SlideShare a Scribd company logo
1 of 1
Download to read offline
EXISTING
PHASE 9
TK-3506S
2" COLD WATER
4" COMPRESSED AIR
TK-1254S
3" HOT WATER
2" COMPRESSED AIR (AT LOADING BAY)
50-CA-A-002 (EXISTING LINE)
INSTRUMENT AIR FOR POV
80-HW-C-006 (EXISTING LINE)
50-CW-C-001 (EXISTING LINE)
100-CA-A-005 (EXISTING LINE)
4" NITROGEN
100-N2-A-001 (EXISTING LINE)
REFER TO DRAWING NO.:
P&ID FOR NITROGEN LINE
REFER TO DRAWING NO.: 1109/PH8/M/PID-06
P&ID FOR UTILITY LINES
REFER TO DRAWING NO.: 1109/PH8/M/PID-06
P&ID FOR UTILITY LINES
REFER TO DRAWING NO.: 1109/PH8/M/PID-06
P&ID FOR UTILITY LINES
REFER TO DRAWING NO.: 1109/PH8/M/PID-06
P&ID FOR UTILITY LINES
REFER TO DRAWING NO.: 1109/PH8/M/PID-05
P&ID FOR NITROGEN LINE (FOR EXISTING) &
80-HW-C-007-00 (PHASE 9)
50-CW-C-003-00 (PHASE 9)
100-N2-A-065-00 (PHASE 9)
100-CA-A-004-00 (PHASE 9)
DRAWING NO.: 10-13041-A3-U07
P&ID FOR NITROGEN LINE (FOR PHASE 9)
TK-1253STK-1255S
10-13041-A3-U07
REFER TO DRAWING NO.:
P&ID FOR NITROGEN LINE
10-13041-A3-U07
REFER TO DRAWING NO.:
P&ID FOR NITROGEN LINE
10-13041-A3-U07
REFER TO DRAWING NO.:
P&ID FOR NITROGEN LINE
10-13041-A3-U07
TU
03
TU
04
TU
05
TU
06
FOR APPROVAL
10-13041-A3-U08 03 8
P&ID for UTILITIES LINE
STOLTHAVEN (WESTPORT) SDN. BHD.
Lipotech Engineering SDN. BHD.
PHASE 9 EXPANSION
EPCC PROJECT FOR PHASE 9
EXPANSION OF TANK FARM 10 AT
PETROCHEMICAL JETTY, WESTPORT,
42009, PORT KLANG,
SELANGOR DARUL EHSAN.
STOLTHAVEN WESTPORT SDN. BHD.
03

More Related Content

What's hot

AIRCRAFT STATUS REVIEW PDF PDF PDF
AIRCRAFT STATUS REVIEW PDF PDF PDFAIRCRAFT STATUS REVIEW PDF PDF PDF
AIRCRAFT STATUS REVIEW PDF PDF PDFAction Chinjekure
 
Pipe Insulation System_2
Pipe Insulation System_2Pipe Insulation System_2
Pipe Insulation System_2Wafik Zakhary
 
Pipe Insulation System
Pipe Insulation SystemPipe Insulation System
Pipe Insulation SystemWafik Zakhary
 
Parker valve brochure
Parker valve brochure Parker valve brochure
Parker valve brochure ERIKS UK
 
Simulation of a Process
Simulation of a ProcessSimulation of a Process
Simulation of a ProcessAshik Mahmud
 
Filter part list
Filter part listFilter part list
Filter part listJ2smartceo
 
Czerniak eage rhove_20190521_final
Czerniak eage rhove_20190521_finalCzerniak eage rhove_20190521_final
Czerniak eage rhove_20190521_finalMatt Czerniak
 
95 john paul mello - 7237539 - control method and apparatus for use in an a...
95   john paul mello - 7237539 - control method and apparatus for use in an a...95   john paul mello - 7237539 - control method and apparatus for use in an a...
95 john paul mello - 7237539 - control method and apparatus for use in an a...Mello_Patent_Registry
 
Combined PDF Indy Rack
Combined PDF Indy RackCombined PDF Indy Rack
Combined PDF Indy RackArom Schultz
 
Ciclotron dynamic 12000 h 2ω
Ciclotron   dynamic 12000 h 2ωCiclotron   dynamic 12000 h 2ω
Ciclotron dynamic 12000 h 2ωMuniz Rodrigues
 

What's hot (16)

