital Transformation starts with a well defined Strategy
Successful Digital Transformation starts with a well defined StrategySuccessful Digital Transformation starts with a well defined Strategy
Successful Digital Transformation starts with a well defined Strategy
 

Recently uploaded

Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skillskristinalimarenko7
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdffillmonipdc
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 

Recently uploaded (18)

Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skills
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdf
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 

CSR in ITProject Management - Why Bother?

  • 1. Incorporating Corporate Sustainability and Responsibility (CSR) in Project Management for the Information Technology (IT) Sector: Barriers and Enablers A study conducted by Shadreck Phiri from May to Nov 2014, to satisfy part of the requirements for the MBA offered by the University of Pretoria’s Gordon Institute of Business Science (GIBS) Supervised by Dr. Wayne Visser PMI AFRICA CONFERENCE 2015
  • 2. PMI AFRICA CONFERENCE 2015 Managerial Recommendations Research Objectives & Design General Recommendations Key Findings
  • 3. PMI AFRICA CONFERENCE 2015 Research Objectives & Design
  • 4. Primary Research Objective Incorporation of CSR? What CSR means? PMI AFRICA CONFERENCE 2015 Society Economy Environment
  • 5. Secondary Research Objectives Business Case o Determine what the Business Case for CSR? Barriers o CSR incorporation? Enablers o What can be done to further improve the incorporation of CSR? PMI AFRICA CONFERENCE 2015
  • 6. CSR Principles PMI AFRICA CONFERENCE 2015 personal values & ethicstransparency & accountability consuming income, NOT capital local & global orientation both short-term & long-term orientation balancing social, environmental & economic interests
  • 7. DNA Model of CSR Value Creation Good Governance Societal Contribution Environmental Integrity Beneficial Products Inclusive Business Institutional Effectiveness Ethical Effectiveness Stakeholder Engagement Zero-Waste 100% Renewable Energy Fair Labour Practices Community Participation
  • 8. Research Propositions o Little impact of the non-conformance o Pressure groups - impact on enforcement of CSR o Intangible IT products o CSR legislation as enabler of incorporation o Successful CSR case studies o CSR drivers that address value creation, good governance, and societal contribution PMI AFRICA CONFERENCE 2015
  • 9. Semi-structured Interviews PMI AFRICA CONFERENCE 2015 6.5 Hours 190 Pages of Transcriptions Respondent's Role and Industry Duration (Min:Sec) Tools Manager_Project Management Consulting 49:20:00 Chief Technology Officer_Broadcast Media 41:29:00 Programme Quality Manager_Project Management Consulting 49:55:00 Delivery Manager_IT and IT-Enabled Services 28:27:00 Portfolio Manager_Financial Services 25:54:00 Project Consultant_Project Management Consulting 28:48:00 Team Lead (EPM, MSP, SharePoint)_Consulting Services and Development 17:07:00 Change Lead_Financial Services 26:20:00 Group IT Manager_Infrastructure and Facilities Solutions 25:36:00 Project Support Office: Head_Financial Services 22:43:00 Project Manager_Financial Services 20:03:00 Senior Manager: Application Architect_Financial Services 25:41:00 Director of Business Development_National Credit Bureau 18:02:00 13 Respondents
  • 10. PMI AFRICA CONFERENCE 2015 Managerial Recommendations Research Objectives & Design General Recommendations Key Findings Where Are We?
  • 11. PMI AFRICA CONFERENCE 2015 9 out of 13 Respondents do not agree that CSR principles are well incorporated into IT Projects. 3 6 0 4 0 0 1 2 3 4 5 6 7 Strongly Disagree Disagree Undecided Agree Strongly Agree Q1. CSR principles are well incorporated into IT Projects.
  • 12. PMI AFRICA CONFERENCE 2015 10 out of 13 Respondents feel there is a strong Business Case for CSR in IT Projects and IT Project Management 1 1 1 8 2 0 1 2 3 4 5 6 7 8 9 Strongly Disagree Disagree Undecided Agree Strongly Agree Q3. There is a strong Business Case for CSR in IT Projects and IT Project Management.
