1. EXISTING
PHASE 9
TK-3506S
2" COLD WATER
4" COMPRESSED AIR
TK-1254S
3" HOT WATER
2" COMPRESSED AIR (AT LOADING BAY)
50-CA-A-002 (EXISTING LINE)
INSTRUMENT AIR FOR POV
80-HW-C-006 (EXISTING LINE)
50-CW-C-001 (EXISTING LINE)
100-CA-A-005 (EXISTING LINE)
4" NITROGEN
100-N2-A-001 (EXISTING LINE)
REFER TO DRAWING NO.:
P&ID FOR NITROGEN LINE
REFER TO DRAWING NO.: 1109/PH8/M/PID-06
P&ID FOR UTILITY LINES
REFER TO DRAWING NO.: 1109/PH8/M/PID-06
P&ID FOR UTILITY LINES
REFER TO DRAWING NO.: 1109/PH8/M/PID-06
P&ID FOR UTILITY LINES
REFER TO DRAWING NO.: 1109/PH8/M/PID-06
P&ID FOR UTILITY LINES
REFER TO DRAWING NO.: 1109/PH8/M/PID-05
P&ID FOR NITROGEN LINE (FOR EXISTING) &
80-HW-C-007-00 (PHASE 9)
50-CW-C-003-00 (PHASE 9)
100-N2-A-065-00 (PHASE 9)
100-CA-A-004-00 (PHASE 9)
DRAWING NO.: 10-13041-A3-U07
P&ID FOR NITROGEN LINE (FOR PHASE 9)
TK-1253STK-1255S
10-13041-A3-U07
REFER TO DRAWING NO.:
P&ID FOR NITROGEN LINE
10-13041-A3-U07
REFER TO DRAWING NO.:
P&ID FOR NITROGEN LINE
10-13041-A3-U07
REFER TO DRAWING NO.:
P&ID FOR NITROGEN LINE
10-13041-A3-U07
TU
03
TU
04
TU
05
TU
06
FOR APPROVAL
10-13041-A3-U08 03 8
P&ID for UTILITIES LINE
STOLTHAVEN (WESTPORT) SDN. BHD.
Lipotech Engineering SDN. BHD.
PHASE 9 EXPANSION
EPCC PROJECT FOR PHASE 9
EXPANSION OF TANK FARM 10 AT
PETROCHEMICAL JETTY, WESTPORT,
42009, PORT KLANG,
SELANGOR DARUL EHSAN.
STOLTHAVEN WESTPORT SDN. BHD.
03