IMG_20141212_0007
IMG_20141212_0007IMG_20141212_0007
IMG_20141212_0007
 
AIRCRAFT STATUS REVIEW PDF PDF PDF
AIRCRAFT STATUS REVIEW PDF PDF PDFAIRCRAFT STATUS REVIEW PDF PDF PDF
AIRCRAFT STATUS REVIEW PDF PDF PDF
 
valve_drawing
valve_drawingvalve_drawing
valve_drawing
 
Pipe Insulation System_2
Pipe Insulation System_2Pipe Insulation System_2
Pipe Insulation System_2
 
Pipe Insulation System
Pipe Insulation SystemPipe Insulation System
Pipe Insulation System
 
1 ca1s
1 ca1s1 ca1s
1 ca1s
 
Parker valve brochure
Parker valve brochure Parker valve brochure
Parker valve brochure
 
Fire safety products 12
Fire safety products 12Fire safety products 12
Fire safety products 12
 
Simulation of a Process
Simulation of a ProcessSimulation of a Process
Simulation of a Process
 
Filter part list
Filter part listFilter part list
Filter part list
 
Sistemas hidraulicos
Sistemas hidraulicosSistemas hidraulicos
Sistemas hidraulicos
 
Czerniak eage rhove_20190521_final
Czerniak eage rhove_20190521_finalCzerniak eage rhove_20190521_final
Czerniak eage rhove_20190521_final
 
95 john paul mello - 7237539 - control method and apparatus for use in an a...
95   john paul mello - 7237539 - control method and apparatus for use in an a...95   john paul mello - 7237539 - control method and apparatus for use in an a...
95 john paul mello - 7237539 - control method and apparatus for use in an a...
 
Thurlow Basement
Thurlow BasementThurlow Basement
Thurlow Basement
 
Combined PDF Indy Rack
Combined PDF Indy RackCombined PDF Indy Rack
Combined PDF Indy Rack
 
Ciclotron dynamic 12000 h 2ω
Ciclotron   dynamic 12000 h 2ωCiclotron   dynamic 12000 h 2ω
Ciclotron dynamic 12000 h 2ω
 

Viewers also liked

60-13041-A1-103-R00-Piping Plan at-TK1255S-Layout1 (2)
60-13041-A1-103-R00-Piping Plan at-TK1255S-Layout1 (2)60-13041-A1-103-R00-Piping Plan at-TK1255S-Layout1 (2)
60-13041-A1-103-R00-Piping Plan at-TK1255S-Layout1 (2)Shafairan Ramly
 
60-13041-A1-103-R03 - Piping Plan - Stage 3 - GA in Pump Loading Bay (Sec & F...
60-13041-A1-103-R03 - Piping Plan - Stage 3 - GA in Pump Loading Bay (Sec & F...60-13041-A1-103-R03 - Piping Plan - Stage 3 - GA in Pump Loading Bay (Sec & F...
60-13041-A1-103-R03 - Piping Plan - Stage 3 - GA in Pump Loading Bay (Sec & F...Shafairan Ramly
 
40-13041-A1-104-R08-Detail Drawing - Tank & Nozzle Orientation - AFC-TK-1255S...
40-13041-A1-104-R08-Detail Drawing - Tank & Nozzle Orientation - AFC-TK-1255S...40-13041-A1-104-R08-Detail Drawing - Tank & Nozzle Orientation - AFC-TK-1255S...
40-13041-A1-104-R08-Detail Drawing - Tank & Nozzle Orientation - AFC-TK-1255S...Shafairan Ramly
 
EDP401-M - Presentation - 07.02.2010
EDP401-M - Presentation - 07.02.2010EDP401-M - Presentation - 07.02.2010
EDP401-M - Presentation - 07.02.2010Vimal Lalloo
 
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 0.590mm (2 of 10)
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 0.590mm  (2 of 10)60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 0.590mm  (2 of 10)
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 0.590mm (2 of 10)Shafairan Ramly
 
Tank gauging-presentation-2016
Tank gauging-presentation-2016Tank gauging-presentation-2016
Tank gauging-presentation-2016John M. Williams
 
radar tank gauging and dcs
radar tank gauging and dcsradar tank gauging and dcs
radar tank gauging and dcsSaravana Kumar
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-IGAURAV. H .TANDON
 
Fire fighting presentation
Fire  fighting presentationFire  fighting presentation
Fire fighting presentationRaghunath Patil
 

Viewers also liked (16)