  • 13. Nature of Incorporation of CSR o Non-deliberate incorporation o Accidental o Often a “by-product” of other processes PMI AFRICA CONFERENCE 2015
  • 14. Extent of Incorporation of CSR o Incorporation at organizational level influences incorporation in IT Project Management PMI AFRICA CONFERENCE 2015
  • 15. PMI AFRICA CONFERENCE 2015 8 out of 13 Respondents feel that there are more barriers than enablers to the adoption of CSR in IT Projects and IT Project Managers. 2 1 2 7 1 0 1 2 3 4 5 6 7 8 Strongly Disagree Disagree Undecided Agree Strongly Agree Q4. The barriers for the incorporation of CSR principles into IT Projects and IT Project Management are a lot stronger than the enablers.
  • 16. PMI AFRICA CONFERENCE 2015 8 out of 13 Respondents feel that non-conforming firms do not face any consequences. 0 4 1 6 2 0 1 2 3 4 5 6 7 Strongly Disagree Disagree Undecided Agree Strongly Agree Q8. Non-conformance to CSR Has Little Impact to the Non- conforming firms in IT Project Management.
  • 17. PMI AFRICA CONFERENCE 2015 10 out 13 Respondents agree that pressure groups have little impact on the enforcement of CSR in IT Project Management. 2 1 0 9 1 0 1 2 3 4 5 6 7 8 9 10 Strongly Disagree Disagree Undecided Agree Strongly Agree Q9. Pressure Groups Have Little Impact on Enforcement of CSR in IT Project Management.
  • 18. Barriers of Incorporation of CSR o Contradictory objectives between CSR and IT Project Management o Project Managers are not well-equipped to address CSR requirements o Poor governance, with lack of consequences for non-compliance PMI AFRICA CONFERENCE 2015
  • 19. PMI AFRICA CONFERENCE 2015 10 out of 13 Respondents feel there is a strong Business Case for CSR in IT Projects and IT Project Management 1 1 1 8 2 0 1 2 3 4 5 6 7 8 9 Strongly Disagree Disagree Undecided Agree Strongly Agree Q3. There is a strong Business Case for CSR in IT Projects and IT Project Management.
  • 20. PMI AFRICA CONFERENCE 2015 The Respondents are split equally between those who agree and those who disagree with the given statement. 0 6 1 5 1 0 1 2 3 4 5 6 7 Strongly Disagree Disagree Undecided Agree Strongly Agree Q13. CSR Drivers that address Value Creation, Good Governance, and Societal Contribution are more relevant to IT Project Management than those that address Environmental Integrity.
  • 21. PMI AFRICA CONFERENCE 2015 8 out of 13 Respondents favour use of effective legislation. 0 5 0 6 2 0 1 2 3 4 5 6 7 Strongly Disagree Disagree Undecided Agree Strongly Agree Q11. Effecting new stringent CSR legislation or effectively policing the implementation of existing CSR legislation for the IT Project Management sector would encourage companies to comply and incorporate CSR into their Project Management processes.
  • 22. Enablers of Incorporation of CSR o Critical mass to be achieved when consumers and other stakeholders demand sustainable products and services o Use case studies of organizations that have successfully incorporated CSR to provide proof-of- concept PMI AFRICA CONFERENCE 2015
  • 23. PMI AFRICA CONFERENCE 2015 Managerial Recommendations Research Objectives & Design General Recommendations Key Findings Where Are We?
  • 24. PMI AFRICA CONFERENCE 2015 Meerkat Enabling Scientific Research Project Loon Internet For Everyone Energy Saving Karoo Fully Operational Mid-2020s 5bn Watt Hours Saved! Develop Beneficial Products
  • 27. Quantify CSR Financial Bottom-Line PMI AFRICA CONFERENCE 2015 Cost & Risk Reduction Positioning Highest Weighting CSR Impact on Bottom- Line Incentivise Business Models
  • 28. PMI AFRICA CONFERENCE 2015 Managerial Recommendations Research Objectives & Design General Recommendations Key Findings Where Are We?