60-13041-A1-103-R00-Piping Plan at-TK1255S-Layout1 (2)
60-13041-A1-103-R00-Piping Plan at-TK1255S-Layout1 (2)60-13041-A1-103-R00-Piping Plan at-TK1255S-Layout1 (2)
60-13041-A1-103-R00-Piping Plan at-TK1255S-Layout1 (2)
 
60-13041-A1-103-R03 - Piping Plan - Stage 3 - GA in Pump Loading Bay (Sec & F...
60-13041-A1-103-R03 - Piping Plan - Stage 3 - GA in Pump Loading Bay (Sec & F...60-13041-A1-103-R03 - Piping Plan - Stage 3 - GA in Pump Loading Bay (Sec & F...
60-13041-A1-103-R03 - Piping Plan - Stage 3 - GA in Pump Loading Bay (Sec & F...
 
40-13041-A1-104-R08-Detail Drawing - Tank & Nozzle Orientation - AFC-TK-1255S...
40-13041-A1-104-R08-Detail Drawing - Tank & Nozzle Orientation - AFC-TK-1255S...40-13041-A1-104-R08-Detail Drawing - Tank & Nozzle Orientation - AFC-TK-1255S...
40-13041-A1-104-R08-Detail Drawing - Tank & Nozzle Orientation - AFC-TK-1255S...
 
EDP401-M - Presentation - 07.02.2010
EDP401-M - Presentation - 07.02.2010EDP401-M - Presentation - 07.02.2010
EDP401-M - Presentation - 07.02.2010
 
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 0.590mm (2 of 10)
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 0.590mm  (2 of 10)60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 0.590mm  (2 of 10)
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 0.590mm (2 of 10)
 
Tank gauging-presentation-2016
Tank gauging-presentation-2016Tank gauging-presentation-2016
Tank gauging-presentation-2016
 
radar tank gauging and dcs
radar tank gauging and dcsradar tank gauging and dcs
radar tank gauging and dcs
 
Fire pumps
Fire pumpsFire pumps
Fire pumps
 
Working of DCS systems
Working of DCS systemsWorking of DCS systems
Working of DCS systems
 
Ppt
PptPpt
Ppt
 
Dcs operator training
Dcs operator trainingDcs operator training
Dcs operator training
 
Fire Fighting
Fire FightingFire Fighting
Fire Fighting
 
DCS Or PLC
DCS Or PLCDCS Or PLC
DCS Or PLC
 
Basics of Fire fighting
Basics of Fire fightingBasics of Fire fighting
Basics of Fire fighting
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-I
 
Fire fighting presentation
Fire  fighting presentationFire  fighting presentation
Fire fighting presentation
 

Similar to 10-13041-A3-U08-R03-P&ID FOR UTILITIES LINE

Bubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement InstrumentsBubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement InstrumentsMiller Energy, Inc.
 
Wiring diagram caterpillar c13 of engine
Wiring diagram caterpillar c13 of engineWiring diagram caterpillar c13 of engine
Wiring diagram caterpillar c13 of engineWalterYc
 
Design and Footprint of LH2 Supplied Refueling.pdf
Design and Footprint of LH2 Supplied Refueling.pdfDesign and Footprint of LH2 Supplied Refueling.pdf
Design and Footprint of LH2 Supplied Refueling.pdfssuserbd5784
 
Plug Valve Installation and Operating Instructions
Plug Valve Installation and Operating InstructionsPlug Valve Installation and Operating Instructions
Plug Valve Installation and Operating Instructionsalexbrown529
 
Spicepark JAN2019 (4,953 SPICE Models)
Spicepark JAN2019 (4,953 SPICE Models)Spicepark JAN2019 (4,953 SPICE Models)
Spicepark JAN2019 (4,953 SPICE Models)Tsuyoshi Horigome
 
2014 price list
2014 price list2014 price list
2014 price listjag0105010
 
ISV 3 PC trunnion ball valve SB600.5b-web(1)
ISV 3 PC trunnion ball valve SB600.5b-web(1)ISV 3 PC trunnion ball valve SB600.5b-web(1)
ISV 3 PC trunnion ball valve SB600.5b-web(1)Hermawan Tigriest
 
Spicepark NOV2018 (4,930 SPICE Models)
Spicepark NOV2018  (4,930 SPICE Models)Spicepark NOV2018  (4,930 SPICE Models)
Spicepark NOV2018 (4,930 SPICE Models)Tsuyoshi Horigome
 
SPICE PARK OCT2018 (4,914 Models)
SPICE PARK OCT2018 (4,914 Models)SPICE PARK OCT2018 (4,914 Models)
SPICE PARK OCT2018 (4,914 Models)Tsuyoshi Horigome
 
Cobol Error Its states that my patron-line wasnt defined as a data .pdf
Cobol Error Its states that my patron-line wasnt defined as a data .pdfCobol Error Its states that my patron-line wasnt defined as a data .pdf
Cobol Error Its states that my patron-line wasnt defined as a data .pdfrydeberghal13313
 
Kf ball-floating flangedseriesf-fe
Kf ball-floating flangedseriesf-feKf ball-floating flangedseriesf-fe
Kf ball-floating flangedseriesf-fesuraj_2011
 
Lam Research ,Novellus, Gasonics, Tel ,Tokyo Electron Ltd, Matrix etc. Spare ...
Lam Research ,Novellus, Gasonics, Tel ,Tokyo Electron Ltd, Matrix etc. Spare ...Lam Research ,Novellus, Gasonics, Tel ,Tokyo Electron Ltd, Matrix etc. Spare ...
Lam Research ,Novellus, Gasonics, Tel ,Tokyo Electron Ltd, Matrix etc. Spare ...Emily Tan
 
SPICE PARK SEP2018 (4,893 Models)
SPICE PARK SEP2018 (4,893 Models) SPICE PARK SEP2018 (4,893 Models)
SPICE PARK SEP2018 (4,893 Models) Tsuyoshi Horigome
 
Spencer Turbine - Vacuum and Low Pressure Air Tubing
Spencer Turbine - Vacuum and Low Pressure Air TubingSpencer Turbine - Vacuum and Low Pressure Air Tubing
Spencer Turbine - Vacuum and Low Pressure Air TubingJeremy J. Manning
 

Similar to 10-13041-A3-U08-R03-P&ID FOR UTILITIES LINE (20)

Bubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement InstrumentsBubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement Instruments
 
Wellhead Valves Technical Data
Wellhead Valves Technical DataWellhead Valves Technical Data
Wellhead Valves Technical Data
 
Wiring diagram caterpillar c13 of engine
Wiring diagram caterpillar c13 of engineWiring diagram caterpillar c13 of engine
Wiring diagram caterpillar c13 of engine
 
Design and Footprint of LH2 Supplied Refueling.pdf
Design and Footprint of LH2 Supplied Refueling.pdfDesign and Footprint of LH2 Supplied Refueling.pdf
Design and Footprint of LH2 Supplied Refueling.pdf
 
Plug Valve Installation and Operating Instructions
Plug Valve Installation and Operating InstructionsPlug Valve Installation and Operating Instructions
Plug Valve Installation and Operating Instructions
 
254815797-PLANOS-Estandares.pdf
254815797-PLANOS-Estandares.pdf254815797-PLANOS-Estandares.pdf
254815797-PLANOS-Estandares.pdf
 
Spicepark JAN2019 (4,953 SPICE Models)
Spicepark JAN2019 (4,953 SPICE Models)Spicepark JAN2019 (4,953 SPICE Models)
Spicepark JAN2019 (4,953 SPICE Models)
 
2014 price list
2014 price list2014 price list
2014 price list
 
Compact Clean Steam Generator
Compact Clean Steam GeneratorCompact Clean Steam Generator
Compact Clean Steam Generator
 
ISV 3 PC trunnion ball valve SB600.5b-web(1)
ISV 3 PC trunnion ball valve SB600.5b-web(1)ISV 3 PC trunnion ball valve SB600.5b-web(1)
ISV 3 PC trunnion ball valve SB600.5b-web(1)
 
Spicepark NOV2018 (4,930 SPICE Models)
Spicepark NOV2018  (4,930 SPICE Models)Spicepark NOV2018  (4,930 SPICE Models)
Spicepark NOV2018 (4,930 SPICE Models)
 
SPICE PARK OCT2018 (4,914 Models)
SPICE PARK OCT2018 (4,914 Models)SPICE PARK OCT2018 (4,914 Models)
SPICE PARK OCT2018 (4,914 Models)
 