  • 29. Managerial Recommendations Engender Good Governance Through the Project Management Office (PMO) o Good Governance is well incorporated in organizations that have PMOs PMI AFRICA CONFERENCE 2015
  • 30. Managerial Recommendations Insist on Experienced and Certified IT Project Managers o Most providers of certifications for Project Managers, such as the Office of Government Commerce (OGC) for PRINCE2 certification, and the Project Management Institute (PMI) for the Project Management Professional (PMP) certification, ensure that they stay abreast of topical areas of interest such as CSR in IT Project Management PMI AFRICA CONFERENCE 2015
  • 31. Managerial Recommendations Drive for an Expanded Project Management Role That Includes CSR Responsibilities o Include CSR metrics in IT Project Managers’ responsibilities and accountabilities PMI AFRICA CONFERENCE 2015
  • 32. Managerial Recommendations PMI AFRICA CONFERENCE 2015 How does my project contribute to Environmental Integrity, Societal Contribution, Value Creation and Good Governance?
  • 33. Managerial Recommendations Diversity & Equal Opportunity o Diversity and transformation should be an organization-wide vision which would then be inculcated into IT Projects and IT Project Management processes PMI AFRICA CONFERENCE 2015
  • 34. Managerial Recommendations Include a Deliberate, Planned Skills Development Effort on Each Project o Create value through up- skilling project team o Contributes to the resource pool of good quality resources that would become available for future projects o Seek opportunities to develop their project team members and rely less on using international consultants at the expense of developing local skills PMI AFRICA CONFERENCE 2015
  • 35. Managerial Recommendations PMI AFRICA CONFERENCE 2015 Deliberate Skills Development Good Governance - PMO Experienced & Certified PM’s Expanded PM Role How does my project impact CSR? Embrace Diversity & Equal Opportunity
  • 36. Recommendations for Future Research o Extend to a multi-sectoral comparison on how CSR is being incorporated into Project Management across the various industries o Conduct case studies of companies that have successfully embraced CSR principles in their IT Projects and IT Project Management to provide proof of concept o Examine the role of the IT Project Managers in ensuring the incorporation of CSR principles in the IT Projects they manage  Is there a Business Case to expand the IT Project Managers’ roles to allow them to take on more responsibility and accountability for CSR in the IT Projects they manage?  Would it be considered fair practice to load on this extra responsibility to the Project Managers? PMI AFRICA CONFERENCE 2015
  • 37. PMI AFRICA CONFERENCE 2015 1 Results 3 References 2 Research Design & Methodology Appendices
  • 38. o To request a copy of the Detailed Report or to get in touch, contact Shadreck Phiri on shaddy.phiri@hotmail.com o Mobile No. +27 83 237 1120 o LinkedIn: https://za.linkedin.com/in/shaddyphiri o Google+: https://plus.google.com/+ShaddyPhiri o Website: http://shadreck-phiri-mba-pmp-prince2- advdippm-bsc-hons-bit.strikingly.com PMI AFRICA CONFERENCE 2015
  • 39. PMI AFRICA CONFERENCE 2015 Results Appendix 1
  • 40. PMI AFRICA CONFERENCE 2015 9 out of 13 Respondents do not agree that CSR principles are well incorporated into IT Projects. 3 6 0 4 0 0 1 2 3 4 5 6 7 Strongly Disagree Disagree Undecided Agree Strongly Agree Q1. CSR principles are well incorporated into IT Projects.
  • 41. PMI AFRICA CONFERENCE 2015 9 out of 13 Respondents do not agree that CSR principles are well incorporated into IT Project Management. 3 6 0 4 0 0 1 2 3 4 5 6 7 Strongly Disagree Disagree Undecided Agree Strongly Agree Q2. CSR principles are well incorporated into IT Project Management.