Vpa4000
  Vpa4000  Vpa4000
Vpa4000
 
PID final.pdf
PID final.pdfPID final.pdf
PID final.pdf
 
Cobol Error Its states that my patron-line wasnt defined as a data .pdf
Cobol Error Its states that my patron-line wasnt defined as a data .pdfCobol Error Its states that my patron-line wasnt defined as a data .pdf
Cobol Error Its states that my patron-line wasnt defined as a data .pdf
 
Trunnion Mount Ball Valves For Industrial Pipelines
Trunnion Mount Ball Valves For Industrial PipelinesTrunnion Mount Ball Valves For Industrial Pipelines
Trunnion Mount Ball Valves For Industrial Pipelines
 
Kf ball-floating flangedseriesf-fe
Kf ball-floating flangedseriesf-feKf ball-floating flangedseriesf-fe
Kf ball-floating flangedseriesf-fe
 
Lam Research ,Novellus, Gasonics, Tel ,Tokyo Electron Ltd, Matrix etc. Spare ...
Lam Research ,Novellus, Gasonics, Tel ,Tokyo Electron Ltd, Matrix etc. Spare ...Lam Research ,Novellus, Gasonics, Tel ,Tokyo Electron Ltd, Matrix etc. Spare ...
Lam Research ,Novellus, Gasonics, Tel ,Tokyo Electron Ltd, Matrix etc. Spare ...
 
SPICE PARK SEP2018 (4,893 Models)
SPICE PARK SEP2018 (4,893 Models) SPICE PARK SEP2018 (4,893 Models)
SPICE PARK SEP2018 (4,893 Models)
 
Spencer Turbine - Vacuum and Low Pressure Air Tubing
Spencer Turbine - Vacuum and Low Pressure Air TubingSpencer Turbine - Vacuum and Low Pressure Air Tubing
Spencer Turbine - Vacuum and Low Pressure Air Tubing
 

More from Shafairan Ramly

60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 1.472mm (3 of 10)
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 1.472mm  (3 of 10)60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 1.472mm  (3 of 10)
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 1.472mm (3 of 10)Shafairan Ramly
 
40-13041-A1-122-R04-Detail Drawing - Detail Drawing Nozzle & Internal Pipes T...
40-13041-A1-122-R04-Detail Drawing - Detail Drawing Nozzle & Internal Pipes T...40-13041-A1-122-R04-Detail Drawing - Detail Drawing Nozzle & Internal Pipes T...
40-13041-A1-122-R04-Detail Drawing - Detail Drawing Nozzle & Internal Pipes T...Shafairan Ramly
 
40-13041-A1-117-R04-Detail Drawing - Link Bridge Plan and Elevation View - AF...
40-13041-A1-117-R04-Detail Drawing - Link Bridge Plan and Elevation View - AF...40-13041-A1-117-R04-Detail Drawing - Link Bridge Plan and Elevation View - AF...
40-13041-A1-117-R04-Detail Drawing - Link Bridge Plan and Elevation View - AF...Shafairan Ramly
 
20-13041-A1-116-R01 - Detail drawing - Service Platform For POV At TLB-PLAN V...
20-13041-A1-116-R01 - Detail drawing - Service Platform For POV At TLB-PLAN V...20-13041-A1-116-R01 - Detail drawing - Service Platform For POV At TLB-PLAN V...
20-13041-A1-116-R01 - Detail drawing - Service Platform For POV At TLB-PLAN V...Shafairan Ramly
 
20-13041-A1-115-R0.1-General Arragment Pipe Support and Maintenant Platform-L...
20-13041-A1-115-R0.1-General Arragment Pipe Support and Maintenant Platform-L...20-13041-A1-115-R0.1-General Arragment Pipe Support and Maintenant Platform-L...
20-13041-A1-115-R0.1-General Arragment Pipe Support and Maintenant Platform-L...Shafairan Ramly
 
60-13041-A1-109-R00 Piping Insulation-Piping Insulation 1
60-13041-A1-109-R00 Piping Insulation-Piping Insulation 160-13041-A1-109-R00 Piping Insulation-Piping Insulation 1
60-13041-A1-109-R00 Piping Insulation-Piping Insulation 1Shafairan Ramly
 

More from Shafairan Ramly (7)

60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 1.472mm (3 of 10)
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 1.472mm  (3 of 10)60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 1.472mm  (3 of 10)
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 1.472mm (3 of 10)
 
40-13041-A1-122-R04-Detail Drawing - Detail Drawing Nozzle & Internal Pipes T...
40-13041-A1-122-R04-Detail Drawing - Detail Drawing Nozzle & Internal Pipes T...40-13041-A1-122-R04-Detail Drawing - Detail Drawing Nozzle & Internal Pipes T...
40-13041-A1-122-R04-Detail Drawing - Detail Drawing Nozzle & Internal Pipes T...
 
40-13041-A1-117-R04-Detail Drawing - Link Bridge Plan and Elevation View - AF...
40-13041-A1-117-R04-Detail Drawing - Link Bridge Plan and Elevation View - AF...40-13041-A1-117-R04-Detail Drawing - Link Bridge Plan and Elevation View - AF...
40-13041-A1-117-R04-Detail Drawing - Link Bridge Plan and Elevation View - AF...
 
20-13041-A1-116-R01 - Detail drawing - Service Platform For POV At TLB-PLAN V...
20-13041-A1-116-R01 - Detail drawing - Service Platform For POV At TLB-PLAN V...20-13041-A1-116-R01 - Detail drawing - Service Platform For POV At TLB-PLAN V...
20-13041-A1-116-R01 - Detail drawing - Service Platform For POV At TLB-PLAN V...
 
20-13041-A1-115-R0.1-General Arragment Pipe Support and Maintenant Platform-L...
20-13041-A1-115-R0.1-General Arragment Pipe Support and Maintenant Platform-L...20-13041-A1-115-R0.1-General Arragment Pipe Support and Maintenant Platform-L...
20-13041-A1-115-R0.1-General Arragment Pipe Support and Maintenant Platform-L...
 
sijil teknology
sijil teknologysijil teknology
sijil teknology
 
60-13041-A1-109-R00 Piping Insulation-Piping Insulation 1
60-13041-A1-109-R00 Piping Insulation-Piping Insulation 160-13041-A1-109-R00 Piping Insulation-Piping Insulation 1
60-13041-A1-109-R00 Piping Insulation-Piping Insulation 1
 

10-13041-A3-U08-R03-P&ID FOR UTILITIES LINE

  • 1. EXISTING PHASE 9 TK-3506S 2" COLD WATER 4" COMPRESSED AIR TK-1254S 3" HOT WATER 2" COMPRESSED AIR (AT LOADING BAY) 50-CA-A-002 (EXISTING LINE) INSTRUMENT AIR FOR POV 80-HW-C-006 (EXISTING LINE) 50-CW-C-001 (EXISTING LINE) 100-CA-A-005 (EXISTING LINE) 4" NITROGEN 100-N2-A-001 (EXISTING LINE) REFER TO DRAWING NO.: P&ID FOR NITROGEN LINE REFER TO DRAWING NO.: 1109/PH8/M/PID-06 P&ID FOR UTILITY LINES REFER TO DRAWING NO.: 1109/PH8/M/PID-06 P&ID FOR UTILITY LINES REFER TO DRAWING NO.: 1109/PH8/M/PID-06 P&ID FOR UTILITY LINES REFER TO DRAWING NO.: 1109/PH8/M/PID-06 P&ID FOR UTILITY LINES REFER TO DRAWING NO.: 1109/PH8/M/PID-05 P&ID FOR NITROGEN LINE (FOR EXISTING) & 80-HW-C-007-00 (PHASE 9) 50-CW-C-003-00 (PHASE 9) 100-N2-A-065-00 (PHASE 9) 100-CA-A-004-00 (PHASE 9) DRAWING NO.: 10-13041-A3-U07 P&ID FOR NITROGEN LINE (FOR PHASE 9) TK-1253STK-1255S 10-13041-A3-U07 REFER TO DRAWING NO.: P&ID FOR NITROGEN LINE 10-13041-A3-U07 REFER TO DRAWING NO.: P&ID FOR NITROGEN LINE 10-13041-A3-U07 REFER TO DRAWING NO.: P&ID FOR NITROGEN LINE 10-13041-A3-U07 TU 03 TU 04 TU 05 TU 06 FOR APPROVAL 10-13041-A3-U08 03 8 P&ID for UTILITIES LINE STOLTHAVEN (WESTPORT) SDN. BHD. Lipotech Engineering SDN. BHD. PHASE 9 EXPANSION EPCC PROJECT FOR PHASE 9 EXPANSION OF TANK FARM 10 AT PETROCHEMICAL JETTY, WESTPORT, 42009, PORT KLANG, SELANGOR DARUL EHSAN. STOLTHAVEN WESTPORT SDN. BHD. 03