  • 42. PMI AFRICA CONFERENCE 2015 10 out of 13 Respondents feel there is a strong Business Case for CSR in IT Projects and IT Project Management 1 1 1 8 2 0 1 2 3 4 5 6 7 8 9 Strongly Disagree Disagree Undecided Agree Strongly Agree Q3. There is a strong Business Case for CSR in IT Projects and IT Project Management.
  • 43. PMI AFRICA CONFERENCE 2015 8 out of 13 Respondents feel that there are more barriers than enablers to the adoption of CSR in IT Projects and IT Project Managers. 2 1 2 7 1 0 1 2 3 4 5 6 7 8 Strongly Disagree Disagree Undecided Agree Strongly Agree Q4. The barriers for the incorporation of CSR principles into IT Projects and IT Project Management are a lot stronger than the enablers.
  • 44. PMI AFRICA CONFERENCE 2015 9 out of 13 agree that failed institutions undermine CSR efforts. 0 1 3 6 3 0 1 2 3 4 5 6 7 Strongly Disagree Disagree Undecided Agree Strongly Agree Q5. Failed institutions undermine the very principles that CSR champions.
  • 45. PMI AFRICA CONFERENCE 2015 12 out of 13 Respondents agree with the given statement. 1 0 0 7 5 0 1 2 3 4 5 6 7 8 Strongly Disagree Disagree Undecided Agree Strongly Agree Q6. Societal Contribution should consider issues such as stakeholder engagement, community participation and supply chain integrity, in addition to putting the spotlight on the fairness of an organisation's labour practices.
  • 46. PMI AFRICA CONFERENCE 2015 12 out of 13 Respondents agree with the given statement. 0 0 1 4 8 0 1 2 3 4 5 6 7 8 9 Strongly Disagree Disagree Undecided Agree Strongly Agree Q7. IT projects should include training, education and development of stakeholders.
  • 47. PMI AFRICA CONFERENCE 2015 8 out of 13 Respondents feel that non-conforming firms do not face any consequences. 0 4 1 6 2 0 1 2 3 4 5 6 7 Strongly Disagree Disagree Undecided Agree Strongly Agree Q8. Non-conformance to CSR Has Little Impact to the Non- conforming firms in IT Project Management.
  • 48. PMI AFRICA CONFERENCE 2015 10 out 13 Respondents agree that pressure groups have little impact on the enforcement of CSR in IT Project Management. 2 1 0 9 1 0 1 2 3 4 5 6 7 8 9 10 Strongly Disagree Disagree Undecided Agree Strongly Agree Q9. Pressure Groups Have Little Impact on Enforcement of CSR in IT Project Management.
  • 49. PMI AFRICA CONFERENCE 2015 11 out of 13 Respondents agree that IT Projects and IT Project Management really do not come under scrutiny. 0 2 0 9 2 0 2 4 6 8 10 Strongly Disagree Disagree Undecided Agree Strongly Agree Q10. IT Projects and IT Project Management are not likely to receive the same scrutiny as other domains would, thus presenting a potential barrier to the incorporation of CSR principles.
  • 50. PMI AFRICA CONFERENCE 2015 8 out of 13 Respondents favour use of effective legislation. 0 5 0 6 2 0 1 2 3 4 5 6 7 Strongly Disagree Disagree Undecided Agree Strongly Agree Q11. Effecting new stringent CSR legislation or effectively policing the implementation of existing CSR legislation for the IT Project Management sector would encourage companies to comply and incorporate CSR into their Project Management processes.
  • 51. PMI AFRICA CONFERENCE 2015 11 out 13 Respondents feel that using successful case studies would help drive adoption of CSR. 0 0 2 7 4 0 1 2 3 4 5 6 7 8 Strongly Disagree Disagree Undecided Agree Strongly Agree Q12. Using Successful CSR Case Studies in IT Project Management as Enabler of Incorporation of CSR in IT Project Management would help drive adoption of CSR in IT Project Management.
  • 52. PMI AFRICA CONFERENCE 2015 The Respondents are split equally between those who agree and those who disagree with the given statement. 0 6 1 5 1 0 1 2 3 4 5 6 7 Strongly Disagree Disagree Undecided Agree Strongly Agree Q13. CSR Drivers that address Value Creation, Good Governance, and Societal Contribution are more relevant to IT Project Management than those that address Environmental Integrity.
  • 53. PMI AFRICA CONFERENCE 2015 Research Design & Methodology Appendix 2
  • 54. Respondents’ Roles and Primary Business PMI AFRICA CONFERENCE 2015 Respondent’s Role Primary Business Tools Manager Project Management Consulting Chief Technology Officer Broadcast Media Programme Quality Manager Project Management Consulting Delivery Manager IT and IT-Enabled Services Portfolio Manager Financial Services Project Consultant Project Management Consulting Team Lead (EPM, MSP, SharePoint) Consulting Services and Development Change Lead Financial Services Group IT Manager Infrastructure and Facilities Solutions Project Support Office: Head Financial Services Project Manager Financial Services Senior Manager: Application Architect Financial Services Director of Business Development National Credit Bureau
  • 55. Experience in IT PMI AFRICA CONFERENCE 2015 11 out of 13 Respondents had experience in IT of more than 6 years, making them a very experienced group. 1 1 4 7 0 1 2 3 4 5 6 7 8 <2 years 2-5 years 6-10 years 11 years or over IT Experience
  • 56. Experience in Project Management PMI AFRICA CONFERENCE 2015 10 out of 13 Respondents had experience in Project Management of more than 6 years, making them a very experienced group. 2 1 3 7 0 1 2 3 4 5 6 7 8 <2 years 2-5 years 6-10 years 11 years or over Project Management Experience
  • 57. Experience in IT Project Management PMI AFRICA CONFERENCE 2015 9 out of 13 Respondents had experience in IT Project Management of more than 6 years, making them a very experienced group. 2 2 1 8 0 1 2 3 4 5 6 7 8 9 <2 years 2-5 years 6-10 years 11 years or over IT Project Management Experience
  • 58. Semi-structured Interviews PMI AFRICA CONFERENCE 2015 6.5 Hours 190 Pages of Transcriptions Respondent's Role and Industry Duration (Min:Sec) Tools Manager_Project Management Consulting 49:20:00 Chief Technology Officer_Broadcast Media 41:29:00 Programme Quality Manager_Project Management Consulting 49:55:00 Delivery Manager_IT and IT-Enabled Services 28:27:00 Portfolio Manager_Financial Services 25:54:00 Project Consultant_Project Management Consulting 28:48:00 Team Lead (EPM, MSP, SharePoint)_Consulting Services and Development 17:07:00 Change Lead_Financial Services 26:20:00 Group IT Manager_Infrastructure and Facilities Solutions 25:36:00 Project Support Office: Head_Financial Services 22:43:00 Project Manager_Financial Services 20:03:00 Senior Manager: Application Architect_Financial Services 25:41:00 Director of Business Development_National Credit Bureau 18:02:00 13 Respondents
  • 59. Research Limitations o Purposive sampling with possible sampling bias o Absence of sampling frame o Possible bias from patriotic respondents o Limited to South African companies, so may not be generalisable o Maturity level of organisations assumed, not measured PMI AFRICA CONFERENCE 2015
  • 60. PMI AFRICA CONFERENCE 2015 References Appendix 3
  • 61. List of References 1. Attaran, M. (2003). Information technology and business-process redesign. Business Process Management Journal 9(4), 440-458. 2. Brent, A.C., and Labuschagne, C. (2007). An appraisal of social aspects in project and technology life cycle management in the process industry. Management of Environmental Quality: An International Journal, 18(4), 413-426. 3. CGI Group. (2008). Emerging Trends in IT. Retrieved from www.cgi.com/files/white-papers/cgi_whpr_84_emerging_trends_in_green_it_e.pdf. 4. Creswell, J. W. (2003). Research Design: Qualitative, Quantitative, and Mixed Methods Approaches, Second Edition. London: Sage Publications. 5. Creswell, J. W. (2014). Research Design: Qualitative, Quantitative, and Mixed Methods Approaches, International Student Edition. London: Sage Publications. 6. Elkington, J. (2008). Corporate Sustainability. In Visser, W., Matten, D., Pohl, M., Tolhurst, N. The A to Z of Corporate Social Responsibility (p. 132-139). USA: Wiley. 7. Elkington, J. (1994). Towards the Sustainable Corporation: Win-Win-Win Business Strategies for Sustainable Development. Califonia Management Review, 36(2), 90-100. 8. Kurucz, E. C., Colbert, B.A., and Wheeler, D. (2008). The Business Case for Corporate Social Responsibility. In Crane, A., McWilliams, A., Matten, D., Moon, J., and Seigel, D. (Eds.), The Oxford Handbook on Corporate Social Responsibility (pp. 8-112). Oxford: Oxford University Press. 9. Labuschagne, C., and Brent, A. C. (2005). Sustainable Project Life Cycle Management: the need to integrate life cycles in the manufacturing sector. International Journal of Project Management, 23(2), 159-168. 10. Lim, J., Stratopoulos, T.S., and Wirjanto, T.S. (2013). Sustainability of a Firm’s Reputation for Information Technology Capability: The Role of Senior IT Executives. Journal of Management Information Systems, 30(1), 57-95. 11. Melville, N.P., and Ross, S.M. (2010). Information Systems Innovation For Environmental Sustainability. MIS Quarterly Review, 34(1), 1-21. 12. Project Management Institute (2008). A Guide to the Project Management Body of Knowledge (PMBOK Guide) - Fourth Edition. Newton Square: Project Management Institute, Inc. 13. Project Management Institute. (2011). The Bottom Line on Sustainability. Retrieved from www.pmi.ord/business-solutions/~/media/PDF/Business- Solutions/The%20Bottom%20Line%20on%20Sustainability_FINAL.ashx. 14. Rahman, N., and Akhter, S. (2010). Incorporating Sustainability Into Information Technology Management. International Journal of Technology Management & Sustainable Development, 9(2), 95-111. 15. Saunders, M., and Lewis, P. (2012). Doing Research in Business & Management. United Kingdom: Pearson. 16. Shen, L., Wu, Y., and Zhang, X. (2011). Key Assessment Indicators for the Sustainability of Infrastructure Projects. Journal of Construction Engineering and Management, 137(6). 17. Silvius, A.J.G., Schipper, R., and Nedeski, S. (2012). "Sustainability in Project Management: Reality Bites." 26th IPMA World Congress. Elsevier Ltd., 1-11. 18. Silvius, G., Schipper, R., Planko, J., van den Brink, J., and Kohler, A. (2012). Sustainability in Project Management. Gower Publishing Limited: England. 19. Valdes-Vasquez, R., and Klotz, L. E. (2013). Social sustainability considerations during planning and design: Framework of processes for construction projects. Journal of Construction Engineering & Management, 139(1), 80-89. doi: 10.1061/ (ASCE) CO.1943-7862.0000566. 20. Visser, W. (2013). Corporate Sustainability & Responsibility. Kaleidoscope Futures Ltd.: London. 21. Watson, R.T., Boudreau, M.-C., and Chen, A.J. (2010). Information systems and Environmentally Sustainable Development: Energy Informatics and New Directions for the IS Community. MIS Quarterly, 34(1), 23-38. 22. World Commission on Environment and Development (1987). Chapter 2: Towards Sustainable Development. In World Commission on Environment and Development, Our Common Future (pp. 41-59). Oxford University Press: Great Britain. PMI AFRICA CONFERENCE 2015